Saudi Aramco Oil Company: SECTION 05500 Miscellaneous Metals

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

Saudi Aramco 2616-ENG (3/99) 

OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

SECTION 05500
CERT

MISCELLANEOUS METALS
ENG’G

PART 1 - GENERAL

1.01 DESCRIPTION:
DESCRIPTION

Description of Work

Miscellaneous metal work includes items fabricated from iron and steel
shapes, ladder rung, Stair treads & nosing, Loose lintels, Counter and shelf
supports plates, Elevator hoist and separator beams , Wall opening frames ,
Dock edge angles , Bollards , Gratings , Trench covers ,bars, Strips, Tubes,
Pipe, Pipe clamps & supports, Castings and anchors in cast-in-place
concrete which are not a part of the structural steel or other metal systems in
DATE JOB/EWO

other sections of these Specifications, except as specified herein.

1.02 RELATED WORK SPECIFIED ELSEWHERE:


REV.
NO.

Formatted: Font color: Auto


A. Applicable Sections: Division 5.
DISCIPLINE B. Painting: Section 09900
ENGINEER C. Dock Bumpers: Section 11165
__ ________ _ D. Hydraulic Elevator: Section 14250
 DATE: ________
E. LEED Requirements: Section 01352 
Formatted: Font color: Auto
PROJECT
ENGINEER F. Construction Waste Management – Section 01524 Formatted: Font: Not Bold, Not
____________ Italic, Font color: Auto, Complex
DATE ______
1.03 REFERENCE CODES AND STANDARDS Script Font: Not Bold, Not Italic
CERTIFIED Formatted: Font color: Auto

_ __________
DATE: ________
Comply with the following in accordance with Division 1.
Formatted: Font: Not Bold, Complex
CONSTRUCTION Script Font: Bold
AGENCY A. American Institute of Steel Construction (AISC)
Formatted: Complex Script Font:
________________
DATE: _________
Specification for Structural Steel Buildings" Bold
OPERATIONS Formatted: Font: Not Bold, Complex
______________ B. American National Standards Institute/National Association of Script Font: Bold
DATE:_________
Architectural Metal Manufacturers (ANSI/NAAMM)
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

BG 531 Metal Bar Grating Manual


BG 532 Heavy Duty Metal Bar Grating Manual
Date:
By:

Formatted: Font: Not Bold, Complex


Script Font: Bold
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

1. American National Standards Institute/American Welding Society


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

(ANSI/AWS)
REVISION CERTIFICATION

1.1 Structural Welding Code, Steel


SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 1
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

2. American Society for Testing and Materials (ASTM)


CERT

A 36/A 36M Structural Steel


ENG’G

A 47 Ferritic Malleable Iron Castings


A 47M Ferritic Malleable Iron Castings
A 48 Gray Iron Castings
A 53 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated
DESCRIPTION

Welded and Seamless


A 123 Zinc (Hot-Dip Galvanized) Coatings on Iron and
Steel Products
A 153 Zinc Coating (Hot-Dip) on Iron and Steel
Hardware
A 167 Stainless and Heat-Resisting Chromium-Nickel
DATE JOB/EWO

Steel Plate, Sheet, and Strip


A 269 Seamless and Welded Austenitic Stainless Steel
Tubing for General Service
REV.
NO.

A 276 Stainless and Heat-Resisting Steel Bars and


DISCIPLINE
ENGINEER Shapes
__ ________ _ A 366/A 366M Steel, Carbon, Cold-Rolled Sheet, Commercial
 DATE: ________
Quality 
PROJECT
ENGINEER
A 446/A 446M Steel Sheet, Zinc-Coated (Galvanized) Hot-Dip
____________
DATE ______ Process, Structural (Physical) Quality
CERTIFIED A 483 Silicomanganese
_ __________ A 500 Cold-Formed Welded and Seamless Carbon
DATE: ________
Steel Structural Tubing in Rounds and Shapes
CONSTRUCTION
AGENCY A 501 Hot-Formed Welded and Seamless Carbon Steel
________________ Structural Tubing
DATE: _________

