Professional Documents
Culture Documents
Eldorado Resorts CitiCenter Proposal
Eldorado Resorts CitiCenter Proposal
Eldorado Resorts CitiCenter Proposal
2
CONTENTS
4-5 CitiCenter Plaza | The Heart of Downtown
6-7 A History of Prioritizing Cars
8-9 Creating Spaces for People in the Public Realm
10-15 Existing Conditions TESTING FONT
16-17 “We Can Be So Much More”
18 Phasing Plan
19-22 Site Analysis
23 Planning Principles
24-25 Planning Concept
Team
PROJECT OUTLINE
The quality of our downtown has a significant impact on the experiences and interactions of both the locals and visitors to Reno. Quality urban design makes a valuable
contribution to the economy by promoting the enjoyment of walking through the city as a journey, not just a thoroughfare. Local businesses can attract new customers;
sidewalks can become activated and serve as extensions of our street fronting developments. Quality urban design integrates natural and built environments to
influence our physical health and well-being. This provides opportunities for a healthier lifestyle and community interactions.
Creating quality urban spaces for people does not take one singular solution. The opportunity for CitiCenter Plaza is to be part of a network of urban experiences and
connections; to be a catalyst for a series of outdoor spaces that encourages people to be downtown & to experience all that Reno has to offer. The opportunity for
CitiCenter Plaza is to enhance the Reno vibe, to expand upon the characteristics of downtown Reno and to create a place for people.
The CitiCenter Plaza RFP design proposes to integrate adjacent under-utilized properties (of the same ownership) to create a sequence of visually and pedestrian-
connected urban spaces that enhance the experience of Downtown Reno. This sequence includes:
TO DOWNTOWN
16
DE BARTOLO + RIMANIC DESIGN STUDIO 17
RENO
BALLROOM
RENO EVENTS
CENTER
SILVER LEGACY
RESORT PHASE 1
(container park)
PUBLIC
TRANSIT
EXISTING TERMINAL
COMMERCIAL
NORTH VIRGINIA STREET
LAKE STREET
(events plaza)
PHASE 1
(pedestrian link)
NATIONAL
EL DORADO BOWLING
RESORT STADIUM
PARKING
GARAGE
downtown reno
RFP location
or
o r
6th st corrid
rid
o r
li c or
ra
id
rr
co
st
h
4t
l ow
winter solar access
high s
ummer solar access
mid-rise/high-rise
mid-rise/high-rise structures
structures midday sun
potential
mountain views
downtown views
mountain views
downtown views
midtown views
1-route bus
2-route bus
bus station
1-route bus
0.10 miles away
4-route bus
1-route bus
rail station
0.05 miles away
1-route bus
24
northern resorts
connection to
INES
D GRIDL
ROTATE
CEPT
RTH CON
TRUE NO
connection to
connection to university communities
western resorts
connection to
ballpark
connection to
surrounding open spaces
SILVER LEGACY
RESORT PHASE 1
(container park)
PUBLIC
TRANSIT
EXISTING TERMINAL
COMMERCIAL
NORTH VIRGINIA STREET
LAKE STREET
(events plaza)
PHASE 1
(pedestrian link)
NATIONAL
EL DORADO BOWLING
RESORT STADIUM
PARKING
GARAGE
26
DE BARTOLO + RIMANIC DESIGN STUDIO PHASE 1 PLAN
ALLEY
EAST 4TH STREET
0.3 ACRE
PARK
ALLEY
NORTH VIRGINIA STREET
EXISTING THREE-STORY
COMMERCIAL
SHADE
STRUCT.
FOOD
0.3 ACRE TRUCKS
PARK
TERRACED STEPS
ALLEY
EXISTING
TWO-STORY
COMMERCIAL
ALLEY
BATHROOMS
DOWNT RSHIP
SATELLIT
AMBASS FFICE
PARTNE ORS
OWN RE
COFFEE SHOP
EO
AD
NO
ART
GALLERY