Professional Documents
Culture Documents
Vijay Pal: GB Project
Vijay Pal: GB Project
VIJAY PAL
OBJECTIVE
Seeking a responsible and challenging opportunity that would utilize and enhance my skills, where I can devote my creative capabilities
through intellectual, dedicated hard work and resources of the company to achieve the combined growth.
CURRENT EMPLOYMENT
PROFESSIONAL EXPERIENCE
[Nov’10 to Feb’12] [Kandhari Beverages Pvt. Ltd. (FOBO Plant Coca-Cola) [Nabipur .Rajpura (Punjab) and Saha , Ambala]
Project/Production
Line Engineer
Job Profile :
Completing all project related activities i.e. utility civil foundations & installing of Equipments e.g. Boiler, Refrigeration area,
Compressor, 40 bar & 7 bar, Cooling Towers, DG sets, Water treatment plant, piping’s to plant from all utilities.
Erection & commissioning of Beverage line(720 bpm) including Blow molding, Filler, Warmer, Labeler, Wrapa-Pac, Palletizer,
Atlanta Stretch Wrap & Conveyors(Air & container).
Handling all production related activities.
Planning man-power, material and machine activities.
Making the maintenance & lubrication schedules of all the machines.
Operating & trouble–shooting of all the machines i.e. Blow-Molding, Filler, Labeler, Wrapa-pac , Palletizer & Atlanta Stretch Wrap.
Optimizing process parameters of machines to establish the best setting for achieving the desired speed and productivity of the
line on diff. pack sizes.
Motivating the team for performing better in general & adverse conditions and also sharing technical skills with them to increase
the efficiency and productivity of the Line
Ensuring GMP, HACCP in Plant and keep updating my team to standardize these practices.
Worked as Lab In charge (Mechanical Deptt.) In GGS College of Modern Technology, Kharar (Pb.) CG Lab, Auto CAD Lab & All ME
(B-Tech.) Labs from Aug’08 to Oct’2010.
Page 1
[Sep’05 to Aug’08] [Moser Baer India Ltd.] [Greater Noida , U.P]
Engineering/Product & Process Development
Deputy Engineer
{Manufacturing CDR , DVDR , Mini CDR & DVDR, DualLayer-1P & 2P , High Density DVD-HDDVD and Blue Ray Discs
Job Profile :
New Product Development in order to withstand in global market & making new customers .
Raw Material Qualification, from alternate sources for cost savings and improvement in product.
Pre-production trials through ECR for better quality & optimization of process and product.
Release the ECN after Process and Line stabilization in three build-up cycles.
Cost saving by implementing new techniques & new ideas. by doing trials on various lines & seeing the forward results so that our
quality & material don’t be downgraded.
Project Planning, Estimating, and Scheduling. Work in partnership with Product Management to ensure the project plan meets market
requirements. Use in-depth knowledge of and experience with estimating and scheduling project tasks in multiple and diverse
environments. Devise detailed project schedules and resource requirements.
Meeting Facilitation and Issue Resolution. Set the agenda for weekly project review meetings. Follow up with cross-functional teams
on system impact and feasibility for tasks, nominations and issues raised. Ensures that team is energized, unified, and moving
towards a common goal.
Team Management and Team Building. Experienced with leading and managing a variety of teams. Discusses alternative techniques
for maintaining enthusiasm, energy and focus. Communicates verbally and in writing within team and across and up the organization.
Interaction with Chemical Lab. & Process deptt. to stabilize the process on a new trial.
Interaction with Media Lab. to optimize our trialed product on various compatible drives , on various speeds , power margin &
WRS. etc.
Preparation of technical BOM in order to find the actual cost and %age of diff. raw materials used actually at every stage of the
process in making a product.
Active member of a Six Sigma Project ( Improved Archival life for Professional-gold DVD +/- R ) , completed within time & clean
as no further suggestions were given by Motorola University and got accepted without any changes.
Job Profile :
Operation of fully automated 100% hydrogen based (hicon) high Convection Annealing furnaces from world leaders M/s EBNER ,
AUSTRIA, one of the exclusive of BHUSHAN’S identity.
Operation of Hydrogen plant (Vandenborre, Belgium) fully automated having capacity to produce 50nm3/hr. of Hydrogen having two
units producing 25nm3/hr. each with safety as 1st priority and solving the problems with the help of mechanical maintenance &
electrical maintenance team if any , in order to ensure proper running of the plant.
Page 2
Responsible for achieving production targets ensuring strict adherences to quality requirements.
Looking over and optimizing process for troubleshooting different problems regarding process and operating machines or
equipments i.e. Annealing furnaces, Valve Stand, Work Base & other operating equipments in Plant .
Interaction with rolling , rewinding , skin-pass and R&D department for optimizing and achieving the high production.
Interaction with the maintenance deptt. for maintenance and modification of Annealing furnaces to overcome various
problems.
Documentation of machine utilization, capacity calculation , daily progress reports & shift reports.
To co-ordinate with PPC & manufacturing department to continually enhance customer satisfaction through quality service.
Verifying the hardness, elongation & other properties of all grade materials before & after annealing to upgrade the cycle according to
the customer’s requirement.
PROJECTS EXECUTED :
BELL ANNEALER FACILLITY (Ebner, Austria), HYDROGEN SYSTEMS (Vandenborre , Belgium ) , HARDENING &
TEMPERINGLINE –TERMINAL EQUIPMENTS(Daehuntech, S.Korea), HIGH TENSILE STEEL STRAPPING LINE (ASI
Robicon USA &Daehuntech, S. Korea).
RESPONSIBILLITIES :-
CO-ORDINATION WITH VENDORS, CONTRACTORS AND VARIOUS DEPARTMENTS VIZ: CIVIL, MECHANICAL,
ELECTRICAL, INSTRUMENTATION AND OTHER UTILITIES.
VOLUNTEER EXPERIENCE
July2001—July2002 B.B.M.B.(Irrigation Wing) Nangal T/Ship (Punjab)
a) In Field Deptt. where complete maintenance of Tippers , Caterpillars , Trailors& Mobile cranes where done. Was responsible
to maintain all catalogues & to remain in touch with stores regularly in order to have all the necessary components used during
maintenance in the right time.
b) In Gate Erectionwhere maintenance of Flood gates , Erection gates for Irrigation ,lifts & Wire Rope Bridge were done.
c) In Transport Div. where maintenance of Ambassador Cars ,Trucks , Buses , Mahindra Jeeps & Vans etc. where done.
SOFT SKILLS
July’2000-Jan’2001 CEDTI-now C-DAC, Mohali (Punjab.)
Page 3
EDUCATION
Diploma in Mechanical Engineering (Punjab State Board Of Technical Education & Industrial Training)
Master Program In Business Administration (MBA) – Operations Management through Distance Learning Program
from an ISO 9001:2000 certified International B-School accredited by United Kingdom Accreditation Services (UKAS)
who are members of the IAF (International Accreditation Forum) and signatories to the IAF MLA (Multi lateral
Agreements) with ‘A’ Grade.
AWARDS RECEIVED
Best employee in Engg. Deptt. For Smart work while completing DVDR Cycle-Time Reduction project.
For completing a Double Side Mini-DVDR crucial project in accordance to the business expansion with Panasonic
(Japan).
PERSONAL DETAILS
PLACE:- -------------------------------
DATE :- _______________ VIJAY PAL
Page 4