Storage Vessel (1,2,3) 10

10000001 20
10002094 30
10002095 40
50
60
70
80
90
Fluid Bed Dryer(60kg) 2 10
10000014 20
10000103 30
40
50
60
70
80
90
100
110
120
ZP-37 B1 Tablet Compression Ma10
10000026 20
10000027 30
40
50
60
70
80
90
100
110
120
130
140
150
160
ZPW 26 Tablet Compression Mach10
10000030 20
10000035 30
40
50
60
70
80
90
100
Tablet Deduster (12) 10
10000033,10002104,10002105,120
10002112,10002113,10002114,130
40
Blister Machine BM-350 (A,C) 10
10000041 20
10000043 30
40
50
60
70
80
90
100
110
120
Packing conveyor belt (1--7) 10
10000052 20
10000053 30
10000054 40
10000055 50
10000056 60
10000057 70
10000058 80
90
100
Packing Conveyor Belt No 1,2,3 10
10000082 20
10000083 30
10000084 40
50
60
70
80
90
100
110
Chilled Water Pumps (Centrifugal10
10000168 20
10000169 30
40
50
60
70
80
Chilled Water Pumps (Absorption10
10000145 20
10000146 30
40
50
60
70
80
Condenser Water Pumps (Centrifug
10
10000170 20
10000171 30
40
50
60
70
80
Condenser Water Pumps (Absorpt 10
10000147 20
10000156 30
40
50
60
70
80
Cooling Tower-I (1,2) 10
10000148 20
10000149 30
40
50
60
70
80
90
100
110
120
Package unit 1,2,3,4,5,6,7,8,9 10
10000153 20
10000154 30
10000163 40
10000172 50
10000173 60
10000174 70
10000175 80
10000176 90
10000177 10
20
30
40
50
60
Air Handling Unit # 1,2 3,4,5,5,6 10
10000254,10000266 20
10000255,10000267 30
10000256,10000268 40
10000257,10000269 50
10000258,10000270 60
10000259,10000271 70
10000260,10000272 80
10000261,10000273 90
10000262,10000274 100
10000263,10000275 110
10000264,10000276 120
10000265,10000277 130
Dehumidifier 1---7 (Non-Ceph) 10
10000248,10000251,10000278, 20
10000249,10000252, 30
10000250,10000253, 40
Air Handling Unit # 14--22 (Ceph 10
10000279 20
10000280 30
10000281 40
10000282 50
10000283 60
10000284 70
10000285 80
10000286 90
10000287 100
110
120
130
Dehumidifier 1---2 (Ceph) 10
10000288 20
10000289 30
40
Air Handling Unit # 1--14,20 (Nu 10
10000290,10000181 20
10000291,10000182 30
10000292,10000183 40
10000293,10000184 50
10000294,10000185 60
10000295,10000186 70
10000296,10000187 80
10000297,10000188 90
10000298,10000189 100
10000299, 110
10000300 120
10000301 130
10000302
10000303
10000305
Dehumidifier 1---5 (Nutra) 10
10000306 20
10000307 30
10000308 40
10000309 50
10000310
Fan Coil Unit # 01----33 10
10000190 20
10000191 30
10000192 40
10000193 50
10000194 60
10000195 70
10000196 80
10000197 90
Split Unit # 01----25 10
10000223 20
10000224 30
10000225 40
10000226 50
10000227 60
10000228 70
10000229 80
10000230 90
Water Cooler 1-4 10
10000164 20
10000165 30
10000343 40
50
Change Room Exhaust (Ceph,Non10
10000167 20
10000179 30
10000180 40
50
Liquid Storage Vessel 10
20
30
40
50
70
80
90
Packing belt # 01--02 10
10000101 20
10000102 30
40
50
60
70
80
90
100
110
Lift # 1 ---4 10
10000122 20
10000123 30
10000340 40
10000341 50
60
70
80
90
100
110
120
130
140
150
Dispensing booth 1--2 10
10000124 20
10000125 30
40
50
60
70
CAT 810-KVA Generator-1---2 10
10000312 20
10000313 30
40
50
60
70
80
Inset-o-Cuter (22) 10
10000318,10000319,10000320,120
10000326,10000327,10000328,130
10000334,10000335,10000336,140
Fire Alarm System 10
10000315 20
30
40
50
60
70
80
90
Check gearbox for oil leakage.if leakage(Q) 1.0 HR
Check stirrer for noise, vibration or (Q) 1.0 HR
Check pressure gauges and replace if(Q) 0.5 HR
Check oil level in gearbox. Top up SAE40(Y) 0.5 HR
Check motor bearing for wear and play.(Q) 1.0 HR
Check motor gearbox coupling for wear(Q) 1.0 HR
Check discharge valve of vessels and (Q) 0.5 HR
Inspect the stirrer coupling bolts for(Q) 0.5 HR
Check dents and rust in the side of (Y) 0.5 HR
Remove the trolley and check its mesh (Q) 0.5 HR
Remove the upper and lower gasket and(Q) 0.5 HR
Remove the all filters and check its(Y) 1.0 HR
Check the all solenoids of air purging(Q) 0.5 HR
Check the water inlet solenoid and water(Q) 1.0 HR
Clean the bag filters of fresh air units(Q) 1.0 HR
Check the steam valve and leakage of (Q) 0.5 HR
Check the hot air inlet damper and cold (Q) 0.5 HR
Check the exhaust motor sound and noteQ) 0.5 HR
Check the outlet air adjustment motorize(Q) 0.5 HR
Check all temperatures indicator sensors.(Q) 0.5 HR
Set the air pressure of gasket with air(Q) 1.0 HR
Check the movement of punches in sockets(Q) 1.0 HR
Check the lubrication of punches through(Q) 1.0 HR
Check the leakage in lubricating circuit(Q) 0.5 HR
Spray anti-friction solid lubricant over(Y) 1.0 HR
Clean cam tracks and inspect for wear(Y) 1.0 HR
Check pressure roller for free movement(Q) 1.0 HR
Check lubricant over all lever linkage(Q) 0.5 HR
Check the working of hydraulic pump(Q) 1.0 HR
Check the pulley of oil pump and main(Q) 0.5 HR
Check the working of gear box, top up(Q) 1.0 HR
Check the main motor belt and pulley(Q) 0.5 HR
Check the weight and thickness adjustmen(Q) 0.5 HR
Check all the grease nipples for damage.(Y) 0.5 HR
Check all the safety interlocks for(Q) 0.5 HR
Check all the machine limit switches and(Q) 1.0 HR
Check all the electrical panels and(Q) 1.0 HR
Check the movement of punches in their(Q) 0.5 HR
Check the lubrication of punches through(Q) 1.0 HR
Check the leakage in lubricating circuit 1.5 HR
Spray anti-friction solid lubricant over(Y) 0.5 HR
Clean cam tracks and inspect for wear(Y) 0.5 HR
Check pressure roller for free movement(Q) 1.0 HR
Check lubricant over all lever linkage(Q) 0.5 HR
Check the pulley of oil pump and main(Y) 0.5 HR
Check all safety interlocks for proper(Q) 1.0 HR
Check all grease nipples for damage(Y) 1.0 HR
Check for the noise and damped vibration(Q) 0.5 HR
Check the electrical connectors for(Q) 0.5 HR
Check for the proper movement of tablets(Q) 1.0 HR
Check the castor wheels and its bearings(Y) 1.0 HR
Lubricate all designated points with(Q) 1.0 HR
Check the maintained gearbox oil level (Q) 1.0 HR
Visually check machine bushes and(Q) 0.5 HR
clean the FRL and refill the pneumatic (Q) 1.0 HR
Check the machine indexing system for we(Q) 1.0 HR
Check the cams and main shaft of machine(Q) 1.0 HR
Check the cooling water hoses and air (Q) 1.0 HR
Check and remove dust from inside the(Q) 1.0 HR
Check the power connections as well as(Q) 0.5 HR
Check spring washers of all station(Q) 0.5 HR
Check the conveyor belt for its proper (Q) 1.1 HR
Dismantle and inspect forming, sealing(Y) 1.0 HR
Uncover the conveyor and make its(Q) 1.0 HR
Inspect the v-belts chain & sproket(Q) 0.5 HR
Inspect the motor gearbox against any(Y) 1.0 HR
Inspect the mounting of motor and gear(Q) 1.0 HR
Inspect the oil level of gearbox. Top(Q) 1.0 HR
Inspect the chain wheels of conveyor(Q) 1.0 HR
Inspect the belt joints and its condi(Q) 0.5 HR
Check the slat link pins for wear.(Q) 1.0 HR
Check the driving and driven chain and(Q) 1.0 HR
Inspect the balancing bolts located (Q) 1.0 HR
Uncover the conveyor and make its inter(Q) 1.0 HR
Inspect the v-belts chain & spooks agai(Y) 1.3 HR
Inspect the motor gearbox against any (Y) 1.0 HR
Inspect the mounting of motor and gearbo(Q) 1.0 HR
Inspect the oil level of gearbox. Top it(Q) 1.1 HR
Inspect the chain wheels of conveyor (Q) 1.2 HR
Inspect the slat bed fiber or PVC for (Q) 1.3 HR
Check the slat link pins for wear. Repla(Q) 1.3 HR
Check the driving and driven chain and (Y) 1.0 HR
After completion of maintenance work, (Q) 1.0 HR
Inspect the balancing bolts located at (Q) 1.1 HR
Checking of discharge and suction pressu (Q) 1.0 HR
Check the alignment of pump and motor.(Y) 0.5 HR
Check the alignment of coupling.(Y) 0.5 HR
Check the condition of seals.(Y) 0.5 HR
Check the condition of bearings, replace(Y) 1.0 HR
Check the suction strainer and discharge (Q) 1.0 HR
Inspect any integrity and abnormality. (Q) 0.5 HR
Check the condition of impeller.(Y) 0.5 HR
Checking of discharge and suction pressu (Q) 1.0 HR
Check the alignment of pump and motor.(Y) 0.5 HR
Check the alignment of coupling.(Y) 0.5 HR
Check the condition of seals.(Y) 0.5 HR
Check the condition of bearings, replace(Y) 1.0 HR
Check the suction strainer and discharge (Q) 1.0 HR
