Professional Documents
Culture Documents
Tugas Af Chapter 13
Tugas Af Chapter 13
Kelompok 6:
1. Engeline Imaculata M. ( 18REG74037)
2. Hafiz Ilmi P. (18REG74051)
3. Mardiyah (18REG74074)
4. Rizky Ananto Yandira (18REG74103)
MAGISTER MANAJEMEN
FAKULTAS EKONOMIKA DAN BISNIS
UNIVERSITAS GADJAH MADA
YOGYAKARTA
2019
13-9
a. Biaya untuk uji kelayakan sebesar $5,000 ini termasuk sunk cost maka dari itu tidak masuk dalam
analisis
b. The net cost is $126,000:
Harga ($108,000)
Modification (12,500)
Increase in NWC (5,500)
Cash outlay (Mesin Baru) ($126,000)
I/YR = 12%
22,800 26,760 22,470 20,160 19,830 18,180 16,200 16,200
NPV = -82,500 + (1.12)1 + (1.12)2 + (1.12)3 + (1.12)4 + (1.12)5 + (1.12)6 + (1.12)7 + (1.12)8
NPV = $22,329.39
13-12
a. Expected annual cash flows:
Project A: Probable
Probability × Cash Flow = Cash Flow
0.2 $6,000 $1,200
0.6 6,750 4,050
0.2 7,500 1,500
Expected annual cash flow = $6,750
Project B: Probable
Probability × Cash Flow = Cash Flow
0.2 $ 0 $ 0
0.6 6,750 4,050
0.2 18,000 3,600
Expected annual cash flow = $7,650
Coefficient of variation:
Standard deviation NPV
CV
Expected value Expected NPV
Project A:
Project B:
Proyek B memiliki NPV yang lebih tinggi; oleh karena itu, perusahaan harus menerima Proyek B.
c. Dengan asumsi high risk high return. Efek portofolio dari Proyek B cenderung membuatnya lebih
berisiko daripada proyek A. jika Proyek B berkorelasi negatif dengan PDB (Proyek B
menguntungkan ketika ekonomi sedang turun), maka lebih tidak beresiko dan penerimaan Proyek
B diperkuat.
13-13
a. Project A:
6,000 8,000
NPV = -10,000 + (1.10)1 + (1.10)2
NPVA = $2,066.12
Project B:
b. Project A:
NPVA = $3,773.65
Dalam kasus ini kita lebih memilih NPVA karena memiliki NPV yang lebih besar dari Project B
sebesar $3,773.65
c. Menggunakan Financial Calculator:
Project A: N = 2, I/YR = 10, PV = -2066.12, FV = 0; solve for PMT = $1,190.48.