PETROVIETNAM GAS CORPORATION
PETROVIETNAM SOUTH-EAST GAS
PROJECT MANAGEMENT BOARD
PYGAS
PROJECT NAM CON SON 2 GAS PIPELINE PROJECT
UPDATING FEED AND COST ESTIMATION
PACKAGE
FOR PIPELINES AND STATIONS ~ PHASE 2
SPECIFICATION FOR OFFSHORE PIPELINE
ac | 142g
Rey, | Date
ixat apg
Description
FIELD WELDING AND NDT
fondest
cA
PV ENGINEERING
JSC
Document Number:
INCS2-PVE-ReFD-1-06-02-SP-009
Number of pages: 48
(including caver pages)
Aaa
Gana
Wraxgcry
eTNaMPROJECT
NAM CON SON 2 GAS PIPELINE PROJECT
PACKAGE
UPDATING FEED AND COST ESTIMATION
FOR PIPELINES AND STATIONS — PHASE 2__
WELDING AND NDT
SPECIFICATION FOR OFFSHORE PIPELINE FIELD
[OT ee
AG | 14/2M8 | Issued for Approval OTP KD. NNH
26/1118 | Retssuedfor Review | OTP | KD __ NNH [NNT
1 | 31048 | _ Issued for Review DIP KD NNH | NNT
Rov. | Date Description Rrepeied | Cheetos APES | lem
Document Number:
PV ENGINEERING J.S.C oe |
NCS2-PVE-ReFD-1-06-02-SP-009
Av—&
Sey
WG. ~NAM CON SON 2 GAS PIPELINE PROJECT
UPDATING FEED AND COST ESTIMATION
FOR PIPELINES AND STATIONS - PHASE 2
SPECIFICATION FOR OFFSHORE PIPELINE FIELD
WELDING AND NDT
REVISION LOG
7 Design | Remar
Doc No Doc Title 7 Rev. Stage ;
Specification for ee
Offshore Pipeline y
NCS2-PVE-FD-1-00-02-SP-004 | Po a aiee mang | AC2 | Phase 1- | Update J
2014
NOT )
Rev.| Date Issuance Purpose | Section | Changes Description y
1 | aioe | Issued for Review All Update all sections
2 | 28/11/18. | Re-lssued for Review - Update comments
ac | 14/12/18 | Issued for Approval | - 3
NCS2-PVE-ReFD-1-06-02-SP-009 Rev. AC. Page 3/45