Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Project: By: Date:

A7 RATIONAL METHOD PIPE DESIGN FOR INLET CONTROL

Type of Channel Type of Channel Type of Channel


x x x
Elevation 1 Elevation 1 Elevation 1
Elevation 2 Elevation 2 Elevation 2
DY ft DY ft DY ft
L ft L ft L ft

TIME OF CONCENTRATION

Tc = x min. Tc = x min. Tc = x min.


= min. = min. = min.

Tc total = min.

DETERMINATION OF "C" VALUE

Type of Land Use :

Range = Choose C =

Reason for C :

RAINFALL INTENSITY

Tc total = min. Return Period years

Rainfall Intensity, I = in/hr

DRAINAGE AREA

Area = sq. ft. / 43,560

Drainage Area = acres

DISCHARGE CALCULATION

Q= X X
C I (in/hr) A (acres)

Q= cfs

PIPE SIZE AND HEADWATER

For RCP & HDPE use : n = 0.012 HW/D = (scaling factor)

n= s= % HW = X / 12 in
Q= cfs (HW/D) Diameter

Diameter = in.
Velocity = ft/s HW = ft
RAINFALL INTENSITY LINEAR INTERPOLATION

Tc = 0.00 Return Period = 0

Storm Duration 1 = 0.00 Rainfall Intensity 1 = 0.00

Storm Duration 2 = 0.00 Rainfall Intensity 2 = 0.00

MID CALCULATIONS

0.00 0.00 0.00


#DIV/0! #DIV/0!
0.00 0.00 0.00
#DIV/0! #DIV/0!

FINAL CALCULATION

With a Tc equal to 0.00 and a return period equal to 0 ,

The Rainfall Intensity will be = #DIV/0! in/hr


Check = #DIV/0! in/hr

You might also like