TASK

task_code status_code wbs_id task_name


Activity ID Activity Status WBS Code Activity Name
A5190 Not Started Schedule-2.23.2.4 MTO Material Pondasi Tangki
A5200 Not Started Schedule-2.23.2.4 MTO Material Pondasi Shelter
A5250 Not Started Schedule-2.23.2.4 TBE for Material Pondasi Tangk
A5260 Not Started Schedule-2.23.2.4 TBE for Material Pondasi Shel
A2370 Not Started Schedule-2.23.4.1 Specification for Tank
A2380 Not Started Schedule-2.23.4.1 Specification for Tank Appuer
A2390 Not Started Schedule-2.23.4.1 Specification for Recovery Ves
A2680 Not Started Schedule-2.23.4.3 Drawing Layout Tangki
A4450 Not Started Schedule-2.23.3.4 MTO for Piping Material
A4630 Not Started Schedule-2.23.3.4 TBEof Piping Material
A4540 Not Started Schedule-2.23.3.4 MR for Piping Material
A2100 Not Started Schedule-2.23.3.1 Piping Design Basis
A2120 Not Started Schedule-2.23.3.1 Piping Material Specification
A2150 Not Started Schedule-2.23.3.2 Piping strees analysis
A4900 Not Started Schedule-2.23.5.4 MTO for MV switch gear
A4910 Not Started Schedule-2.23.5.4 MTO for LV switchgear MCC
A4920 Not Started Schedule-2.23.5.4 MTO for power transformer
A4970 Not Started Schedule-2.23.5.4 MR for MV switch gear
A4980 Not Started Schedule-2.23.5.4 MR for LV switchgear MCC
A4990 Not Started Schedule-2.23.5.4 MR for power transformer
A5040 Not Started Schedule-2.23.5.4 MV switch gear - TBE
A5050 Not Started Schedule-2.23.5.4 LV switchgear MCC - TBE
A5060 Not Started Schedule-2.23.5.4 power transformer - TBE
A2700 Not Started Schedule-2.23.5.1 Specification for MV Switchge
A2710 Not Started Schedule-2.23.5.1 Specification for LV Switchboa
A2720 Not Started Schedule-2.23.5.1 Specification for power transf
A2730 Not Started Schedule-2.23.5.1 Specification for LV Induction
A2740 Not Started Schedule-2.23.5.1 Specification for Uninteruptib
A2750 Not Started Schedule-2.23.5.1 Specification for VDC UPS
A2760 Not Started Schedule-2.23.5.1 Specification forElectrical cab
A2770 Not Started Schedule-2.23.5.1 Specification for electrical cab
A2780 Not Started Schedule-2.23.5.1 Specification for Lighting & a
A2790 Not Started Schedule-2.23.5.1 Specification for cathodic prot
A2800 Not Started Schedule-2.23.5.1 Specification for electrical e
A2810 Not Started Schedule-2.23.5.1 Specification for electrical co
A2690 Not Started Schedule-2.23.5.1 Electrical Single Line Diagram
A2850 Not Started Schedule-2.23.5.2 Electrical Material & System
A2880 Not Started Schedule-2.23.5.2 MV Switchgear
A2890 Not Started Schedule-2.23.5.2 LV switchgear MCC
A2900 Not Started Schedule-2.23.5.2 Power transformer
A2950 Not Started Schedule-2.23.5.3 Overall Single Line Diagram
A3780 Not Started Schedule-2.23.6.4 MTO for Field instrument mate
A3790 Not Started Schedule-2.23.6.4 MTO for Instrument bulk mater
A5150 Not Started Schedule-2.23.6.4 MR for Mov DBB
A5160 Not Started Schedule-2.23.6.4 MR for Tank Gauge Transmiter
A5110 Not Started Schedule-2.23.6.4 MR for Fire & gas detector
A5120 Not Started Schedule-2.23.6.4 MR for Motor operated valve
A6850 Not Started Schedule-2.23.6.4 TBE for fire & Gas detector

Page 1
TASK

A6860 Not Started Schedule-2.23.6.4 TBE for Motor operated valve


A6870 Not Started Schedule-2.23.6.4 TBE for Mov DBB
A6880 Not Started Schedule-2.23.6.4 TBE for Tank Gauge Transmite
A3200 Not Started Schedule-2.23.6.1 Instrumen Design Basis
A3210 Not Started Schedule-2.23.6.1 General Instrument specificat
A3220 Not Started Schedule-2.23.6.1 distributed control system spe
A3340 Not Started Schedule-2.23.6.2 Control valve
A3350 Not Started Schedule-2.23.6.2 Presure relief valve
A3360 Not Started Schedule-2.23.6.2 Safety & relief valve
A3370 Not Started Schedule-2.23.6.2 Fire & gas detector
A3380 Not Started Schedule-2.23.6.2 Motor Operated valve
A3390 Not Started Schedule-2.23.6.2 MOV DBB
A3400 Not Started Schedule-2.23.6.2 Overall instrument datasheet
A3600 Not Started Schedule-2.23.6.3 Overall instrumentation diag
A3610 Not Started Schedule-2.23.6.3 Overall control system & safe
A1100 Not Started Schedule-2.23.1 Process Design Basis verificat
A1110 Not Started Schedule-2.23.1 Proses Safety Design Basis ver
A1120 Not Started Schedule-2.23.1 Civil Design Basis verification
A1130 Not Started Schedule-2.23.1 Piping Design Basis verificatio
A1140 Not Started Schedule-2.23.1 Mechanical Design Basis verifi
A1150 Not Started Schedule-2.23.1 Elektrikal Design Basis verific
A1160 Not Started Schedule-2.23.1 Instrument Design Basis verifi
A5290 Not Started Schedule-2.4.1.1 TBE/CBT
A5300 Not Started Schedule-2.4.1.1 PO Issued
A5310 Not Started Schedule-2.4.1.1 Manufacturing
A5320 Not Started Schedule-2.4.1.1 Delivery material to site
A5280 Not Started Schedule-2.4.1.1 Tender
A5330 Not Started Schedule-2.4.1.2 Tender
A5340 Not Started Schedule-2.4.1.2 TBE/CBT
A5350 Not Started Schedule-2.4.1.2 PO Issued
A5360 Not Started Schedule-2.4.1.2 Manufacturing
A5370 Not Started Schedule-2.4.1.2 Delivery material to site
A8530 Not Started Schedule-2.4.2.1 Tender
A8540 Not Started Schedule-2.4.2.1 TBE/CBT
A8550 Not Started Schedule-2.4.2.1 PO Issued
A8560 Not Started Schedule-2.4.2.1 Manufacturing
A8570 Not Started Schedule-2.4.2.1 Delivery material to site
A6010 Not Started Schedule-2.4.2.3 Tender
A6020 Not Started Schedule-2.4.2.3 TBE/CBT
A6030 Not Started Schedule-2.4.2.3 PO Issued
A6040 Not Started Schedule-2.4.2.3 Manufacturing
A6050 Not Started Schedule-2.4.2.3 Delivery material to site
A8580 Not Started Schedule-2.4.2.2 Tender
A8590 Not Started Schedule-2.4.2.2 TBE/CBT
A8600 Not Started Schedule-2.4.2.2 PO Issued
A8610 Not Started Schedule-2.4.2.2 Manufacturing
A8620 Not Started Schedule-2.4.2.2 Delivery material to site
A6310 Not Started Schedule-2.4.4.1 Tender
A6320 Not Started Schedule-2.4.4.1 TBE/CBT
A6330 Not Started Schedule-2.4.4.1 PO Issued

