OR-O5-217 /B-II Raod A Paruabhadi

2 Earthwork in hard soil in embankments roads


etc within 50m initial lead and 1.5m initial lift
including rough dressing and breaking clods to
maximum 5cm to 7cm and laying in layers not
exceeding 0.3cm in depth and compaction
with PRR including hire & running charges of
PRR as per the direction of the E.I.C

Ch 0/00
7.00
4.50
0.50 0.50
0.50 0.50
5.50
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.5 +5.50) X (0.50 +0.50) = 1.375 Sqm
2 2 2 2
Ch 0/100
7.00
4.50
0.60 0.60
0.60 0.60
5.70
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.5 +5.70) X (0.60 +0.60) = 1.680 Sqm
2 2 2 2
Ch 0/200
7.00
4.50
0.60 0.60
0.60 0.60
5.70
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.5 +5.70) X (0.60 +0.60) = 1.680 Sqm
2 2 2 2
Ch 0/300 7.00
4.50
0.60 0.60
0.60 0.60
5.70
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.5 +5.70) X (0.60 +0.60) = 1.680 Sqm
2 2 2 2
Ch 0/400 7.00
4.50
0.70 0.70
0.70 0.70
5.90
9.10
CS Area =
(7.00 +9.10) X (0.70 +0.70) - (4.5 +5.90) X (0.70 +0.70) = 1.995 Sqm
2 2 2 2
Ch 0/500 7.00
4.50
0.70 0.70
0.70 0.70
5.90
9.10
CS Area =
(7.00 +9.10) X (0.70 +0.70) - (4.5 +5.90) X (0.70 +0.70) = 1.995 Sqm
2 2 2 2
Ch0/600 7.00
4.50
0.80 0.80
0.80 0.80
6.10
9.40
CS Area =
(7.00 +9.40) X (0.80 +0.80) - (4.5 +6.10) X (0.80 +0.80) = 2.320 Sqm
2 2 2 2
Ch 0/700
7.00
4.50
0.80 0.80
0.80 0.80
6.10
9.40
CS Area =
(7.00 +9.40) X (0.80 +0.80) - (4.5 +6.10) X (0.80 +0.80) = 2.320 Sqm
2 2 2 2
Ch 0/800
7.00
4.50
0.60 0.60
0.60 0.60
5.70
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.5 +5.70) X (0.60 +0.60) = 1.680 Sqm
2 2 2 2
Ch 0/870
7.00
4.50
0.50 0.50
0.50 0.50
5.50
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.5 +5.50) X (0.50 +0.50) = 1.375 Sqm
2 2 2 2
Ch 1/000 7.00
4.50
0.50 0.50
0.50 0.50
5.50
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.5 +5.50) X (0.50 +0.50) = 1.375 Sqm
2 2 2 2
Ch 1/100 7.00
4.50
0.50 0.50
0.50 0.50
5.50
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.5 +5.50) X (0.50 +0.50) = 1.375 Sqm
2 2 2 2
Ch 1/200 7.00
4.50
0.60 0.60
0.60 0.60
5.70
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.5 +5.70) X (0.60 +0.60) = 1.680 Sqm
2 2 2 2
R.H.S Approach
Ch Area Mean Area Distance
Volume
0/00 1.375 - 0 0.00

Ch 0/100 1.680 1.5280 100.00 152.80

Ch 0/200 1.680 1.6800 100.00 168.00

Ch 0/300 1.680 1.6800 100.00 168.00

Ch 0/400 1.995 1.8380 100.00 183.80

Ch 0/500 1.995 1.9950 100.00 199.50

Ch0/600 2.320 2.1580 100.00 215.80

Ch 0/700 2.320 2.3200 100.00 232.00

Ch 0/800 1.680 2.0000 100.00 200.00

Ch 0/870 1.375 1.5280 70.00 106.96

Ch 1/000 1.375 1.3750 130.00 178.75

Ch 1/100 1.375 1.3750 100.00 137.50

Ch 1/200 1.680 1.5280 100.00 152.80


Total Qty = 1805.61 = 1805.61
Junior Engineer Assistant Executive Engineer Executive Engineer
R.W Section, Bangomunda R.W.Sub-Division, Kantabanji R.W.Division, Titlagarh
BANGOMUNDA NALLAH
TITLAGARH SIDE
SL NO ITEMS
EARTH WORK IN
1 EXCAVATION
1 X 44.00 X 2.20 X 1.00 = 96.80

