Obras de Toma: Replanteo (Estructuras) M2

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 15

REPLANTEO (ESTRUCTURAS)

M2
OBRAS DE TOMA
VARIOS DE REPLANTEO GLB 1,000 5.00 M
TOPOGRAFO HR. 0.150 28.00 O
PEON HR. 0.150 12.00 O
EQUIPO TOPOGRFICO (ESTACION TOTAL ) HR. 0.150 20.00 E

EXCAVACION COMUN SUELO DURO


M3
OBRAS DE TOMA
PEON COMUNIDAD HR. 3,358 17.22 O
HERRAMIENTAS MENORES HR. 1,000 2.00 E

Hº Cº BASE 1:2:4 -50% P.D.


M3
OBRAS DE TOMA
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 4,000 7.20 M
CLAVOS KG. 0.500 15.00 M
ALAMBRE DE AMARRE KG. 0.200 15.00 M
ALBAÑIL HR. 3,500 18.00 O
AYUDANTE HR. 4,000 15.00 O
VIBRADORA HR. 0.750 20.00 E
MEZCLADORA U HORMIGONERA HR. 0.350 40.00 E

Hº Cº ELEVACIONES 1:2:4 -50% P.D.


M3
OBRAS DE TOMA
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 10,000 7.20 M
CLAVOS KG. 1,000 15.00 M
ALAMBRE DE AMARRE KG. 0.500 15.00 M
ALBAÑIL HR. 4,000 18.00 O
AYUDANTE HR. 5,000 15.00 O
VIBRADORA HR. 0.350 20.00 E
HORMIGONERA DE 250 LT HR. 0.750 60.00 E

CONTRAPISO DE PIEDRA Y CEMENTO(HO 1:3:4)


M2
OBRAS DE TOMA
ARENA M3 0.025 72.00 M

GRAVA M3 0.030 90.00 M

CEMENTO PORTLAND KG. 10,000 1.12 M

PIEDRA MANZANA M3 0.120 50.00 M

ALBAÑIL HR. 1,500 18.00 O

PEON HR. 1,500 12.00 O

Hº Aº LOSA TAPA
M3
OBRAS DE TOMA
ACERO ESTRUCTURAL KG. 110,000 12.00 M
ALAMBRE DE AMARRE KG. 1,000 15.00 M
CEMENTO PORTLAND KG. 315,000 1.12 M
CLAVOS KG. 1,000 15.00 M
MADERA DE ENCOFRADO P2 70,000 7.20 M
ARENA M3 0.400 72.00 M
GRAVA M3 0.800 90.00 M
ALBAÑIL HR. 24,000 18.00 O
PEON HR. 26,000 12.00 O
MEZCLADORA U HORMIGONERA HR. 0.300 40.00 E

VIBRADORA HR. 0.300 20.00 E

VOLQUETA HR. 0.600 20.00 E

REVOQUE DE MORTERO C/SIKA 1 (1:3-E=2.5CM


M2
OBRAS DE TOMA
SIKA 1 IMPERMEABILIZANTE KG. 0.420 5.00 M

CEMENTO PORTLAND KG. 14,000 1.12 M

ARENA M3 0.030 72.00 M

ALBAÑIL HR. 2,000 18.00 O

PEON HR. 2,500 12.00 O

VOLQUETE HR. 0.300 25.00 E

REJILLA METALICA (SEG. DISEÑO)


PZA
OBRAS DE TOMA
SOLDADURA DE ARCO KG. 10,000 20.00 M
FIERRO ANGULAR 2"*1/4" ML 3,000 28.00 M
FIERRO LISO D=1/2" KG. 45,000 16.00 M
ALBAÑIL HR. 0.500 18.00 O

MECANICO SOLDADOR HR. 4,000 20.00 O

PEON HR. 2,000 12.00 O

EQUIPO DE SOLDAR HR. 1,000 30.00 E

ACCESORIOS OBRA DE TOMA TIROLESA


PZA
OBRAS DE TOMA
CODO FG 90° D=2" PZA 1,000 250.00 M
UNION UNIVERSAL F.G.D=2" PZA 1,000 150.00 M
FILRO BRONCE 2" PZA 1,000 150.00 M
PLOMERO HR. 2,000 20.00 O
AYUDANTE HR. 2,000 15.00 O
HERRAMIENTAS PLOMERIA HR. 1,000 2.00 E
REPLANTEO (ESTRUCTURAS)
M2
OBRAS DE TOMA
VARIOS DE REPLANTEO GLB 1,000 5.00 M
TOPOGRAFO HR. 0.150 28.00 O