Inspect any integrity and abnormality. (Q) 0.5 HR
Check the condition of impeller.(Y) 0.5 HR
Checking of discharge and suction press (Q) 1.0 HR
Check the alignment of pump and motor.(Y) 0.5 HR
Check the alignment of coupling.(Y) 0.5 HR
Check the condition of seals.(Y) 0.5 HR
Check the condition of bearings, replace(Y) 1.0 HR
Check the suction strainer and discharge (Q) 1.0 HR
Inspect any integrity and abnormality. (Q) 0.5 HR
Check the condition of impeller.(Y) 0.5 HR
Checking of discharge and suction pressu (Q) 1.0 HR
Check the alignment of pump and motor.(Y) 0.5 HR
Check the alignment of coupling.(Y) 0.5 HR
Check the condition of seals.(Y) 0.5 HR
Check the condition of bearings, replace(Y) 1.0 HR
Check the suction strainer and discharge (Q) 1.0 HR
Inspect any integrity and abnormality. (Q) 0.5 HR
Check the condition of impeller.(Y) 0.5 HR
Check the tension of the V-belt. Adjust (M) 1.0 HR
Check the float valve for proper operati(Q) 0.5 HR
Check lubrication of bearing hosing. Do (Q) 0.5 HR
Check the tower for deposition of dirt, (M) 1.0 HR
Blow down the tower. Check the last wate(M) 1.0 HR
Recommended action if any. 1.0 HR
Drain and clean cold water basing and su(Q) 1.0 HR
Inspect V-belt and bearing wear. Replace(Q) 1.0 HR
Note down amperes and CFM of the fan.(Q) 0.5 HR
Maintain the TDS of operational water (M) 0.5 HR
Check the status of oxidization in the (Q) 1.0 HR
Check the nozzles of main spray louvers (Q) 1.0 HR
Note down the amperes of compressor. (M) 1.0 HR
Clean the condenser with air. (Q) 0.5 HR
Inspect the vibration of fan motor of co (Q) 1.0 HR
Check the normal chilled Air temperature (M) 1.0 HR
Check the electrical controls and safety(Y) 1.0 HR
Check the side glasses for refrigerant l (Q) 0.5 HR
Check the expansion valves super heat. (Q) 1.0 HR
Check the evaporator fan blowers. (M) 0.5 HR
Check the pre-filters of return air. (M) 0.5 HR
Note down the compressor amperes. 0.5 HR
Clean the condenser of the cooler. 1.0 HR
Check the refrigerant pressure. 0.5 HR
Inspect any leakage or abnormal sound. 1.0 HR
Inspect all the refrigerant piping. 0.5 HR
Inspect electric controlling wiring and 1.0 HR
Check the condition of V-belt and blower(M) 0.5 HR
Replace filters if damage (M) 0.5 HR
Wash G-4 filters (M) 1.0 HR
Clean drain lines of the unit, also clea(M) 0.5 HR
Check the V.F.D and motor amp and work o(Q) 1.0 HR
Check blower(AHU,Fresh air,Exhaust air) (Q) 0.5 HR
Check pulleys and their alignment .Align(Q) 1.0 HR
Inspect the HEPA filter condition.(Q) 0.5 HR
Wash cooling coils, check for any leaks.(Y) 0.5 HR
Check and verify the electrical connecti(Y) 0.5 HR
Inspect and calibration of all pressure (Y) 1.1 HR
Inspect entire insulation, drain tray an(Y) 1.2 HR
Inspect ducting and its insulation for a(Y) 0.5 HR
Check G-4 filters and clean with water p (M) 0.5 HR
Check electric heater or steam coils and (Q) 1.0 HR
Check electrical panel and clean with bl (Q) 0.5 HR
Check timing belt and drum condition. (Y) 1.0 HR
Check the condition of V-belt and blower(M) 0.5 HR
Replace filters if damage (M) 1.0 HR
Wash G-4 filters (M) 0.5 HR
Clean drain lines of the unit, also clea (M) 0.5 HR
Check the V.F.D and motor amp and work o(Q) 1.0 HR
Check blower (Q) 0.5 HR
Check pulleys and their alignment .Align(Q) 1.0 HR
Inspect the HEPA filter condition.(Q) 0.5 HR
Wash cooling coils, check for any leaks. (Y) 1.0 HR
Check and verify the electrical connecti (Y) 0.5 HR
Inspect and calibration of all pressure (Y) 1.1 HR
Inspect entire insulation, drain tray an(Y) 1.2 HR
Inspect ducting and its insulation for a(Y) 0.5 HR
Check G-4 filters and clean with water p (M) 0.5 HR
Check electric heater or steam coils and (Q) 1.0 HR
Check electrical panel and clean with bl (Q) 0.5 HR
Check timing belt and drum condition. (Y) 1.0 HR
Check the condition of V-belt and blower(M) 0.5 HR
Replace filters if damage (M) 1.0 HR
Wash G-4 filters (M) 0.5 HR
Clean drain lines of the unit, also clea(M) 0.5 HR
Check the V.F.D and motor amp and work o(Q) 1.0 HR
Check blower (Q) 0.5 HR
Check pulleys and their alignment .Align(Q) 1.0 HR
Inspect the HEPA filter condition.(Q) 0.5 HR
Wash cooling coils, check for any leaks.(Y) 1.0 HR
Check and verify the electrical connecti(Y) 0.5 HR
Inspect and calibration of all pressure (Y) 1.1 HR
Inspect entire insulation, drain tray an(Y) 1.2 HR
Inspect ducting and its insulation for a(Y) 0.5 HR
HR
HR
HR
Check G-4 filters and clean with water p (M) 0.5 HR
Check electric heater or steam coils and (Q) 1.0 HR
Check electrical panel and clean with bl (Q) 0.5 HR
Check timing belt and drum condition. (Y) 1.0 HR
Check the condition of V-belt and blower 0.5 HR
HR
Open the filters cover and dismantle the(M) 1.0 HR
Wash filters with water if they are wash(M) 1.0 HR
Clean the evaporator fins with soft brus(Q) 1.0 HR
Inspect chilled line insulation, make ne(Y) 1.0 HR
After cleaning the filters re-fix them o(M) 1.0 HR
Positioning of filters that is left or r(Q) 1.0 HR
Clean filters cover, air swing flap and (M) 1.0 HR
Clean the condenser fins incase of split(Q) 1.0 HR
After cleaning of both indoor and outdoo(Y) 1.0 HR
Open the filters cover and dismantle the(M) 1.0 HR
Wash filters with water if they are wash(M) 0.5 HR
Clean the evaporator fins with soft brus(Q) 0.5 HR
Inspect chilled line insulation, make ne(Y) 1.0 HR
After cleaning the filters re-fix them o(M) 0.5 HR
Positioning of filters that is left or r(M) 1.0 HR
Clean filters cover, air swing flap and (M) 0.5 HR
Clean the condenser fins incase of split(Q) 1.0 HR
After cleaning of both indoor and outdoo(Y) 1.0 HR
Check the compressor amperes.(Q) 0.5 HR
Clean the condenser of the cooler.(M) 1.0 HR
Check the refrigerant pressure.(Q) 0.5 HR
Inspect any leakage or abnormal sound.(Q) 1.0 HR
Inspect all the refrigerant piping.(Y) 0.5 HR
Check the proper ventilation of change r (M) 0.5 HR
Condition of intake air filter.(M) 0.5 HR
Cleaning status of blower fan. (Y) 0.5 HR
Cleaning status of supply and exhaust ai (Q) 1.0 HR
Check the motor ampere and condition. (Q) 1.0 HR
Check gearbox for oil leakage.if leakage(Q) 1.0 HR
Check stirrer for noise, vibration or (Q) 1.0 HR
Check pressure gauges and replace if(Q) 1.0 HR
Check oil level in gearbox. Top up if (Q) 1.0 HR
Check motor bearing for wear and play. (Y) 0.5 HR
Check discharge valve of vessels and (Q) 0.5 HR
Inspect the stirrer coupling bolts for (Q) 1.0 HR
Check dents and rust in the side of (Q) 1.0 HR
Uncover the conveyor and make its inter(Q) 1.0 HR
Inspect the v-belts chain & spooks agai(Y) 0.5 HR
Inspect the motor gearbox against any (Y) 0.5 HR
Inspect the mounting of motor and gearbo(Q) 0.5 HR
Inspect the oil level of gearbox. Top it(Q) 1.0 HR
Inspect the chain wheels of conveyor (Q) 1.0 HR
Inspect the slat bed fiber or PVC for (Q) 1.0 HR
Check the slat link pins for wear. Repla(Q) 1.0 HR
Check the driving and driven chain and (Y) 0.5 HR
After completion of maintenance work, (Q) 0.5 HR
Inspect the balancing bolts located at (Q) 0.5 HR
Check Cabin pulley and its bearings.(M) 1.0 HR
Check Control cards.(M) 0.5 HR
Check doors and its sensors.(M) 0.5 HR
Check and service its electrical panel.(M) 1.0 HR
Check guide rails and grease it.(M) 1.0 HR
Check its cop.(M) 0.5 HR
Check inverters for proper working.(M) 0.5 HR
Check motor and its bearings.(M) 0.5 HR
Check for proper oiling on all designate(M) 1.0 HR
Check brakes for proper working.(M) 0.5 HR
Check cabin pulley(M) 0.5 HR
Check counter weight pulley(M) 0.5 HR
Check cabin shoes(M) 0.5 HR
Check counter weight shoes(M) 0.5 HR
Check for Pit cleaning(M) 0.5 HR
Inspect the filter against choking & int 1.0 HR
Inspect the blower bearings against wear 1.0 HR
Test the pressure differential across th 0.5 HR
Inspect the mesh pre filter & clean it t 0.5 HR
Inspect the motor bearings against exces 0.5 HR
During the re-installation of HEPA filte 1.0 HR
Check the electrical system & clean. 1.0 HR
Replacement of Engine Oil at 200 hrs 1.0 HR
