Project Management Office - Philippine Coast Guard: Email: Tel No: 706-9827
Project Management Office - Philippine Coast Guard: Email: Tel No: 706-9827
29 April 2019
1. O/a 26 1030H April 2019 PMO-PCG Personnel Depart Columbia Tower Building,
Ortigas Avenue, Mandaluyong City to conduct the PMO-PCG Quarterly Assessment
Workshop at Ridgewood Hotel, Barangay Lualhati, Baguio City.
2 O/a 26 1830H April 2019 PMO-PCG Personnel aboard Ridgewood Hotel, Barangay
Lualhati, Baguio City and proceed to their designated room.
3. O/a 27 0800H April 2019 PMO-PCG conducted the PMO-PCG Quarterly Assessment
Workshop.
4. O/a 27 1645H April 2019 end of 1st day PMO-PCG Quarterly Assessment Workshop.
Proceed to their respective room to prepare for dinner.
5. O/a 28 0800H April 2019 start of the 2 nd day of PMO-PCG Quarterly Assessment
Workshop.
6. O/a 28 1130H April 2019 end of the 2nd day PMO-PCG Quarterly Assessment
Workshop and start for Lunch before going back to Manila.
7. O/a 28 1400H April 2019 depart Ridgewood Hotel, Barangay Lualhati, Baguio City to
PMO-PCG Office Columbia Tower Building, Ortigas Avenue, Mandaluyong City.
8. O/a 28 0930H April 2019 arrived safely at PMO-PCG Office Columbia Tower Building,
Ortigas Avenue, Mandaluyong City.
Hiring of Civilian Personnel (COS) to fill-up the vacant positions as per TOE.
Request for additional PCG Officers and Non-Officers to be assigned at
PMO-PCG Office.
PCG’s Justification on the modification made from the 94-m MRRV design.
Status of MSCIP 2: Acquisition of Two (2) 94-m vessel from Japan.
JMU and Cat Marine Proposal to PCG for recovery of MRRV-
4410(BAGACAY) Generator.
Draft calculation of the proposed new re-allocation of man-months for
Phase 1 for project consultants.
TEOTIMO R BORJA JR
COMMO PCG