PEON HR. 0.150 12.00 O

EQUIPO TOPOGRFICO (ESTACION TOTAL ) HR. 0.150 20.00 E

EXCAVACION COMUN SUELO DURO


M3
OBRAS DE TOMA
PEON COMUNIDAD HR. 3,358 17.22 O
HERRAMIENTAS MENORES HR. 1,000 2.00 E

Hº Cº BASE 1:2:4 -50% P.D.


M3
OBRAS DE TOMA
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 4,000 7.20 M
CLAVOS KG. 0.500 15.00 M
ALAMBRE DE AMARRE KG. 0.200 15.00 M
ALBAÑIL HR. 3,500 18.00 O
AYUDANTE HR. 4,000 15.00 O
VIBRADORA HR. 0.750 20.00 E

MEZCLADORA U HORMIGONERA HR. 0.350 40.00 E

Hº Cº ELEVACIONES 1:2:4 -50% P.D.


M3
OBRAS DE TOMA
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 10,000 7.20 M
CLAVOS KG. 1,000 15.00 M
ALAMBRE DE AMARRE KG. 0.500 15.00 M
ALBAÑIL HR. 4,000 18.00 O
AYUDANTE HR. 5,000 15.00 O
VIBRADORA HR. 0.350 20.00 E

HORMIGONERA DE 250 LT HR. 0.750 60.00 E

CONTRAPISO DE PIEDRA Y CEMENTO(HO 1:3:4)


M2
OBRAS DE TOMA
ARENA M3 0.025 72.00 M

GRAVA M3 0.030 90.00 M

CEMENTO PORTLAND KG. 10,000 1.12 M

PIEDRA MANZANA M3 0.120 50.00 M

ALBAÑIL HR. 1,500 18.00 O

PEON HR. 1,500 12.00 O

Hº Aº LOSA TAPA
M3
OBRAS DE TOMA
ACERO ESTRUCTURAL KG. 110,000 12.00 M
ALAMBRE DE AMARRE KG. 1,000 15.00 M
CEMENTO PORTLAND KG. 315,000 1.12 M
CLAVOS KG. 1,000 15.00 M
MADERA DE ENCOFRADO P2 70,000 7.20 M
ARENA M3 0.400 72.00 M
GRAVA M3 0.800 90.00 M
ALBAÑIL HR. 24,000 18.00 O
PEON HR. 26,000 12.00 O
MEZCLADORA U HORMIGONERA HR. 0.300 40.00 E

VIBRADORA HR. 0.300 20.00 E

VOLQUETA HR. 0.600 20.00 E

REVOQUE DE MORTERO C/SIKA 1 (1:3-E=2.5CM


M2
OBRAS DE TOMA
SIKA 1 IMPERMEABILIZANTE KG. 0.420 5.00 M

CEMENTO PORTLAND KG. 14,000 1.12 M

ARENA M3 0.030 72.00 M

ALBAÑIL HR. 2,000 18.00 O

PEON HR. 2,500 12.00 O

VOLQUETE HR. 0.300 25.00 E

PROV. Y COLOCADO DE TUBERIA PVC C-6 CRIBADA D=4”


