SUWAIDI INDUSTRIAL SERVICES, CO. LTD.

HAZARD IDENTIFICATION PLAN


Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

1 ALL SITE 1.0 Crane Lifting and A/B/C 1.1 Crane failure; 1.1(a) Secure necessary
LOCATIONS Erection Activities: failure of crane work permits.
Using various crane boom or hoist 1.1(b) Use cranes and
types and crane system; failure of rigging equipment as
capacities. rigging accessories; per GI 7.028 and GI
Important Note: accident to 7.029.
Most of the personnel-being 1.1(c) Assign only Saudi
activities are struck by moving or Aramco certified
common to all falling loads; Crane Operators and
site locations. damages to the Riggers.
load or structures 1.1(d) Use approved
rigging plan as per
GI 7.028.1.1(e)
Conduct pre-task
instruction among
crewmembers prior
to lifting.
Disseminate
information to crane
crew. Ensure all
information is
attached on rigging

Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

plan.
1.1(f) Crane Operator and
assign Rigger inspect
their respective
crane unit daily. Use
crane daily
inspection checklist.
1.1(g) Defects noted
during inspection
recorded and
immediately
reported to site
supervisor/maintena
nce.
1.1(h) Isolate lifting radius.
Keep area free of
other equipment or
personnel; provide
barricade or warning
signboards.

1.2(a) Beware of overhead

Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

1.2 Contact with power lines when craning,


existing high- and maintain clear distance
tension lines. from live lines. (Refer to
recommend distances in
Loss Prevention Program or
as per GI 7.028 and GI
2.702).
2 ALL SITE 2.0 Excavations and A/B/C 2.1 Accidental damage 2.1(a) Secure SA
LOCATIONS Trenching (For Larger to existing UG Excavation Permit.
Scale) including utilities. 2.1(b) Avoid mechanical
(Including pits, lift backfilling. excavation close to UG
stations, sewers, etc. utilities (<10 feet). Refer
to drawings and mark
exact locations at site with
stakes.
2.1(b) Use exploratory
trench in areas where UG
utilities are known to be
present, and using hand-
dig only.
2.1(c) Use only plastic
shovels for suspected UG
Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

power cables.
2.1(d) Supervisor conducts
pre-task safety instruction
daily.
2.1(e) Orientation of
concerned workers to
specific excavation job
hazards, and controls.

2.2 Falls into 2.2(a) Provide standard


excavation barricades, signs.

2.3(a) Provide safe


alternate routes, install
crossboards.
2.3(b) Provide standard
traffic signs, road closure
signs, detour warning signs
on both approaches as per
GI 1021.000.
2.3(c) Provide lighting
system for nighttime in

Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

accordance with Aramco


specifications.
2.3(d) Maintain close
coordination with Owner
Security force and other
departments.

2.3 Collapse of 2.3(a) Provide approved


sidewalls on means of access into
excavations excavations including cross
boards with a minimum of
(3) planks/boards.
2.3(b) Install approved-
design shoring or support
system as per SACSM;
assign a competent person
to record and monitor
conditions of shoring daily.
3 ALL SITE 3.0 Foundation B 3.1 Slips, Trips and 3.1(a) Maintain high level
LOCATIONS Works: Excavations Falls of housekeeping.
and backfilling, drain- 3.1(b) Provide approved
out, disposal, rebar means of access i.e.
Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

work, embedded platforms, scaffolds,


steel fixing, ladders, etc.
concreting, curing,
masonry and 3.2 Hazards on the use 3.2(a) Use standard PPE,
grouting, plastering, B of hand tools and inspect tool conditions, do
surface coating, portable power tools not use substandard
accessory tools/equipment, and
installation, water compliance to regulations.
proof lining, etc.

3.3 Rebar cap hazards- 3.3(a) Install rebar caps on


piercing injuries. all protruding ends of
rebars.

Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

4 ALL SITE 4.0 Hot Works: A 4.1 Accidental fires or 4.1(a) Secure necessary
LOCATIONS cutting operations, explosions; personal work permits.
brazing, etc. injury due to burns; 4.1(b) Request for gas-
gaseous fumes tests from SA
inhalation. Representative for any
suspected condition, or as
required in the permit to
know and ensure level of
gaseous elements in the
immediate environment.
4.1(c) Secure the hot work
area by blanketing or by
other means to contain the
sparks and slags. If
required, provide a trained
fire watch.
4.1(d) Make available
ready supply of water and
sufficient number of 20-lb
Type ABC fire extinguishers
close to the work and close
to the ICE.

Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

4.1(e) Crafts personnel


must be fully-equipped
with complete body
protection.

5 ALL SITE 5.0 Structural Frame 5.1 Slips, trips, falls 5.1(a) Maintain high level
LOCATIONS Work: Concrete from heights. of housekeeping.
Framing, rebar 5.1(b) Provide approved
works, steel framing, means of access i.e.
brick framing, load platforms, scaffolds,
bearing concrete ladders, etc.
block wall.

