Fck Fy Df palw yt d'

ISOLATED FOOTING Provided


20 500 1.52 100 16 footing size 50

PU Pu Mux Muy Bc Dc Req. A L B L B LF BF S


Footing
From MF (kN) (kN-M) (kN-M) (mm) (mm) (M )
2
(Ft) (Ft) (Ft) (Ft) (M) (M) (kN/M2)
1 616 677.60 15 17 400 400 5.62 7.77 7.77 10.00 10.00 3.05 3.05 76.5
2 912 1,003.20 13 11 400 400 8.31 9.46 9.46 10.00 10.00 3.05 3.05 110.7
3 700 770.00 26 17 400 400 6.38 8.29 8.29 10.00 10.00 3.05 3.05 88.4
4 707 777.70 4 3 400 400 6.45 8.33 8.33 10.00 10.00 3.05 3.05 84.6
5 971 1,068.10 14 20 400 400 8.85 9.76 9.76 10.00 10.00 3.05 3.05 119.2
6 1540 1,694.00 20 20 400 400 14.04 12.29 12.29 13.00 13.00 3.96 3.96 109.8
7 1373 1,510.30 20 20 400 400 12.52 11.60 11.60 13.00 13.00 3.96 3.96 98.1
8 967 1,063.70 20 20 400 400 8.82 9.74 9.74 10.00 10.00 3.05 3.05 118.7
9 974 1,071.40 20 20 400 400 8.88 9.77 9.77 10.00 10.00 3.05 3.05 119.6
10 1676 1,843.60 20 20 400 400 15.28 12.82 12.82 13.00 13.00 3.96 3.96 119.4
11 1490 1,639.00 20 20 400 400 13.58 12.09 12.09 13.00 13.00 3.96 3.96 106.3
12 707 777.70 20 32 400 400 6.45 8.33 8.33 10.00 10.00 3.05 3.05 90.5
13 833 916.30 20 20 400 400 7.59 9.04 9.04 10.00 10.00 3.05 3.05 102.9
14 1065 1,171.50 20 20 400 400 9.71 10.22 10.22 11.00 11.00 3.35 3.35 107.4
15 851 936.1 34 26 400 400 7.76 9.14 9.14 10.00 10.00 3.05 3.05 108.0
d0
200 One way

BM/M dM D Bar dia Spacing Ast d p2 p3 BM2 BM3 K pt Vu


(kN-M) (mm) (mm) (mm) cm c/c (cm )/M (mm)
2
(%) (N/mm2)
67 89 450 12 20.9 5.40 362.2 76.55 76.12 67.08 66.71 40.00 0.15 224.36
97 107 450 12 17.5 6.45 362.2 110.33 110.75 96.69 97.06 40.00 0.18 324.62
77 96 450 12 20.9 5.40 362.2 86.49 88.40 75.80 77.47 40.00 0.15 259.11
74 94 450 12 20.9 5.40 362.2 84.35 84.57 73.93 74.11 40.00 0.15 247.87
104 111 450 12 16.2 6.97 362.2 119.22 117.95 104.48 ### 40.00 0.19 349.44
174 126 550 12 12.1 9.37 450.9 109.83 109.83 174.21 ### 40.00 0.21 578.89
156 119 550 12 13.6 8.32 450.9 98.13 98.13 155.65 ### 40.00 0.18 517.22
104 111 450 12 16.3 6.94 362.2 118.75 118.75 104.07 ### 40.00 0.19 348.05
105 112 450 12 16.2 6.99 362.2 119.57 119.57 104.79 ### 40.00 0.19 350.48
189 132 600 12 12.1 9.36 488.2 119.36 119.36 189.33 ### 40.00 0.19 611.45
169 124 550 12 12.5 9.05 450.9 106.33 106.33 168.66 ### 40.00 0.20 560.43
79 97 450 12 20.9 5.40 362.2 90.50 87.96 79.31 77.09 40.00 0.15 265.27
90 104 450 12 19.0 5.97 362.2 102.88 102.88 90.16 90.16 40.00 0.16 301.54
117 112 450 12 14.6 7.76 366.1 107.41 107.41 117.05 117.05 40.00 0.21 399.78
95 106 450 12 18.0 6.28 362.2 106.28 107.98 93.14 94.63 40.00 0.17 316.49
One way Two way

