1
Problem Solving & 7 QC Tools
Agenda
• Objective of the Programme
• Need of the Programme
• Introduction to Problem Solving
• Introduction to 7 QC tools
• Detailed interpretation of each Quality Tool
• Case studies on each Quality Tool
• Introduction to Problem Solving using Kaizen method
• Steps for Problem Solving
• Usage of Seven QC tools in Problem Solving
• Conclusion
Zero Defect Consultants Rev No:01, Date: 01.10.2001 3
2
Problem Solving & 7 QC Tools
Need for this Program
Generally following are the observation on kaizen’s sent by the
suppliers
- Problem Definition and identification is not specific
- No proper flow of Analysis and arriving at the Root cause
- Most of the kaizen’s are one man activity and not the team
- No relation between the Corrective Actions taken and Root
cause
- No action taken on the Potential causes to eliminate the
defects
- Actions are not always recorded in process documentation
3
Problem Solving & 7 QC Tools
Introduction
Solving a problem involves
a) Understanding and Description of the Problem
b) Analyzing the Problem and its contributors such as Operator,
Machine, Tools, Jigs, Fixtures, Material, Method and
Components in a assembly etc.
c) Identification of the cause due to which problem has occurred
presently (Root cause)
d) Usage of Statistical Tools such as Why-Why Analysis, Pareto
Diagram, and Cause & Effect Diagram are a must for
identifying the root cause, but generally we tend to use
shortcuts and Judge by present knowledge leading to re-
occurrence of problem
Introduction
e) More focus to be on permanent solutions rather than
temporary solution because customer always demand
permanent solutions which can be achieved only through
proper analysis and implementation of actions on all Potential
causes and root cause.
g) Corrective and Preventive actions needs to be brought back to
PDCA cycle and Poka Yoke to be initiated to ensure Zero
Defect.
i) Kaizen Sheet is the aid used to ensure the effective
implementation of Corrective and Preventive actions
4
Problem Solving & 7 QC Tools
Introduction to Problem Solving.
Following are the steps to be followed for solving a problem
1. Select the Team
2. Describe the Problem
3. Implement & verify Short term corrective actions
4. Define and Verify root cause
5. Verify Corrective action
6. Implement Permanent corrective actions
7. Prevent Recurrence
8. Congratulate Team
5
Problem Solving & 7 QC Tools
7 QC Tools
1. Check Sheet Data Collection Tool
2. Pareto Chart Data Analysis Tools
3. Cause & Effect Diagram
4. Histogram
5. Graphs Data Monitoring tools
6. Scatter diagram
7. Control Charts
6
Problem Solving & 7 QC Tools
CHECK SHEET
Why Data?
7
Problem Solving & 7 QC Tools
CHECK SHEET
Data Collection check sheet
8
Problem Solving & 7 QC Tools
CHECK SHEET
Uses of Check sheet
• To grasp the past and present situation
• To stratify
• To monitor the changes through time
• To monitor the improvement result
• To confirm the standards
9
Problem Solving & 7 QC Tools
GRAPHS - TYPES:
TYPES:--
• Line Graphs
• Bar Graphs
• Pie Charts
• Multiple Charts
47.5
47
46.5
46
45.5
45
44.5
44
43.5
43
42.5
42
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
10
Problem Solving & 7 QC Tools
GRAPHS - TYPES:
TYPES:--
Bar Graphs
Graphs::-
47.5
47
46.5
46
45.5
45
44.5
44
43.5
43
42.5
42
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
East
West
North
south
11
Problem Solving & 7 QC Tools
GRAPHS - TYPES:
TYPES:--
Multiple Charts:
Charts:-
90
80
70
60
50
East
40
West
30
20
10
0
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
Graph Application
Line Graph Online monitoring of sales, rejection,
rework, etc. wrt targets.
12
Problem Solving & 7 QC Tools
PARETO DIAGRAM
• Pareto charts are used to identify and prioritize problems to
be solved
solved..
• They are actually histograms aided by the 80/
80/20 rule adapted
by Pareto an Italian Economists
Economists..
• Remember the 80/
80/20 rule states that approximately 80%
80% of
the problems are created by approximately 20%
20% of the causes
causes..
Vital Few,
Trivial Many
13
Problem Solving & 7 QC Tools
CONSTRUCTION OF PARETO DIAGRAM
• Information must be selected based on types or classifications
of defects that occur as a result of a process.
process.