OPERATIONS
A 526/A 526M Steel Sheet, Zinc-Coated (Galvanized) by the
______________
Hot-Dip Process, Commercial Quality
DATE:_________
A 569/A 569M Steel, Carbon (0.15 Maximum, Percent), Hot-
Rolled Sheet and Strip, Commercial Quality
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

A 570/A 570M Hot-Rolled Carbon Steel Sheet and Strip,


Structural Quality
Date:
By:

A 575 Steel Bars, Carbon, Merchant Quality, M-Grades


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

B 117 Salt Spray (Fog) Testing


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

B 209 Aluminum and Aluminum-Alloy Sheet and Plate


B 209M Aluminum and Aluminum-Alloy Sheet and Plate
SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 2
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

B 210 Aluminum-Alloy Drawn Seamless Tubes


CERT

B 210M Aluminum-Alloy Drawn Seamless Tubes


B 211 Aluminum-Alloy Bars, Rods, and Wire
ENG’G

B 211M Aluminum-Alloy Bars, Rods, and Wire


B 221 Aluminum-Alloy Extruded Bars, Rods, Wires,
Shapes and Tubes
B 221M Aluminum-Alloy Extruded Bars, Rods, Wires,
DESCRIPTION

Shapes and Tubes


B 308/B 308M Aluminum-Alloy 6061-T6 Standard Structural
Shapes, Rolled or Extruded
B 429 Aluminum-Alloy Extruded Structural Pipe and
Tube
B 483 Aluminum and Aluminum-Alloy Drawn Tubes for
DATE JOB/EWO

General Purpose Applications


B 483M Aluminum and Aluminum-Alloy Drawn Tubes for
General Purpose Applications
REV.
NO.

D 822 Practice for Conducting Tests on Paint and


Related Coatings and Materials using Filtered
DISCIPLINE Open-Flame Carbon-Arc Light and Water
ENGINEER
Exposure Apparatus
__ ________ _
 DATE: ________ 
PROJECT
ENGINEER
3. Industrial Fasteners Institute (IFI)
____________
DATE ______

CERTIFIED
"Fasteners Standards Book"

_ __________
DATE: ________
4. Steel Structures Painting Council (SSPC)
CONSTRUCTION
AGENCY

________________
Painting Manual, Volume 1, Good Painting Practices
DATE: _________
Painting Manual, Volume 2, Systems and Specifications
OPERATIONS
______________
DATE:_________ 5. Saudi Aramco Standards
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

AE-036 092 SHT 2 Man-Vertical Ladders Details for Tanks –


EDSD

Metric
Date:
By:

DE-95 0101 SHT 1 Safety Guards for Ladders, Assembly and


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

Details
REVISION CERTIFICATION

SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 3
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

6. Saudi Aramco Material Systems Specifications


CERT

12-SAMSS-007 Fabrication of Structural Steel and


ENG’G

Miscellaneous Metal
1.04 QUALITY ASSURANCE:

A. Qualifications for Welding Work: Qualify welding processes and


welding operators in accordance with AWS D1.1 - "Standard
DESCRIPTION

Qualification Procedure". All welding operators shall be SAUDI


ARAMCO certified Welders.
Formatted: Font color: Auto

B. Patent Rights: Provide trade-named material where specified. Do not


build facsimile thereof which might infringe upon patent rights.
DATE JOB/EWO

1.05 SUBMITTALS:

A. Submit per the requirements of Contract Documents.

B. Calculations: Submit design calculations for connections and


REV.
NO.

members not Shown, in conformance with specified design intent and


DISCIPLINE criteria. Account for Connection eccentricities. Calculations shall be
ENGINEER
sealed by and performed by, Or Under the direct supervision of a
__ ________ _
licensed Professional Structural Engineer
 DATE: ________ 
PROJECT
ENGINEER C. Manufacturer's Data: Submit copies of manufacturer's specifications,
____________ load tables, dimension diagrams, anchor details and installation
DATE ______
instructions for products to be used in fabrication of miscellaneous
CERTIFIED
metal work, including paint products.
_ __________
DATE: ________ D. Shop Drawings: Submit shop drawings for fabrication and erection of
CONSTRUCTION all assemblies of miscellaneous metal work. Include in metric
AGENCY
dimensions, plans and elevations and include details of sections and
________________
DATE: _________
connections. Show extent of welds, in addition to materials to be
used and surface finishes. Show anchorage and accessory items.
OPERATIONS
Furnish templates and setting diagrams for anchor installation as
______________
DATE:_________ required.
Formatted: Font color: Auto
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER

E. LEED Submittals:
VERIFICATION
EDSD

1. Product Data for Credit MR 4.1 and Credit MR 4.2: For products
Date:

having recycled content, documentation indicating percentages


By:

by weight of postconsumer and preconsumer recycled content.