Repl of Air,fuel,oil & water seprator at 200hrs 0.5 HR
Check physical appearance of Genset.(D) 0.5 HR
Check water coolant. (D) 0.5 HR
Check Oil Leakage.(D) 1.0 HR
Check oil level. (D) 1.0 HR
Check battery’s voltage. (D) 1.0 HR
Clean radiator. (M) 1.0 HR
Inspect the insect-o-cuter against prope(M) 1.0 HR
Inspect the equipment against cleanlines(M) 1 HR
Check the illumination of Ultra Violet (M) 1 HR
Replace Ultra Violet Light. (Y) 2.0 HR
Establish whether light / LED on each (Q) 0.5 HR
Check whether all the detectors are prop(Q) 1.0 HR
Check all the detectors for any sign of (Q) 2.0 HR
Clean each detector with blower and soft(Q) 2.0 HR
Check Alarm functions of the panel (Q) 2.0 HR
Test and calibrate alarm sensors, includ(Q) 2.0 HR
Visually inspect the control panel for(Q) 1.0 HR
Visually check all cable fittings and (Q) 1.0 HR
Check the battery for corrosion and expi(Q) 0.5 HR
Machine Name
Storage Vessel (1,2,3) 10 Performing Work Center 1100 Inhouse
10000000 9 20 Performing Work Center 1100 Inhouse
10000000 9 30 Performing Work Center 1100 Inhouse
10000000 9 40 Performing Work Center 1100 Inhouse
10000000 9 50 Performing Work Center 1100 Inhouse
10000000 9 60 Performing Work Center 1100 Inhouse
10000000 9 70 Performing Work Center 1100 Inhouse
10000000 9 80 Performing Work Center 1100 Inhouse
10000000 9 90 Performing Work Center 1100 Inhouse
10000000 9 100 Performing Work Center 1100 Inhouse
Storage Vessel (1,2,3) 10 Performing Work Center 1100 Inhouse
10000001 1 20 Performing Work Center 1100 Inhouse
10002094 1 30 Performing Work Center 1100 Inhouse
10002095 6 40 Performing Work Center 1100 Inhouse
10002095 6 50 Performing Work Center 1100 Inhouse
10002095 6 60 Performing Work Center 1100 Inhouse
10002095 6 70 Performing Work Center 1100 Inhouse
10002095 6 80 Performing Work Center 1100 Inhouse
10002095 6 90 Performing Work Center 1100 Inhouse
Liquid Transfer Pump 10 Performing Work Center 1100 Inhouse
10000002 6 20 Performing Work Center 1100 Inhouse
10000002 6 30 Performing Work Center 1100 Inhouse
10000002 6 40 Performing Work Center 1100 Inhouse
10000002 6 50 Performing Work Center 1100 Inhouse
10000002 6 60 Performing Work Center 1100 Inhouse
10000002 6 70 Performing Work Center 1100 Inhouse
Bottle Blowing Machine 10 Performing Work Center 1100 Inhouse
10000003 12 20 Performing Work Center 1100 Inhouse
10000003 12 30 Performing Work Center 1100 Inhouse
10000003 12 40 Performing Work Center 1100 Inhouse
10000003 12 50 Performing Work Center 1100 Inhouse
10000003 12 60 Performing Work Center 1100 Inhouse
10000003 12 70 Performing Work Center 1100 Inhouse
10000003 12 80 Performing Work Center 1100 Inhouse
10000003 12 90 Performing Work Center 1100 Inhouse
10000003 12 100 Performing Work Center 1100 Inhouse
10000003 12 110 Performing Work Center 1100 Inhouse
10000003 12 120 Performing Work Center 1100 Inhouse
10000003 12 130 Performing Work Center 1100 Inhouse
Bottle Filling & Capping Machine 10 Performing Work Center 1100 Inhouse
10000004 18 20 Performing Work Center 1100 Inhouse
10000004 18 30 Performing Work Center 1100 Inhouse
10000004 18 40 Performing Work Center 1100 Inhouse
10000004 18 50 Performing Work Center 1100 Inhouse
10000004 18 60 Performing Work Center 1100 Inhouse
10000004 18 70 Performing Work Center 1100 Inhouse
10000004 18 80 Performing Work Center 1100 Inhouse
10000004 18 90 Performing Work Center 1100 Inhouse
10000004 18 100 Performing Work Center 1100 Inhouse
10000004 18 110 Performing Work Center 1100 Inhouse
10000004 18 120 Performing Work Center 1100 Inhouse
10000004 18 130 Performing Work Center 1100 Inhouse
10000004 18 140 Performing Work Center 1100 Inhouse
10000004 18 150 Performing Work Center 1100 Inhouse
10000004 18 160 Performing Work Center 1100 Inhouse
10000004 18 170 Performing Work Center 1100 Inhouse
10000004 18 180 Performing Work Center 1100 Inhouse
10000004 18 190 Performing Work Center 1100 Inhouse
Ointment Filling Machine 10 Performing Work Center 1100 Inhouse
10000006 8 20 Performing Work Center 1100 Inhouse
10000006 8 30 Performing Work Center 1100 Inhouse
10000006 8 40 Performing Work Center 1100 Inhouse
10000006 8 50 Performing Work Center 1100 Inhouse
10000006 8 60 Performing Work Center 1100 Inhouse
10000006 8 70 Performing Work Center 1100 Inhouse
10000006 8 80 Performing Work Center 1100 Inhouse
10000006 8 90 Performing Work Center 1100 Inhouse
Ointment Manufacturing Machine 10 Performing Work Center 1100 Inhouse
10000007 4 20 Performing Work Center 1100 Inhouse
10000007 4 30 Performing Work Center 1100 Inhouse
10000007 4 40 Performing Work Center 1100 Inhouse
10000007 4 50 Performing Work Center 1100 Inhouse
Fluid Bed Dryer 120 kg 10 Performing Work Center 1100 Inhouse
10000008 12 20 Performing Work Center 1100 Inhouse
10000008 12 30 Performing Work Center 1100 Inhouse
10000008 12 40 Performing Work Center 1100 Inhouse
10000008 12 50 Performing Work Center 1100 Inhouse
10000008 12 60 Performing Work Center 1100 Inhouse
10000008 12 70 Performing Work Center 1100 Inhouse
10000008 12 80 Performing Work Center 1100 Inhouse
10000008 12 90 Performing Work Center 1100 Inhouse
10000008 12 100 Performing Work Center 1100 Inhouse
10000008 12 110 Performing Work Center 1100 Inhouse
10000008 12 120 Performing Work Center 1100 Inhouse
10000008 12 130 Performing Work Center 1100 Inhouse
High Shear Mixer Granulator (GHL) 10 Performing Work Center 1100 Inhouse
10000009 11 20 Performing Work Center 1100 Inhouse
10000009 11 30 Performing Work Center 1100 Inhouse
10000009 11 40 Performing Work Center 1100 Inhouse
10000009 11 50 Performing Work Center 1100 Inhouse
10000009 11 60 Performing Work Center 1100 Inhouse
10000009 11 70 Performing Work Center 1100 Inhouse
10000009 11 80 Performing Work Center 1100 Inhouse
10000009 11 90 Performing Work Center 1100 Inhouse
10000009 11 100 Performing Work Center 1100 Inhouse
10000009 11 110 Performing Work Center 1100 Inhouse
10000009 11 120 Performing Work Center 1100 Inhouse
Fitz Mill 10 Performing Work Center 1100 Inhouse
10000012 4 20 Performing Work Center 1100 Inhouse
10000012 4 30 Performing Work Center 1100 Inhouse
10000012 4 40 Performing Work Center 1100 Inhouse
10000012 4 50 Performing Work Center 1100 Inhouse
YK Oscillator Granulator 10 Performing Work Center 1100 Inhouse
10000010 7 20 Performing Work Center 1100 Inhouse
10000010 7 30 Performing Work Center 1100 Inhouse
10000010 7 40 Performing Work Center 1100 Inhouse
10000010 7 50 Performing Work Center 1100 Inhouse
10000010 7 60 Performing Work Center 1100 Inhouse
10000010 7 70 Performing Work Center 1100 Inhouse
10000010 7 80 Performing Work Center 1100 Inhouse
Steam Jackated kettle 10 Performing Work Center 1100 Inhouse
10000013 4 20 Performing Work Center 1100 Inhouse
10000013 4 30 Performing Work Center 1100 Inhouse
10000013 4 40 Performing Work Center 1100 Inhouse
10000013 4 50 Performing Work Center 1100 Inhouse
Pallet Trucks 10 Performing Work Center 1100 Inhouse
10000011 4 20 Performing Work Center 1100 Inhouse
10000011 4 30 Performing Work Center 1100 Inhouse
10000011 4 40 Performing Work Center 1100 Inhouse
10000011 4 50 Performing Work Center 1100 Inhouse
Fluid Bed Dryer(60kg) 2 10 Performing Work Center 1100 Inhouse
10000014 1 20 Performing Work Center 1100 Inhouse
10000103 22 30 Performing Work Center 1100 Inhouse
10000103 22 40 Performing Work Center 1100 Inhouse
10000103 22 50 Performing Work Center 1100 Inhouse
10000103 22 60 Performing Work Center 1100 Inhouse
10000103 22 70 Performing Work Center 1100 Inhouse
10000103 22 80 Performing Work Center 1100 Inhouse
10000103 22 90 Performing Work Center 1100 Inhouse
10000103 22 100 Performing Work Center 1100 Inhouse
10000103 22 110 Performing Work Center 1100 Inhouse
10000103 22 120 Performing Work Center 1100 Inhouse
Gral Mixer 100KG 10 Performing Work Center 1100 Inhouse
10000015 9 20 Performing Work Center 1100 Inhouse