• Re-
Re-order the frequency of occurrences of defect type in the
descending order - Column 2.
• Determine the cumulative percentage of the total for each
defect type -Column 3.
• Draw and label the left vertical axis
axis..
• Draw and label the horizontal axis
axis..
• Draw and label the right vertical axis
axis..
14
Problem Solving & 7 QC Tools
CONSTRUCTION OF PARETO DIAGRAM
Factor Frequency % Frequency Cum %
A
B
C
..
Total N
100 100.0
90 90.0
80 80.0
70 70.0
Cum %
60 60.0
Qty
50 50.0
40 40.0
30 30.0
20 20.0
10 10.0
0 0.0
ch
ty
/S
S
/S
S
s
ns
/S
s
/S
ns
le
ut
U/
si
U/
O
O
U
at
sio
Ho
ru
Sh
ro
m
s
ss
e
re
th
po
es
clu
th
is
or
is
old
w
ne
Bo
M
ng
ng
B
kn
lo
in
le
ck
C
Le
Le
B
ic
e
ho
irt
lin
i
Th
Th
ro
tre
ic
en
M
C
Defe ct
15
Problem Solving & 7 QC Tools
HISTOGRAM
• Histogram is a graphical representation of data and shows the
frequency of data.
• Histogram provides the easiest way to understand the
distribution of data. It gives the Birds eye view of the
variation in Data set.
• Portrays the information on location, spread and shape that
enables the user to interpret the Process behavior.
• It indicates whether the process is operating under Normal /
stable conditions.
Class Width:-
Width:- Width of the class.
16
Problem Solving & 7 QC Tools
HISTOGRAM – Contd..
STEPS FOR CONSTRUCTING HISTOGRAM
• Collect Min 50 no. of readings (N). 50 readings should be
continuous data.
• Determine Max value and Min value & Calculate Range.
Range = Max – Min.
• Record the measurement unit (MU) used. This is usually
controlled by the measuring instrument least count.
count.
17
Problem Solving & 7 QC Tools
Class Tally Frequency
L1 – U1
L2 – U2
…
Upto Max value
Total N
Where L1 = Minimum value – (1/2*Measurement Unit)
U1 = L1 + Class Width
L2 = U1,
U2 = L2 + Class Width & so on.
18
Problem Solving & 7 QC Tools
STEPS FOR CONSTRUCTING HISTOGRAM – Contd..
HISTOGRAM – GRAPHICAL REPRESENTATION.
• Depicted by a bell
bell--shaped curve
curve.. Most frequent measurement
appears as center of distribution & less frequent
measurements taper gradually at both ends of distribution.
distribution.
• Indicates that a process is running normally (only common
causes are present)
present)..
19
Problem Solving & 7 QC Tools
HSITOGRAM – INTERPRETATIONS:
BIMODAL
HSITOGRAM – INTERPRETATIONS:
SKEWED
20
Problem Solving & 7 QC Tools
CAUSE & EFFECT DIAGRAM
• The cause and effect diagram is also called the Ishikawa
diagram or the fishbone diagram
diagram.
• It was developed by Dr.K.Ishikawa.
• It is a tool for discovering all the possible causes for a
particular effect
effect..
• It is a tool to represent the relationship between Effect /
Problem and all the possible cause.
cause.
• The major purpose of this diagram is to act as a first step in
problem solving by creating a list of possible causes.
causes.
21
Problem Solving & 7 QC Tools
BRAINSTORMING
WHAT IS BRAIN STORMING?
Brain Storming is a technique to obtain creative ideas from a
group of persons in a shortest possible time on an effect
effect.. Brain
Storming plays an important role to build a Cause & Effect
Diagram..
Diagram
WHY BRAIN STORMING?
• To Identify the Problem
• To Identify the critical Causes
• To find the solution
• To Prevent the Problem
22
Problem Solving & 7 QC Tools
CONSTRUCTION OF CAUSE & EFFECT DIAGRAM
• First, clearly identify and define the problem or effect for
which the causes must be identified
identified.. Place the problem or
effect at the right or the head of the diagram
• Identify all the Main Cause of the problem(I
problem(I..e Man, Machine,
Method & Material)
• Write in all the detailed possible causes in each of the Main
Causes.
Causes
• Each cause identified should be looked upon for further more
specific causes
• View the diagram and evaluate the main causes
causes..