ML
OBRAS DE TOMA
TUBERIA PERFORADA PVC. C-6 DE D=4" ML 1,010 60.00 M
PLOMERO CALIFICADO HR. 0.250 24.00 O

AYUDANTE HR. 0.250 15.00 O

HERRAMIENTAS PLOMERIA HR. 0.100 2.00 E

FILTRO DE GRAVA GRADUADA


M3
OBRAS DE TOMA
MATERIAL FILTRANTE (D=3, 5, 10 CM) M3 1,050 609.60 M
PEON HR. 2,000 12.00 O

ACCES.OBRA TOMA 2 -TIPO FILTRANTE


GLB
OBRAS DE TOMA
TUBERIA PVC D=2" ML 4,000 18.00 M
CODO PVC D=2" PZA 3,000 15.00 M
COLADOR PVC D=2" PZA 1,000 120.00 M
TUBERIA F.G. D=2" ML 1,000 63.40 M
NIPLE HEXAGONAL F.G. D=2" PZA 2,000 120.00 M
CODO 90º F.G. D=2" PZA 1,000 110.00 M
PLOMERO HR. 3,000 20.00 O
AYUDANTE HR. 5,000 15.00 O
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
CONDUCCIÓN
ESTACAS 2"*2"*30 CM PZA 0.040 4.00 M

PINTURA AL ACEITE CON BRILLO L 0.001 150.00 M

CLAVOS KG. 0.010 15.00 M

ALAMBRE DE AMARRE KG. 0.010 15.00 M

YESO O ESTUCO KG. 0.010 0.35 M

TOPOGRAFO HR. 0.020 28.00 O

ALARIFE HR. 0.030 22.00 O

ESTACION TOTAL (EQUIPO TOPOGRAICO) HR. 0.010 20.00 E

NIVEL DE INGENIERO HR. 0.010 20.00 E

EXCAVACION DE 0 - 2 M SUELO SEMIDURO


M3
CONDUCCIÓN
PEON COMUNIDAD HR. 5,000 17.22 O
HERRAMIENTAS MENORES HR. 2,000 2.00 E

CAMA DE ARENA
M3
CONDUCCIÓN
ARENA FINA M3 1,000 80.00 M
PEON HR. 0.600 12.00 O

VOLQUETE HR. 0.300 25.00 E

PROV. Y COLOC. SUPERTUBO HDPE 63MM D=2"


ML
CONDUCCIÓN
SUPERTUBO HDPE 63MM 2 " ML 1,000 25.00 M
ACOPLE HDPE 63MM 2 " PZA 0.020 90.00 M

PLOMERO HR. 0.100 20.00 O

AYUDANTE HR. 0.200 15.00 O

PROV. Y COLOC. SUPERTUBO HDPE 75 MM D =2 1/2"


ML
CONDUCCIÓN
SUPERTUBO HDPE 75MM 2 1/2" ML 1,000 40.00 M
ACOPLE 75MM 2 1/2" PZA 0.013 120.00 M

PLOMERO HR. 0.100 20.00 O

AYUDANTE HR. 0.200 15.00 O

PROVISION Y COLOCACION TUBRIA FG 2"


ML
CONDUCCIÓN
TUBERIA F.G. D=2" ML 1,030 63.40 M
COPLA F.G. D=2" PZA 0.300 36.00 M

PLOMERO HR. 0.200 20.00 O

AYUDANTE HR. 0.600 15.00 O

RELLENO DE ZANJA CON TIERRA CERNIDA H=0.30 M.


M3
CONDUCCIÓN
PEON COMUNIDAD HR. 3,000 17.22 O
HERRAMIENTAS MENORES HR. 1,000 2.00 E

ACCESORIOS ADUCCION
GLB.
CONDUCCIÓN
TEE 63MM" PZA 1,000 140.00 M
TEE REDUCCION 75MM A 50MM " PZA 8,000 210.00 M
TAPON DE 75MM" GLB 1,000 70.00 M
ACOPLE REDUCCION DE 75MMX63MM" PZA 1,000 110.00 M
ADAPTADOR MACHO 63MMX2 PZA 3,000 53.00 M
ADAPTADOR MACHO DE 75MMX2 1/2 PZA 16,000 84.00 M
ADAPTADOR HEMBRA 63MMX2 PZA 2,000 54.00 M
CUELLERIA DE 75MMX1 PZA 1,000 48.00 M
CUELLERIA DE 63MMX1 1/2 PZA 2,000 54.00 M
CUELLERIA DE 75MMX2 PZA 1,000 53.00 M
PLOMERO HR. 50,000 20.00 O
PEON HR. 80,000 12.00 O
EQUIPOS Y HERRAMIENTAS MENORES HR. 100,000 10.00 E

PRUEBA HIDRAULICA HASTA 3"


