Staircase handrail ht 36”(915mm) top of wooden rail work going

Mosaic polishing work progress

Old bldg Skirting HDF 50mm Ht., can we use Hdf skirting 50mm ht., for wooden flooring area also.

New bldg Rafter & Shera board fabrication work started

Door design required for New bldg Kitchen service area door,Toilet door,Powder room ( can we use
same

All Bathroom CP fittings and Sanitary fitting list ?

Shall we proceed with detail Old bldg Master bed step detail

Quote given by Mr.Srinivasan

Supply charges for Brass Rangoli pattern=80,000 (Fabrication time 1 Week) Fixing charges extra

Main gate column detail pls confirm

Aluminum Door fixing new bldg