Zero Defect Consultants Rev No:01, Date: 01.10.2001 45
23
Problem Solving & 7 QC Tools
SCATTER DIAGRAM
• Scatter Diagrams are used to study and identify the possible
relationship between the two different sets of variables.
variables. Two
factors which are considered to be having Cause & Effect
Linkage..
Linkage
24
Problem Solving & 7 QC Tools
SCATTER DIAGRAM – INTERPRETATIONS
POSITIVE RELATION
RELATION::- Increasing trend indicates the positive
relation..
relation
25
Problem Solving & 7 QC Tools
SCATTER DIAGRAM – INTERPRETATIONS
NO RELATION
RELATION::- Indicates there is no relation between two
variables..
variables
26
Problem Solving & 7 QC Tools
CONTROL CHARTS:-
CHARTS:-
• Centre line represents the Average line
line.. UCL & LCL are the
limits for process.
process.
• These control limits are chosen so that if the process is in
control, nearly all of the sample points will fall between
them..
them
• As long as the points fall within the control limits, the process
is assumed to be in control, and no action is necessary
necessary..
Upper Limit
X
Lower Limit
Unacceptable
deviation
27
Problem Solving & 7 QC Tools
CONTROL CHARTS:-
CHARTS:-
• Even if all the points plot inside the control limits, if they
behave in a systematic or nonrandom manner, then this is an
indication that the process is out of control.
control.
• Very Useful for online monitoring and controlling the process
process..
28
Problem Solving & 7 QC Tools
CONTROL CHARTS-
CHARTS-TYPES:
TYPES:--
• Variable types.
types.
• Xbar--R Chart
Xbar
• Median--R Chart
Median
• Xbar--S Chart
Xbar
• Pre Control Chart
• I-MR Chart
• P Chart
• np Chart
• C Chart
• U Chart
29
Problem Solving & 7 QC Tools
PROBLEM SOLVING – USING KAIZEN APPROACH
Definitions:--
Definitions:
Problem:-
Problem:-
Is defined as negative deviation from the expected result.
Disposition Action:-
Is the action taken immediately on the Nonconformance
situation. Eg:- Rework / Reject / Accept under deviation
Containment Action:-
Temporary actions taken on the process to ensure defective
parts are not produced. Eg:- 100% Inspection, Increased audits,
etc..
Preventive Action:-
Is the action taken on the potential problems / causes
to ensure Problems does not occur.
30
Problem Solving & 7 QC Tools
This Kaiz en is
Reversible
Ir-reversible
Analysis Results:
If Reversible updated in
OS/Process Sheet
JH Check Sheet
PM Check Sheet
Eqpt. / Fixture Drawing
31
Problem Solving & 7 QC Tools
Establish Team
Describe the problem
Take containment actions
Do Root Cause Analysis
Arrive Corrective Actions
Implement Corrective Actions
Take Preventive measures
Congratulate the Team
ESTABLISH TEAM
Mix-up of
required All areas should
skills be represented
32
Problem Solving & 7 QC Tools
Customers
language Quantum of
rejection
Specification
Describe
the problem Failure mode
Period Frequency
Location
Attack vital few problems rather than all. Use Pareto chart for
prioritizing the identification of problem.
33
Problem Solving & 7 QC Tools
34
Problem Solving & 7 QC Tools
Corrective Actions
35
Problem Solving & 7 QC Tools
Preventive Measures
• Revise Quality Plan / Control Plan
• Update Work Instructions/Process instructions
• Updation of process sheet,
• Visual aids etc
• Poka – Yoke
• Documentation
Congratulate
• Good recognition.
36
Problem Solving & 7 QC Tools
Usage of 7 QC tools in 8D approach
Steps/Tools Chec Graphs Pareto Histogram Cause & Effect Scatter Control
k Diagram Diagram diagram Chart
Shee
t
Team
Problem Defin
Interim Action
Root Cause
Analysis
Corrective
Action
Implement CA
Preventive
Measures
Congratulation
Theme & Target :TO AVOID WRINKLES NOTICED IN FRONT AREA Fla sh re port no.
