BHARAT SANCHAR NIGAM LIMITED
fam fetes |
A Und Ga
[Erna nwocfa@bsni.co.in | YAGow. of naa Entorpise)
No, 6-12/2015-NM/SSTP/MNP/FMNP. Dated 19/5/15.
To,
Chief General Managers, All Telecom Circles/Metro districts
CGM NTR/ETR/NCNGN/ITPC.
Sub: Implementation of FMNP in Circles-regarding
Ref: 1. No. 6-12/2015-NM/SSTP/MNP/FMNP Dated 20/04/15 &
06.05.15.
This is in continuation with letters cited under reference wherein, instructions were
issued by this office for modifications to be carried out in TAX Switch /Local
switch/SSTP for implementation of FMNP.
In response, the circles have confirmed to this office about technical feasibility for
implementing the instructions issued by this office regarding FMNP, However, the
completion of activity has not been confirmed. As per directions of DOT, the FMNP
inter operator test will be commenced shortly. For readiness of BSNL landline
network, it is, therefore, once again reiterated that the moc
completed in the following flow chart in time bound manner.
‘ations may be
Step 1- TAX switche:
A. Creation of announcement for PORT IN and PORT OUT scenario in TAXs.
B. Intra Circle Creation of Home LSA LRN in NAI-1 Category with proper routing
to the respective POI/MSC's i.e intra circle mobile Calls may be routed to
respected POIs/MSC with NAI 1 parameter + home Circle LRN.
__. Creation of other LSA LRN in NAI-1 and routed to PORT OUT announcement
“C. Creation of other LSA LRN in NAI-3 Category with proper routing to the
respective TAX'S, (if not exist)
‘Step 2- SSTP:
Modification in SSTP screen rule should be carried out for stopping NAI modification
in coordination with NOC SSTP Bangalore.
_ a)
Lyd MF I ?
gy oN s\ Ce
al a ee
we Bo, co 2) 23-S-p01S wre \ ’
& eddy sop 2alshs-Step 3- TAX switches:
Modification of HOME LSA LRN’s for NAI-3 and routed to PORT IN announce!
‘Step 4- Local Switches:
‘After carrying out the modifications in TAX switches and concerned SSTP, the levels
7, 8, 9 and 07, 08, 09 may be opened in all the Local switches.
‘Step 5-Testing-The testing may be conducted by simulating Port out/Port In
mobile numbers with in BSNL mobile network. Accordingly, CDR may also be
confirmed from ITPC. A list of officers of mobile wing in LSAs is enclosed herewith
who may be contacted for testing activity
Circle NWO-CFA cell is requested to coordinate the activity and furnish completion
report in respect of above modifications by 31st May 2015 on FAX 011-23734135 or
email nwo3cfa@gmail.com.
SC Tiwari
DGM (NWO III-CFA)
Encl: A/ANetwork Operations-CM Cell, .
BSNL Corporate office 7 ane tan Fre fates
113, Bharat Sanchar Bhawan, (m0 BOS TER)
H.C. Mathur Lane, Janpath, BHARAT SANCHAR NIGAM LIMITED
New Delhi-110 004 (Ao ota Eps)
1e Bound/ Most important
MoB-45/MiNP 2015/46 an dated 19.05.2015
AZO
To OA AS
Chief General Manager wy
All Telecom Circles / Metro Districts
1. MOB-45/MNP 2015/37 dated 28.04.2015, and
2. MOB-45/MNP 2015/42 dated 12.05.2015.
2 Vide letter dated 28.04.2015, the TRAI Direction dated 16.04.2015 was forwarded and it was
requested to modify the existing “Porting Request Form” to incorporate an undertaking in
the “Porting Request Form” being obtained from the subscriber seeking porting of his
mobile number at the earliest, declaring that “he is the owner of the said mobile number
and in case the undertaking is found to be false, the said mobile number shall be
disconnected.” and to submit the compliance towards the same to this office.
3 Vide letter dated 12.05.2015, it was requested to send two activated test SIMs to each circle
and to send the list of shared test SIMs along with the Details of Nodal Officers of your circle
(Name, Designation, Mobile Number & Email of concerned GM & DGM) to this office via
email at mnpbsnl@gmail.com & nwocm4co@gmail.com
In this regard, it may kindly be noted that compliance report regarding undertaking is still
pending from majority of the Circles, TRAI is seeking compliance for its above-said
Direction, and as such Compliance report is being sent to TRAI and Circles are directed to
re-ensure that the said Directions are being complied with
5. It is reiterated that in case of non-compliance of TRAI Regulations/Directions mentioned
above and/or non-conformance to BSNL C.O. Letters, Circles themselves will be responsible
for any penal action initiated by TRAI/DoT.
6. Further, itis informed that DoT has issued a final test matrix (Annexure-1) and therefore it is
reiterated to ensure timely sending of two activated test SIMs to each circle and to send the
list of shared test SIMs along with the Details of Nodal Officers of your circle (Name,
Designation, Mobile Number & Email of concerned GM & DGM) to this office via email at
mnobsni@gmail,com & nwocm4co@email,com
—This has the approval of Sr GM (NWO-CM). sd/-
PA (RK Sharma)