Page 2
TASK

A6340 Not Started Schedule-2.4.4.1 Manufacturing


A6350 Not Started Schedule-2.4.4.1 Delivery material to site
A6360 Not Started Schedule-2.4.4.2 Tender
A6370 Not Started Schedule-2.4.4.2 TBE/CBT
A6380 Not Started Schedule-2.4.4.2 PO Issued
A6390 Not Started Schedule-2.4.4.2 Manufacturing
A6400 Not Started Schedule-2.4.4.2 Delivery material to site
A6410 Not Started Schedule-2.4.4.3 Tender
A6420 Not Started Schedule-2.4.4.3 TBE/CBT
A6430 Not Started Schedule-2.4.4.3 PO Issued
A6440 Not Started Schedule-2.4.4.3 Manufacturing
A6450 Not Started Schedule-2.4.4.3 Delivery material to site
A7200 Not Started Schedule-2.4.5.3 Tender
A7210 Not Started Schedule-2.4.5.3 TBE/CBT
A7220 Not Started Schedule-2.4.5.3 PO Issued
A7230 Not Started Schedule-2.4.5.3 Manufacturing
A7240 Not Started Schedule-2.4.5.3 Delivery material to site
A7100 Not Started Schedule-2.4.5.1 Tender
A7110 Not Started Schedule-2.4.5.1 TBE/CBT
A7120 Not Started Schedule-2.4.5.1 PO Issued
A7130 Not Started Schedule-2.4.5.1 Manufacturing
A7140 Not Started Schedule-2.4.5.1 Delivery material to site
A7160 Not Started Schedule-2.4.5.2 TBE/CBT
A7150 Not Started Schedule-2.4.5.2 Tender
A7170 Not Started Schedule-2.4.5.2 PO Issued
A7180 Not Started Schedule-2.4.5.2 Manufacturing
A7190 Not Started Schedule-2.4.5.2 Delivery material to site
A7250 Not Started Schedule-2.4.5.4 Tender
A7260 Not Started Schedule-2.4.5.4 TBE/CBT
A7270 Not Started Schedule-2.4.5.4 PO Issued
A7280 Not Started Schedule-2.4.5.4 Manufacturing
A7290 Not Started Schedule-2.4.5.4 Delivery material to site
A1010 Not Started Schedule-2.2 Survei Lapangan
A1020 Not Started Schedule-2.2 Ijin Gangguan
A1030 Not Started Schedule-2.2 Ijin Keamanan
A1040 Not Started Schedule-2.5.1.1 Mobilisasi Material, alat kerja
A1050 Not Started Schedule-2.5.1.1 Penyiapan air kerja,listrik da
A1070 Not Started Schedule-2.5.1.1 Penyiapan akses jalan
A1080 Not Started Schedule-2.5.1.1 Persiapan Kelengkapan Safety
A1090 Not Started Schedule-2.5.1.1 Site Preparation & Clearing
A8630 Not Started Schedule-2.23.2.3 Pondasi Tangki
A8640 Not Started Schedule-2.23.2.3 Pondasi Shelter & Pompa
A8650 Not Started Schedule-2.23.2.4 MR Material Pondasi Tangki
A8660 Not Started Schedule-2.23.2.4 MR Material Pondasi Shelter
A8670 Not Started Schedule-2.23.2.1 Spesifikasi Pondasi tangki
A8680 Not Started Schedule-2.23.2.1 Spesifikasi Pondasi shelter &
A8690 Not Started Schedule-2.23.2.2 Calculation for Tank Foundatio
A8700 Not Started Schedule-2.23.2.2 Calculation For Shelter & Pum
A8730 Not Started Schedule-2.23.3.2 Datasheet for Pipe
A8750 Not Started Schedule-2.23.3.3 Drawing for piping diagram &

Page 3
TASK

A8760 Not Started Schedule-2.4.3.1 Tender


A8770 Not Started Schedule-2.4.3.1 TBE/CBT
A8780 Not Started Schedule-2.4.3.1 PO Issued
A8790 Not Started Schedule-2.4.3.1 Manufacturing
A8800 Not Started Schedule-2.4.3.1 Delivery material to site
A8810 Not Started Schedule-2.23.4.4 Material Plat tangki
A8820 Not Started Schedule-2.23.4.4 Material Tank Appuertenance'
A8830 Not Started Schedule-2.23.4.4 Drain Tank & Recovery Vessel
A8840 Not Started Schedule-2.23.4.4 Pompa
A8850 Not Started Schedule-2.23.4.4 Material Plat Tangki
A8860 Not Started Schedule-2.23.4.4 Material Tank Appuertenance'
A8870 Not Started Schedule-2.23.4.4 Drain Tank & Recovery Vessel
A8880 Not Started Schedule-2.23.4.4 Pompa
A8890 Not Started Schedule-2.23.4.4 Material Plat Tangki
A8900 Not Started Schedule-2.23.4.4 Material Tank Appuertenance'
A8910 Not Started Schedule-2.23.4.4 Drain Tank & Recovery Vessel
A8920 Not Started Schedule-2.23.4.4 Pompa
A8960 Not Started Schedule-2.23.4.1 Specification for Pump
A8980 Not Started Schedule-2.4.2.4 Tender
A8990 Not Started Schedule-2.4.2.4 TBE/CBT
A9000 Not Started Schedule-2.4.2.4 PO Issued
A9010 Not Started Schedule-2.4.2.4 Manufacturing
A9020 Not Started Schedule-2.4.2.4 Delivery material to site
A8740 Not Started Schedule-2.23.3.2 Datasheet for Gate valve
A9030 Not Started Schedule-2.23.3.2 Datasheet for check valve
A9040 Not Started Schedule-2.23.3.4 MTO for Gate valve
A9050 Not Started Schedule-2.23.3.4 MTO for check valve
A9060 Not Started Schedule-2.23.3.4 MR for Gate valve
A9070 Not Started Schedule-2.23.3.4 MR for check valve
A9080 Not Started Schedule-2.23.3.4 TBE for Gate valve
A9090 Not Started Schedule-2.23.3.4 TBE for check valve
A9100 Not Started Schedule-2.23.4.3 Drawing Layout Tank Appurte
A9110 Not Started Schedule-2.23.4.3 Drawing Recovery Vessel
A9120 Not Started Schedule-2.23.4.3 Drawing layout Pump
A9130 Not Started Schedule-2.4.3.2 Tender
A9140 Not Started Schedule-2.4.3.2 TBE/CBT
A9150 Not Started Schedule-2.4.3.2 PO Issued
A9160 Not Started Schedule-2.4.3.2 Manufacturing
A9170 Not Started Schedule-2.4.3.2 Delivery material to site
A9180 Not Started Schedule-2.4.3.3 Tender
A9190 Not Started Schedule-2.4.3.3 TBE/CBT
A9200 Not Started Schedule-2.4.3.3 PO Issued
A9210 Not Started Schedule-2.4.3.3 Manufacturing
A9220 Not Started Schedule-2.4.3.3 Delivery material to site
A9230 Not Started Schedule-2.5.1.2.2Pasang bouwplank
A9240 Not Started Schedule-2.5.1.2.2Pekerjaan pemancangan
A9260 Not Started Schedule-2.5.1.2.2Pembuatan pondasi
A9270 Not Started Schedule-2.5.1.2.2Asphalt concrete
A9280 Not Started Schedule-2.5.1.2.2pipe support
A9290 Not Started Schedule-2.5.1.2.2Gravel, bundwall & drainage

Page 4
TASK

A9310 Not Started Schedule-2.5.1.2.3Urugan Tanah


A9320 Not Started Schedule-2.5.1.2.3Pondasi drain tank
A9340 Not Started Schedule-2.5.1.2.3Install handrail
A9350 Not Started Schedule-2.5.1.2.3Install brace
A9360 Not Started Schedule-2.5.1.2.3Install roofing
A9390 Not Started Schedule-2.5.1.3.1Penyetelan pipa NPS 16 API 5L
A9400 Not Started Schedule-2.5.1.3.1Pengelasan pipa NPS 16 API 5
A9410 Not Started Schedule-2.5.1.3.2Penyetelan pipa NPS 16 API 5L
A9420 Not Started Schedule-2.5.1.3.2Pengelasan pipa NPS 16 API 5
A9430 Not Started Schedule-2.5.1.3.3Penyetelan pipa NPS 2 API 5L
A9440 Not Started Schedule-2.5.1.3.3Pengelasan pipa NPS 2 API 5L
A9470 Not Started Schedule-2.5.1.5.1Install Cable & equipment
A9550 Not Started Schedule-2.5.1.6 Instalasi instrumen
A9590 Not Started Schedule-2.6.1 Pengetesan Tangki
A9600 Not Started Schedule-2.7 Cleaning area
A1000 Not Started Schedule-2.1 Effective date of contract
A9620 Not Started Schedule-2.8 Finish
A9630 Not Started Schedule-2.23.4.2 Datasheet for Tank
A9640 Not Started Schedule-2.23.4.2 Datasheet for Tank Appurtena
A9650 Not Started Schedule-2.23.4.2 Datasheet for Recovery Vesse
A9660 Not Started Schedule-2.23.4.2 Datasheet for Pump
A2820 Not Started Schedule-2.23.5.1 Electrical system Study
A9610 Not Started Schedule-2.7 Commisioning
A9690 Not Started Schedule-2.7 Report of completion
A9700 Not Started Schedule-2.5.1.4.1Erection annular & bottom pla
A9710 Not Started Schedule-2.5.1.4.1welding bottom & annular pla
A9720 Not Started Schedule-2.5.1.4.2Erection shell course 7 & 8
A9730 Not Started Schedule-2.5.1.4.2Welding
A9740 Not Started Schedule-2.5.1.4.3Preparation Tankerection
A9750 Not Started Schedule-2.5.1.4.4Install rafter & roof
A9760 Not Started Schedule-2.7 As built drawing
A9770 Not Started Schedule-2.5.1.4.5Painting

Page 5
TASK

start_date end_date resource_list delete_record_flag


(*)Start (*)Finish (*)Resources Delete This Row
5/15/2017 8:00:0 5/29/2017 5:00:00 PM
5/15/2017 8:00:0 5/29/2017 5:00:00 PM
6/6/2017 8:00:00 6/12/2017 5:00:00 PM
6/6/2017 8:00:00 6/12/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/15/2017 8:00:0 5/29/2017 5:00:00 PM
6/10/2017 8:00:0 6/16/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
5/16/2017 8:00:0 5/30/2017 5:00:00 PM
5/16/2017 8:00:0 5/30/2017 5:00:00 PM
5/16/2017 8:00:0 5/30/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
6/10/2017 8:00:0 6/16/2017 5:00:00 PM
6/10/2017 8:00:0 6/16/2017 5:00:00 PM
6/10/2017 8:00:0 6/16/2017 5:00:00 PM
4/20/2017 8:00:0 5/19/2017 5:00:00 PM
4/20/2017 8:00:0 5/19/2017 5:00:00 PM
4/20/2017 8:00:0 5/19/2017 5:00:00 PM
4/20/2017 8:00:0 5/19/2017 5:00:00 PM
4/21/2017 8:00:0 5/20/2017 5:00:00 PM
4/21/2017 8:00:0 5/20/2017 5:00:00 PM
4/21/2017 8:00:0 5/20/2017 5:00:00 PM
4/22/2017 8:00:0 5/21/2017 5:00:00 PM
4/22/2017 8:00:0 5/21/2017 5:00:00 PM
4/22/2017 8:00:0 5/21/2017 5:00:00 PM
4/22/2017 8:00:0 5/21/2017 5:00:00 PM
4/22/2017 8:00:0 5/21/2017 5:00:00 PM
4/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/8/2017 8:00:00 6/6/2017 5:00:00 PM
6/1/2017 8:00:00 6/15/2017 5:00:00 PM
6/1/2017 8:00:00 6/15/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
7/6/2017 8:00:00 7/12/2017 5:00:00 PM

