The document outlines the various costs associated with operating an incinerator, including fixed costs of over RM 102 million for land, equipment, and construction; collection costs of RM 140,000 per truck; fuel costs per liter of diesel and gallon of propane or per MMBtu of natural gas; operational costs of RM 35.50 per kW of electricity and RM 1.2 million annually for chemicals; maintenance costs of RM 50,000 for offices and RM 1.5 million for equipment annually; and labor costs of RM 10,000, RM 7,000, RM 2,000, and RM 1,800 per month for managers, engineers, technicians, and non-technical staff respectively.
The document outlines the various costs associated with operating an incinerator, including fixed costs of over RM 102 million for land, equipment, and construction; collection costs of RM 140,000 per truck; fuel costs per liter of diesel and gallon of propane or per MMBtu of natural gas; operational costs of RM 35.50 per kW of electricity and RM 1.2 million annually for chemicals; maintenance costs of RM 50,000 for offices and RM 1.5 million for equipment annually; and labor costs of RM 10,000, RM 7,000, RM 2,000, and RM 1,800 per month for managers, engineers, technicians, and non-technical staff respectively.
The document outlines the various costs associated with operating an incinerator, including fixed costs of over RM 102 million for land, equipment, and construction; collection costs of RM 140,000 per truck; fuel costs per liter of diesel and gallon of propane or per MMBtu of natural gas; operational costs of RM 35.50 per kW of electricity and RM 1.2 million annually for chemicals; maintenance costs of RM 50,000 for offices and RM 1.5 million for equipment annually; and labor costs of RM 10,000, RM 7,000, RM 2,000, and RM 1,800 per month for managers, engineers, technicians, and non-technical staff respectively.