ML
CONDUCCIÓN
AGUA LT 4,000 0.04 M
PLOMERO HR. 0.006 20.00 O

PEON HR. 0.019 12.00 O

BOMBA DE AGUA A GASOLINA HR. 0.006 25.00 E

EQUIPO PARA PRUEBA HIDRAULICA HASTA D=8" HR. 0.020 50.00 E


REPLANTEO (ESTRUCTURAS)
M2
OBRAS COMPLEMENTARIAS
VARIOS DE REPLANTEO GLB 1,000 5.00 M
TOPOGRAFO HR. 0.150 28.00 O

PEON HR. 0.150 12.00 O

EQUIPO TOPOGRFICO (ESTACION TOTAL ) HR. 0.150 20.00 E

EXCAVACION COMUN SUELO DURO


M3
OBRAS COMPLEMENTARIAS
PEON COMUNIDAD HR. 3,358 17.22 O
HERRAMIENTAS MENORES HR. 1,000 2.00 E

Hº Cº BASE 1:2:4 -50% P.D.


M3
OBRAS COMPLEMENTARIAS
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 4,000 7.20 M
CLAVOS KG. 0.500 15.00 M
ALAMBRE DE AMARRE KG. 0.200 15.00 M
ALBAÑIL HR. 3,500 18.00 O
AYUDANTE HR. 4,000 15.00 O
VIBRADORA HR. 0.750 20.00 E

MEZCLADORA U HORMIGONERA HR. 0.350 40.00 E

Hº Cº ELEVACIONES 1:2:4 -50% P.D.


M3
OBRAS COMPLEMENTARIAS
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 10,000 7.20 M
CLAVOS KG. 1,000 15.00 M
ALAMBRE DE AMARRE KG. 0.500 15.00 M
ALBAÑIL HR. 4,000 18.00 O
AYUDANTE HR. 5,000 15.00 O
VIBRADORA HR. 0.350 20.00 E

HORMIGONERA DE 250 LT HR. 0.750 60.00 E

CONTRAPISO DE PIEDRA Y CEMENTO(HO 1:3:4)


M2
OBRAS COMPLEMENTARIAS
ARENA M3 0.025 72.00 M

GRAVA M3 0.030 90.00 M

CEMENTO PORTLAND KG. 10,000 1.12 M

PIEDRA MANZANA M3 0.120 50.00 M

ALBAÑIL HR. 1,500 18.00 O

PEON HR. 1,500 12.00 O

Hº Aº LOSA TAPA
M3
OBRAS COMPLEMENTARIAS
ACERO ESTRUCTURAL KG. 110,000 12.00 M
ALAMBRE DE AMARRE KG. 1,000 15.00 M
CEMENTO PORTLAND KG. 315,000 1.12 M
CLAVOS KG. 1,000 15.00 M
MADERA DE ENCOFRADO P2 70,000 7.20 M
ARENA M3 0.400 72.00 M
GRAVA M3 0.800 90.00 M
ALBAÑIL HR. 24,000 18.00 O
PEON HR. 26,000 12.00 O
MEZCLADORA U HORMIGONERA HR. 0.300 40.00 E