Tc > Tv Vu b0Tc` > Tv Check for output zone


(N/mm(N/mm
2
) 2
) (N/mm
(N/mm
2
) 2
) s Shear S.No. Description D d0 dia spacing min rein
0.29 0.20######### 0.60 OK OK 1 1 20 8 14 8 762 4.95
0.31 0.29######### 0.87 OK OK 2 2 20 8 14 7 762 4.95
0.29 0.23######### 0.70 OK OK 3 3 20 8 14 8 762 4.95
0.29 0.22######### 0.67 OK OK 4 4 20 8 14 8 762 4.95
0.32 0.32######### 0.94 OK OK 5 5 20 8 14 6 762 4.95
0.33 0.32######### 1.07 OK OK 6 6 24 8 14 5 914.4 5.94
0.32 0.29######### 0.96 OK OK 7 7 24 8 14 5 914.4 5.94
0.32 0.32######### 0.94 OK OK 8 8 20 8 14 6 762 4.95
0.32 0.32######### 0.94 OK OK 9 9 20 8 14 6 762 4.95
0.32 0.32######### 1.03 OK OK 10 10 26 8 14 5 990.6 6.44
0.33 0.31######### 1.04 OK OK 11 11 24 8 14 5 914.4 5.94
0.29 0.24######### 0.71 OK OK 12 12 20 8 14 8 762 4.95
0.30 0.27######### 0.81 OK OK 13 13 20 8 14 7 762 4.95
0.33 0.33######### 1.02 OK OK 14 14 20 8 14 6 762 4.95
0.31 0.29######### 0.85 OK OK
7.95 7.95
7.95 6.91
7.95 7.95
7.95 7.95
7.95 6.39
6.63 4.75
6.63 5.35
7.95 6.42
7.95 6.37
6.12 4.76
6.63 4.92
7.95 7.95
7.95 7.46
7.95 5.74
TABLE: Joint Reactions
Story Joint Label Unique Name Load Case/Combo FX FY FZ MX
kN kN kN kN-m
BASE 1 43 RXN 9.3939 35.05 529.0085 -5.5438
BASE 2 46 RXN 8.0842 -32.304 622.5247 3.7129
BASE 3 49 RXN 8.2847 8.444 896.2563 -4.1281
BASE 4 52 RXN 8.5338 -8.4088 863.0799 3.896
BASE 5 55 RXN 26.4759 28.4404 537.6959 -4.201
BASE 6 58 RXN 34.7288 -27.8279 677.9288 2.6848
BASE 7 61 RXN 10.1163 7.0725 1181.3377 -2.5118
BASE 9 66 RXN 11.7236 -19.9539 756.7205 9.8828
BASE 10 69 RXN -3.2375 11.7791 810.5285 -5.4048
BASE 11 72 RXN -2.8516 -3.4966 937.0677 1.0633
BASE 12 75 RXN -2.7085 4.2496 1248.6718 -2.7355
BASE 13 78 RXN -1.5361 -3.8279 1244.0541 2.5552
BASE 14 81 RXN 9.1538 6.059 918.4672 -2.2399
BASE 15 84 RXN 3.3828 -5.6343 1245.932 2.2995
BASE 16 87 RXN -3.5906 11.2795 1581.7728 -3.2987
BASE 18 92 RXN -3.7076 -22.3268 1023.3501 11.9726
BASE 19 95 RXN 2.4976 4.0136 721.9844 -1.7332
BASE 20 98 RXN 2.3485 2.4755 834.0139 -1.221
BASE 21 101 RXN 2.3646 3.1886 1212.7067 -1.9276
BASE 22 104 RXN 4.6155 13.9621 1475.9671 -4.8504
BASE 24 109 RXN 4.0484 -14.1819 1484.597 5.5704
BASE 25 112 RXN 2.4038 -3.5934 1240.1417 2.8588
BASE 26 115 RXN -3.432 -3.7031 905.7625 2.5548
BASE 27 118 RXN 3.3399 -4.6943 745.1887 2.9021
BASE 28 121 RXN -10.1397 3.9631 489.3239 -1.3112
BASE 29 124 RXN -8.4584 0.2821 604.4959 0.2067
BASE 30 127 RXN -8.4454 6.9378 877.6398 -2.8938
BASE 31 130 RXN -7.1069 11.4117 1356.8842 -4.0335
BASE 33 135 RXN -7.2299 -11.7836 1374.7013 5.2227
BASE 34 138 RXN -8.1575 -7.9713 876.2675 4.5337
BASE 35 141 RXN -8.6958 -1.9888 594.5478 1.714
BASE 36 144 RXN -9.5458 -4.8638 493.5451 2.882
BASE 40 150 RXN -4.3787 6.4904 376.2354 -2.8202
BASE 42 156 RXN -4.2347 -6.5939 373.6816 4.0941
BASE 57 192 RXN -26.4474 0.3683 155.5377 -0.1857
BASE 58 193 RXN 0.7485 19.8797 143.4844 -0.5424
BASE 59 194 RXN 0.4714 -11.4325 108.4735 0.1998
BASE 60 195 RXN -21.0005 -0.0839 123.083 -0.0478
BASE 61 196 RXN 0.6217 21.8242 169.3763 -0.5538
BASE 62 197 RXN 0.7493 -12.923 135.8661 0.1493
BASE ~414 RXN -4.6326 -0.4558 300.5117 0.0123
BASE ~421 RXN -4.5497 0.8785 236.8602 -0.4211

