➢Introduction
➢General information about Mine
➢Geology of the mine
➢ Method of working
➢ Mining Operations
➢ Supports
➢ Ventilation
➢ Mining Machineries
➢ Survey
➢ Safety
INTRODUCTION
➢The parent company and subsidiary of DRC UG Mine is COAL INDIA LIMITED and
WESTERN COALFIELD LIMITED.
➢The head office of WCL is at NAGPUR( Maharastra).
➢The mine is situated at WARDHA RIVER BELT.
➢Durgapur Rayatwari Colliery is the largest underground mine of Chandrapur Area.
approximately 165 Km away from Nagpur by road.
➢The mine has common boundary with Chanda Rayatwari Colliery and DRC 6,7,8 (Sinala UG
project).
➢The mine as part of Chanda Rayatwari Colliery and become a separate mine in the year 1982.
➢The mine has three entries and two airshafts. DRC 6,7 & 8 has two entries and one return
airway.
Location Plan Of Durgapur Rayatwari Colliery
CRC UG MINE
DRC UG MINE
MAHAKALI UG MINE
General Information Of The Mine
FILTER PLANT
WORKSHOP
Geology Of Mine
➢Name of Seam Being worked with stage of working:
S. No. Seam Thickness Direction/ Depth Of Working Stage of Working
Avg. Dip Max. Min. Development Depillaring
Geological disturbances:
Fault: - One down throw fault on southern boundary to the mine openings.
1. Throw: - 70m(approx.
2. Angle of Hade: - 70⁰(approx.)
Method Of Working
Bord And Pillar With Sand stowing method
➢ Depillaring of Developed Pillar:-” Each pillar so developed is divided in to two equal halves by driving
level split & dip slices towards the goaf, maintaining a rib of coal against adjacent goaf.”
➢ Sand stowing operation:-” The void created as a result of driving slice is completely filled with sand”.
➢ 2nd lift extraction:-” Extraction of 2nd lift is commenced in such manner that original gallery, split gallery &
slice are driven exactly over the 1st lift”’
➢The holes of 32 mm diameter and depth 1.5m are drilled by Portable Drilling Machine.
❑ Quantity of explosive:
➢ 1 hole: 3x185=555gm
➢ 11 holes: 11x555=6105gm/blast
➢ Output per blast: 11tonns
SUPPORTS
It is a safety device use for indication of strata load.It is thin from middle part so when strata load
is high than it breaks from middle of prop.
Ventilation
Air Quantity:
Intake: Return:
DRC No.-03 Incline: 2500m³/min Air Shaft(0L/32D): 3100m³/min\
DRC No.-04 Incline: 1100m³/min Air Shaft(-4L/94D): 3250m³/min
Total Return: 6350m³/min
DRC No.-05 Incline: 2500m³/min
Total Intake: 6100m³/min
➢Ventilation Control
1. Isolation Stopping: Existing: - 284 nos.
Accessible: - 261nos.
Incomplete: - 12 nos. (In tendering process)
2. Doors/Air Locks
3. Air Crossings
MINE-MACHINARIES
➢No. of SDL: 08
➢Bucket Capacity: 1.1 m3
➢Electric motor: 65 HP/550 volts
➢Travelling Speed: 3 Km/hr
➢Operating Weight:8900 Kg
HAULAGE
Direct Haulage:
There are four no. of direct haulages in the mine which hauls the coal loaded tubs up to the tippler.
Endless Haulage:
There are two endless haulages working at present which hauls the coal loaded tubs from the working face
and transfer it to direct haulage.
Run off mine coal is transferred to the mechanical tippler with loaded tub through a series of haulages from where
it is again transferred to strata bunker by mechanically operated tippler.
Conveyor Belt
➢ There are two belt conveyors TB1 (Surface) & TB2 (Underground) in the mine.
➢ PLANS
1. Surface Plan
2. Line diagram of ventilation system
3. Bore-holes section
4. Emergency Plan
5. Separate Plan of each district with Section
6. Location plan
SAFETY DEVICES
➢Safety helmets
➢Flame safety lamp
➢Multi Gas Detector
➢Mining Shoes
➢Fire Extinguisher
➢Life Oxygen Bag
➢Stretcher
➢float alarm
➢Audio Visual Alarm
➢Dust Mask
➢Safety Goggles
➢Hand Gloves
➢Safety Chamber/Rescue Chamber
Rescue Chamber
➢Capacity: 50 Person
➢Ventilation Fan: 300 m3
➢First Aid Available
➢Drinking water available
➢Air tight/Water tight
➢Telephonic Communication
➢Arrangement for supply of food or water