VIBRADORA HR. 0.300 20.00 E

VOLQUETA HR. 0.600 20.00 E

REVOQUE DE MORTERO C/SIKA 1 (1:3-E=2.5CM


M2
OBRAS COMPLEMENTARIAS
SIKA 1 IMPERMEABILIZANTE KG. 0.420 5.00 M

CEMENTO PORTLAND KG. 14,000 1.12 M

ARENA M3 0.030 72.00 M

ALBAÑIL HR. 2,000 18.00 O

PEON HR. 2,500 12.00 O

VOLQUETE HR. 0.300 25.00 E

COMPUERTA METALICA 40X50CM


PZA
OBRAS COMPLEMENTARIAS
ACERO ESTRUCTURAL LISO KG. 0.500 15.00 M

FIERRO ANGULAR 2"*1/8" ML 1,800 18.00 M

PLANCHA DE ACERO 3/8" (10MM) M2 0.250 200.00 M

PERNOS DE FIJACION DE ½"*4" PZA 2,000 2.30 M

ELECTRODO PUNTO ROJO KG. 0.200 15.00 M

PERFIL U DE FIERRO 2"*2"*1/8" ML 1,500 50.00 M

MECANICO SOLDADOR HR. 15,000 20.00 O

ALBAÑIL HR. 8,000 18.00 O

PEON HR. 2,000 12.00 O

EQUIPO DE SOLDAR HR. 2,000 30.00 E


PROV. Y COLOCADO ACCESORIOS DESARENADOR
GLB
OBRAS COMPLEMENTARIAS
COLADOR PVC D=2" PZA 1,000 120.00 M
TUBERIA F.G. D=2" ML 0.500 63.40 M
LLAVE DE PASO CORTINA D=2" PZA 1,000 185.00 M
UNION UNIVERSAL F.G. D=2" PZA 1,000 49.80 M
NIPLE HEXAGONAL F.G. D=2" PZA 2,000 120.00 M
PLOMERO HR. 3,000 20.00 O
AYUDANTE HR. 6,000 15.00 O
EXCAVACION DE 0 - 2 M SUELO SEMIDURO
M3
PASOS DE QUEBRADA
PEON COMUNIDAD HR. 5,000 17.22 O
HERRAMIENTAS MENORES HR. 2,000 2.00 E

PROV. E INST. CABLE ACERADO PRINCIPAL 1/2"


ML
PASOS DE QUEBRADA
CABLE ACERADO D=1/2" ML 1,010 15.00 M
PLOMERO HR. 0.200 20.00 O

AYUDANTE HR. 0.100 15.00 O

Hº Cº BASE 1:2:4 -50% P.D.


M3
PASOS DE QUEBRADA
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 4,000 7.20 M
CLAVOS KG. 0.500 15.00 M
ALAMBRE DE AMARRE KG. 0.200 15.00 M
ALBAÑIL HR. 3,500 18.00 O
AYUDANTE HR. 4,000 15.00 O
VIBRADORA HR. 0.750 20.00 E

MEZCLADORA U HORMIGONERA HR. 0.350 40.00 E

PROV. Y COLOC. TORRES DE TUBERIA FG D=2" H=3.5M


PZA
PASOS DE QUEBRADA
TUBERIA F.G. D=2" ML 11,000 63.40 M
ACERO ESTRUCTURAL KG. 2,000 12.00 M
SOLDADURA DE ARCO KG. 10,000 20.00 M
ALBAÑIL HR. 0.500 18.00 O

AYUDANTE HR. 1,000 15.00 O

MECANICO SOLDADOR HR. 2,000 20.00 O

EQUIPO DE SOLDAR HR. 2,000 30.00 E

BLOQUE DE ANCLAJE DE Hº Cº 50% PD


M3
PASOS DE QUEBRADA
CEMENTO PORTLAND KG. 150,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 4,000 7.20 M
CLAVOS KG. 0.500 15.00 M
ALAMBRE DE AMARRE KG. 0.200 15.00 M
ALBAÑIL HR. 5,000 18.00 O
AYUDANTE HR. 5,000 15.00 O
VIBRADORA HR. 0.750 20.00 E

HORMIGONERA DE 250 LT HR. 0.350 60.00 E

ACCESORIOS PASO QUEBRADAS S/DISEÑO L=34M


GLB
PASOS DE QUEBRADA
GUARDACABLE PARA D=3/8" PZA 10,000 8.00 M
MORDAZA PARA D=3/8" PZA 20,000 5.00 M
TENSOR DE 1" PZA 1,000 140.00 M
MORDAZA PARA D=5/8" PZA 26,000 12.00 M
GUARDACABLE PARA D=5/8" PZA 2,000 18.00 M
MORDAZA MODIFICADA PARA D=5/8" PZA 10,000 10.00 M
CANDADO MEDIANO PZA 1,000 10.00 M
SOLDADURA DE ARCO KG. 3,000 20.00 M
CADENA DE ACERO ML 1,000 10.00 M
CABLE DE SUSPENSION D=3/8" ML 15,000 12.00 M
PEON HR. 8,000 12.00 O
AYUDANTE HR. 8,000 15.00 O
ALBAÑIL HR. 8,000 18.00 O
MECANICO SOLDADOR HR. 1,000 20.00 O
EQUIPO DE SOLDAR HR. 5,000 30.00 E