Page 6
TASK

7/6/2017 8:00:00 7/12/2017 5:00:00 PM


7/6/2017 8:00:00 7/12/2017 5:00:00 PM
7/6/2017 8:00:00 7/12/2017 5:00:00 PM
4/1/2017 8:00:00 5/30/2017 5:00:00 PM
4/17/2017 8:00:0 5/16/2017 5:00:00 PM
4/17/2017 8:00:0 5/16/2017 5:00:00 PM
4/24/2017 8:00:0 5/23/2017 5:00:00 PM
4/24/2017 8:00:0 5/23/2017 5:00:00 PM
4/27/2017 8:00:0 5/26/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/15/2017 8:00:0 6/13/2017 5:00:00 PM
5/22/2017 8:00:0 6/20/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
7/31/2017 8:00:0 8/6/2017 5:00:00 PM
8/7/2017 8:00:00 8/7/2017 5:00:00 PM
8/8/2017 8:00:00 9/6/2017 5:00:00 PM
9/8/2017 8:00:00 9/12/2017 5:00:00 PM
7/1/2017 8:00:00 7/30/2017 5:00:00 PM
7/6/2017 8:00:00 8/4/2017 5:00:00 PM
8/5/2017 8:00:00 8/10/2017 5:00:00 PM
8/11/2017 8:00:0 8/11/2017 5:00:00 PM
8/12/2017 8:00:0 9/20/2017 5:00:00 PM
9/21/2017 8:00:0 9/25/2017 5:00:00 PM
7/19/2017 8:00:0 8/7/2017 5:00:00 PM
8/8/2017 8:00:00 8/17/2017 5:00:00 PM
8/18/2017 8:00:0 8/18/2017 5:00:00 PM
8/19/2017 8:00:0 11/6/2017 5:00:00 PM
11/7/2017 8:00:0 11/16/2017 5:00:00 PM
7/20/2017 8:00:0 8/3/2017 5:00:00 PM
8/4/2017 8:00:00 8/10/2017 5:00:00 PM
8/11/2017 8:00:0 8/11/2017 5:00:00 PM
8/12/2017 8:00:0 11/9/2017 5:00:00 PM
11/10/2017 8:00: 11/16/2017 5:00:00 PM
7/21/2017 8:00:0 8/9/2017 5:00:00 PM
8/10/2017 8:00:0 8/19/2017 5:00:00 PM
8/21/2017 8:00:0 8/21/2017 5:00:00 PM
8/22/2017 8:00:0 11/9/2017 5:00:00 PM
11/10/2017 8:00: 11/16/2017 5:00:00 PM
7/21/2017 8:00:0 8/19/2017 5:00:00 PM
8/21/2017 8:00:0 8/30/2017 5:00:00 PM
9/1/2017 8:00:00 9/1/2017 5:00:00 PM

Page 7
TASK

9/2/2017 8:00:00 10/31/2017 5:00:00 PM


11/1/2017 8:00:0 11/15/2017 5:00:00 PM
7/24/2017 8:00:0 8/22/2017 5:00:00 PM
8/23/2017 8:00:0 8/27/2017 5:00:00 PM
8/28/2017 8:00:0 8/28/2017 5:00:00 PM
8/29/2017 8:00:0 10/27/2017 5:00:00 PM
10/28/2017 8:00: 11/16/2017 5:00:00 PM
7/24/2017 8:00:0 8/17/2017 5:00:00 PM
8/18/2017 8:00:0 9/1/2017 5:00:00 PM
9/2/2017 8:00:00 9/2/2017 5:00:00 PM
9/4/2017 8:00:00 11/12/2017 5:00:00 PM
11/13/2017 8:00: 11/27/2017 5:00:00 PM
7/26/2017 8:00:0 8/24/2017 5:00:00 PM
8/25/2017 8:00:0 9/8/2017 5:00:00 PM
9/9/2017 8:00:00 9/9/2017 5:00:00 PM
9/11/2017 8:00:0 11/9/2017 5:00:00 PM
11/10/2017 8:00: 11/19/2017 5:00:00 PM
7/25/2017 8:00:0 8/23/2017 5:00:00 PM
8/24/2017 8:00:0 9/7/2017 5:00:00 PM
9/8/2017 8:00:00 9/8/2017 5:00:00 PM
9/8/2017 8:00:00 11/6/2017 5:00:00 PM
11/7/2017 8:00:0 11/21/2017 5:00:00 PM
8/24/2017 8:00:0 9/12/2017 5:00:00 PM
7/25/2017 8:00:0 8/23/2017 5:00:00 PM
9/13/2017 8:00:0 9/13/2017 5:00:00 PM
9/14/2017 8:00:0 11/12/2017 5:00:00 PM
11/13/2017 8:00: 11/27/2017 5:00:00 PM
7/27/2017 8:00:0 8/25/2017 5:00:00 PM
8/26/2017 8:00:0 9/9/2017 5:00:00 PM
9/11/2017 8:00:0 9/11/2017 5:00:00 PM
9/12/2017 8:00:0 11/10/2017 5:00:00 PM
11/11/2017 8:00: 11/25/2017 5:00:00 PM
4/1/2017 8:00:00 4/7/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 5/30/2017 5:00:00 PM
6/1/2017 8:00:00 6/30/2017 5:00:00 PM
6/19/2017 8:00:0 7/18/2017 5:00:00 PM
7/19/2017 8:00:0 8/8/2017 5:00:00 PM
7/19/2017 8:00:0 8/7/2017 5:00:00 PM
4/24/2017 8:00:0 5/23/2017 5:00:00 PM
4/24/2017 8:00:0 5/23/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/14/2017 8:00:0 5/13/2017 5:00:00 PM
4/15/2017 8:00:0 5/14/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/14/2017 8:00:0 5/13/2017 5:00:00 PM

Page 8
TASK

7/17/2017 8:00:0 8/5/2017 5:00:00 PM


8/7/2017 8:00:00 8/26/2017 5:00:00 PM
8/28/2017 8:00:0 8/29/2017 5:00:00 PM
8/30/2017 8:00:0 10/28/2017 5:00:00 PM
10/30/2017 8:00: 11/5/2017 5:00:00 PM
6/1/2017 8:00:00 6/15/2017 5:00:00 PM
6/1/2017 8:00:00 6/15/2017 5:00:00 PM
6/1/2017 8:00:00 6/15/2017 5:00:00 PM
6/1/2017 8:00:00 6/15/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
6/16/2017 8:00:0 7/5/2017 5:00:00 PM
7/6/2017 8:00:00 7/12/2017 5:00:00 PM
7/6/2017 8:00:00 7/12/2017 5:00:00 PM
7/6/2017 8:00:00 7/12/2017 5:00:00 PM
7/6/2017 8:00:00 7/12/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
7/22/2017 8:00:0 8/10/2017 5:00:00 PM
8/11/2017 8:00:0 8/20/2017 5:00:00 PM
8/21/2017 8:00:0 8/21/2017 5:00:00 PM
8/22/2017 8:00:0 10/20/2017 5:00:00 PM
10/21/2017 8:00: 10/27/2017 5:00:00 PM
4/1/2017 8:00:00 4/5/2017 5:00:00 PM
4/1/2017 8:00:00 4/5/2017 5:00:00 PM
5/16/2017 8:00:0 5/30/2017 5:00:00 PM
5/17/2017 8:00:0 5/31/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
5/22/2017 8:00:0 6/10/2017 5:00:00 PM
6/10/2017 8:00:0 6/16/2017 5:00:00 PM
6/10/2017 8:00:0 6/16/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
5/1/2017 8:00:00 5/30/2017 5:00:00 PM
7/24/2017 8:00:0 8/2/2017 5:00:00 PM
8/3/2017 8:00:00 8/9/2017 5:00:00 PM
8/10/2017 8:00:0 8/10/2017 5:00:00 PM
8/11/2017 8:00:0 10/9/2017 5:00:00 PM
10/10/2017 8:00: 10/16/2017 5:00:00 PM
7/31/2017 8:00:0 8/14/2017 5:00:00 PM
8/15/2017 8:00:0 8/19/2017 5:00:00 PM
8/21/2017 8:00:0 8/21/2017 5:00:00 PM
8/22/2017 8:00:0 10/5/2017 5:00:00 PM
10/6/2017 8:00:0 10/12/2017 5:00:00 PM
8/8/2017 8:00:00 8/14/2017 5:00:00 PM
7/12/2017 8:00:0 9/9/2017 5:00:00 PM
9/13/2017 8:00:0 10/12/2017 5:00:00 PM
10/13/2017 8:00: 10/26/2017 5:00:00 PM
10/27/2017 8:00: 11/16/2017 5:00:00 PM
11/17/2017 8:00: 12/16/2017 5:00:00 PM