5.2 Hazards on the use 5.2(a) Use standard PPE,


of hand tools and inspect tool conditions, do
portable power tools not use substandard
tools/equipment, and
Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

compliance to regulations.

5.3 Rebar cap hazards- 5.3(a) Install rebar caps on


piercing injuries. all protruding ends of
rebars.
6 ALL SITE 6.0 Exterior and Note: Same hazards of Note: Same control
LOCATIONS Interior Finishing: Activity 5.0 measures of Activity 5.0
roofing, flooring,
miscellaneous
7 Warehouse 7.0 HVAC: 7.1 Hazards on the use 7.1(a) Use standard PPE,
Buildings, Site Installation of of hand tools and inspect tool conditions, do
Office Buildings equipment, control portable power tools not use substandard
and Other panels, fixtures, tools/equipment, and
Buildings instruments, cabling compliance to regulations.
wiring, duct works, 7.2 Slips, trips, falls 7.2(a) Maintain high level
piping and tubing, of housekeeping.
insulation, etc. 7.2(b) Provide approved
means of access i.e.
platforms, scaffolds,
ladders, etc.

Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

8 ALL SITE 8.0 Electrical Works: 8.1 Electrical hazards, 8.1(a) Closer supervision
LOCATIONS Installation of power hazards on the use of by and coordination.
cable, main hand tools 8.1(b) Use complete PPE.
distribution panel, Work ladders to be in good
distribution panels, condition always.
lighting facilities, 8.1(c) Use GFCI’s for all
grounding, wiring, temporary lighting and
communication power tools as per SACSM.
system, etc. Note: 8.1(d) Regular safety
Excavation and inspection of power tools,
trenching shall be cables and equipment to
form part of the be documented; implement
electrical scope of color-coding system as
work. necessary.

8.2 Falls from heights; 8.2(a) Standard


SLIPS AND TRIPS precautions on elevated
works apply (As reflected
in Activity 11.0).
9 Camp and Site Pipe 9.0 Hydrotest of B/C 9.1 Exposure to 9.1(a) No unauthorized
Service Amenities Service Lines pressurized test crew in the vicinity.
medium, and failure of 9.1(b) Test crew to isolate
Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

components due to test area by installing


overpressure. barricade/sign.
9.1(c) Test crew to pre-
inspect gauges, fittings,
valves, and threads for
defects.
10 ALL LOCATIONS 10.0 Scaffolding B/C 10.1 Falls from 10.1(a) Engaged the
Erection, Use and heights, struck by services of SA certified
Dismantling falling objects; failure scaffold erectors.
of scaffold structure 10.1(b) Compliance to the
design and use
requirements of SA as per
SSH and relevant general
instructions.
10.1(c) Provide fall
prevention and protection
system.
10.1(d) Compliance to
scaffold tag system.

11 All Locations 11.0 Heavy A/B/C 11.1 Blind spots; 11.1(a) Impose traffic
Equipment and collision to stationary scheme by designating
Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

Mobile Equipment structure, other clear access routes,


Operations in moving equipment, entrances, exits.
association with personnel. 11.1(b) Provide standard
hauling/loading, traffic signs.
grading, road and 11.1(c) Provide flagman or
paving traffic man on approaches
to road mains to control
traffic leading to site
locations.
11.1(d) Provide equipment
spotter or whistle man on
heavy equipment
operations especially in
congested locations.
11.1(e) Ensure all heavy
mobile equipment
equipped with automatic
back-up alarm and roof
beacon lights.
12 12.0 Work at Heights 12.1 Personnel falls 12.1(a) Observe tie-off
on Temporary from higher to lower policy.
Platforms level; 12.1(b) Use of Full body
Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005
SUWAIDI INDUSTRIAL SERVICES, CO. LTD.
HAZARD IDENTIFICATION PLAN
Rabigh Development Project-Temporary Facilities Works

--------------------------------------------------------------------------------------------------------------------------------------------------------------
Class A Hazard: Those hazards that have a potential to cause death or permanent disability to people, permanent damage to
equipment or structure.
Class B Hazard: Those hazards that have a potential to cause serious injury or major downtime in the use of plant, equipment or
structure.
Class C Hazard: Those hazards that have a potential to cause minor injury or illness or minor damage to plant, equipment or
structure.

SN AREA/LOCATION WORK ACTIVITY CLASS POTENTIAL HAZARD CONTROL MEASURES

falling loose objects harness, shock absorbing


lanyards and lifelines must
comply with industry
standards.
12.1(c) Pre-task safety
instruction by the
supervisor.
12.1 (d) Secure small
objects in tool bags/cans
and provide toe board
protection on all sides.

Hazard Identification Plan Rabigh Development Project-Temporary Facilities Works JGC Arabia Limited Revision 00
September 2005