1 X 21.00 X 2.20 X 1.00 = 46.20

1 X 10.00 X 2.20 X 1.00 = 22.00


165.00 CUM

FILLING SAND IN
2 FOUNDATION
1 X 44.00 X 2.20 X 0.10 = 9.68

1 X 21.00 X 2.20 X 0.10 = 4.62

1 X 10.00 X 2.20 X 0.10 = 2.20


16.50 CUM

3 PCC M15
1 X 44.00 X 2.20 X 0.10 = 9.68

1 X 21.00 X 2.20 X 0.10 = 4.62

1 X 10.00 X 2.20 X 0.10 = 2.20


16.50 CUM
0.00
4 PCC M15 & RAFT
1 X 44.00 X 2.00 X 0.30 = 26.40
1 X 44.00 X (2.2+0.3)/2 X 0.20 = 11.00
1 X 21.00 X 2.00 X 0.30 = 12.60
1 X 21.00 X (1.3+0)/2 X 0.10 = 1.37
1 X 21.00 X (0.4+0)/2 X 0.10 = 0.42
1 X 21.00 X 0.30 X 0.10 = 0.42
1 X 10.00 X (0.9+0)/2 X 0.10 = 0.45
1 X 10.00 X (0.4+0)/2 X 0.10 = 0.20
1 X 10.00 X 0.30 X 0.10 = 0.30
53.16 CUM
5 SUPER STRUCTURE

1 X 44.00 X 0.30 X 2.00 = 26.40

1 X 21.00 X 0.30 X 2.00 = 12.60


1 X 10.00 X 0.30 X 2.00 = 6.00
45.00 CUM
6 WEEPHOLES

1.00 X 45.00 X 0.40 = 18.00

1.00 X 21.00 X 0.40 = 8.40

1.00 X 10.00 X 0.40 4.00


30.40 CUM

7 DRAIN
PCC M15 1 X 47.00 X 0.50 X 0.20 = 4.70
W.C M20 1 X 47.00 X 0.50 X 0.10 = 2.35
WALL M15 1 X 47.00 X 0.15 X 0.50 = 3.53
1 X 3.00 X 0.15 X 0.50 = 0.23
10.80 CUM

9 DECK SLAB 2 NOS


ETAINING WALL
10CIRCULAR PORTION BANGOMUNDA SIDE
2.00 X 20.00 = 40.00 MTRS
11 side road slope 1 X 3.20 X 2.70 X 0.10 = 0.86
m20 1 X 2.70 X 2.20 X 0.10 = 0.59
1 X 2.00 X 1.80 X 0.10 = 0.36
1.82 CUM
BANGOMUNDA NALLAH
BANGOMUNDA SIDE
CHAINAGEDISTANCE

0 - 10 10 X (18.20 +17.00) X (2.80 +2.00) = 422.4


- 2 2
10 - 20 10 X (18.20 +16.40) X (2.90 +2.80) = 493.05
- 2 2
20 - 30 10 X (18.00 +16.20) X (3.25 +2.10) = 457.425
- 2 2
30 - 40 10 X (18.50 +16.00) X (2.10 +3.15) = 452.8125
- 2 2
40 - 50 10 X (18.20 +15.40) X (1.90 +3.10) = 420
- 2 2
50 - 60 10 X (17.50 +15.20) X (1.90 +2.50) = 359.7
- 2 2
60 - 70 10 X (17.00 +15.00) X (1.50 +1.89) = 271.2
- 2 2
70 - 80 10 X (16.00 +15.00) X (1.50 +1.89) = 262.725
- 2 2
80 - 90 10 X (15.40 +14.20) X (1.10 +0.90) = 148
- 2 2
90 - 100 10 X (15.20 +14.20) X (1.20 +1.30) = 183.75
- 2 2
100 - 110 10 X (15.00 +14.40) X (0.80 +1.00) = 132.3
- 2 2
110 - 120 10 X (15.20 +14.20) X (0.40 +0.80) = 88.2
- 2 2
120 - 125 5X (15.50 +9.00) X (0.40 +0.30) = 21.4375
2 2
3713 CUM

