Professional Documents
Culture Documents
IADC HSE Case Guideline
IADC HSE Case Guideline
IADC HSE Case Guideline
Global Version
including
Combined Operations
Dominic Cattini
Director European Operations
What is our Focus?
Integration
• Experience
• Knowledge
• International Standards
• ISO 9001
• ISO 14001
• ISO 17776
• OSHAS 18001
Identify
Step 1 hazards
Evaluate Screening
Step 2
risk Criteria
Identify
Risk-reduction
measures
Step 3
Set functional
requirements
Risk Management Process (SHIDAC)
• The SHIDAC process incorporates:
• The basics of Fault and Event Tree Analyses;
• Measures to control major and other workplace
hazards;
• Ensures barriers are identified, established, monitored
and consistently maintained
• Key deliverables:
• Determination of major and other workplace hazards;
• Critical Activities / tasks related to a drilling contractors
scope of operations;
Risk Assessment Matrix
1 Slight
harm
Slight
damage
Slight
effect
Slight
impact
Low Risk
2 Minor Minor Minor Limited
harm damage effect impact
3 Major
harm
Local
damage
Local
effect
Considerable
impact
Medium Risk
4 Single Major Major National
fatality damage effect impact
Control 2.1
Source 2.1
Consequence 2.1 3A / 2B / Control 2.2 Defence 2.1
Source 2.2
Hazard 2 Consequence 2.2 N Y 3E / 2B – Control 2.3 Defence 2.2
Source 2.3
Source 2.4
Consequence 2.3 3E Control 2.4 Defence 2.3
Control 2.5
Risk Optimisation Strategy