Include statement indicating costs for each product having
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

recycled content.
REVISION CERTIFICATION

SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 4
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

2. Product Data for Credit EQ 4.1 and 4.2: For Sealants and Formatted: Font: Not Bold, Font
Adhesives and Paintings and Coatings used at Project site, color: Auto, Complex Script Font:
CERT

Bold
including printed statement of VOC content. Formatted: Font color: Auto,
Complex Script Font: Bold
ENG’G

3. Product Data for Credit Credit MR 5.2: For products regionally Formatted: Font: Not Bold, Not
(500 miles or 800 km) extracted, processed & manufactured, Italic, Font color: Auto, Complex
Script Font: Not Italic
documentation indicating 1) cost of each regional material or
product; 2) location of point of raw material extraction and Formatted: Indent: Before: 0.6",
Hanging: 1.4"
distance from the project site; and 3) location of material or
DESCRIPTION

product manufacturer and the distance from the project site. Formatted: Font color: Auto,
Complex Script Font: Bold
Include manufacturer's document verifying the location and
distance of the raw material extraction and manufacturer. Formatted: Font: Not Bold, Not
Italic, Font color: Auto, Complex
Script Font: Not Italic
Formatted: Font color: Auto,
Complex Script Font: Bold
Formatted: Font: Bold, Italic, Font
PART 2 - PRODUCTS color: Auto, Complex Script Font:
DATE JOB/EWO

Bold, Italic
2.01 MANUFACTURERS:

A. Saudi Steel Products Factory.


REV.
NO.

B. Arabian metal Products Organization.


DISCIPLINE
ENGINEER

__ ________ _
C. Baghlaf Alzafer Factory.
 DATE: ________ 
PROJECT D. Haitham Enterprise Mech. Division.
ENGINEER

____________
DATE ______
E. Frimida anchors.
CERTIFIED
F. Abahsain - Cope S. A. Ltd.
_ __________
DATE: ________
2.02 MATERIALS:
CONSTRUCTION
AGENCY
2.02.1 STEEL:
________________
DATE: _________

OPERATIONS A. Rolled Steel Plates, Shapes and Bars: ASTM A36.


______________ B. Pipe, galvanized, seamless or welded, standard weight,for ordinary Formatted: Font color: Auto
DATE:_________
uses: ASTM A 53.
C. Structural Steel Tubing: ASTM A500, Grade B or C.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

Formatted: Font color: Auto


D. Sheet:Cold-rolled carbon steel, commercial quality, ASTM A 366M.
Date:
By:

1. Hot-rolled carbon steel sheet and strip, structural quality, ASTM


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

A 570M.
REVISION CERTIFICATION

2. Hot-rolled carbon steel sheets and strip, commercial quality,


ASTM A 569M.
SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 5
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

3. Zinc-coated carbon steel sheets of commercial quality, ASTM A


CERT

526M.
ENG’G

4. Zinc-coated carbon steel sheets of structural quality, ASTM A


446M.
2.02.2 ALUMINUM:

Formatted: Font color: Auto


DESCRIPTION

A. Sheet and Plate: ASTM B 209M.


B. Tubular Shapes: ASTM B 210M, B 221M, B 483M as best suited for
each application.

C. Bars, Rods, Wires and Shapes: ASTM B 211M or B 221M as best


suited for each application.
DATE JOB/EWO

D. Structural Shapes: ASTM B 308M and B 429 as applicable to the Work.


REV.
NO.