TITLAGARH SIDE
CHAINAGEDISTANCE

0 - 10 10 X (20.00 +16.40) X (2.50 +3.00) = 500.5


- 2 2
10 - 20 10 X (19.00 +16.20) X (2.10 +2.50) = 404.8
- 2 2
20 - 30 10 X (18.50 +16.00) X (2.56 +2.25) = 414.8625
- 2 2
30 - 40 10 X (17.50 +16.20) X (2.00 +2.55) = 383.3375
- 2 2
40 - 50 10 X (17.00 +16.00) X (1.56 +1.68) = 267.3
- 2 2
50 - 60 10 X (16.80 +15.80) X (1.56 +1.80) = 273.84
- 2 2
60 - 70 10 X (16.00 +15.00) X (1.50 +1.40) = 224.75
- 2 2
70 - 80 10 X (16.00 +15.00) X (1.40 +1.00) = 186
- 2 2
80 - 90 10 X (15.80 +14.00) X (0.85 +1.00) = 137.825
- 2 2
90 - 100 10 X (15.64 +14.20) X (0.50 +0.85) = 100.71
- 2 2
100 - 110 10 X (15.00 +14.00) X (0.30 +0.50) = 58

2951.925 CUM

BANGOMUNDA SIDE 3713


TITLAGARH SIDE 2951.925
6664.925 CUM
OR-O5-217 /B-II Raod A Paruabhadi

2 Earthwork in hard soil in embankments roads


etc within 50m initial lead and 1.5m initial lift
including rough dressing and breaking clods to
maximum 5cm to 7cm and laying in layers not
exceeding 0.3cm in depth and compaction
with PRR including hire & running charges of
PRR as per the direction of the E.I.C

Ch 0/00
7.00
4.80
0.50 0.50
0.50 0.50
5.80
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.8 +5.80) X (0.50 +0.50) = 1.225 Sqm
2 2 2 2
Ch 0/100
7.00
4.50
0.60 0.60
0.60 0.60
5.70
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.5 +5.70) X (0.60 +0.60) = 1.680 Sqm
2 2 2 2
Ch 0/200
7.00
4.50
0.60 0.60
0.60 0.60
5.70
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.5 +5.70) X (0.60 +0.60) = 1.680 Sqm
2 2 2 2
Ch 0/300 7.00
4.20
0.60 0.60
0.60 0.60
5.40
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.2 +5.40) X (0.60 +0.60) = 1.860 Sqm
2 2 2 2
Ch 0/400 7.00
4.00
0.70 0.70
0.70 0.70
5.40
9.10
CS Area =
(7.00 +9.10) X (0.70 +0.70) - (4.0 +5.40) X (0.70 +0.70) = 2.345 Sqm
2 2 2 2
Ch 0/500 7.00
4.00
0.70 0.70
0.70 0.70
5.40
9.10
CS Area =
(7.00 +9.10) X (0.70 +0.70) - (4.0 +5.40) X (0.70 +0.70) = 2.345 Sqm
2 2 2 2
Ch0/600 7.00
4.00
0.80 0.80
0.80 0.80
5.60
9.40
CS Area =
(7.00 +9.40) X (0.80 +0.80) - (4.0 +5.60) X (0.80 +0.80) = 2.720 Sqm
2 2 2 2
Ch 0/700
7.00
4.00
0.80 0.80
0.80 0.80
5.60
9.40
CS Area =
(7.00 +9.40) X (0.80 +0.80) - (4.0 +5.60) X (0.80 +0.80) = 2.720 Sqm
2 2 2 2
Ch 0/800
7.00
4.00
0.60 0.60
0.60 0.60
5.20
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.0 +5.20) X (0.60 +0.60) = 1.980 Sqm
2 2 2 2
Ch 0/870
7.00
4.20
0.50 0.50
0.50 0.50
5.20
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.2 +5.20) X (0.50 +0.50) = 1.525 Sqm
2 2 2 2