& Date
Start Dt.12/07/05
problem / present status : WRINKLES NOTICED AT Action T aken / coundermeasure : FORMING TOLL WAS Results / Benefit : T HE COMPONENT LOOKS LIKE
THE FRONT AREA PALLISHED AND THE WRINKLES WERE REMOVED. PALLICED NO WRINKLES WERE FOUND
INST RUCTION WAS GIVEN T O T HAT MACHINE OPERAT ORS
This Kaizen is
Reversible
Ir-reversible
Analysis: 1) DIE AND PUNCH WORN OUT AT THE
FRONT AREA . 2) AFTER ASSY BUFFING PROCESS If Reversible updated in
IS NOT PROPERLY OS/Process She et
After improvement : NO WRINKLES WERE NOT ICED Control Plan
Drawing Change
Eqpt. / Fixture Drawing
37
Team : J.VIMAL BABU & Ka izen Supplie r code &
KAIZEN - SHEET D.Raveendran
No : Na me :
DPAP/KA
Category: Cannot Be Inspected IZEN/ 4&5 Pa rt no & Rev :
Press/Fab/Plastic/Rubber/Others - pl.specify Did Not Inspect Pa rt De s :
Theme & Target :TO AVOID TOOL MARK & DEEP SCORING MARK Fla sh re port no.
& Date
Start Dt.06/07/05
problem / present status : TOOL MARK & DEEP Action T aken / coundermeasure :REWORKED T HE EXISTING Results / Benefit : T OOL MARK AND DEEP
SCORING MARK TOOL AS A TEMPROUARY SOLUT ION NEW FORMING SCORING MARK WERE NOT FOUND
TOOL MANUFACT0URING IS IN PROGRESS. INST RUCT ION
WAS GIVEN TO T HE MACHINE OPERAT ORS
This Kaizen is
Reversible
Ir-reversible
Analysis:1) TOOL MARK NOTICED DUE TO THE
SCORING MARK IN THE FORMING TOOL. If Reversible updated in
2) IMPROPER BUFFING PROCESS OS/Process She et
After improvement : T HE COMPONENT S LOOKS GOOD Control Plan
Drawing Change
Eqpt. / Fixture Drawing
Theme & Target :TO AVOID M8 THREAD WAS NOT ANSWERING TO THREAD PLUG GAUGE Fla sh re port no.
& Date
Start Dt.06/07/05
problem / present status : M8 THREAD WAS NOT Action T aken / coundermeasure : 100% INSPECTION OF ARM Results / Benefit : 100% INSPECTION FOR ALL
ANSWERING TO THREAD PLUG GAUGE REST TO BE CHECKED BY VISSUALLY AND ALSO COMPONENT S. PREPARING FULL PROOFING
CHECKED BY THREAD PLUG GAUGE. THE OPERAT ORS METHOD
WERE GIVEN INST RUCT ION T O DO THE RET APPING
PROPERLY AND WIT HOUT MATERIAL MIXUP.
This Kaizen is
Reversible
Ir-reversible
Analysis:1) RETAPPING PROCESS WAS NOT DONE
2) MATERIAL MIX UP If Reversible updated in
OS/Process She et
After improvement : T HREAD GAUGE ENT ERS FREELY Control Plan
Drawing Change
Eqpt. / Fixture Drawing
38
KAIZEN - SHEETS Core Teams:CS/VRK/CK/M D/SA/SRM Kaizen No Supplier Code& Name
Category Can not be Inspected Part no & Rev B 147 24188/BR18102066 DO1
Press/Fab Did not Inspect 28 Part Name ASSY2/3 S/F
Theme & Target : ELEMINATE CUSTOMER COMPLAINTS IN Assy 2/3 S/FICF AC Flash Report No & Date 3194/4093-28.6.05
DIM VARIATION Start Date : 29.6.05 End Date: 19.7.05
PROBLEM / PRESENT STATUS CORRECTIVE ACTION RESULTS / BENEFIT
481+/-2 MEASURES 471 TO 484 1.BOWNESS TO BE REMOVED IN ALL STAGES No complaints
6 MM SEAT BASE TUBE BOWNESS NOTICED. ( SQ. TUBE ASSY , FIRST STAGE , FINAL STAGE )
DIM 1270+/-2 MEASURES 1267/ 1271 2.ARMREST PLATE INNER DTISTANCE CHECKING REVERSIBLE
BUSH TAPPER 2.75 MM NOTICED GAUGE MADE.