2.02.3 STAINLESS STEEL:


DISCIPLINE
ENGINEER Formatted: Font color: Auto
Type 302 or 304, ASTM A 276, A l67, or A 269 as applicable to the Work.
__ ________ _
 DATE: ________ 
PROJECT 2.02.4 Anchors and Fasteners
ENGINEER

____________
DATE ______ 1. Anchor Bolts: ASTM A307.
CERTIFIED
2. Threaded Fasteners: ASTM A307, Grade A machine bolts, hexagon
_ __________ head type.
DATE: ________

CONSTRUCTION
AGENCY
3. Plain Washers: Round, general assembly grade carbon steel,
________________
galvanized.
DATE: _________

OPERATIONS 4. Lock Washers: Helical spring type carbon steel, galvanized.


______________
DATE:_________
5. Concrete Anchors: Expansion shields.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

6. Toggle Bolts: Galvanized.


EDSD

2.02.5 Metal Primer Paint:


Date:
By:

Hemple Hempalin No. 1205 or approved equal. Primer paint selected must
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

be compatible with the required finish coats of paint. Coordinate selection of


REVISION CERTIFICATION

metal primer with finish paint requirements specified in Section 09900 of


these specifications.
SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 6
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

2.02.6 Galvanizing Repair Paint:


CERT

High zinc dust content paint, "Galv-Weld" or an approved equal


ENG’G

2.02.7 Ferrous Metals Formatted: Font color: Auto

Recycled Content of Steel Products: Provide products with an average


recycled content of steel products so postconsumer recycled content plus one-
DESCRIPTION

half of preconsumer recycled content is not less than 60 percent.


2.03 FABRICATION, GENERAL:

A. Workmanship:

1. Use materials of size and thickness shown, or if not shown, of


required size and thickness to produce adequate strength and
durability in finished product for intended use. Work from
DATE JOB/EWO

dimensions shown or accepted on shop drawings, using


proven details of fabrication and support. Use type of
materials shown or specified for various components of work.
REV.
NO.

2. Form work true to line and level with accurate angles and
surfaces and straight sharp edges. Form bent metal corners
DISCIPLINE
ENGINEER to smallest radius possible without causing gain or separation
__ ________ _
or otherwise impairing the work.
 DATE: ________ 
PROJECT 3. Weld corners and seams continuously and in accordance with
ENGINEER
recommendations of AWS D1.1 and 12-SAMSS-007. Grind
____________
DATE ______ exposed welds smooth and flush, to match and blend with
CERTIFIED
adjoining surfaces.

_ __________ 4. Provide for anchorage of type shown coordinated with


DATE: ________
structure. Fabricate and space anchoring devices as shown
CONSTRUCTION and as required to provide adequate support for intended use
AGENCY
of work.
________________
DATE: _________

OPERATIONS 5. Cut, reinforce, drill and tap miscellaneous metal work as may
______________
be required to receive finish hardware and similar items of
DATE:_________ work.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

6. Connections: All connections shall be welded, unless


EDSD

otherwise shown on Drawings or specified herein.


Date:
By:

B. Inserts and Achorages


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

1. Furnish inserts and anchoring devices which must be set in


concrete or built into masonry for installation of work. Provide
REVISION CERTIFICATION

setting drawings, templates, instructions and directions of


SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 7
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

installation of anchorage devices. Coordinate with other works


to avoid delay.
CERT

2. See concrete and masonry sections of these Specifications for


ENG’G

installation of inserts and anchorage devices.

3. Inserts and anchorages should be coated in accordance with


SAES-Q-001 sections 6.3 & 6.4.
DESCRIPTION

4. Pre-assemble items in shop to the greatest extent possible, so


as to minimize field splicing and assembly of units at project
site. Disassemble units only to extent necessary for shipping
and handling limitations. Clearly mark units for reassembling
and coordinated installation.

C. Galvanizing: Provide a zinc coating for those items shown on the


Drawings or specified to be galvanized using the hot-dip process after
DATE JOB/EWO

fabrication.

1. Comply with ASTM A153 for galvanizing of iron and steel


hardware.
REV.
NO.