3 896.2563 2 622.5247
12 1248.6718 61 169.3763
21 1212.7067 11 937.0677
30 877.6398 20 834.0139
29 604.4959

4 863.0799
13 1244.0541 9 756.72 26 905.7625
22 1475.9671 18 1023.35 35 594.5478
31 1356.8842 27 745.19
40 376.2354 36 493.55
MY MZ
kN-m kN-m
3.3396 0.1293
2.6844 -0.1505
3.0552 -0.0255
3.5616 -0.0741
3.7348 -0.1473
4.9909 0.3066
4.5506 -0.0596
5.5761 -0.0657
-1.7892 -0.0399
-1.5127 -0.0234
-1.2911 -0.0294
-0.3666 -0.016
3.5553 -0.0109
1.63 -0.0992
-0.8743 -0.0206
-0.6455 -0.0262
0.6592 -0.0415
0.7688 -0.037
0.8764 -0.0468
2.2856 -0.0038
2.1412 -0.0427
1.6938 0.0058
-1.0685 -0.0033
2.388 -0.0038
-4.4492 -0.0533
-3.386 -0.0367
-3.3765 -0.0468
-2.1135 0.0465
-1.9888 -0.1041
-2.4168 -0.0139
-2.6348 -0.0273
-2.7706 -0.0379
-2.6907 -0.0545
-2.4601 -0.0249
-1.0129 -0.0357
0.4127 -0.0554
0.2874 0.0332
-0.7935 0.0049
0.2784 -0.0358
0.3441 0.0464 1 529.0085 6 677.9288 5
0.0899 0.009 62 135.8661 57 155.5377 59
-0.0032 -0.0132 10 810.5285 15 1245.932 60
19 721.9844 24 1484.597 14
28 489.3239 33 1374.7013
42 373.6816
58 143.4844

7 1181.338
16 1581.773
25 1240.142
34 876.2675
537.6959
108.4735
123.083
918.4672
GRID -2
Column Loads in KN
6 624.00 edge column LT Allowable bearing capacity of Site = 100 KN/m2
5 593.00 Center column Span of columns 0.3
B1-B2 = 3.27 m
Considering B1 and B2 only
Total Column Loads = 1217.00
Area of Footing Required = 12.17

Cg of loads from edge column = 1.67 m 1.67


Adopt width of footing (B) = 3.66 m 12
L1+L2 = 3.33 a 0.5 x1 3.49
b -3.27 x2 3.05
centre Provide L2 = 0.2800 c 5.32 0.92
edge Provide L1 = 3.0465 m 10.00
Design of Footing Slab
Upward Reaction = 100.00 KN/m2
Width of Footing beam assumed = 0.35 m
Length of cantilever footing = 1.654 m
Maximum bending moment = 136.83 KNm
Maximum shear force = 165.43 KN

Depth of Slab required according to BM = 226.80 mm τv 0.66


Depth of Slab required according to SF = 459.52 mm for Ast/bdX100=0.25%,
Provide d= 250 mm ʈc 0.36
D= 300 mm Ast for 0.25% = 1567.84 mm2
Ast for 0.15% = 375.00 mm2
10 8
19.97 7.46
50.07 133.97
Provide
10 dia at 2.00 c/c
8 dia at 5.50 c/c

Beam
6 624.00 1217.00 KN
5 593.00

L1 0.00 ft.