3.MTG PITCH GAUGE MADE . IR - REVERSIBLE
POTENTIAL CAUSES If Reversible Updated in
DIM VARIATION OS / Process sheet
WHY? Control plan
FRAME BOWNESS Drawing Change
WHY? BEFORE IMPROVEMENT Edpt. / Fixture Drawing
1426 MM LENGTH FRAME 481+/-2 MEASURES 471 TO 484
4 PIVOT BRKT WELDED IN S/B TUBE DIM 1270+/-2 MEASURES 1267/ 1271
MORE WELDING LENGTH
EVERY STAGE REVISING OPERATION NOT DONE
1 ST STAGE WELDING DONE AT 2 STAGES Scope & plan for Horizontal Improvement
HALF LENGTH CLAMPING. SNO ITEM RESP. TARGET STATUS
1
2
3
4
ROOT CAUSE AFTER IMPROVEMENT 5
1. MTG PITCH ANSWERING TO GAUGE 6
BOWNESS 2.A/R INNER DT ANSWERING TO GAUGE 7
8
If It is Poka Yoka - Type & Function
REMARKS : Prevention Shoutdown
Detection Warning
Prepared by Checked by Approved by
Category Can not be Inspected Part no & Rev B 147 24 296 DO1
Press/Fab Did not Inspect 28 Part Name ASSY 2 S/F VO3
Theme & Target : ELEMINATE CUSTOMER COMPLAINTS IN Assy 2 S/F VO3 Flash Report No & Date 3374/13.6.05
REAR TUBE MISSED Start Date : 14.6.05 End Date: 18.7.05
PROBLEM / PRESENT STATUS CORRECTIVE ACTION RESULTS / BENEFIT
REAR TUBE MISSED(ONE FRAME) 1.S/B MTG GAUGE MADE. No complaints
IR - REVERSIBLE
POTENTIAL CAUSES If Reversible Updated in
REAR TUBE MISSED(ONE FRAME) OS / Process sheet
WHY? Control plan
REAR TUBE NOT WELDED AT SUBASSY STAGE Drawing Change
FRAME MIXUP(REAR TUBE NOT WELDED FRAMES BEFORE IMPROVEMENT Edpt. / Fixture Drawing
MIXED WITH WELDED FRAMES) REAR TUBE MISSED
S/B MTG GAUGE NOT DONE FOR C/S FRAME
39
KAIZEN - SHEETS Core Teams:CS/VRK/CK/MD/SA/SRM Kaizen No Supplier Code& Name
Category Can not be Inspected 26 Part no & Rev B 167 10 173 D01
Press/Fab Did not Inspect Part Name Assy 3 s/f JAICO
Theme & Target : ELEMINATE CUSTOMER COMPLAINTS IN A ssy 3 S/F JAICO Flash Report No & Date 3191/9.6.05
Dim 28+/-0.2 measures 18.05 Start Date : 10.6.05 End Date: 12.7.05
PROBLEM / PRESENT STATUS CORRECTIVE ACTION RESULTS / BENEFIT
Dim 28+/-0.2 measures 18.05 No complaints
Full proff pin provided in piercing tool &
sub assy f ixture REV ERSIBLE
40
KAIZEN - SHEETS Core Teams:CS/VRK/CK/M D/SA/SRM Kaizen No Supplier Code& Name
Category Can not be Inspected 27 Part no & Rev B 167 15 429
Press/Fab Did not Inspect Part Name ASSY 3 S/F AL SRILAANGA
Theme & Target : ELEMINATE CUSTOMER COMPLAINTS IN A ssy ASSY 3 S/F AL SRILANGA Flash Report No & Date 3373/13.6.05
Back rest Hook w rongly w elded. Start Date : 14.6.05 End Date: 11.7.05
PROBLEM / PRESENT STATUS CORRECTIVE ACTION RESULTS / BENEFIT
Back rest Hook w rongly w elded. No complaints
Instruction given to Operator to use
mistake proof poration. REV ERSIBLE
2 bin provided f or separate storage
IR - REVERSIBLE
POTENTIAL CAUSES Gauge provided. If Reversible Updated in
OS / Process sheet
Back rest Hook w rongly w elded. Control plan
Why? Drawing Change
Same side b/r tube w elded.w hy? BEFORE IMPROVEMENT Edpt. / Fixture Drawing
Mistake proof not used. Why?
operator not AWA RE Back rest Hook w rongly w elded.
41
Problem Solving & 7 QC Tools
THANK YOU
42