Ch 1/100 7.00
4.00
0.50 0.50
0.50 0.50
5.00
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.0 +5.00) X (0.50 +0.50) = 1.625 Sqm
2 2 2 2
Ch 1/200 7.00
4.00
0.60 0.60
0.60 0.60
5.20
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.0 +5.20) X (0.60 +0.60) = 1.980 Sqm
2 2 2 2
Ch 1/300 7.00
4.00
0.70 0.70
0.70 0.70
5.40
9.10
CS Area =
(7.00 +9.10) X (0.70 +0.70) - (4.0 +5.40) X (0.70 +0.70) = 2.345 Sqm
2 2 2 2
Ch 1/400 7.00
4.00
0.70 0.70
0.70 0.70
5.40
9.10
CS Area =
(7.00 +9.10) X (0.70 +0.70) - (4.0 +5.40) X (0.70 +0.70) = 2.345 Sqm
2 2 2 2
Ch 1/500 7.00
4.00
0.60 0.60
0.60 0.60
5.20
8.80
CS Area =
(7.00 +8.80) X (0.60 +0.60) - (4.0 +5.20) X (0.60 +0.60) = 1.980 Sqm
2 2 2 2
Ch 1/600 7.00
4.00
0.50 0.50
0.50 0.50
5.00
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.0 +5.00) X (0.50 +0.50) = 1.625 Sqm
2 2 2 2
R.H.S Approach
Ch Area Mean Area Distance
Volume
0/00 1.225 - 0 0.00
Ch 0/100 1.680 1.4530 100.00 145.30

Ch 0/200 1.680 1.6800 100.00 168.00

Ch 0/300 1.860 1.7700 100.00 177.00

Ch 0/400 2.345 2.1030 100.00 210.30

Ch 0/500 2.345 2.3450 100.00 234.50

Ch0/600 2.720 2.5330 100.00 253.30

Ch 0/700 2.720 2.7200 100.00 272.00

Ch 0/800 1.980 2.3500 100.00 235.00

Ch 0/870 1.525 1.7530 70.00 122.71

Ch 1/100 1.625 - 0.00 0.00

Ch 1/200 1.980 1.8030 100.00 180.30

Ch 1/300 2.345 2.1630 100.00 216.30

Ch 1/400 2.345 2.3450 100.00 234.50

Ch 1/500 1.980 2.1630 100.00 216.30

Ch 1/600 1.625 1.8030 100.00 180.30


Total Qty = 2845.81 = 2845.81

Junior Engineer Assistant Executive Engineer Executive Engineer


R.W Section, Bangomunda R.W.Sub-Division, Kantabanji R.W.Division, Titlagarh
2845.81
OR-O5-217 /B-II Raod B Purapali

2 Earthwork in hard soil in embankments roads


etc within 50m initial lead and 1.5m initial lift
including rough dressing and breaking clods to
maximum 5cm to 7cm and laying in layers not
exceeding 0.3cm in depth and compaction
with PRR including hire & running charges of
PRR as per the direction of the E.I.C