Page 9
TASK

9/1/2017 8:00:00 9/21/2017 5:00:00 PM


9/26/2017 8:00:0 10/25/2017 5:00:00 PM
10/26/2017 8:00: 11/9/2017 5:00:00 PM
11/10/2017 8:00: 11/24/2017 5:00:00 PM
11/25/2017 8:00: 12/8/2017 5:00:00 PM
11/6/2017 8:00:0 12/10/2017 5:00:00 PM
11/6/2017 8:00:0 12/10/2017 5:00:00 PM
12/11/2017 8:00: 1/14/2018 5:00:00 PM
12/11/2017 8:00: 1/14/2018 5:00:00 PM
1/15/2018 8:00:0 2/18/2018 5:00:00 PM
1/15/2018 8:00:0 2/18/2018 5:00:00 PM
3/3/2018 8:00:00 5/1/2018 5:00:00 PM
3/3/2018 8:00:00 5/1/2018 5:00:00 PM
3/30/2018 8:00:0 4/28/2018 5:00:00 PM
6/1/2018 8:00:00 6/14/2018 5:00:00 PM
4/1/2017 8:00:00 AM
6/30/2018 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/30/2017 5:00:00 PM
4/1/2017 8:00:00 4/5/2017 5:00:00 PM
6/15/2018 8:00:0 6/19/2018 5:00:00 PM
5/30/2018 8:00:0 6/28/2018 5:00:00 PM
11/17/2017 8:00: 12/1/2017 5:00:00 PM
12/2/2017 8:00:0 12/15/2017 5:00:00 PM
12/16/2017 8:00: 1/5/2018 5:00:00 PM
1/6/2018 8:00:00 1/26/2018 5:00:00 PM
1/27/2018 8:00:0 1/31/2018 5:00:00 PM
2/1/2018 8:00:00 3/2/2018 5:00:00 PM
5/31/2018 8:00:0 6/29/2018 5:00:00 PM
3/20/2018 8:00:0 3/29/2018 5:00:00 PM