Area od foundation

Upward Reaction
#DIV/0! KN/m
Design of Beam

Hogging Moment #DIV/0! KNm

b 350
d #DIV/0! mm Provide d= 360
D= 400
Trial Ast 821.000 Trial
Final Ast #DIV/0! Provide 2-20+1-16 Final

GRID -3
Column Loads in KN
9 262.69 edge column LT Allowable bearing capacity of Site = 140 KN/m2
8 321.90 Center column Span of columns 0.23
B1-B2 = 3.80 m
Considering B1 and B2 only
Total Column Loads = 584.59
Area of Footing Required = 4.18

Cg of loads from edge column = 2.14 m 2.14


Adopt width of footing (B) = 1.52 m 5
L1+L2 = 2.74 a 0.5 x1 6.11
b -3.80 x2 1.48
centre Provide L2 = 1.2558 c 4.53 4.12
edge Provide L1 = 1.4834 m 4.87
Design of Footing Slab
Upward Reaction = 140.00 KN/m2
Width of Footing beam assumed = 0.35 m
Length of cantilever footing = 0.587 m
Maximum bending moment = 24.14 KNm
Maximum shear force = 82.21 KN

Depth of Slab required according to BM = 95.26 mm τv 0.33


Depth of Slab required according to SF = 228.35 mm for Ast/bdX100=0.25%,
Provide d= 250 mm ʈc 0.36
D= 300 mm Ast for 0.25% = 527.59 mm2
Ast for 0.15% = 375.00 mm2
10 8
6.72 7.46
148.79 133.97
Provide
10 dia at 6.00 c/c
8 dia at 5.50 c/c
Beam
9 262.69 584.59 KN
8 321.90

L1 12.08 ft.

Area od foundation

Upward Reaction
158.78 KN/m

Design of Beam

Hogging Moment 107.62 KNm

b 350
d 340 mm Provide d= 360
D= 400
Trial Ast 820.000 Trial
Final Ast 820.745 Provide 2-20+1-16 Final
329.26829
3.12 624.00

365.85366

FT IN
- 11.0
9.0 11.9

Err:508 %of bar ʈc


0.15 0.28
N/mm2 0.25 0.36
0.6271

821.00
658.00
Sagging Moment ### KNm

Ast 658.000
Ast #DIV/0! Provide 2-16+1-20 Provide2 legged 8 dai ring 150mm c/c

12.08 137.19512
3.68

213.41463

FT IN
4.0 1.4
4.0 10.4

Err:508 %of bar ʈc


0.15 0.28
N/mm2 0.25 0.36
0.2110
820.00
658.00

Sagging Moment 89.68 KNm

Ast 658.000
Ast 658.669 Provide 1-20+2-16 Provide2 legged 8 dai ring 150mm c/c
Bearing 100 7.2
FE 500
FC 20

PRESSUR
AREA LENGTH WIDTH Width PRESSURE
GRID E (KN/M) PROJECTION
m2 m m adopted m (KN/M2)
per m

1 231.80
2 288.82 A-A 16.46 13.7 1.2 1.22 98.37 98.37 0.920
3 417.67 44.998 3.935 4.000
4 396.24 119.96
5 311.25

1 231.80
6 307.64 1-1 7.83 8.0 1.0 0.98 100.01 100.01 0.676
11 243.16 26.309 3.200 3.200
97.57
300

MOMENT d required dadopt Ast reqd spacing spacing


c b a rebar
(kNm) (mm) (mm) mm2 mm inch

62.379 153.137 300 143400.34 -300 0.025 498.729 10 157.40 6


78.5

34.236 113.450 200 78704.40 -200 0.025 415.056 10 189.13 6


78.5

% of steel M15 M20 M25


0.15 0.28 0.28 0.29
0.25 0.35 0.36 0.36
0.50 0.46 0.48 0.49
0.75 0.54 0.56 0.57
1.00 0.60 0.62 0.64
1.25 0.64 0.67 0.70
1.50 0.68 0.72 0.74
1.75 0.75
2.00 0.79
2.25 0.81
2.50 0.82
2.75 0.82
Ast adopted τv
% adopted Vu (kN/m) τc
mm2

523.33 0.21 91.41 0.305 0.33 SAFE

523.33 0.35 71.35 0.357 0.41 SAFE

X Y
X1,Y1 0.25 0.36
X,Y 0.35 ###
X2.Y2 0.5 0.48

X Y
X1,Y1 0.15 0.28
X,Y 0.21 ###
X2.Y2 0.25 0.36