Ch 0/050
7.00
4.00
0.30 0.30
0.15 0.15
4.30
7.90
CS Area =
(7.00 +7.90) X (0.30 +0.30) - (4.0 +4.30) X (0.15 +0.15) = 1.613 Sqm
2 2 2 2
Ch 0/100
7.00
4.00
0.35 0.35
0.15 0.15
4.30
8.05
CS Area =
(7.00 +8.05) X (0.35 +0.35) - (4.0 +4.30) X (0.15 +0.15) = 2.011 Sqm
2 2 2 2
Ch 0/200
7.00
3.50
0.30 0.30
0.15 0.15
3.80
7.90
CS Area =
(7.00 +7.90) X (0.30 +0.30) - (3.5 +3.80) X (0.15 +0.15) = 1.688 Sqm
2 2 2 2
Ch 0/300 7.00
3.50
0.35 0.35
0.15 0.15
3.80
8.05
CS Area =
(7.00 +8.05) X (0.35 +0.35) - (3.5 +3.80) X (0.15 +0.15) = 2.086 Sqm
2 2 2 2
Ch 0/400 7.00
3.50
0.35 0.35
0.15 0.15
3.80
8.05
CS Area =
(7.00 +8.05) X (0.35 +0.35) - (3.5 +3.80) X (0.15 +0.15) = 2.086 Sqm
2 2 2 2
Ch 0/500 7.00
3.50
0.40 0.40
0.15 0.15
3.80
8.20
CS Area =
(7.00 +8.20) X (0.40 +0.40) - (3.5 +3.80) X (0.15 +0.15) = 2.493 Sqm
2 2 2 2
Ch0/600 7.00
3.50
0.45 0.45
0.20 0.20
3.90
8.35
CS Area =
(7.00 +8.35) X (0.45 +0.45) - (3.5 +3.90) X (0.20 +0.20) = 2.714 Sqm
2 2 2 2
Ch 0/700
7.00
3.50
0.40 0.50
0.20 0.20
3.90
8.35
CS Area =
(7.00 +8.35) X (0.40 +0.50) - (3.5 +3.90) X (0.20 +0.20) = 2.714 Sqm
2 2 2 2
Ch 0/800
7.00
3.80
0.45 0.50
0.25 0.25
4.30
8.43
CS Area =
(7.00 +8.43) X (0.45 +0.50) - (3.8 +4.30) X (0.25 +0.25) = 2.652 Sqm
2 2 2 2
Ch 0/900
7.00
4.00
0.40 0.40
0.15 0.15
4.30
8.20
CS Area =
(7.00 +8.20) X (0.40 +0.40) - (4.0 +4.30) X (0.15 +0.15) = 2.418 Sqm
2 2 2 2
Ch 1/000 7.00
4.00
0.30 0.45
0.15 0.20
4.35
8.13
CS Area =
(7.00 +8.13) X (0.30 +0.45) - (4.0 +4.35) X (0.15 +0.20) = 2.106 Sqm
2 2 2 2
Ch 1/100 7.00
4.00
0.40 0.45
0.20 0.20
4.40
8.28
CS Area =
(7.00 +8.28) X (0.40 +0.45) - (4.0 +4.40) X (0.20 +0.20) = 2.407 Sqm
2 2 2 2
Ch 1/200 7.00
4.00
0.50 0.50
0.40 0.40
4.80
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.0 +4.80) X (0.40 +0.40) = 2.115 Sqm
2 2 2 2
Ch 1/300 7.00
4.00
0.50 0.40
0.40 0.40
4.80
8.35
CS Area =
(7.00 +8.35) X (0.50 +0.40) - (4.0 +4.80) X (0.40 +0.40) = 1.694 Sqm
2 2 2 2
Ch 1/400 7.00
4.00
0.50 0.50
0.40 0.40
4.80
8.50
CS Area =
(7.00 +8.50) X (0.50 +0.50) - (4.0 +4.80) X (0.40 +0.40) = 2.115 Sqm
2 2 2 2
R.H.S Approach
Ch Area Mean Area Distance
Volume
Ch 0/050 1.613 - 0 0.00

