Thanks for everyone help me to write this document, and I hope that help site engineer to
know some information around one type of our actions in this project called Mini link
upgrade from Mini link to TN6 P
MLU Project
|Pag e3
Contents
1. Before Site Access: ....................................................................................................... 4
i. Site Access Message ................................................................................................. 4
ii. Risk Assessment ....................................................................................................... 4
2. Site Survey ................................................................................................................... 5
i. Site ............................................................................................................................ 5
ii. Facing ....................................................................................................................... 8
3. Check Delivery .......................................................................................................... 14
4. Installation ................................................................................................................. 18
5. Configure TN ............................................................................................................. 21
6. Call 2nd line ............................................................................................................... 27
7. Call NMC to Halt Site and effected sites ................................................................... 27
8. Complete Action ........................................................................................................ 27
9. Drop E1 Physical ....................................................................................................... 31
10. Call BEB to Add Node and E1dropping ............................................................... 31
11. After finish call NMC to Active sites ..................................................................... 31
12. Take Acceptance Package ..................................................................................... 31
APPENDIX A ..................................................................................................................... 33
APPENDIX B ..................................................................................................................... 37
APPENDIX C: .................................................................................................................... 44
APPENDIX D: .................................................................................................................... 51
MLU Project
|Pag e4
MLU Project
|Pag e5
2. Site Survey
i. Site
Placement
Check where you will fix TN6 P where magazine need 3U at rack, 1U for each
ICF3
MLU Project
|Pag e6
Power
PBC 6200
This case connect TN6 P direct with PBC 6200
As fig show
PBC 6500
Black terminal on
Straight
Red terminal on L
terminal
MLU Project
|Pag e7
In this case TN6 P Power connector as show in fig with -48 V Source
Black terminal
RED Terminal
DC BOX (+24V)
This case connect TN6 P direct with DC Box (+24 V)
As fig show
Black terminal
Check old link parameter with SF6 file (Review APPENDIX B) most important
parameter:
MLU Project
|Pag e8
4) Link performance
E1 survey
Trace each E1 cable if these cable direct to other sites you can check it with End
to End
IF Connector
Standard or not, if not standard you should change it after halting sites
Standard as show in fig
IF cable
Washer
Jumper
ii. Facing
MMU Placement
Free Position
Check TN release
R22T18
MLU Project
|Pag e9
MLU Project
| P a g e 10
Press double click on NPU and ETU to get the following screen
NPU and ETU P.s
MLU Project
| P a g e 11
Notification history:
Right click on TN and choose view Notification History
Traffic Routing P.s: right click on TN and choose configure then traffic routing
DCN P.s:
PPP: right click on TN and choose configure then choose DCN then choose PPP
MLU Project
| P a g e 12
OSPF area: right click on TN and choose configure then choose DCN then OSPF
area
MLU Project
| P a g e 13
Basic NE:
Inventory P.s:
Right click on TN then tools then inventory
Report:
right click Tools tab and choose FTP server and press start then choose help tab and press on
debug error report you write description and press save after finish you will find this file at
C:\tn_ftp_home as (.RAR) file this file contain Backup and report
MLU Project
| P a g e 14
Check old link parameter with SF6 file (Review APPENDIX B) most important
parameter:
Check IF connector
Standard or not, if not standard you should change it after halting sites
Standard as show in fig
IF cable
Washer
Jumper
3. Check Delivery
AMM (Access Module Magazine)
MLU Project
| P a g e 15
NPU: can support 4E1 and it responsible main function, Contain internal memory to save