10000015 9 30 Performing Work Center 1100 Inhouse
10000015 9 40 Performing Work Center 1100 Inhouse
10000015 9 50 Performing Work Center 1100 Inhouse
10000015 9 60 Performing Work Center 1100 Inhouse
10000015 9 70 Performing Work Center 1100 Inhouse
10000015 9 80 Performing Work Center 1100 Inhouse
10000015 9 90 Performing Work Center 1100 Inhouse
10000015 9 100 Performing Work Center 1100 Inhouse
V-Blender 10 Performing Work Center 1100 Inhouse
10000017 4 20 Performing Work Center 1100 Inhouse
10000017 4 30 Performing Work Center 1100 Inhouse
10000017 4 40 Performing Work Center 1100 Inhouse
10000017 4 50 Performing Work Center 1100 Inhouse
Tray Dryer 10 Performing Work Center 1100 Inhouse
10000019 10 20 Performing Work Center 1100 Inhouse
10000019 10 30 Performing Work Center 1100 Inhouse
10000019 10 40 Performing Work Center 1100 Inhouse
10000019 10 50 Performing Work Center 1100 Inhouse
10000019 10 60 Performing Work Center 1100 Inhouse
10000019 10 70 Performing Work Center 1100 Inhouse
10000019 10 80 Performing Work Center 1100 Inhouse
10000019 10 90 Performing Work Center 1100 Inhouse
10000019 10 100 Performing Work Center 1100 Inhouse
10000019 10 110 Performing Work Center 1100 Inhouse
Compactor Machine 10 Performing Work Center 1100 Inhouse
10000018 10 20 Performing Work Center 1100 Inhouse
10000018 10 30 Performing Work Center 1100 Inhouse
10000018 10 40 Performing Work Center 1100 Inhouse
10000018 10 50 Performing Work Center 1100 Inhouse
10000018 10 60 Performing Work Center 1100 Inhouse
10000018 10 70 Performing Work Center 1100 Inhouse
10000018 10 80 Performing Work Center 1100 Inhouse
10000018 10 90 Performing Work Center 1100 Inhouse
10000018 10 100 Performing Work Center 1100 Inhouse
10000018 10 110 Performing Work Center 1100 Inhouse
Double cone blender 400kg 10 Performing Work Center 1100 Inhouse
10000016 11 20 Performing Work Center 1100 Inhouse
10000016 11 30 Performing Work Center 1100 Inhouse
10000016 11 40 Performing Work Center 1100 Inhouse
10000016 11 50 Performing Work Center 1100 Inhouse
10000016 11 60 Performing Work Center 1100 Inhouse
10000016 11 70 Performing Work Center 1100 Inhouse
10000016 11 80 Performing Work Center 1100 Inhouse
10000016 11 90 Performing Work Center 1100 Inhouse
10000016 11 100 Performing Work Center 1100 Inhouse
10000016 11 110 Performing Work Center 1100 Inhouse
10000016 11 120 Performing Work Center 1100 Inhouse
Sama sachet Filling Machine 10 Performing Work Center 1100 Inhouse
10000020 7 20 Performing Work Center 1100 Inhouse
10000020 7 30 Performing Work Center 1100 Inhouse
10000020 7 40 Performing Work Center 1100 Inhouse
10000020 7 50 Performing Work Center 1100 Inhouse
10000020 7 60 Performing Work Center 1100 Inhouse
10000020 7 70 Performing Work Center 1100 Inhouse
10000020 7 80 Performing Work Center 1100 Inhouse
vertical Sachet Filing Machine 10 Performing Work Center 1100 Inhouse
10000021 10 20 Performing Work Center 1100 Inhouse
10000021 10 30 Performing Work Center 1100 Inhouse
10000021 10 40 Performing Work Center 1100 Inhouse
10000021 10 50 Performing Work Center 1100 Inhouse
10000021 10 60 Performing Work Center 1100 Inhouse
10000021 10 70 Performing Work Center 1100 Inhouse
10000021 10 80 Performing Work Center 1100 Inhouse
10000021 10 90 Performing Work Center 1100 Inhouse
10000021 10 100 Performing Work Center 1100 Inhouse
10000021 10 110 Performing Work Center 1100 Inhouse
Double cone blender 30kg 10 Performing Work Center 1100 Inhouse
10000022 7 20 Performing Work Center 1100 Inhouse
10000022 7 30 Performing Work Center 1100 Inhouse
10000022 7 40 Performing Work Center 1100 Inhouse
10000022 7 50 Performing Work Center 1100 Inhouse
10000022 7 60 Performing Work Center 1100 Inhouse
10000022 7 70 Performing Work Center 1100 Inhouse
10000022 7 80 Performing Work Center 1100 Inhouse
ZJT 40 Capsule Filling Machine 10 Performing Work Center 1100 Inhouse
10000024 9 20 Performing Work Center 1100 Inhouse
10000024 9 30 Performing Work Center 1100 Inhouse
10000024 9 40 Performing Work Center 1100 Inhouse
10000024 9 50 Performing Work Center 1100 Inhouse
10000024 9 60 Performing Work Center 1100 Inhouse
10000024 9 70 Performing Work Center 1100 Inhouse
10000024 9 80 Performing Work Center 1100 Inhouse
10000024 9 90 Performing Work Center 1100 Inhouse
10000024 9 100 Performing Work Center 1100 Inhouse
Fette P-3030 Tablet Compression Machine 10 Performing Work Center 1100 Inhouse
10000025 16 20 Performing Work Center 1100 Inhouse
10000025 16 30 Performing Work Center 1100 Inhouse
10000025 16 40 Performing Work Center 1100 Inhouse
10000025 16 50 Performing Work Center 1100 Inhouse
10000025 16 60 Performing Work Center 1100 Inhouse
10000025 16 70 Performing Work Center 1100 Inhouse
10000025 16 80 Performing Work Center 1100 Inhouse
10000025 16 90 Performing Work Center 1100 Inhouse
10000025 16 100 Performing Work Center 1100 Inhouse
10000025 16 110 Performing Work Center 1100 Inhouse
10000025 16 120 Performing Work Center 1100 Inhouse
10000025 16 130 Performing Work Center 1100 Inhouse
10000025 16 140 Performing Work Center 1100 Inhouse
10000025 16 150 Performing Work Center 1100 Inhouse
10000025 16 160 Performing Work Center 1100 Inhouse
10000025 16 170 Performing Work Center 1100 Inhouse
ZP-37 B1 Tablet Compression Machine (B2) 10 Performing Work Center 1100 Inhouse
10000026 1 20 Performing Work Center 1100 Inhouse
10000027 14 30 Performing Work Center 1100 Inhouse
10000027 14 40 Performing Work Center 1100 Inhouse
10000027 14 50 Performing Work Center 1100 Inhouse
10000027 14 60 Performing Work Center 1100 Inhouse
10000027 14 70 Performing Work Center 1100 Inhouse
10000027 14 80 Performing Work Center 1100 Inhouse
10000027 14 90 Performing Work Center 1100 Inhouse
10000027 14 100 Performing Work Center 1100 Inhouse
10000027 14 110 Performing Work Center 1100 Inhouse
10000027 14 120 Performing Work Center 1100 Inhouse
10000027 14 130 Performing Work Center 1100 Inhouse
10000027 14 140 Performing Work Center 1100 Inhouse
10000027 14 150 Performing Work Center 1100 Inhouse
10000027 14 160 Performing Work Center 1100 Inhouse
Fette P-2000 Tablet Compression Machine 10 Performing Work Center 1100 Inhouse
10000028 16 20 Performing Work Center 1100 Inhouse
10000028 16 30 Performing Work Center 1100 Inhouse
10000028 16 40 Performing Work Center 1100 Inhouse
10000028 16 50 Performing Work Center 1100 Inhouse
10000028 16 60 Performing Work Center 1100 Inhouse
10000028 16 70 Performing Work Center 1100 Inhouse
10000028 16 80 Performing Work Center 1100 Inhouse
10000028 16 90 Performing Work Center 1100 Inhouse
10000028 16 100 Performing Work Center 1100 Inhouse
10000028 16 110 Performing Work Center 1100 Inhouse
10000028 16 120 Performing Work Center 1100 Inhouse
10000028 16 130 Performing Work Center 1100 Inhouse
10000028 16 140 Performing Work Center 1100 Inhouse
10000028 16 150 Performing Work Center 1100 Inhouse
10000028 16 160 Performing Work Center 1100 Inhouse
10000028 16 170 Performing Work Center 1100 Inhouse
ZPW 20 Tablet Compression Machine 10 Performing Work Center 1100 Inhouse
10000029 9 20 Performing Work Center 1100 Inhouse
10000029 9 30 Performing Work Center 1100 Inhouse
10000029 9 40 Performing Work Center 1100 Inhouse
10000029 9 50 Performing Work Center 1100 Inhouse
10000029 9 60 Performing Work Center 1100 Inhouse
10000029 9 70 Performing Work Center 1100 Inhouse
10000029 9 80 Performing Work Center 1100 Inhouse
10000029 9 90 Performing Work Center 1100 Inhouse
10000029 9 100 Performing Work Center 1100 Inhouse
ZPW 26 Tablet Compression Machine (2) 10 Performing Work Center 1100 Inhouse
10000030 1 20 Performing Work Center 1100 Inhouse
10000035 8 30 Performing Work Center 1100 Inhouse
10000035 8 40 Performing Work Center 1100 Inhouse
10000035 8 50 Performing Work Center 1100 Inhouse
10000035 8 60 Performing Work Center 1100 Inhouse
10000035 8 70 Performing Work Center 1100 Inhouse
