Currency: USD

Item Choice1 Choice2 Comments


Pictures

More pictures I took in


the factory can be
attached as a separate
document
Machine Rolling machine 60-200 Rolling machine 100-200 Section Perfil: C
type ( X*Y*Z)
Requirement:
200*50*15mm
X=60-200mm
Y=50-60mm
Z is according to the
width of the steel
sheet.
The choice 2 needs 45
days to make
60-200mm, and 30
days to make
100-200mm
Material 1-3mm 1.5-3mm
thickness
Motor 15kw 18.5kw With the requirements
power of the thickness 3mm,
the machine needs
higher power, the
choice two can provide
higher power to make
the production more
stable
Hydraulic 7.5kw 5.5kw There are some parts
power easy to be broken, we
can provide them, also
the oil needed for the
hydraulic motor,
usually need to be
replaced once a year (if
the machine needs to
work everyday)
usually after 8 hours
working, the oil need
to cool down a bit
Producing 10m/min (max 20m/min) 15-20m/min Usually its better to set
speed a bit slower speed and
not change the speed
often
Material of Cr12
the cutting
knife
Control PLC Mitsubishi PLC & transducer Choice 2 provide a
system better PLC which is a
good Japanese brand
Both choices use
touching screen, can
set the length of the
steel from the control,
Language: English,
Chinese
Voltage 380V 380V
Size The main part of the machine The main part contains 15 groups The total length of the
contains 11 groups The entire machine: choice 1 is longer than
Length: 6m L*H*W=10*0.8*1.5m 7.5m
Width: 1.5m Choice 2 can be
separate into 2 parts
Choice 1 can not be
separated
Weight 4t 7.5t
Container 40G (a big container) 24G(a small container) Because choice 2 can
for be separated into 2
internation parts, it can be shipped
al by a small container
shipment
Machine 22 000 25 000
cost
Shipment 5500 3500
cost
(including
the
shipment
in china
and from
china to
port Arica
Total cost 27 500 28 500

Certificate ISO12100 Choice 2 also has the


similar certificate
Time Producing time (10days) + Producing time (30days) + The time you can
shipment arrange (approx. shipment arrange (approx. 7days) receive the machine in
7days) + international shipment + international shipment (approx. the port ARICA since
(approx. 35 days) = 52 days 35 days) = 72 days your order the
machine
Warrant One year provide the spare parts One year provide the spare parts For this machine, it’s
for free for free not so expensive, the
If you need the supplier to send If you need the supplier to send ppl supplier don’t provide
ppl to repair the machine, you to repair the machine, you need to the last 3% of th
need to pay all the travel cost pay all the travel cost machine cost pay in
one year, but if the
client really need, we
can guarantee that to
let him pay us the last
3% in one year.
Payment The order: 12100 The order: 11000 Order the machine:
The rest pay in 5 days after the The rest pay in 20 days after the 30% of the machine
order: 15400 order: 175000 cost and the cost of the
shipment, when the
machine is ready, we
will go to run the
machine and check
everything, the rest
70% of the machine
cost need to be sent to
us one week before the
machine is ready
(there is delay for the
international money
transfer)