main parameter for Magazine and Routing table
RMM
rmm
LTU 12/1: use to support three
group and each group support four
E1
There are Traffic cable uses to distribute these E1 on ICF (Interconnection
Frame), from ICF to RBS (Radio Base station)
MLU Project
| P a g e 16
LTU 32/1: use to support eight group and each group support four E1
There are Traffic cable uses to distribute these E1 on ICF (Interconnection
Frame), from ICF to RBS (Radio Base station)
NOTE: at least you should have on LTU card (LTU 12/1 or LTU32/1) for physical E1 dropping
MMU 2H
Two PFU3 B
MLU Project
| P a g e 17
Dummy
1. NPU
2. LTU (LTU12/1 or LTU32/1
3. MMU
4. FAN + Two PFU3B+ Power cable
5. ICF + traffic cable
MLU Project
| P a g e 18
Additional Material
Washer, heat shrink, Metal Connector and other material please check
APPENDIX D
4. Installation
TN Power Source explained in (section Site Survey/Power)
Recommendation position for Modules in TN6P C
PFU 3 B
FAU
LTU 32/1
NPU
MLU Project
| P a g e 19
At TMR 9202:
At TMR 9206
MLU Project
| P a g e 20
SIAE Rack
MLU Project
| P a g e 21
5. Configure TN
Use USB to Mini cable to connect with AMM through USB Mini port in NPU Card
NE: 192.168.0.1
User: Control_user
Password: ericsson
MLU Project
| P a g e 22
Software Upgrade
Before any Update or Back up you should start FTP server (APPENDIX C)
At first time when you start TN 6P
http://www.mediafire.com/download/ancpam2gj9g814r/tn_ftp_home.7z.002
MLU Project
| P a g e 23
MLU Project
| P a g e 24
MLU Project
| P a g e 25
Continent: Africa
City: Cairo
To Hide License error: open any explorer and write 10.0.0.1 and user name: Control_user,
password: ericsson
*Hide License
errors
*Hide License
Warning
Then make Warm restart for AMM: press Right click on TN and choose tools then
restart; there are two type of restart:
Warm restart: Not distribute traffic
Cold Restart: distribute traffic
255.255.255.248
MLU Project
| P a g e 26
Show MMU
position
MLU Project
| P a g e 27
8. Complete Action
Jumper Connected
Connect jumper on MMU
RAU Software upgrade
Open Mini link craft and right click on TN then choose tools then Software
upgrade (Choose upgrade modules)
MLU Project
| P a g e 28
MMU ID at Sf6
Check mark
Choose it from Tx
frequency
Read it from Tx
Tx on Power at SF6
MLU Project
| P a g e 29
MMU ID: if you configure radio link at site 211 terminal ID 594F and Far end ID 594E
It mean RAU 2N
Link 1+0 no
MMU type: MMU2H protection
After end configuration at two sides check received power and if it in range show in SF6 file
or not (Accept if Rx+/- 3 dBm)
MLU Project
| P a g e 30
Show Tx and
Rx power
Open start menu and write cmd at RUN menu and press enter
MLU Project
| P a g e 31
9. Drop E1 Physical
E1 cable
MLU Project
| P a g e 32
Finish your Acceptance label and take your Package as show in APPENDIX A for
Acceptance
NOTE: Don't forget BNC Connector Video to see sample on this link
http://www.mediafire.com/download/h4yp0d55kitny78/Cut_over_video.7z
MLU Project
| P a g e 33
APPENDIX A
Acceptance label
AMM:
MMU Label
DIR site #
Label on jumper:
MMU type
DIR site # RAU #
Jumper connector
Label on IF cable:
MLU Project
| P a g e 34
AMM IP label:
IP: xxx.xxx.xxx.xxx
Mask: 255.255.255.XXX
TN6 P PBC6200
If source PBC 6200 PFU 3B pos# DC (-48V) C.B#
If Source PBC 6500
TN6 P PBC6500
C Connection PFU 3B pos# DC (-48V) C.B#
TN6 P PBC6200
A,B connection PFU 3B pos# DC (+24V) C.B#
TN6 P
Label on Source C.B port #
MLU Project
| P a g e 35
ICF Label:
DIR Site #
http://www.mediafire.com/download/9uhucr60hb818az/Site-211-PCK.7z
Template photo for site (take after your package complete photo+ Video+ print
screen):
Main earth
MLU Project
| P a g e 36
MLU Project
| P a g e 37
APPENDIX B
Access Mini link E and take P.S
You should have Windows XP and MSM Program (Mini Link Service Manager) and USB to
Serial cable
MLU Project
| P a g e 38
Set COM
port
MLU Project
| P a g e 39
Choose it
MLU Project
| P a g e 40
Press here to
show link
MLU Project
| P a g e 41
MLU Project
| P a g e 42
Take P.S for HOP Setup: Right click on Link ID and choose HOP setup
MLU Project
| P a g e 43
Performance P.S
MLU Project
| P a g e 44
APPENDIX C:
How opne FTP server
Open FTP server (file and transfer protocol), prepare FTP at first time
Press on user account to create user (anonymous), when press on it will appear the following
picture
MLU Project
| P a g e 45
Press Ok
MLU Project
| P a g e 46
MLU Project
| P a g e 47
MLU Project
| P a g e 48
After end of selection set check box as follow in picture and set login and password then
select folder path and press ok
MLU Project
| P a g e 49
Second Method:
MLU Project
| P a g e 50
Note: you should take copy from file tn_ftp_home and past it in C:\
http://www.mediafire.com/download/1yexjr2zn6jimzh/tn_ftp_home.7z.001
MLU Project
| P a g e 51
APPENDIX D:
Needed material:
MLU Project
| P a g e 52
MLU Project
| P a g e 53
Plastic cable
8 Black and white with different size
Tie
13 mm Ø
cable
9
terminal
6 mm Ø
MLU Project