10000035 8 80 Performing Work Center 1100 Inhouse
10000035 8 90 Performing Work Center 1100 Inhouse
10000035 8 100 Performing Work Center 1100 Inhouse
ZPW 23 Tablet Compression Machine 10 Performing Work Center 1100 Inhouse
10000031 9 20 Performing Work Center 1100 Inhouse
10000031 9 30 Performing Work Center 1100 Inhouse
10000031 9 40 Performing Work Center 1100 Inhouse
10000031 9 50 Performing Work Center 1100 Inhouse
10000031 9 60 Performing Work Center 1100 Inhouse
10000031 9 70 Performing Work Center 1100 Inhouse
10000031 9 80 Performing Work Center 1100 Inhouse
10000031 9 90 Performing Work Center 1100 Inhouse
10000031 9 100 Performing Work Center 1100 Inhouse
ZP 23D Tablet Compression Machine 10 Performing Work Center 1100 Inhouse
10000032 9 20 Performing Work Center 1100 Inhouse
10000032 9 30 Performing Work Center 1100 Inhouse
10000032 9 40 Performing Work Center 1100 Inhouse
10000032 9 50 Performing Work Center 1100 Inhouse
10000032 9 60 Performing Work Center 1100 Inhouse
10000032 9 70 Performing Work Center 1100 Inhouse
10000032 9 80 Performing Work Center 1100 Inhouse
10000032 9 90 Performing Work Center 1100 Inhouse
10000032 9 100 Performing Work Center 1100 Inhouse
Tablet Deduster (12) 10 Performing Work Center 1100 Inhouse
10000033,10002104,10002105,1 1 20 Performing Work Center 1100 Inhouse
10002112,10002113,10002114,1 2 30 Performing Work Center 1100 Inhouse
10002112,10002113,10002114,1 2 40 Performing Work Center 1100 Inhouse
Metal Detector 10 Performing Work Center 1100 Inhouse
10000034 3 20 Performing Work Center 1100 Inhouse
10000034 3 30 Performing Work Center 1100 Inhouse
10000034 3 40 Performing Work Center 1100 Inhouse
Conventional Coating Machine 10 Performing Work Center 1100 Inhouse
10000036 10 20 Performing Work Center 1100 Inhouse
10000036 10 30 Performing Work Center 1100 Inhouse
10000036 10 40 Performing Work Center 1100 Inhouse
10000036 10 50 Performing Work Center 1100 Inhouse
10000036 10 60 Performing Work Center 1100 Inhouse
10000036 10 70 Performing Work Center 1100 Inhouse
10000036 10 80 Performing Work Center 1100 Inhouse
10000036 10 90 Performing Work Center 1100 Inhouse
10000036 10 100 Performing Work Center 1100 Inhouse
10000036 10 110 Performing Work Center 1100 Inhouse
High Efficiency Coating Machine 150 kg 10 Performing Work Center 1100 Inhouse
10000037 18 20 Performing Work Center 1100 Inhouse
10000037 18 30 Performing Work Center 1100 Inhouse
10000037 18 40 Performing Work Center 1100 Inhouse
10000037 18 50 Performing Work Center 1100 Inhouse
10000037 18 60 Performing Work Center 1100 Inhouse
10000037 18 70 Performing Work Center 1100 Inhouse
10000037 18 80 Performing Work Center 1100 Inhouse
10000037 18 90 Performing Work Center 1100 Inhouse
10000037 18 100 Performing Work Center 1100 Inhouse
10000037 18 110 Performing Work Center 1100 Inhouse
10000037 18 120 Performing Work Center 1100 Inhouse
10000037 18 130 Performing Work Center 1100 Inhouse
10000037 18 140 Performing Work Center 1100 Inhouse
10000037 18 150 Performing Work Center 1100 Inhouse
10000037 18 160 Performing Work Center 1100 Inhouse
10000037 18 170 Performing Work Center 1100 Inhouse
10000037 18 180 Performing Work Center 1100 Inhouse
10000037 18 190 Performing Work Center 1100 Inhouse
High Efficiency Coating Machine 400 kg 10 Performing Work Center 1100 Inhouse
10000038 18 20 Performing Work Center 1100 Inhouse
10000038 18 30 Performing Work Center 1100 Inhouse
10000038 18 40 Performing Work Center 1100 Inhouse
10000038 18 50 Performing Work Center 1100 Inhouse
10000038 18 60 Performing Work Center 1100 Inhouse
10000038 18 70 Performing Work Center 1100 Inhouse
10000038 18 80 Performing Work Center 1100 Inhouse
10000038 18 90 Performing Work Center 1100 Inhouse
10000038 18 100 Performing Work Center 1100 Inhouse
10000038 18 110 Performing Work Center 1100 Inhouse
10000038 18 120 Performing Work Center 1100 Inhouse
10000038 18 130 Performing Work Center 1100 Inhouse
10000038 18 140 Performing Work Center 1100 Inhouse
10000038 18 150 Performing Work Center 1100 Inhouse
10000038 18 160 Performing Work Center 1100 Inhouse
10000038 18 170 Performing Work Center 1100 Inhouse
10000038 18 180 Performing Work Center 1100 Inhouse
10000038 18 190 Performing Work Center 1100 Inhouse
Silverson Mixer 10 Performing Work Center 1100 Inhouse
10000039 4 20 Performing Work Center 1100 Inhouse
10000039 4 30 Performing Work Center 1100 Inhouse
10000039 4 40 Performing Work Center 1100 Inhouse
10000039 4 50 Performing Work Center 1100 Inhouse
Semi Electric Stacker EMS-E1000(WIP) 10 Performing Work Center 1100 Inhouse
10000040 6 20 Performing Work Center 1100 Inhouse
10000040 6 30 Performing Work Center 1100 Inhouse
10000040 6 40 Performing Work Center 1100 Inhouse
10000040 6 50 Performing Work Center 1100 Inhouse
10000040 6 60 Performing Work Center 1100 Inhouse
10000040 6 70 Performing Work Center 1100 Inhouse
Blister Machine BM-350 (A,C) 10 Performing Work Center 1100 Inhouse
10000041 1 20 Performing Work Center 1100 Inhouse
10000043 10 30 Performing Work Center 1100 Inhouse
10000043 10 40 Performing Work Center 1100 Inhouse
10000043 10 50 Performing Work Center 1100 Inhouse
10000043 10 60 Performing Work Center 1100 Inhouse
10000043 10 70 Performing Work Center 1100 Inhouse
10000043 10 80 Performing Work Center 1100 Inhouse
10000043 10 90 Performing Work Center 1100 Inhouse
10000043 10 100 Performing Work Center 1100 Inhouse
10000043 10 110 Performing Work Center 1100 Inhouse
10000043 10 120 Performing Work Center 1100 Inhouse
Blister Machine BM-350 (B) 10 Performing Work Center 1100 Inhouse
10000042 12 20 Performing Work Center 1100 Inhouse
10000042 12 30 Performing Work Center 1100 Inhouse
10000042 12 40 Performing Work Center 1100 Inhouse
10000042 12 50 Performing Work Center 1100 Inhouse
10000042 12 60 Performing Work Center 1100 Inhouse
10000042 12 70 Performing Work Center 1100 Inhouse
10000042 12 80 Performing Work Center 1100 Inhouse
10000042 12 90 Performing Work Center 1100 Inhouse
10000042 12 100 Performing Work Center 1100 Inhouse
10000042 12 110 Performing Work Center 1100 Inhouse
10000042 12 120 Performing Work Center 1100 Inhouse
10000042 12 130 Performing Work Center 1100 Inhouse
Blister Machine DPP-250 10 Performing Work Center 1100 Inhouse
10000044 11 20 Performing Work Center 1100 Inhouse
10000044 11 30 Performing Work Center 1100 Inhouse
10000044 11 40 Performing Work Center 1100 Inhouse
10000044 11 50 Performing Work Center 1100 Inhouse
10000044 11 60 Performing Work Center 1100 Inhouse
10000044 11 70 Performing Work Center 1100 Inhouse
10000044 11 80 Performing Work Center 1100 Inhouse
10000044 11 90 Performing Work Center 1100 Inhouse
10000044 11 100 Performing Work Center 1100 Inhouse
10000044 11 110 Performing Work Center 1100 Inhouse
10000044 11 120 Performing Work Center 1100 Inhouse
Blister Machine UPS-2DT 10 Performing Work Center 1100 Inhouse
10000045 14 20 Performing Work Center 1100 Inhouse
10000045 14 30 Performing Work Center 1100 Inhouse
10000045 14 40 Performing Work Center 1100 Inhouse
10000045 14 50 Performing Work Center 1100 Inhouse
10000045 14 60 Performing Work Center 1100 Inhouse
10000045 14 70 Performing Work Center 1100 Inhouse
10000045 14 80 Performing Work Center 1100 Inhouse
10000045 14 90 Performing Work Center 1100 Inhouse
10000045 14 100 Performing Work Center 1100 Inhouse
10000045 14 110 Performing Work Center 1100 Inhouse
10000045 14 120 Performing Work Center 1100 Inhouse
10000045 14 130 Performing Work Center 1100 Inhouse
10000045 14 140 Performing Work Center 1100 Inhouse
10000045 14 150 Performing Work Center 1100 Inhouse
Blister Machine UPS-300 10 Performing Work Center 1100 Inhouse
10000046 13 20 Performing Work Center 1100 Inhouse
10000046 13 30 Performing Work Center 1100 Inhouse
10000046 13 40 Performing Work Center 1100 Inhouse
10000046 13 50 Performing Work Center 1100 Inhouse
10000046 13 60 Performing Work Center 1100 Inhouse
