PROCESS AUDIT CHECK SHEET

Auditors: Product Name: Part No.- Date :-

Auditees: Signs: Auditors( ), Auditees ( ), Control Plan Ref. No.-

OPN. Process Observations on _________ Observations on ________ Status Remarks


Control Item Specifications Checking Method
No.

Casting temp. 660°± 20°C Thermo meter

Hydraulic Pressure(LP) 30-35 Kg/cm2 Pressure Gauge

Hydraulic Pressure(HP) 120±10 Pressure Gauge

N2 Pressure 70±10 Pressure Gauge

Intensification Pressure 160-200 Pressure Gauge

Die Opening Time 6-8 Sec. PLC Control

30 Die Casting Ejector Forword Time 2 Sec. PLC Control

Ejector Return time 2 Sec. PLC Control

Injection Speed 1st phase 1-3 turn Manually

Injection Speed 2nd phase 1/2-5 Turn Manually

2nd phase timer 3-6 Sec Timer

Hydraulic oil tempreture 35-55°C Thermo meter

Die Tempreture 150-250° Thermo meter

First Part inspection and Inprocess


40 Process parameter not available
Inspection

50 Trimining Press Machine 30T-50T Visual

60 Saving Press Machine 30T-50T Visual

70 Shot Blasting Process parameter not available

Tempreture 290°± 10°C Lasure Gun/Temp. Meter


80 Heat Treatment
Heating Time 30 min. Timer/Watch

Page 1 of 1