2. Comply with ASTM A123 for galvanizing of rolled, pressed and


DISCIPLINE
ENGINEER forged steel shapes, plates, bars and strip 1/8" thick and
__ ________ _
heavier.
 DATE: ________ 
PROJECT 3. Comply with ASTM A386 for galvanizing of assembled steel
ENGINEER
products.
____________
DATE ______

CERTIFIED
D. Shop Painting:

_ __________ 1. Shop paint all miscellaneous metal work except those


DATE: ________
members or portions of members to be embedded in concrete
CONSTRUCTION
AGENCY
or masonry, surfaces and edges to be field welded and
________________
galvanized surfaces, unless otherwise specified.
DATE: _________

OPERATIONS 2. Remove scale, rust and other deleterious materials before the
______________ shop coat of paint is applied. Clean off heavy rust and loose
DATE:_________
mill scale off using "Blast Cleaning". Remove oil, grease and
similar contaminants using "Solvent Cleaning".
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

3. Apply one shop coat of zinc rich metal primer paint to


fabricated metal items, except apply 2 coats of paint to
Date:
By:

surfaces which are inaccessible after assembly or erection.


Change color of second coat to distinguish it from the first.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

4. Immediately after surface preparation, brush or spray metal


primer paint, applied in accordance with the manufacturer's
SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 8
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

instructions and at a rate to provide a uniform dry film


thickness of 2.0 mils for each coat. Use painting methods
CERT

which will result in full coverage of joints, corners, edges and


all exposed surfaces.
ENG’G

All painting & coating shall conform to SAES-H-001 & SAES-H-101.

Formatted: Font color: Auto


E. Interior Sealants: VOC Content: Not more than 250 g/L when
DESCRIPTION

calculated according to 40 CFR 59, Subpart D (EPA Method 24).

F. All paintings and Coatings, Adhesives and Sealants shall be


compliant with Section 01352 – LEED Requirements.

2.04 MISCELLANEOUS METAL ITEMS:


DATE JOB/EWO

A. Carpenter's Iron Work:

1. Furnish bent or otherwise custom fabricate bolts, plates,


REV.
NO.

anchors, hangers, dowels and other miscellaneous steels and


iron shapes as required for framing and supporting woodwork
DISCIPLINE
ENGINEER and for anchoring or securing to concrete or other structures.
__ ________ _
 DATE: ________ 2. Manufacture or fabricate items of sizes, shapes and 
PROJECT dimensions required. Furnish malleable iron washers for
ENGINEER
heads and nuts which bear on wood structural connections;
____________
DATE ______ elsewhere furnish steel washers.
CERTIFIED
B. Miscellaneous Framing and Supports:
_ __________
DATE: ________
1. Provide miscellaneous steel framing and supports which are
CONSTRUCTION not a part of structural steel framework as required to complete
AGENCY
work.
________________
DATE: _________

OPERATIONS 2. Fabricate miscellaneous units to sizes, shapes and profiles


______________
shown or, if not shown, of required dimensions to receive
DATE:_________ adjacent work to be retained by the framing. Except as
otherwise shown, fabricate from structural steel, plates and
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

steel bars all welded construction using mitered corners,


EDSD

welded brackets and splice plates and a minimum number of


joints for field connection.
Date:
By:

Cut, drill and tap units to receive hardware and similar items to
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

be anchored to work.
REVISION CERTIFICATION

C. Pipe Supports:
SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 9
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

Provide Saudi Superstrut or approved equal wall/ceiling mounted pipe


support system with the specified and approved anchorages/inserts in
CERT

the walls and ceiling.


Formatted: Font color: Auto
ENG’G

D. Overhead Supports:

1. Overhead supports, above suspended ceilings, and exposed to


view if suspended ceilings do not occur, shall be structural steel
DESCRIPTION

shapes which are suited to the Work to be supported, including


anchorage and bracing to building structure, and slotted holes
properly spaced to receive the anchoring devices of the Work to
be supported.

To the extent required by the Project, provide overhead supports


for:
DATE JOB/EWO

a. Ceiling-hung pilasters of toilet compartments.

b. Exhaust hoods.
REV.
NO.

c. Ceiling-hung equipment.
DISCIPLINE
ENGINEER
d. Monorail.
__ ________ _
 DATE: ________ 
PROJECT e. Other Work indicated on Drawings as requiring overhead
ENGINEER
supports.
____________
DATE ______

CERTIFIED Coordinate overhead supports with Trades which require them.