10000046 13 70 Performing Work Center 1100 Inhouse
10000046 13 80 Performing Work Center 1100 Inhouse
10000046 13 90 Performing Work Center 1100 Inhouse
10000046 13 100 Performing Work Center 1100 Inhouse
10000046 13 110 Performing Work Center 1100 Inhouse
10000046 13 120 Performing Work Center 1100 Inhouse
10000046 13 130 Performing Work Center 1100 Inhouse
10000046 13 140 Performing Work Center 1100 Inhouse
Domino Inkjet Printer A-200 Plus 10 Performing Work Center 1100 Inhouse
10000051 4 20 Performing Work Center 1100 Inhouse
10000051 4 30 Performing Work Center 1100 Inhouse
10000051 4 40 Performing Work Center 1100 Inhouse
10000051 4 50 Performing Work Center 1100 Inhouse
Willet Inkjet Printer 460si (1-2) 10 Performing Work Center 1100 Inhouse
10000047 4 20 Performing Work Center 1100 Inhouse
10000047 4 30 Performing Work Center 1100 Inhouse
10000047 4 40 Performing Work Center 1100 Inhouse
10000047 4 50 Performing Work Center 1100 Inhouse
Markoprint X1 Jet (Pacode) 10 Performing Work Center 1100 Inhouse
10000048 4 20 Performing Work Center 1100 Inhouse
10000048 4 30 Performing Work Center 1100 Inhouse
10000048 4 40 Performing Work Center 1100 Inhouse
10000048 4 50 Performing Work Center 1100 Inhouse
Packing conveyor belt (1--7) 10 Performing Work Center 1100 Inhouse
10000052 1 20 Performing Work Center 1100 Inhouse
10000053 1 30 Performing Work Center 1100 Inhouse
10000054 1 40 Performing Work Center 1100 Inhouse
10000055 1 50 Performing Work Center 1100 Inhouse
10000056 1 60 Performing Work Center 1100 Inhouse
10000057 1 70 Performing Work Center 1100 Inhouse
10000058 3 80 Performing Work Center 1100 Inhouse
10000058 3 90 Performing Work Center 1100 Inhouse
10000058 3 100 Performing Work Center 1100 Inhouse
Semi Automatic Cartoner 10 Performing Work Center 1100 Inhouse
10000059 14 20 Performing Work Center 1100 Inhouse
10000059 14 30 Performing Work Center 1100 Inhouse
10000059 14 40 Performing Work Center 1100 Inhouse
10000059 14 50 Performing Work Center 1100 Inhouse
10000059 14 60 Performing Work Center 1100 Inhouse
10000059 14 70 Performing Work Center 1100 Inhouse
10000059 14 80 Performing Work Center 1100 Inhouse
10000059 14 90 Performing Work Center 1100 Inhouse
10000059 14 100 Performing Work Center 1100 Inhouse
10000059 14 110 Performing Work Center 1100 Inhouse
10000059 14 120 Performing Work Center 1100 Inhouse
10000059 14 130 Performing Work Center 1100 Inhouse
10000059 14 140 Performing Work Center 1100 Inhouse
10000059 14 150 Performing Work Center 1100 Inhouse
Shredding Machine 10 Performing Work Center 1100 Inhouse
10000060 4 20 Performing Work Center 1100 Inhouse
10000060 4 30 Performing Work Center 1100 Inhouse
10000060 4 40 Performing Work Center 1100 Inhouse
10000060 4 50 Performing Work Center 1100 Inhouse
Pallet Trucks 10 Performing Work Center 1100 Inhouse
10000061 4 20 Performing Work Center 1100 Inhouse
10000061 4 30 Performing Work Center 1100 Inhouse
10000061 4 40 Performing Work Center 1100 Inhouse
10000061 4 50 Performing Work Center 1100 Inhouse
Steam Operated Autoclave (Shinva) 10 Performing Work Center 1100 Inhouse
10000062 19 20 Performing Work Center 1100 Inhouse
10000062 19 30 Performing Work Center 1100 Inhouse
10000062 19 40 Performing Work Center 1100 Inhouse
10000062 19 50 Performing Work Center 1100 Inhouse
10000062 19 60 Performing Work Center 1100 Inhouse
10000062 19 70 Performing Work Center 1100 Inhouse
10000062 19 80 Performing Work Center 1100 Inhouse
10000062 19 90 Performing Work Center 1100 Inhouse
10000062 19 100 Performing Work Center 1100 Inhouse
10000062 19 110 Performing Work Center 1100 Inhouse
10000062 19 120 Performing Work Center 1100 Inhouse
10000062 19 130 Performing Work Center 1100 Inhouse
10000062 19 140 Performing Work Center 1100 Inhouse
10000062 19 150 Performing Work Center 1100 Inhouse
10000062 19 160 Performing Work Center 1100 Inhouse
10000062 19 170 Performing Work Center 1100 Inhouse
10000062 19 180 Performing Work Center 1100 Inhouse
10000062 19 190 Performing Work Center 1100 Inhouse
10000062 19 200 Performing Work Center 1100 Inhouse
Dry Heat Sterilizer 10 Performing Work Center 1100 Inhouse
10000063 8 20 Performing Work Center 1100 Inhouse
10000063 8 30 Performing Work Center 1100 Inhouse
10000063 8 40 Performing Work Center 1100 Inhouse
10000063 8 50 Performing Work Center 1100 Inhouse
10000063 8 60 Performing Work Center 1100 Inhouse
10000063 8 70 Performing Work Center 1100 Inhouse
10000063 8 80 Performing Work Center 1100 Inhouse
10000063 8 90 Performing Work Center 1100 Inhouse
Vial Washing Machine 10 Performing Work Center 1100 Inhouse
10000064 14 20 Performing Work Center 1100 Inhouse
10000064 14 30 Performing Work Center 1100 Inhouse
10000064 14 40 Performing Work Center 1100 Inhouse
10000064 14 50 Performing Work Center 1100 Inhouse
10000064 14 60 Performing Work Center 1100 Inhouse
10000064 14 70 Performing Work Center 1100 Inhouse
10000064 14 80 Performing Work Center 1100 Inhouse
10000064 14 90 Performing Work Center 1100 Inhouse
10000064 14 100 Performing Work Center 1100 Inhouse
10000064 14 110 Performing Work Center 1100 Inhouse
10000064 14 120 Performing Work Center 1100 Inhouse
10000064 14 130 Performing Work Center 1100 Inhouse
10000064 14 140 Performing Work Center 1100 Inhouse
10000064 14 150 Performing Work Center 1100 Inhouse
Ampoule Washing Machine 10 Performing Work Center 1100 Inhouse
10000065 14 20 Performing Work Center 1100 Inhouse
10000065 14 30 Performing Work Center 1100 Inhouse
10000065 14 40 Performing Work Center 1100 Inhouse
10000065 14 50 Performing Work Center 1100 Inhouse
10000065 14 60 Performing Work Center 1100 Inhouse
10000065 14 70 Performing Work Center 1100 Inhouse
10000065 14 80 Performing Work Center 1100 Inhouse
10000065 14 90 Performing Work Center 1100 Inhouse
10000065 14 100 Performing Work Center 1100 Inhouse
10000065 14 110 Performing Work Center 1100 Inhouse
10000065 14 120 Performing Work Center 1100 Inhouse
10000065 14 130 Performing Work Center 1100 Inhouse
10000065 14 140 Performing Work Center 1100 Inhouse
10000065 14 150 Performing Work Center 1100 Inhouse
Ambica Dry Powder Filling Machine 10 Performing Work Center 1100 Inhouse
10000066 20 20 Performing Work Center 1100 Inhouse
10000066 20 30 Performing Work Center 1100 Inhouse
10000066 20 40 Performing Work Center 1100 Inhouse
10000066 20 50 Performing Work Center 1100 Inhouse
10000066 20 60 Performing Work Center 1100 Inhouse
10000066 20 70 Performing Work Center 1100 Inhouse
10000066 20 80 Performing Work Center 1100 Inhouse
10000066 20 90 Performing Work Center 1100 Inhouse
10000066 20 100 Performing Work Center 1100 Inhouse
10000066 20 110 Performing Work Center 1100 Inhouse
10000066 20 120 Performing Work Center 1100 Inhouse
10000066 20 130 Performing Work Center 1100 Inhouse
Ambica Vial Sealing Machine 10 Performing Work Center 1100 Inhouse
10000066 20 20 Performing Work Center 1100 Inhouse
10000066 20 30 Performing Work Center 1100 Inhouse
10000066 20 40 Performing Work Center 1100 Inhouse
10000066 20 50 Performing Work Center 1100 Inhouse
10000066 20 60 Performing Work Center 1100 Inhouse
10000066 20 70 Performing Work Center 1100 Inhouse
10000066 20 80 Performing Work Center 1100 Inhouse
10000066 20 90 Performing Work Center 1100 Inhouse
Ampoule Filling Machine 10 Performing Work Center 1100 Inhouse
10000080 10 20 Performing Work Center 1100 Inhouse
10000080 10 30 Performing Work Center 1100 Inhouse
10000080 10 40 Performing Work Center 1100 Inhouse
10000080 10 50 Performing Work Center 1100 Inhouse
10000080 10 60 Performing Work Center 1100 Inhouse
10000080 10 70 Performing Work Center 1100 Inhouse
10000080 10 80 Performing Work Center 1100 Inhouse
10000080 10 90 Performing Work Center 1100 Inhouse
10000080 10 100 Performing Work Center 1100 Inhouse
10000080 10 110 Performing Work Center 1100 Inhouse
Double Nozzle Powder Filling & Capping Ma10 Performing Work Center 1100 Inhouse