RELLENO COMPACTADO MANUAL (NO INC. MAT)


M3
PASOS DE QUEBRADA
PEON COMUNIDAD HR. 2,500 17.22 O
HERRAMIENTAS MENORES HR. 1,000 2.00 E
EXCAVACION DE 0 - 2 M SUELO SEMIDURO
M3
PASOS DE QUEBRADA
PEON COMUNIDAD HR. 5,000 17.22 O
HERRAMIENTAS MENORES HR. 2,000 2.00 E

PROV. E INST. CABLE ACERADO PRINCIPAL 1/2"


ML
PASOS DE QUEBRADA
CABLE ACERADO D=1/2" ML 1,010 15.00 M
PLOMERO HR. 0.200 20.00 O

AYUDANTE HR. 0.100 15.00 O

Hº Cº BASE 1:2:4 -50% P.D.


M3
PASOS DE QUEBRADA
CEMENTO PORTLAND KG. 140,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 4,000 7.20 M
CLAVOS KG. 0.500 15.00 M
ALAMBRE DE AMARRE KG. 0.200 15.00 M
ALBAÑIL HR. 3,500 18.00 O
AYUDANTE HR. 4,000 15.00 O
VIBRADORA HR. 0.750 20.00 E

MEZCLADORA U HORMIGONERA HR. 0.350 40.00 E

PROV. Y COLOC. TORRES DE TUBERIA FG D=3" H=4M


PZA
PASOS DE QUEBRADA
TUBERIA FG 4" ML 18 150 M
ACERO ESTRUCTURAL KG. 2,000 12.00 M
SOLDADURA DE ARCO KG. 10,000 20.00 M
ALBAÑIL HR. 0.500 18.00 O

AYUDANTE HR. 1,000 15.00 O

MECANICO SOLDADOR HR. 2,000 20.00 O

EQUIPO DE SOLDAR HR. 2,000 30.00 E

BLOQUE DE ANCLAJE DE Hº Cº 50% PD


M3
PASOS DE QUEBRADA
CEMENTO PORTLAND KG. 150,000 1.12 M
ARENA M3 0.300 72.00 M
GRAVA M3 0.400 90.00 M
PIEDRA MANZANA M3 0.525 50.00 M
MADERA DE ENCOFRADO P2 4,000 7.20 M
CLAVOS KG. 0.500 15.00 M
ALAMBRE DE AMARRE KG. 0.200 15.00 M
ALBAÑIL HR. 5,000 18.00 O
AYUDANTE HR. 5,000 15.00 O
VIBRADORA HR. 0.750 20.00 E

HORMIGONERA DE 250 LT HR. 0.350 60.00 E

ACCESORIOS PASO QUEBRADAS S/DISEÑO L=40M


GLB
PASOS DE QUEBRADA
GUARDACABLE PARA D=3/8" PZA 20,000 8.00 M
MORDAZA PARA D=3/8" PZA 20,000 5.00 M
TENSOR DE 1" PZA 2,000 140.00 M
MORDAZA PARA D=5/8" PZA 26,000 12.00 M
GUARDACABLE PARA D=5/8" PZA 2,000 18.00 M
MORDAZA MODIFICADA PARA D=5/8" PZA 10,000 10.00 M
CANDADO MEDIANO PZA 1,000 10.00 M
SOLDADURA DE ARCO KG. 3,000 20.00 M
CADENA DE ACERO ML 1,000 10.00 M
CABLE DE SUSPENSION D=3/8" ML 20,000 12.00 M
PEON HR. 9,000 12.00 O
AYUDANTE HR. 9,000 15.00 O
ALBAÑIL HR. 8,000 18.00 O
MECANICO SOLDADOR HR. 1,000 20.00 O
EQUIPO DE SOLDAR HR. 5,000 30.00 E

RELLENO COMPACTADO MANUAL (NO INC. MAT)


M3
PASOS DE QUEBRADA
PEON COMUNIDAD HR. 2,500 17.22 O
HERRAMIENTAS MENORES HR. 1,000 2.00 E