_ __________ Formatted: Font color: Auto


DATE: ________ E. Elevator (Lift) Shaftways:
CONSTRUCTION
AGENCY Structural steel beams and angles for hoist beams and sill angles.
________________
Except as otherwise required by the Elevator (Lift) Supplier, provide:
DATE: _________

OPERATIONS 1. Hoist beam, not smaller than W 8 by 18.


______________
DATE:_________
2. Separator beams, at hoistways housing two (2) or more
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER

elevators, not smaller than W 8 by 18.


VERIFICATION
EDSD

3. Sill angles: 125 mm by 125 mm by 10 mm.


Date:

Formatted: Font color: Auto


By:

G. Dock Edge Angles:


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Structural steel, with anchors welded at maximum 450 mm on centers


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

for embedment into concrete. Miter and weld corners.


REVISION CERTIFICATION

SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 10
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

Miscellaneous Framing at Roof Openings: Where required, whether or Formatted: Font color: Auto
not shown, provide framing and coordinate with related Trades whose
CERT

Work will be supported by such framing.


ENG’G

Formatted: Font color: Auto


H. Steel Ladders:

1. Steel ladders shall have 50 mm by 10 mm flat bar stringers


spaced 400 mm inside dimension, 20 mm round bar rungs
spaced equivalent distant at maximum of 300 mm on centers.
DESCRIPTION

Set and weld into drilled holes in strings.

a. Provide non-slip top surface on each rung, by coating the


rungs with aluminum oxide granules set in epoxy resin
adhesive, or by using manufactured rungs filled with
aluminum oxide grout.
DATE JOB/EWO

2. Set ladders 175 mm minimum clear from centerline of rungs to


wall. Anchor ladders to wall with 50 mm by 10 mm flat bar
brackets at top and bottom of strings, and 3000 mm on centers
maximum for intermediate brackets. Weld brackets to strings.
REV.
NO.

Anchor brackets to wall. Keep ladders 50 mm clear of floor.


DISCIPLINE
ENGINEER 3. Ladders exceeding 6000 mm in height shall have steel cages
__ ________ _ 675 mm deep and 690 mm wide, extending 1050 mm above
 DATE: ________
top of ladder, and from a point 2100 mm minimum and 2400 mm 
PROJECT
ENGINEER
maximum above base of ladder. Include other requirements of
____________
governing law.
DATE ______

CERTIFIED 4. Extend ladder stringers 1050 mm beyond top of parapet or


platform landing where no other handhold is provided.
_ __________
DATE: ________ Formatted: Font color: Auto
I. Stair Nosings:
CONSTRUCTION
AGENCY Except where rubber or other nosing types are detailed, provide stair
________________ nosings on each stair tread and platform and landing edges. Submit
DATE: _________
Samples of each type nosing for approval.
OPERATIONS
Formatted: Font: Not Bold, Complex
______________ Script Font: Times New Roman, Not
DATE:_________
Bold
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER

Formatted: Normal
VERIFICATION
EDSD

Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 11
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

1 Nosings shall be extruded aluminum 75 mm wide, 6 mm thick,


with five (5) abrasive-filled ribs in color selected, equivalent to
CERT

Type 231-BF as manufactured by Wooster Products, Inc.


Equivalent products of American Abrasive Metals Company are
ENG’G

acceptable.

2. Stair nosings shall have continuous anchors for positive


anchorage to concrete, similar to "Sure-Hold" Anchor by
Wooster Products, Inc.
DESCRIPTION

3. Terminate nosings not more than 100 mm from ends of steps for
poured concrete stairs; for concrete-filled steel pan stairs,
nosings shall be full length of steps less 3 mm clearance.
Formatted: Normal, No bullets or
numbering
4. Protect exposed surfaces of stair nosings with tape; remove
DATE JOB/EWO

tape when nosings have been installed. Draw-up bolts tight and
flush.
Formatted: Font color: Auto
J. Gratings:
REV.
NO.