10000067 18 20 Performing Work Center 1100 Inhouse
10000067 18 30 Performing Work Center 1100 Inhouse
10000067 18 40 Performing Work Center 1100 Inhouse
10000067 18 50 Performing Work Center 1100 Inhouse
10000067 18 60 Performing Work Center 1100 Inhouse
10000067 18 70 Performing Work Center 1100 Inhouse
10000067 18 80 Performing Work Center 1100 Inhouse
10000067 18 90 Performing Work Center 1100 Inhouse
10000067 18 100 Performing Work Center 1100 Inhouse
10000067 18 110 Performing Work Center 1100 Inhouse
10000067 18 120 Performing Work Center 1100 Inhouse
10000067 18 130 Performing Work Center 1100 Inhouse
10000067 18 140 Performing Work Center 1100 Inhouse
10000067 18 150 Performing Work Center 1100 Inhouse
10000067 18 160 Performing Work Center 1100 Inhouse
10000067 18 170 Performing Work Center 1100 Inhouse
10000067 18 180 Performing Work Center 1100 Inhouse
10000067 18 190 Performing Work Center 1100 Inhouse
Tray Dryer 10 Performing Work Center 1100 Inhouse
10000068 10 20 Performing Work Center 1100 Inhouse
10000068 10 30 Performing Work Center 1100 Inhouse
10000068 10 40 Performing Work Center 1100 Inhouse
10000068 10 50 Performing Work Center 1100 Inhouse
10000068 10 60 Performing Work Center 1100 Inhouse
10000068 10 70 Performing Work Center 1100 Inhouse
10000068 10 80 Performing Work Center 1100 Inhouse
10000068 10 90 Performing Work Center 1100 Inhouse
10000068 10 100 Performing Work Center 1100 Inhouse
10000068 10 110 Performing Work Center 1100 Inhouse
H. Mixer 10 Performing Work Center 1100 Inhouse
10000069 11 20 Performing Work Center 1100 Inhouse
10000069 11 30 Performing Work Center 1100 Inhouse
10000069 11 40 Performing Work Center 1100 Inhouse
10000069 11 50 Performing Work Center 1100 Inhouse
10000069 11 60 Performing Work Center 1100 Inhouse
10000069 11 70 Performing Work Center 1100 Inhouse
10000069 11 80 Performing Work Center 1100 Inhouse
10000069 11 90 Performing Work Center 1100 Inhouse
10000069 11 100 Performing Work Center 1100 Inhouse
10000069 11 110 Performing Work Center 1100 Inhouse
10000069 11 120 Performing Work Center 1100 Inhouse
Ribbon Blender 10 Performing Work Center 1100 Inhouse
10000070 4 20 Performing Work Center 1100 Inhouse
10000070 4 30 Performing Work Center 1100 Inhouse
10000070 4 40 Performing Work Center 1100 Inhouse
10000070 4 50 Performing Work Center 1100 Inhouse
Zanasi Capsule Filling M/c 10 Performing Work Center 1100 Inhouse
10000071 19 20 Performing Work Center 1100 Inhouse
10000071 19 30 Performing Work Center 1100 Inhouse
10000071 19 40 Performing Work Center 1100 Inhouse
10000071 19 50 Performing Work Center 1100 Inhouse
10000071 19 60 Performing Work Center 1100 Inhouse
10000071 19 70 Performing Work Center 1100 Inhouse
10000071 19 80 Performing Work Center 1100 Inhouse
10000071 19 90 Performing Work Center 1100 Inhouse
10000071 19 100 Performing Work Center 1100 Inhouse
10000071 19 110 Performing Work Center 1100 Inhouse
10000071 19 120 Performing Work Center 1100 Inhouse
10000071 19 130 Performing Work Center 1100 Inhouse
10000071 19 140 Performing Work Center 1100 Inhouse
10000071 19 150 Performing Work Center 1100 Inhouse
10000071 19 160 Performing Work Center 1100 Inhouse
10000071 19 170 Performing Work Center 1100 Inhouse
10000071 19 180 Performing Work Center 1100 Inhouse
10000071 19 190 Performing Work Center 1100 Inhouse
10000071 19 200 Performing Work Center 1100 Inhouse
Drum Mixer 10 Performing Work Center 1100 Inhouse
10000072 5 20 Performing Work Center 1100 Inhouse
10000072 5 30 Performing Work Center 1100 Inhouse
10000072 5 40 Performing Work Center 1100 Inhouse
10000072 5 50 Performing Work Center 1100 Inhouse
10000072 5 60 Performing Work Center 1100 Inhouse
Bottle Blowing M/c 10 Performing Work Center 1100 Inhouse
10000073 12 20 Performing Work Center 1100 Inhouse
10000073 12 30 Performing Work Center 1100 Inhouse
10000073 12 40 Performing Work Center 1100 Inhouse
10000073 12 50 Performing Work Center 1100 Inhouse
10000073 12 60 Performing Work Center 1100 Inhouse
10000073 12 70 Performing Work Center 1100 Inhouse
10000073 12 80 Performing Work Center 1100 Inhouse
10000073 12 90 Performing Work Center 1100 Inhouse
10000073 12 100 Performing Work Center 1100 Inhouse
10000073 12 110 Performing Work Center 1100 Inhouse
10000073 12 120 Performing Work Center 1100 Inhouse
10000073 12 130 Performing Work Center 1100 Inhouse
Conventional Coating Machine 10 Performing Work Center 1100 Inhouse
10000074 10 20 Performing Work Center 1100 Inhouse
10000074 10 30 Performing Work Center 1100 Inhouse
10000074 10 40 Performing Work Center 1100 Inhouse
10000074 10 50 Performing Work Center 1100 Inhouse
10000074 10 60 Performing Work Center 1100 Inhouse
10000074 10 70 Performing Work Center 1100 Inhouse
10000074 10 80 Performing Work Center 1100 Inhouse
10000074 10 90 Performing Work Center 1100 Inhouse
10000074 10 100 Performing Work Center 1100 Inhouse
10000074 10 110 Performing Work Center 1100 Inhouse
Silverson Mixer 10 Performing Work Center 1100 Inhouse
10000079 4 20 Performing Work Center 1100 Inhouse
10000079 4 30 Performing Work Center 1100 Inhouse
10000079 4 40 Performing Work Center 1100 Inhouse
10000079 4 50 Performing Work Center 1100 Inhouse
ZP-17 Compression M/c 10 Performing Work Center 1100 Inhouse
10000075 9 20 Performing Work Center 1100 Inhouse
10000075 9 30 Performing Work Center 1100 Inhouse
10000075 9 40 Performing Work Center 1100 Inhouse
10000075 9 50 Performing Work Center 1100 Inhouse
10000075 9 60 Performing Work Center 1100 Inhouse
10000075 9 70 Performing Work Center 1100 Inhouse
10000075 9 80 Performing Work Center 1100 Inhouse
10000075 9 90 Performing Work Center 1100 Inhouse
10000075 9 100 Performing Work Center 1100 Inhouse
Fitz Mill 10 Performing Work Center 1100 Inhouse
10000077 4 20 Performing Work Center 1100 Inhouse
10000077 4 30 Performing Work Center 1100 Inhouse
10000077 4 40 Performing Work Center 1100 Inhouse
10000077 4 50 Performing Work Center 1100 Inhouse
Pallet Trucks 10 Performing Work Center 1100 Inhouse
10000078 4 20 Performing Work Center 1100 Inhouse
10000078 4 30 Performing Work Center 1100 Inhouse
10000078 4 40 Performing Work Center 1100 Inhouse
10000078 4 50 Performing Work Center 1100 Inhouse
Packing Conveyor Belt No 1,2,3 10 Performing Work Center 1100 Inhouse
10000082 1 20 Performing Work Center 1100 Inhouse
10000083 1 30 Performing Work Center 1100 Inhouse
10000084 8 40 Performing Work Center 1100 Inhouse
10000084 8 50 Performing Work Center 1100 Inhouse
10000084 8 60 Performing Work Center 1100 Inhouse
10000084 8 70 Performing Work Center 1100 Inhouse
10000084 8 80 Performing Work Center 1100 Inhouse
10000084 8 90 Performing Work Center 1100 Inhouse
10000084 8 100 Performing Work Center 1100 Inhouse
10000084 8 110 Performing Work Center 1100 Inhouse
Auto Labeler (Ambica) 10 Performing Work Center 1100 Inhouse
10000085 6 20 Performing Work Center 1100 Inhouse
10000085 6 30 Performing Work Center 1100 Inhouse
10000085 6 40 Performing Work Center 1100 Inhouse
10000085 6 50 Performing Work Center 1100 Inhouse
10000085 6 60 Performing Work Center 1100 Inhouse
10000085 6 70 Performing Work Center 1100 Inhouse
Auto Labeler (HHFZ) 10 Performing Work Center 1100 Inhouse
10000086 6 20 Performing Work Center 1100 Inhouse
10000086 6 30 Performing Work Center 1100 Inhouse
10000086 6 40 Performing Work Center 1100 Inhouse
10000086 6 50 Performing Work Center 1100 Inhouse
10000086 6 60 Performing Work Center 1100 Inhouse
10000086 6 70 Performing Work Center 1100 Inhouse
Magnetic Induction Sealer (LGYF-2000 BX-I)10 Performing Work Center 1100 Inhouse
10000087 3 20 Performing Work Center 1100 Inhouse
10000087 3 30 Performing Work Center 1100 Inhouse
10000087 3 40 Performing Work Center 1100 Inhouse
Blister Machine DPP-250 10 Performing Work Center 1100 Inhouse
10000076 11 20 Performing Work Center 1100 Inhouse