Page 10
Activity ID Activity Name
Schedule-2 PROYEK PEMBANGUNAN TANGKI AVTUR 17.000KL SOEKARNO-HATTA
Schedule-2.1 START MILESTONE
A1000 Effective date of contract
Schedule-2.2 PERIZINAN
A1010 Survei Lapangan
A1020 Ijin Gangguan
A1030 Ijin Keamanan
Schedule-2.23 ENGINEERING
Schedule-2.23.1 Design Basis verification
A1100 Process Design Basis verification
A1110 Proses Safety Design Basis verification
A1120 Civil Design Basis verification
A1130 Piping Design Basis verification
A1140 Mechanical Design Basis verification
A1150 Elektrikal Design Basis verification
A1160 Instrument Design Basis verification
Schedule-2.23.2 Civil
Schedule-2.23.2.2 Calculation
A8690 Calculation for Tank Foundation
A8700 Calculation For Shelter & Pump Foundation
Schedule-2.23.2.1 Specification
A8670 Spesifikasi Pondasi tangki
A8680 Spesifikasi Pondasi shelter & Pompa
Schedule-2.23.2.3 Drawing
A8630 Pondasi Tangki
A8640 Pondasi Shelter & Pompa
Schedule-2.23.2.4 MTO, MR & TBE
Schedule-2.23.2.4.1 MTO
A5190 MTO Material Pondasi Tangki
A5200 MTO Material Pondasi Shelter & Pompa
Schedule-2.23.2.4.2 MR
A8650 MR Material Pondasi Tangki
A8660 MR Material Pondasi Shelter & Pompa
Schedule-2.23.2.4.3 TBE
A5250 TBE for Material Pondasi Tangki
A5260 TBE for Material Pondasi Shelter & Pompa
Schedule-2.23.3 Piping
Schedule-2.23.3.1 Design Basis & Specification
Schedule-2.23.3.1.2 Specification
A2120 Piping Material Specification
Schedule-2.23.3.1.1 Design Basis
A2100 Piping Design Basis
Schedule-2.23.3.2 Calculation & Datasheet
Schedule-2.23.3.2.1 Calculation
A2150 Piping strees analysis
Schedule-2.23.3.2.2 Datasheet
A8730 Datasheet for Pipe
A8740 Datasheet for Gate valve
A9030 Datasheet for check valve
Schedule-2.23.3.3 Drawing
A8750 Drawing for piping diagram & piping instrumen
Schedule-2.23.3.4 MTO, MR & TBE
Schedule-2.23.3.4.1 MTO
A4450 MTO for Piping Material
A9040 MTO for Gate valve
A9050 MTO for check valve
Schedule-2.23.3.4.2 MR
A4540 MR for Piping Material
A9060 MR for Gate valve
A9070 MR for check valve
Schedule-2.23.3.4.3 TBE
A4630 TBEof Piping Material
A9080 TBE for Gate valve
A9090 TBE for check valve
Schedule-2.23.4 Mechanical
Schedule-2.23.4.1 Specification
A2370 Specification for Tank
A2380 Specification for Tank Appuertenance
A2390 Specification for Recovery Vessel
A8960 Specification for Pump
Schedule-2.23.4.2 Datasheet
A9630 Datasheet for Tank
A9640 Datasheet for Tank Appurtenance
A9650 Datasheet for Recovery Vessel
A9660 Datasheet for Pump
Schedule-2.23.4.3 Drawing
A2680 Drawing Layout Tangki
A9100 Drawing Layout Tank Appurtenance
A9110 Drawing Recovery Vessel
A9120 Drawing layout Pump
Schedule-2.23.4.4 MTO, MR & TBE
Schedule-2.23.4.4.2 MR
A8850 Material Plat Tangki
A8860 Material Tank Appuertenance'
A8870 Drain Tank & Recovery Vessel
A8880 Pompa
Schedule-2.23.4.4.3 TBE
A8890 Material Plat Tangki
A8900 Material Tank Appuertenance'
A8910 Drain Tank & Recovery Vessel
A8920 Pompa
Schedule-2.23.4.4.1 MTO
A8810 Material Plat tangki
A8820 Material Tank Appuertenance'
A8830 Drain Tank & Recovery Vessel
A8840 Pompa
Schedule-2.23.5 Elektrikal
Schedule-2.23.5.1 Design Basis & Specification
Schedule-2.23.5.1.1 Design Basis
A2690 Electrical Single Line Diagram Design Basis
A2820 Electrical system Study
Schedule-2.23.5.1.2 Specification
A2700 Specification for MV Switchgear
A2710 Specification for LV Switchboard
A2720 Specification for power transformer
A2730 Specification for LV Induction Motor
A2740 Specification for Uninteruptible Power system
A2750 Specification for VDC UPS
A2760 Specification forElectrical cable tray & Ladder
A2770 Specification for electrical cable
A2780 Specification for Lighting & amall power panel
A2790 Specification for cathodic protection
A2800 Specification for electrical earthing bonding & lighting protection
A2810 Specification for electrical construction requirements
Schedule-2.23.5.2 Calculation & Datasheet
Schedule-2.23.5.2.1 Calculation
A2850 Electrical Material & System
Schedule-2.23.5.2.2 Datasheet
A2880 MV Switchgear
A2890 LV switchgear MCC
A2900 Power transformer
Schedule-2.23.5.3 Drawing
A2950 Overall Single Line Diagram
Schedule-2.23.5.4 MTO, MR & TBE
Schedule-2.23.5.4.2 MR
A4970 MR for MV switch gear
A4980 MR for LV switchgear MCC
A4990 MR for power transformer
Schedule-2.23.5.4.1 MTO
A4900 MTO for MV switch gear
A4910 MTO for LV switchgear MCC
A4920 MTO for power transformer
Schedule-2.23.5.4.3 TBE
A5040 MV switch gear - TBE
A5050 LV switchgear MCC - TBE
A5060 power transformer - TBE
Schedule-2.23.6 Instrument
Schedule-2.23.6.1 Design Basis & specification
Schedule-2.23.6.1.1 Design basis
A3200 Instrumen Design Basis
Schedule-2.23.6.1.2 Specification
A3210 General Instrument specification
A3220 distributed control system specification
Schedule-2.23.6.2 Calculation & Datasheet
Schedule-2.23.6.2.1 Calculation
A3340 Control valve
A3350 Presure relief valve
A3360 Safety & relief valve
Schedule-2.23.6.2.2 Datasheet
A3370 Fire & gas detector
A3380 Motor Operated valve
A3390 MOV DBB
A3400 Overall instrument datasheet
Schedule-2.23.6.3 Drawing
A3600 Overall instrumentation diagram
A3610 Overall control system & safety block diagram
Schedule-2.23.6.4 MTO, MR & TBE
Schedule-2.23.6.4.1 MTO
A3780 MTO for Field instrument material
A3790 MTO for Instrument bulk material
Schedule-2.23.6.4.2 MR
A5110 MR for Fire & gas detector
A5120 MR for Motor operated valve
A5150 MR for Mov DBB
A5160 MR for Tank Gauge Transmiter
Schedule-2.23.6.4.3 TBE
A6850 TBE for fire & Gas detector
A6860 TBE for Motor operated valve
A6870 TBE for Mov DBB
A6880 TBE for Tank Gauge Transmiter
Schedule-2.4 PROCUREMENT
Schedule-2.4.1 Civil
Schedule-2.4.1.1 Material Pondasi Tangki
A5280 Tender
A5290 TBE/CBT
A5300 PO Issued
A5310 Manufacturing
A5320 Delivery material to site
Schedule-2.4.1.2 Material Pondasi Shelter & Pompa
A5330 Tender
A5340 TBE/CBT
A5350 PO Issued
A5360 Manufacturing
A5370 Delivery material to site
Schedule-2.4.2 Mechanical
Schedule-2.4.2.2 Tank Appurtenance
A8580 Tender
A8590 TBE/CBT
A8600 PO Issued
A8610 Manufacturing
A8620 Delivery material to site
Schedule-2.4.2.3 Drain Tank & Recovery Vessel
A6010 Tender
A6020 TBE/CBT
A6030 PO Issued
A6040 Manufacturing
A6050 Delivery material to site
Schedule-2.4.2.1 Material Plat Tangki
A8530 Tender
A8540 TBE/CBT
A8550 PO Issued
A8560 Manufacturing
A8570 Delivery material to site
Schedule-2.4.2.4 Pompa
A8980 Tender
A8990 TBE/CBT
A9000 PO Issued
A9010 Manufacturing
A9020 Delivery material to site
Schedule-2.4.3 Piping
Schedule-2.4.3.2 Gate Valve
A9130 Tender
A9140 TBE/CBT
A9150 PO Issued
A9160 Manufacturing
A9170 Delivery material to site
Schedule-2.4.3.3 Check Valve
A9180 Tender
A9190 TBE/CBT
A9200 PO Issued
A9210 Manufacturing
A9220 Delivery material to site
Schedule-2.4.3.1 Pipe
A8760 Tender
A8770 TBE/CBT
A8780 PO Issued
A8790 Manufacturing
A8800 Delivery material to site
Schedule-2.4.4 Elektrikal
Schedule-2.4.4.2 LV switchgear MCC
A6360 Tender
A6370 TBE/CBT
A6380 PO Issued
A6390 Manufacturing
A6400 Delivery material to site
Schedule-2.4.4.3 Power transformer
A6410 Tender
A6420 TBE/CBT
A6430 PO Issued
A6440 Manufacturing
A6450 Delivery material to site
Schedule-2.4.4.1 MV Switchgear
A6310 Tender
A6320 TBE/CBT
A6330 PO Issued
A6340 Manufacturing
A6350 Delivery material to site
Schedule-2.4.5 Instrument
Schedule-2.4.5.1 Fire & Gas detector
A7100 Tender
A7110 TBE/CBT
A7120 PO Issued
A7130 Manufacturing
A7140 Delivery material to site
Schedule-2.4.5.2 Motor operated valve
A7150 Tender
A7160 TBE/CBT
A7170 PO Issued
A7180 Manufacturing
A7190 Delivery material to site
Schedule-2.4.5.3 MOV DBB
A7200 Tender
A7210 TBE/CBT
A7220 PO Issued
A7230 Manufacturing
A7240 Delivery material to site
Schedule-2.4.5.4 Tank gauge trasnmitter
A7250 Tender
A7260 TBE/CBT
A7270 PO Issued
A7280 Manufacturing
A7290 Delivery material to site
Schedule-2.5 CONSTRUCTION
Schedule-2.5.1 Avtur Tank
Schedule-2.5.1.1 General
A1040 Mobilisasi Material, alat kerja dan tenaga kerja
A1050 Penyiapan air kerja,listrik dan peralatan komunikasi
A1070 Penyiapan akses jalan
A1080 Persiapan Kelengkapan Safety
A1090 Site Preparation & Clearing
Schedule-2.5.1.2 Civil Work & Structure
Schedule-2.5.1.2.2 Tank Foundation
A9230 Pasang bouwplank
A9240 Pekerjaan pemancangan
A9260 Pembuatan pondasi
A9270 Asphalt concrete
A9280 pipe support
A9290 Gravel, bundwall & drainage
Schedule-2.5.1.2.3 Shelter & Pump Foundation
A9310 Urugan Tanah
A9320 Pondasi drain tank
A9340 Install handrail
A9350 Install brace
A9360 Install roofing
Schedule-2.5.1.3 Piping
Schedule-2.5.1.3.1 Pekerjaan Inlet Tangki
A9390 Penyetelan pipa NPS 16 API 5L gr. B sch. 40 (ERW)
A9400 Pengelasan pipa NPS 16 API 5L sch. 40 (ERW)
Schedule-2.5.1.3.2 Pekerjaan Outlet Tangki
A9410 Penyetelan pipa NPS 16 API 5L gr. B sch. 40 (ERW)
A9420 Pengelasan pipa NPS 16 API 5L sch. 40 (ERW)
Schedule-2.5.1.3.3 Pekerjaan Water drain pipe
A9430 Penyetelan pipa NPS 2 API 5L gr. B sch. 40 (ERW)
A9440 Pengelasan pipa NPS 2 API 5L sch. 40 (ERW)
Schedule-2.5.1.4 Mechanical
Schedule-2.5.1.4.1 Erection annular plate & bottom plate
A9700 Erection annular & bottom plate
A9710 welding bottom & annular plate
Schedule-2.5.1.4.2 Erection shell plate 7 & 8
A9720 Erection shell course 7 & 8
A9730 Welding
Schedule-2.5.1.4.3 Preparation tank erection
A9740 Preparation Tankerection
Schedule-2.5.1.4.4 Erection roof structure
A9750 Install rafter & roof
Schedule-2.5.1.4.5 Painting
A9770 Painting
Schedule-2.5.1.5 Elektrikal
Schedule-2.5.1.5.1 Instalasi Elektrical cable & equipment
A9470 Install Cable & equipment
Schedule-2.5.1.6 Instrument
A9550 Instalasi instrumen
Schedule-2.6 PRE- COMMISIONING
Schedule-2.6.1 Pengetesan
A9590 Pengetesan Tangki
Schedule-2.7 COMMISIONING
A9600 Cleaning area
A9610 Commisioning
A9690 Report of completion
A9760 As built drawing
Schedule-2.8 FINISH MILESTONE
A9620 Finish
Original Duration Remaining Duration Schedule % CompletStart
456 456 0% 1-Apr-17
0 0 0% 1-Apr-17
0 0 0% 1-Apr-17
30 30 0% 1-Apr-17
7 7 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
103 103 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
73 73 0% 1-Apr-17
31 31 0% 14-Apr-17
30 30 0% 14-Apr-17
30 30 0% 15-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 24-Apr-17
30 30 0% 24-Apr-17
30 30 0% 24-Apr-17
29 29 0% 15-May-17
15 15 0% 15-May-17
15 15 0% 15-May-17
15 15 0% 15-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
7 7 0% 6-Jun-17
7 7 0% 6-Jun-17
7 7 0% 6-Jun-17
77 77 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
5 5 0% 1-Apr-17
5 5 0% 1-Apr-17
30 30 0% 14-Apr-17
30 30 0% 14-Apr-17
33 33 0% 15-May-17
17 17 0% 15-May-17
15 15 0% 15-May-17
15 15 0% 16-May-17
15 15 0% 17-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
7 7 0% 10-Jun-17
7 7 0% 10-Jun-17
7 7 0% 10-Jun-17
7 7 0% 10-Jun-17
103 103 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-Apr-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
42 42 0% 1-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
15 15 0% 1-Jun-17
15 15 0% 1-Jun-17
15 15 0% 1-Jun-17
15 15 0% 1-Jun-17
15 15 0% 1-Jun-17
77 77 0% 1-Apr-17
60 60 0% 1-Apr-17
60 60 0% 1-Apr-17
60 60 0% 1-Apr-17
5 5 0% 1-Apr-17
32 32 0% 20-Apr-17
30 30 0% 20-Apr-17
30 30 0% 20-Apr-17
30 30 0% 20-Apr-17
30 30 0% 20-Apr-17
30 30 0% 21-Apr-17
30 30 0% 21-Apr-17
30 30 0% 21-Apr-17
30 30 0% 22-Apr-17
30 30 0% 22-Apr-17
30 30 0% 22-Apr-17
30 30 0% 22-Apr-17
30 30 0% 22-Apr-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 8-May-17
30 30 0% 8-May-17
32 32 0% 16-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
20 20 0% 22-May-17
15 15 0% 16-May-17
15 15 0% 16-May-17
15 15 0% 16-May-17
15 15 0% 16-May-17
7 7 0% 10-Jun-17
7 7 0% 10-Jun-17
7 7 0% 10-Jun-17
7 7 0% 10-Jun-17
103 103 0% 1-Apr-17
60 60 0% 1-Apr-17
60 60 0% 1-Apr-17
60 60 0% 1-Apr-17
30 30 0% 17-Apr-17
30 30 0% 17-Apr-17
30 30 0% 17-Apr-17
37 37 0% 24-Apr-17
33 33 0% 24-Apr-17
30 30 0% 24-Apr-17
30 30 0% 24-Apr-17
30 30 0% 27-Apr-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
30 30 0% 1-May-17
37 37 0% 15-May-17
30 30 0% 15-May-17
30 30 0% 22-May-17
42 42 0% 1-Jun-17
15 15 0% 1-Jun-17
15 15 0% 1-Jun-17
15 15 0% 1-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
20 20 0% 16-Jun-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
7 7 0% 6-Jul-17
150 150 0% 1-Jul-17
87 87 0% 1-Jul-17
74 74 0% 1-Jul-17
30 30 0% 1-Jul-17
7 7 0% 31-Jul-17
1 1 0% 7-Aug-17
30 30 0% 8-Aug-17
5 5 0% 8-Sep-17
82 82 0% 6-Jul-17
30 30 0% 6-Jul-17
6 6 0% 5-Aug-17
1 1 0% 11-Aug-17
40 40 0% 12-Aug-17
5 5 0% 21-Sep-17
121 121 0% 19-Jul-17
119 119 0% 21-Jul-17
20 20 0% 21-Jul-17
10 10 0% 10-Aug-17
1 1 0% 21-Aug-17
80 80 0% 22-Aug-17
7 7 0% 10-Nov-17
120 120 0% 20-Jul-17
15 15 0% 20-Jul-17
7 7 0% 4-Aug-17
1 1 0% 11-Aug-17
90 90 0% 12-Aug-17
7 7 0% 10-Nov-17
121 121 0% 19-Jul-17
20 20 0% 19-Jul-17
10 10 0% 8-Aug-17
1 1 0% 18-Aug-17
80 80 0% 19-Aug-17
10 10 0% 7-Nov-17
98 98 0% 22-Jul-17
20 20 0% 22-Jul-17
10 10 0% 11-Aug-17
1 1 0% 21-Aug-17
60 60 0% 22-Aug-17
7 7 0% 21-Oct-17
112 112 0% 17-Jul-17
85 85 0% 24-Jul-17
10 10 0% 24-Jul-17
7 7 0% 3-Aug-17
1 1 0% 10-Aug-17
60 60 0% 11-Aug-17
7 7 0% 10-Oct-17
74 74 0% 31-Jul-17
15 15 0% 31-Jul-17
5 5 0% 15-Aug-17
1 1 0% 21-Aug-17
45 45 0% 22-Aug-17
7 7 0% 6-Oct-17
112 112 0% 17-Jul-17
20 20 0% 17-Jul-17
20 20 0% 7-Aug-17
2 2 0% 28-Aug-17
60 60 0% 30-Aug-17
7 7 0% 30-Oct-17
130 130 0% 21-Jul-17
116 116 0% 24-Jul-17
30 30 0% 24-Jul-17
5 5 0% 23-Aug-17
1 1 0% 28-Aug-17
60 60 0% 29-Aug-17
20 20 0% 28-Oct-17
127 127 0% 24-Jul-17
25 25 0% 24-Jul-17
15 15 0% 18-Aug-17
1 1 0% 2-Sep-17
70 70 0% 4-Sep-17
15 15 0% 13-Nov-17
118 118 0% 21-Jul-17
30 30 0% 21-Jul-17
10 10 0% 21-Aug-17
1 1 0% 1-Sep-17
60 60 0% 2-Sep-17
15 15 0% 1-Nov-17
126 126 0% 25-Jul-17
120 120 0% 25-Jul-17
30 30 0% 25-Jul-17
15 15 0% 24-Aug-17
1 1 0% 8-Sep-17
60 60 0% 8-Sep-17
15 15 0% 7-Nov-17
126 126 0% 25-Jul-17
30 30 0% 25-Jul-17
20 20 0% 24-Aug-17
1 1 0% 13-Sep-17
60 60 0% 14-Sep-17
15 15 0% 13-Nov-17
117 117 0% 26-Jul-17
30 30 0% 26-Jul-17
15 15 0% 25-Aug-17
1 1 0% 9-Sep-17
60 60 0% 11-Sep-17
10 10 0% 10-Nov-17
122 122 0% 27-Jul-17
30 30 0% 27-Jul-17
15 15 0% 26-Aug-17
1 1 0% 11-Sep-17
60 60 0% 12-Sep-17
15 15 0% 11-Nov-17
396 396 0% 1-Apr-17
396 396 0% 1-Apr-17
130 130 0% 1-Apr-17
60 60 0% 1-Apr-17
30 30 0% 1-Jun-17
30 30 0% 19-Jun-17
21 21 0% 19-Jul-17
20 20 0% 19-Jul-17
158 158 0% 12-Jul-17
158 158 0% 12-Jul-17
7 7 0% 8-Aug-17
60 60 0% 12-Jul-17
30 30 0% 13-Sep-17
14 14 0% 13-Oct-17
21 21 0% 27-Oct-17
30 30 0% 17-Nov-17
99 99 0% 1-Sep-17
21 21 0% 1-Sep-17
30 30 0% 26-Sep-17
15 15 0% 26-Oct-17
15 15 0% 10-Nov-17
14 14 0% 25-Nov-17
105 105 0% 6-Nov-17
35 35 0% 6-Nov-17
35 35 0% 6-Nov-17
35 35 0% 6-Nov-17
35 35 0% 11-Dec-17
35 35 0% 11-Dec-17
35 35 0% 11-Dec-17
35 35 0% 15-Jan-18
35 35 0% 15-Jan-18
35 35 0% 15-Jan-18
133 133 0% 17-Nov-17
29 29 0% 17-Nov-17
15 15 0% 17-Nov-17
14 14 0% 2-Dec-17
42 42 0% 16-Dec-17
21 21 0% 16-Dec-17
21 21 0% 6-Jan-18
5 5 0% 27-Jan-18
5 5 0% 27-Jan-18
30 30 0% 1-Feb-18
30 30 0% 1-Feb-18
10 10 0% 20-Mar-18
10 10 0% 20-Mar-18
60 60 0% 3-Mar-18
60 60 0% 3-Mar-18
60 60 0% 3-Mar-18
60 60 0% 3-Mar-18
60 60 0% 3-Mar-18
30 30 0% 30-Mar-18
30 30 0% 30-Mar-18
30 30 0% 30-Mar-18
31 31 0% 30-May-18
14 14 0% 1-Jun-18
5 5 0% 15-Jun-18
30 30 0% 30-May-18
30 30 0% 31-May-18
0 0 0% 30-Jun-18
0 0 0%
Finish Total Float
30-Jun-18 0
1-Apr-17 0