1. Provide gratings of galvanized steel and aluminum construction


DISCIPLINE
as shown, including sub-support members. Steel gratings shall
ENGINEER comply with NAAMM MBG 532. Aluminum gratings shall comply
__ ________ _ with NAAMM MBG 531.
 DATE: ________ 
PROJECT
ENGINEER 2. Basis of pedestrian loading shall be greater than minimum
____________ recommendations of manufacturer's load tables, based on unit
DATE ______
stresses of 124 MPa for steel and 83 MPa for 606l-T6 aluminum
CERTIFIED alloy, respectively, as applicable, and shall meet the following
criteria:
_ __________
DATE: ________

CONSTRUCTION a. A uniform load (w) of 10 kPa of grating;


AGENCY

________________
DATE: _________ b. A concentrated load of 20 kPa at mid-span producing a
OPERATIONS
maximum fiber stress not greater than that produced by the
______________
uniform load; and
DATE:_________

c. A deflection of less than 6 mm


APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

d. Simple Span.
Date:
By:

Formatted: Font color: Auto


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 12
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

K. Bollards:
CERT

Galvanized steel pipe of diameter as indicated on Drawings, 10 mm


minimum wall thickness, unless otherwise indicated. Install bollards in
ENG’G

concrete footing as indicated on Drawings; fill pipe with concrete and


crown off at top to 25 mm above top of pipe.

PART 3 - EXECUTION
DESCRIPTION

3.01 INSTALLATION:

A. Anchorages: Furnish setting drawings, diagrams, templates,


instructions and directions for installations of anchorages, such as
concrete inserts, spread anchors, anchor bolts and miscellaneous
items having integral anchors, which are to be embedded in concrete
construction. Any ferrous metal inserts which will be partially
embedded in concrete shall receive a coat of zinc-chromate primer
DATE JOB/EWO

prior to placing in concrete. Coordinate delivery of such items to


project site.

B. Fastening to In-Place Construction: Provide anchorage devices and


REV.
NO.

fasteners where necessary for securing miscellaneous metal items to


in-place construction; including, threaded fasteners for concrete,
DISCIPLINE
ENGINEER toggle bolts, through-bolts and other connectors as required.
__ ________ _
 DATE: ________ C. Cutting, Fitting and Placement: Perform cutting, drilling and fitting 
PROJECT required for installation of miscellaneous metal items. Set work
ENGINEER
accurately in location, alignment and elevation. Plumb, level true and
____________
DATE ______ measure from established line levels. Provide temporary bracings for
CERTIFIED
anchors in form work for items which are to be built into concrete,
masonry or similar construction.
_ __________
DATE: ________
D. Connections: Fit exposed connections accurately together to form
CONSTRUCTION tight hairline joints. Weld connections which are not to be left as
AGENCY
exposed joints, but cannot be shop welded because of shipping size
________________
DATE: _________ limitations. Grind joints smooth and touch-up shop coat. Do not weld,
OPERATIONS cut or abrade surfaces of units which are galvanized and intended for
______________
bolted or screwed field connections.
DATE:_________

E. Field Welding: Comply with AWS Code for procedures of manual


APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

shielded metallic welding, appearance and quality of welds made and


EDSD

methods used in correcting welding work.


Date:

3.02 FIELD PAINTING:


By:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

Immediately after erection, clean field welds, bolted connections and abraded
areas of shop paint. Wire brush and sand as necessary to obtained a smooth
REVISION CERTIFICATION

surface. Apply paint by brush or spray to provide a minimum dry film


SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 13
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

thickness of 2.0 mils. Touch-up abraded areas in galvanized surfaces with


Galv-Weld or approved equal galvanizing repair paint.
CERT
ENG’G

END OF SECTION
DESCRIPTION
DATE JOB/EWO
REV.
NO.

DISCIPLINE
ENGINEER

__ ________ _
 DATE: ________ 
PROJECT
ENGINEER

____________
DATE ______

CERTIFIED

_ __________
DATE: ________

CONSTRUCTION
AGENCY

________________
DATE: _________

OPERATIONS
______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

SECTION 05500

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 14
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 141
15-May-1017-Dec-0914-Dec-09  413

You might also like