Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Yearly Maintenance Task List

1
Compressor & Dryer

Site : RIL, Hazira Rev: 1

Maintenance Checksheet SE02/12


Equipment Name: Date:
PTW No: Start Time:

Location: Closing Time:

Sr.No. Activity Status/Remark

Compressor
1 Check and clean the suction air filter.
2 Clean Pre filters
3 Check and clean the radiator
Check for oil leakage through connecting hoses and
4 tubes.
5 Check oil level in oil separator tank (>50%)
6 Check cooling fan motor base bolt tightness.
7 Check cooling fan impeller condition
8 Check for tightness of bolts in air end & motor end
9 Check and tighten the anti-vibration pad.
10 Check compressor all doors for proper locking
11 Check for cleanliness of compressor internal area.
12 Clean Scavenging line
Air Dryer
13 Check condition of pre & after filter of dryer
14 Check for any leakages in dryer
15 Clean the heat exchanger and dryer enclosure

Other Observations
1
2
3

Oil Consumption

Grease Consumption
Yearly Maintenance Task List
1
Compressor & Dryer

Site : RIL, Hazira Rev: 1

Maintenance Checksheet SE02/12

Manpower Details:
Engineer

Technician

Signature: Signature:
Checked by: Verified by:

You might also like