30-Apr-17 0
7-Apr-17
30-Apr-17
30-Apr-17
12-Jul-17 0
30-Apr-17 0
30-Apr-17
30-Apr-17
30-Apr-17
30-Apr-17
30-Apr-17
30-Apr-17
30-Apr-17
12-Jun-17 0
14-May-17 0
13-May-17
14-May-17
30-Apr-17 0
30-Apr-17
30-Apr-17
23-May-17 0
23-May-17
23-May-17
12-Jun-17 0
29-May-17 0
29-May-17
29-May-17
10-Jun-17 0
10-Jun-17
10-Jun-17
12-Jun-17 0
12-Jun-17
12-Jun-17
16-Jun-17 0
30-Apr-17 0
30-Apr-17 0
30-Apr-17
30-Apr-17 0
30-Apr-17
30-Apr-17 0
30-Apr-17 0
30-Apr-17
30-Apr-17 0
30-Apr-17
5-Apr-17
5-Apr-17
13-May-17 0
13-May-17
16-Jun-17 0
31-May-17 0
29-May-17
30-May-17
31-May-17
10-Jun-17 0
10-Jun-17
10-Jun-17
10-Jun-17
16-Jun-17 0
16-Jun-17
16-Jun-17
16-Jun-17
12-Jul-17 0
30-Apr-17 0
30-Apr-17
30-Apr-17
30-Apr-17
30-Apr-17
30-Apr-17 0
30-Apr-17
30-Apr-17
30-Apr-17
30-Apr-17
30-May-17 0
30-May-17
30-May-17
30-May-17
30-May-17
12-Jul-17 0
5-Jul-17 0
5-Jul-17
5-Jul-17
5-Jul-17
5-Jul-17
12-Jul-17 0
12-Jul-17
12-Jul-17
12-Jul-17
12-Jul-17
15-Jun-17 0
15-Jun-17
15-Jun-17
15-Jun-17
15-Jun-17
16-Jun-17 0
30-May-17 0
30-May-17 0
30-May-17
5-Apr-17
21-May-17 0
19-May-17
19-May-17
19-May-17
19-May-17
20-May-17
20-May-17
20-May-17
21-May-17
21-May-17
21-May-17
21-May-17
21-May-17
30-May-17 0
30-May-17 0
30-May-17
30-May-17 0
30-May-17
30-May-17
30-May-17
6-Jun-17 0
6-Jun-17
16-Jun-17 0
10-Jun-17 0
10-Jun-17
10-Jun-17
10-Jun-17
30-May-17 0
30-May-17
30-May-17
30-May-17
16-Jun-17 0
16-Jun-17
16-Jun-17
16-Jun-17
12-Jul-17 0
30-May-17 0
30-May-17 0
30-May-17
16-May-17 0
16-May-17
16-May-17
30-May-17 0
26-May-17 0
23-May-17
23-May-17
26-May-17
30-May-17 0
30-May-17
30-May-17
30-May-17
30-May-17
20-Jun-17 0
13-Jun-17
20-Jun-17
12-Jul-17 0
15-Jun-17 0
15-Jun-17
15-Jun-17
5-Jul-17 0
5-Jul-17
5-Jul-17
5-Jul-17
5-Jul-17
12-Jul-17 0
12-Jul-17
12-Jul-17
12-Jul-17
12-Jul-17
27-Nov-17 0
25-Sep-17 0
12-Sep-17 0
30-Jul-17
6-Aug-17
7-Aug-17
6-Sep-17
12-Sep-17
25-Sep-17 0
4-Aug-17
10-Aug-17
11-Aug-17
20-Sep-17
25-Sep-17
16-Nov-17 0
16-Nov-17 0
9-Aug-17
19-Aug-17
21-Aug-17
9-Nov-17
16-Nov-17
16-Nov-17 0
3-Aug-17
10-Aug-17
11-Aug-17
9-Nov-17
16-Nov-17
16-Nov-17 0
7-Aug-17
17-Aug-17
18-Aug-17
6-Nov-17
16-Nov-17
27-Oct-17 0
10-Aug-17
20-Aug-17
21-Aug-17
20-Oct-17
27-Oct-17
5-Nov-17 0
16-Oct-17 0
2-Aug-17
9-Aug-17
10-Aug-17
9-Oct-17
16-Oct-17
12-Oct-17 0
14-Aug-17
19-Aug-17
21-Aug-17
5-Oct-17
12-Oct-17
5-Nov-17 0
5-Aug-17
26-Aug-17
29-Aug-17
28-Oct-17
5-Nov-17
27-Nov-17 0
16-Nov-17 0
22-Aug-17
27-Aug-17
28-Aug-17
27-Oct-17
16-Nov-17
27-Nov-17 0
17-Aug-17
1-Sep-17
2-Sep-17
12-Nov-17
27-Nov-17
15-Nov-17 0
19-Aug-17
30-Aug-17
1-Sep-17
31-Oct-17
15-Nov-17
27-Nov-17 0
21-Nov-17 0
23-Aug-17
7-Sep-17
8-Sep-17
6-Nov-17
21-Nov-17
27-Nov-17 0
23-Aug-17
12-Sep-17
13-Sep-17
12-Nov-17
27-Nov-17
19-Nov-17 0
24-Aug-17
8-Sep-17
9-Sep-17
9-Nov-17
19-Nov-17
25-Nov-17 0
25-Aug-17
9-Sep-17
11-Sep-17
10-Nov-17
25-Nov-17
1-May-18 0
1-May-18 0
8-Aug-17 0
30-May-17
30-Jun-17
18-Jul-17
8-Aug-17
7-Aug-17
16-Dec-17 0
16-Dec-17 0
14-Aug-17
9-Sep-17
12-Oct-17
26-Oct-17
16-Nov-17
16-Dec-17
8-Dec-17 0
21-Sep-17
25-Oct-17
9-Nov-17
24-Nov-17
8-Dec-17
18-Feb-18 0
10-Dec-17 0
10-Dec-17
10-Dec-17
14-Jan-18 0
14-Jan-18
14-Jan-18
18-Feb-18 0
18-Feb-18
18-Feb-18
29-Mar-18 0
15-Dec-17 0
1-Dec-17
15-Dec-17
26-Jan-18 0
5-Jan-18
26-Jan-18
31-Jan-18 0
31-Jan-18
2-Mar-18 0
2-Mar-18
29-Mar-18 0
29-Mar-18
1-May-18 0
1-May-18 0
1-May-18
1-May-18 0
1-May-18
28-Apr-18 0
28-Apr-18 0
28-Apr-18
29-Jun-18 0
14-Jun-18
19-Jun-18
28-Jun-18
29-Jun-18
30-Jun-18 0
30-Jun-18
RSRC

