Professional Documents
Culture Documents
Rear Elevation Details Left Side Elevation Details: Roof Deck Roof Deck
Rear Elevation Details Left Side Elevation Details: Roof Deck Roof Deck
Rear Elevation Details Left Side Elevation Details: Roof Deck Roof Deck
0MM
PRE-PAINTED ALUMINUM GUTTER
(VERIFY PROFILE & COLOR)
ROOF DECK FLOOR FIN. LINE +9000.0MM ROOF DECK FLOOR FIN. LINE +9000.0MM
THIRD FLOOR FIN. LINE +6000.0MM THIRD FLOOR FIN. LINE +6000.0MM
SECOND FLOOR FIN. LINE +3000.0MM SECOND FLOOR FIN. LINE +3000.0MM
GROUND FLOOR FIN. LINE +-00.0MM GROUND FLOOR FIN. LINE +-00.0MM
F
SIDE WALK LEVEL -200.0MM SIDE WALK LEVEL -200.0MM
MASTERS MASTERS
W.I.C BEDROOM FAMILY AREA BEDROOM BEDROOM-1
SECOND FLOOR FIN. LINE +3000.0MM SECOND FLOOR FIN. LINE +3000.0MM
F F
SIDE WALK LEVEL -200.0MM SIDE WALK LEVEL -200.0MM 5 SCHEDULE OF DOORS AND WINDOWS
3 CROSS SECTION ELEVATION DETAILS 4 LONGITUDINAL SECTION ELEVATION DETAILS A 3 SCALE 1:40mts
DESIGNED BY: PRC : R.A. 9266 ART. IV SEC. 33 PROJECT: CADD BY: JHP SHEET CONTENTS: REVISIONS: SHEET NO.:
PTR : DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY DATE APRIL ,2019
SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE
A-3
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER
DATE : CHECKED BY
THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE
UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID Mrs. BETTY GAO-AY ALCIDO
PLACE: DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR OWNER APPROVED BY
BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
TIN : WRITTEN CONSENT OF THE ARCHITECT. LOCATION: PUROK 5 MAGSAYSAY, LOAKAN, BAGUIO CITY DATE APPROVED: