Professional Documents
Culture Documents
MARCOM Job Requisition Form: Breakfast Food Name Tag
MARCOM Job Requisition Form: Breakfast Food Name Tag
Apirath Apirath
Note:
Form must be fully completed, printed and endorsed by the Department Head, Marcom and the General Manager prior to
production.
A minimum lead-time of three weeks for conceptualization and production is required. This timeline is only a guideline,
depending on the materials selected for production. Advertising in magazines requires a minimum of three months lead-time.
For promotions, the Post-Event Report must be submitted two weeks after the promotion ends.
Please plan ahead!