rsrc_short rsrc_name rsrc_title_name


Resource I Resource Title
MathisL Lane Mathis, CIO
AndersonG Glen Anderson, VP Development
VincentI Ian Vincent
CharlesM Mandy Charles, VP IT Ops
ZhuS Shannon Zhu
LaffertyV Vanessa Lafferty
BennettC Carina Bennett
PaxsonD Dan Paxson
SinghD Deepak Singh
SharpeD Dan Sharpe
ITCon IT Consultant
LiR Roy Li
RiceB Barbara Rice, PMO Director
ChopraA Amit Chopra
AbrahamM Molly Abraham
WrenJ Jo Wren
ATM ENG Automation Systems Engineer
IT Information Technology Group
Product De Product Development Resources
ManufEng Manufacturing Engineering Group
CaseyA Andrea CasSix Sigma Engineer
RileyP Paul Riley Product Engineer
MarshallG Gary Marsha Product Engineer
LeeC Cindy Lee Product Engineering Specialist
ProductOpsProduct Operations Group
HillF Frank Hill
WestL Larry West
BaxterS Sue Baxter
WynnA Alice Wynn
ProductMkt Product Marketing Group
LincolnR Robert Linc Manufacturing Engineer
ShawH Harry ShawSenior Engineering Lead
JacksonL Lendell Jackson
RickelsS Sam Rickels
IthanP Peg Ithan
Corporate Corporate Resources
Bpmpmo Business Process PMO
JohnsonR Rea Johnson
McneillL Lori McNeil
Operations Process Operations
BillingsJ Judy Billings
Chuf Frank Chu
Contr External Contractors
Bpm001 BPM Consultant 1
Bpm002 BPM Consultant 2
Bpm003 BPM Consultant 3
FrostB Ben Frost
CooperP Peter Cooper

Page 32
RSRC

PetersonM Michelle Peterson


PrescottW Wayne Prescott
E&C ResourE&C Resources
Subcontrac Subcontractor
Trades Trades
ManagemenManagement
Purchasing Purchasing Department
Engineerin Engineering Department
Cretefinish Concrete Finisher
Admin Administrator
Fabrication Fabrication
Elev Inst Elevator Installer
Elec Electrician
Floor Floor and Carpet Layer
Operator Operator
Plumb Plumber
FCarp Finish Carpenter
RCarp Rough Carpenter
GenLabor Laborer-Construction
FieldEng Field Engineer
IrnWrk Ironworker
FieldEngSnrField Eng-Senior
FieldEngAssField Eng-Assistant
Exc Excavator
KimP Paul Kim Design Engineer
YoungJ Jeff Young Analyst
PMs Project Managers
ResnerW Wendy Res Automation Systems Engineer
DesEng Design Engineer
McGuireO Owen McGuire, Project Manager
Project ConProject ConAccounts Manager
InsEng Instrumentation Engineer
HVAC HVAC
Millwork CaMillwork Subcontractor
Thermal ProThermal Protection Subcontractor
Finishes Finishes & Fit-out Subcontractor
Concrete-S Concrete Foundation Subcontractor
Specialty MSpecialty Metal Fabricator Subcontractor
Pools Pool Installation Subcontractor
Conveying- Conveying Subcontractor
Fire Suppre Fire Suppression Subcontractor
LandscapinLandscaping Subcontractor
Specialties FF&E Specialties
Drywall Drywall Subcontractor
Roofing Roofing Subcontractor
Glass Glass & Glazing Subcontractor
Paving Paving & Roadways Subcontractor
Utilities Utilities Subcontractor
OPTGP Operations Test Group
INSP InspectionsSenior Inspector

Page 33
RSRC

Hydro Hydroblaster
Paint Painter
Material Material Resources
Test resour New Resource Name
Test ResourNew Resource Name-1
Innovative Innovative Construction Internal Resources
NCDT-1 NCDT Resource
NCDT New Condensate & Diesel Tank Project
NCDT-Civil- Civil Team 4
NCDT-Civil- Civil Team 3
NCDT-Civil Civil Team 1
NCDT-Civil- Civil Team 2
NCDT-Civil- Civil Team 7
NCDT-Civil- Civil Team 8
NCDT-Civil- Civil Team 5
NCDT-Civil- Civil Team 6
PCr Project Controls
SMG Site Management
FE Field Engineering
Qlt Quality
ELIN Electrical & Instrument
QCIC QC Inspector Civil
QCIM QC Inspector Mechanical
CM Construction Manager
DoCon Document Controller
ESpv Electrical Supervisor
Pln Planning Engineer
CEng Construction Engineer
DCMg Deputy Construction Manager
PCM Project Control Manager
PRp Project Reporting
MEng Mechanical Engineer
CiE Civil Engineer

Page 34
TASKPRED

pred_proj_i proj_id PREDTASK_TASK__PROJpred_task_i task_id PREDTASK_TASK__tas


(*)Predeces(*)Successo(*)Predece (*)Success Predecesso Successor (*)Predeces(*)Successo
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1010 A1020 Survei Lap Ijin Gangg
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1130 A1140 Piping Des Mechanical
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1140 A1150 Mechanical Elektrikal
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1010 A1030 Survei Lap Ijin Keama
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1110 A1120 Proses Saf Civil Desi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1120 A1130 Civil Desi Piping Des
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1150 A1160 Elektrikal Instrument
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1100 A1110 Process De Proses Saf
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1120 A8670 Civil Desi Spesifikas
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8670 A8680 Spesifikas Spesifikas
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8670 A8690 Spesifikas Calculatio
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8690 A8700 Calculatio Calculatio
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8690 A8630 Calculatio Pondasi Ta
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8630 A8640 Pondasi Ta Pondasi Sh
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1090 A9230 Site Prepa Pasang bou
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1000 A1010 Effective Survei Lap
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8630 A5190 Pondasi Ta MTO Materi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5190 A8650 MTO MateriMR Materia
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5280 A5250 Tender TBE for Ma
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5330 A5260 Tender TBE for Ma
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5250 A5300 TBE for Ma PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5260 A5350 TBE for Ma PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8650 A5280 MR Materia Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8660 A5330 MR Materia Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5200 A8660 MTO MateriMR Materia
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1130 A2100 Piping Des Piping Des
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2100 A2120 Piping Des Piping Mat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2120 A2150 Piping Mat Piping str
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2150 A8730 Piping str Datasheet
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8730 A8740 Datasheet Datasheet
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8740 A9030 Datasheet Datasheet
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8730 A8750 Datasheet Drawing fo
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8750 A4450 Drawing fo MTO for Pi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8640 A5200 Pondasi Sh MTO Materi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8750 A9040 Drawing fo MTO for Ga
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8750 A9050 Drawing fo MTO for ch
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4450 A4540 MTO for Pi MR for Pi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9040 A9060 MTO for Ga MR for Gat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9050 A9070 MTO for ch MR for che
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8760 A4630 Tender TBEof Pip
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9130 A9080 Tender TBE for Ga
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9180 A9090 Tender TBE for ch
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4540 A8760 MR for Pi Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9060 A9130 MR for Gat Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9070 A9180 MR for che Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8760 A8770 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8770 A8780 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8780 A8790 PO Issued Manufactur