Ch 0/100 2.011 1.8120 50.00 90.60

Ch 0/200 1.688 1.8500 100.00 185.00

Ch 0/300 2.086 1.8870 100.00 188.70

Ch 0/400 2.086 2.0860 100.00 208.60

Ch 0/500 2.493 2.2900 100.00 229.00

Ch0/600 2.714 2.6040 100.00 260.40

Ch 0/700 2.714 2.7140 100.00 271.40


Ch 0/800 2.652 2.6830 100.00 268.30

Ch 0/900 2.418 2.5350 100.00 253.50

Ch 1/000 2.106 2.2620 100.00 226.20

Ch 1/100 2.407 2.2570 100.00 225.70

Ch 1/200 2.115 2.2610 100.00 226.10

Ch 1/300 1.694 1.9050 100.00 190.50

Ch 1/400 2.115 1.9050 100.00 190.50


Total Qty = 3014.50 = 3014.50

Junior Engineer Assistant Executive Engineer Executive Engineer


R.W Section, Bangomunda R.W.Sub-Division, Kantabanji R.W.Division, Titlagarh
3014.50
2.25 84.99
1.43895
29.232
26.54196

4.3848
2.8971
17.6958
7.69225442 0.7857

12.663
12 mm dia stirup @ 200 c/c

1 44.00 x 4.70 = 1034.00 mtr


0.200
1 21.00 x 4.50 = 472.50 mtr
0.200
1 10.00 x 3.90 = 195.00 mtr
0.200 1701.50 mtr
@ 0.888 kg/m 1510.932 kg

12 mm dia vertical @200 c/c

wall length 44.00


21.00
10.00
75.00 mtr

2 75.00 x 2.90 2175.00 mtr


0.200 @ 0.888 kg/m 1931.4 kg
10 mm dia distribution

bottom 1 x 65 x 10 = 650
1 x 10 x 9 = 90
side 1 x 3 x 44 = 132
wall 2 x 7 x 75 = 1050
drain 1 x 3 x 44 = 132
drain bottom 1 x (47.00/0.200) x 0.95 = 223.25
2277.25 mtr
@ 0.888 kg/m 2022.198 kg

SLOPE
12 mm dia main @100c/c
1 x (2.7/0.100) x 3.2 = 86.4 mtr
1 x (2.2/0.100) x 2.7 = 59.4 mtr
1 x (1.8/0.100) x 2 = 36 mtr
181.8
@ 0.888 kg/m 161.4384 kg
10 mm dia dist @150c/c
1 x (3.2/0.15) x 2.7 = 57.6 mtr
1 x (2.7/0.150) x 2.2 = 39.6 mtr
1 x (2/0.15) x 1.8 = 24 mtr
121.2
@ 0.615 kg/m 74.538 kg
5700.506 kg
BINAPUR TO KARANGAMAL ROAD

Road length 9288.00

GROSS QNTTY 44295.35

SDBC 1.00 x 9288.00 x 5.50 x 0.025 = 1277.10


2% CURVE &S.E 25.54
1302.64
BM 1.00 x 9288.00 x 5.50 x 0.050 = 2554.20
2% CURVE &S.E 51.08
2605.28

WMM 1.00 x 9288.00 x 5.50 x 0.225 = 11493.90


2% CURVE &S.E 229.88
PCC 5% 1.00 x 9288.00 x 3.50 x 0.100 = 162.54
11886.32

GSB 2.00 x 9288.00 x 1.15 x 0.215 = 4592.92


2% CURVE &S.E 91.86
4684.77

SAND FILLING 2.00 x 9288.00 x 1.96 x 0.150 = 5461.34


5461.34

MOORUM 2.00 x 9288.00 x 1.50 x 0.075 = 2089.80


2089.80

DEPOSITED EARTH ROAD EART EXCAVATION = 4595.51


TOE WALL = 187.20
RETAINING WALL = 1539.44
HPC = 66.50
CULVERT EARTH = 629.50
7018.15

LESS SLOPE
TOE WALL 1.00 x 300.00 x 1.125 = 182.25
182.25

TOTAL 35230.56
9064.79
MTR

CUM

CUM

CUM

CUM

CUM

CUM

CUM

CUM

CUM