Page 35
TASKPRED

Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8790 A8800 ManufacturDelivery m


Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5280 A5290 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5290 A5300 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5300 A5310 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5310 A5320 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5330 A5340 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5340 A5350 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5350 A5360 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5360 A5370 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9130 A9140 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9140 A9150 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9150 A9160 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9160 A9170 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9180 A9190 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9190 A9200 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9200 A9210 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9210 A9220 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1140 A2370 Mechanical Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2370 A2380 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2380 A2390 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2390 A8960 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2370 A9630 Specificat Datasheet
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2380 A9640 Specificat Datasheet
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2390 A9650 Specificat Datasheet
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8960 A9660 Specificat Datasheet
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9630 A2680 Datasheet Drawing La
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9640 A9100 Datasheet Drawing La
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9650 A9110 Datasheet Drawing Re
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9660 A9120 Datasheet Drawing la
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1000 A1100 Effective Process De
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2680 A8810 Drawing La Material P
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9110 A8830 Drawing ReDrain Tank
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9100 A8820 Drawing La Material T
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9120 A8840 Drawing la Pompa
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8810 A8850 Material P Material P
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8820 A8860 Material T Material
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8830 A8870 Drain Tank Drain Tank
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8530 A8890 Tender Material P
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8580 A8900 Tender Material T
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6010 A8910 Tender Drain Tank
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8980 A8920 Tender Pompa
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1150 A2690 Elektrikal Electrical
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2690 A2700 Electrical Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2700 A2710 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2710 A2720 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2720 A2730 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2730 A2740 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2740 A2750 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2750 A2760 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2760 A2770 Specificat Specificat

Page 36
TASKPRED

Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2770 A2780 Specificat Specificat


Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2780 A2790 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2790 A2800 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2800 A2810 Specificat Specificat
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2810 A2850 Specificat Electrical
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2850 A2880 Electrical MV Switchg
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2880 A2890 MV SwitchgLV switchg
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2890 A2900 LV switchg Power tran
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2690 A2820 Electrical Electrical
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2820 A2950 Electrical Overall Si
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2690 A2950 Electrical Overall Si
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A2950 A4900 Overall Si MTO for MV
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4900 A4970 MTO for MVMR for MV
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4910 A4980 MTO for LV MR for LV
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4920 A4990 MTO for po MR for pow
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4630 A8780 TBEof Pip PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9080 A5350 TBE for Ga PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8840 A8880 Pompa Pompa
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8850 A8530 Material P Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8860 A8580 Material Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8870 A6010 Drain Tank Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8880 A8980 Pompa Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8890 A8550 Material P PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8900 A8600 Material T PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8910 A6030 Drain Tank PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8920 A9000 Pompa PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4900 A4910 MTO for MVMTO for LV
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4910 A4920 MTO for LV MTO for po
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4970 A6310 MR for MV Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4980 A6360 MR for LV Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A4990 A6410 MR for pow Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6310 A5040 Tender MV switch
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6360 A5050 Tender LV switchg
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6410 A5060 Tender power tran
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5040 A6330 MV switch PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5050 A6380 LV switchg PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5060 A6430 power tran PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A1160 A3200 Instrument Instrumen
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3200 A3210 Instrumen General In
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3210 A3220 General In distribute
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3220 A3340 distribute Control va
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3340 A3350 Control va Presure re
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3350 A3360 Presure re Safety & r
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3360 A3370 Safety & r Fire & gas
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3370 A3380 Fire & gas Motor Oper
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3380 A3390 Motor Oper MOV DBB
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3390 A3400 MOV DBB Overall in
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3400 A3600 Overall in Overall in
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3600 A3610 Overall in Overall co
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3600 A3780 Overall in MTO for Fi

Page 37
TASKPRED

Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3780 A3790 MTO for Fi MTO for In
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A3790 A5110 MTO for In MR for Fir
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5110 A5120 MR for Fir MR for Mot
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5120 A5150 MR for Mot MR for Mov
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5150 A5160 MR for Mov MR for Tan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5110 A7100 MR for Fir Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5120 A7150 MR for Mot Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5150 A7200 MR for Mov Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5160 A7250 MR for Tan Tender
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7100 A6850 Tender TBE for fi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7150 A6860 Tender TBE for Mo
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7200 A6870 Tender TBE for Mo
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7250 A6880 Tender TBE for Ta
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8530 A8540 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8540 A8550 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9080 A9150 TBE for Ga PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9090 A9200 TBE for ch PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8550 A8560 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8560 A8570 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6010 A6020 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6020 A6030 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6030 A6040 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6040 A6050 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8580 A8590 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8590 A8600 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8600 A8610 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8610 A8620 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8980 A8990 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8990 A9000 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9000 A9010 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9010 A9020 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6310 A6320 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6320 A6330 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6330 A6340 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6340 A6350 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6360 A6370 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6370 A6380 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6380 A6390 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6390 A6400 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6410 A6420 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6420 A6430 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6430 A6440 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6440 A6450 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7100 A7110 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7110 A7120 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7120 A7130 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7130 A7140 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7150 A7160 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7160 A7170 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6860 A7170 TBE for Mo PO Issued

Page 38
TASKPRED

Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7120 A7180 PO Issued Manufactur


Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6440 A7190 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7200 A7210 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7210 A7220 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6870 A7220 TBE for Mo PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7220 A7230 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7230 A7240 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7250 A7260 Tender TBE/CBT
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7260 A7270 TBE/CBT PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7270 A7280 PO Issued Manufactur
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7280 A7290 ManufacturDelivery m
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6880 A7270 TBE for Ta PO Issued
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9230 A9240 Pasang bouPekerjaan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9240 A9260 Pekerjaan Pembuatan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A5320 A9230 Delivery m Pasang bou
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9260 A9270 PembuatanAsphalt co
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9270 A9280 Asphalt co pipe suppo
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9280 A9290 pipe suppo Gravel, bu
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8800 A9390 Delivery m Penyetelan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A6350 A9470 Delivery m Install Ca
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A7140 A9550 Delivery m Instalasi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9390 A9400 Penyetelan Pengelasan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9400 A9410 PengelasanPenyetelan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9410 A9420 Penyetelan Pengelasan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9420 A9430 PengelasanPenyetelan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9430 A9440 Penyetelan Pengelasan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A8570 A9700 Delivery m Erection a
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9700 A9710 Erection a welding bo
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9710 A9720 welding bo Erection s
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9720 A9730 Erection s Welding
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9730 A9740 Welding Preparatio
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9740 A9750 Preparatio Install ra
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9470 A9550 Install Ca Instalasi
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9770 A9590 Painting Pengetesan
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9590 A9600 PengetesanCleaning a
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9600 A9610 Cleaning a Commisioni
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9610 A9690 CommisioniReport of
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9690 A9760 Report of As built d
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9690 A9620 Report of Finish
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9760 A9620 As built d Finish
Schedule-2 Schedule-2 Schedule-2 Schedule-2 A9610 A9620 CommisioniFinish

Page 39
TASKPRED

pred_type lag_hr_cnt PREDTASK__TASK__stat PREDTASK__TASK__rsrc_delete_record_flag


Relationshi Lag(h) (*)Predeces(*)Successo(*)Predeces(*)SuccessoDelete This Row
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte

Page 40
TASKPRED

FS 0 Not Starte Not Starte


FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte

Page 41
TASKPRED

FF 0 Not Starte Not Starte


FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
FS 0 Not Starte Not Starte

Page 42
TASKPRED

SS 0 Not Starte Not Starte


FS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte

Page 43
TASKPRED

FS 0 Not Starte Not Starte


FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FF 0 Not Starte Not Starte
SS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte

Page 44
PROJCOST

task_id cost_name TASK__stat target_cost act_cost remain_costotal_cost delete_record_flag


Activity ID Expense It (*)Activity Budgeted CActual CostRemaining At Complet Delete This Row

Page 45
PROJCOST

delete_record_flag
Delete This Row

Page 46
TASKRSRC

task_id TASK__stat rsrc_id role_id acct_id rsrc_type cost_per_qtstart_date


Activity ID (*)Activity Resource I Role ID Cost Accoun(*)Resource(*)Price / U (*)Start

Page 47
TASKRSRC

end_date delete_record_flag
(*)Finish Delete This Row

Page 48
USERDATA

user_data
UserSettings Do Not Edit

Page 49

You might also like