10000076 11 30 Performing Work Center 1100 Inhouse
10000076 11 40 Performing Work Center 1100 Inhouse
10000076 11 50 Performing Work Center 1100 Inhouse
10000076 11 60 Performing Work Center 1100 Inhouse
10000076 11 70 Performing Work Center 1100 Inhouse
10000076 11 80 Performing Work Center 1100 Inhouse
10000076 11 90 Performing Work Center 1100 Inhouse
10000076 11 100 Performing Work Center 1100 Inhouse
10000076 11 110 Performing Work Center 1100 Inhouse
10000076 11 120 Performing Work Center 1100 Inhouse
Domino Inkjet Printer A-400 & Conveyor 10 Performing Work Center 1100 Inhouse
10000088 4 20 Performing Work Center 1100 Inhouse
10000088 4 30 Performing Work Center 1100 Inhouse
10000088 4 40 Performing Work Center 1100 Inhouse
10000088 4 50 Performing Work Center 1100 Inhouse
Ampule Crushing Machine 10 Performing Work Center 1100 Inhouse
10000089 4 20 Performing Work Center 1100 Inhouse
10000089 4 30 Performing Work Center 1100 Inhouse
10000089 4 40 Performing Work Center 1100 Inhouse
10000089 4 50 Performing Work Center 1100 Inhouse
Pallet Truck 10 Performing Work Center 1100 Inhouse
10000090 4 20 Performing Work Center 1100 Inhouse
10000090 4 30 Performing Work Center 1100 Inhouse
10000090 4 40 Performing Work Center 1100 Inhouse
10000090 4 50 Performing Work Center 1100 Inhouse
LG Centrifugal Chiller 500 Ton 10 Performing Work Center 1100 Inhouse
10000144 16 20 Performing Work Center 1100 Inhouse
10000144 16 30 Performing Work Center 1100 Inhouse
10000144 16 40 Performing Work Center 1100 Inhouse
10000144 16 50 Performing Work Center 1100 Inhouse
10000144 16 60 Performing Work Center 1100 Inhouse
10000144 16 70 Performing Work Center 1100 Inhouse
10000144 16 80 Performing Work Center 1100 Inhouse
10000144 16 90 Performing Work Center 1100 Inhouse
10000144 16 100 Performing Work Center 1100 Inhouse
10000144 16 110 Performing Work Center 1100 Inhouse
10000144 16 120 Performing Work Center 1100 Inhouse
10000144 16 130 Performing Work Center 1100 Inhouse
10000144 16 140 Performing Work Center 1100 Inhouse
10000144 16 150 Performing Work Center 1100 Inhouse
10000144 16 160 Performing Work Center 1100 Inhouse
10000144 16 170 Performing Work Center 1100 Inhouse
LG Absorption Chiller 150 Ton 10 Performing Work Center 1100 Inhouse
10000143 10 20 Performing Work Center 1100 Inhouse
10000143 10 30 Performing Work Center 1100 Inhouse
10000143 10 40 Performing Work Center 1100 Inhouse
10000143 10 50 Performing Work Center 1100 Inhouse
10000143 10 60 Performing Work Center 1100 Inhouse
10000143 10 70 Performing Work Center 1100 Inhouse
10000143 10 80 Performing Work Center 1100 Inhouse
10000143 10 90 Performing Work Center 1100 Inhouse
10000143 10 100 Performing Work Center 1100 Inhouse
10000143 10 110 Performing Work Center 1100 Inhouse
Chilled Water Pumps (Centrifugal Chiller) 1,10 Performing Work Center 1100 Inhouse
10000168 1 20 Performing Work Center 1100 Inhouse
10000169 6 30 Performing Work Center 1100 Inhouse
10000169 6 40 Performing Work Center 1100 Inhouse
10000169 6 50 Performing Work Center 1100 Inhouse
10000169 6 60 Performing Work Center 1100 Inhouse
10000169 6 70 Performing Work Center 1100 Inhouse
10000169 6 80 Performing Work Center 1100 Inhouse
Chilled Water Pumps (Absorption Chiller)1,210 Performing Work Center 1100 Inhouse
10000145 1 20 Performing Work Center 1100 Inhouse
10000146 6 30 Performing Work Center 1100 Inhouse
10000146 6 40 Performing Work Center 1100 Inhouse
10000146 6 50 Performing Work Center 1100 Inhouse
10000146 6 60 Performing Work Center 1100 Inhouse
10000146 6 70 Performing Work Center 1100 Inhouse
10000146 6 80 Performing Work Center 1100 Inhouse
Condenser Water Pumps (Centrifugal Chiller10 Performing Work Center 1100 Inhouse
10000170 1 20 Performing Work Center 1100 Inhouse
10000171 6 30 Performing Work Center 1100 Inhouse
10000171 6 40 Performing Work Center 1100 Inhouse
10000171 6 50 Performing Work Center 1100 Inhouse
10000171 6 60 Performing Work Center 1100 Inhouse
10000171 6 70 Performing Work Center 1100 Inhouse
10000171 6 80 Performing Work Center 1100 Inhouse
Condenser Water Pumps (Absorption Chille10 Performing Work Center 1100 Inhouse
10000147 1 20 Performing Work Center 1100 Inhouse
10000156 6 30 Performing Work Center 1100 Inhouse
10000156 6 40 Performing Work Center 1100 Inhouse
10000156 6 50 Performing Work Center 1100 Inhouse
10000156 6 60 Performing Work Center 1100 Inhouse
10000156 6 70 Performing Work Center 1100 Inhouse
10000156 6 80 Performing Work Center 1100 Inhouse
Cooling Tower-I (1,2) 10 Performing Work Center 1100 Inhouse
10000148 1 20 Performing Work Center 1100 Inhouse
10000149 10 30 Performing Work Center 1100 Inhouse
10000149 10 40 Performing Work Center 1100 Inhouse
10000149 10 50 Performing Work Center 1100 Inhouse
10000149 10 60 Performing Work Center 1100 Inhouse
10000149 10 70 Performing Work Center 1100 Inhouse
10000149 10 80 Performing Work Center 1100 Inhouse
10000149 10 90 Performing Work Center 1100 Inhouse
10000149 10 100 Performing Work Center 1100 Inhouse
10000149 10 110 Performing Work Center 1100 Inhouse
10000149 10 120 Performing Work Center 1100 Inhouse
Worthington Air Compressor 45KW 10 Performing Work Center 1100 Inhouse
10000150 17 20 Performing Work Center 1100 Inhouse
10000150 17 30 Performing Work Center 1100 Inhouse
10000150 17 40 Performing Work Center 1100 Inhouse
10000150 17 50 Performing Work Center 1100 Inhouse
10000150 17 60 Performing Work Center 1100 Inhouse
10000150 17 70 Performing Work Center 1100 Inhouse
10000150 17 80 Performing Work Center 1100 Inhouse
10000150 17 90 Performing Work Center 1100 Inhouse
10000150 17 100 Performing Work Center 1100 Inhouse
10000150 17 110 Performing Work Center 1100 Inhouse
10000150 17 120 Performing Work Center 1100 Inhouse
10000150 17 130 Performing Work Center 1100 Inhouse
10000150 17 140 Performing Work Center 1100 Inhouse
10000150 17 150 Performing Work Center 1100 Inhouse
10000150 17 160 Performing Work Center 1100 Inhouse
10000150 17 170 Performing Work Center 1100 Inhouse
10000150 17 180 Performing Work Center 1100 Inhouse
Atlas Copco Air Compressor 55KW 10 Performing Work Center 1100 Inhouse
10000151 17 20 Performing Work Center 1100 Inhouse
10000151 17 30 Performing Work Center 1100 Inhouse
10000151 17 40 Performing Work Center 1100 Inhouse
10000151 17 50 Performing Work Center 1100 Inhouse
10000151 17 60 Performing Work Center 1100 Inhouse
10000151 17 70 Performing Work Center 1100 Inhouse
10000151 17 80 Performing Work Center 1100 Inhouse
10000151 17 90 Performing Work Center 1100 Inhouse
10000151 17 100 Performing Work Center 1100 Inhouse
10000151 17 110 Performing Work Center 1100 Inhouse
10000151 17 120 Performing Work Center 1100 Inhouse
10000151 17 130 Performing Work Center 1100 Inhouse
10000151 17 140 Performing Work Center 1100 Inhouse
10000151 17 150 Performing Work Center 1100 Inhouse
10000151 17 160 Performing Work Center 1100 Inhouse
10000151 17 170 Performing Work Center 1100 Inhouse
10000151 17 180 Performing Work Center 1100 Inhouse
Refrigerant Air Dryers 1 10 Performing Work Center 1100 Inhouse
10000152 10 20 Performing Work Center 1100 Inhouse
10000152 10 30 Performing Work Center 1100 Inhouse
10000152 10 40 Performing Work Center 1100 Inhouse
10000152 10 50 Performing Work Center 1100 Inhouse
10000152 10 60 Performing Work Center 1100 Inhouse
10000152 10 70 Performing Work Center 1100 Inhouse
10000152 10 80 Performing Work Center 1100 Inhouse
10000152 10 90 Performing Work Center 1100 Inhouse
10000152 10 100 Performing Work Center 1100 Inhouse
10000152 10 110 Performing Work Center 1100 Inhouse
Package unit 1,2,3,4,5,6,7,8,9 10 Performing Work Center 1100 Inhouse
10000153 1 20 Performing Work Center 1100 Inhouse
10000154 1 30 Performing Work Center 1100 Inhouse
10000163 1 40 Performing Work Center 1100 Inhouse
10000172 1 50 Performing Work Center 1100 Inhouse
10000173 1 60 Performing Work Center 1100 Inhouse
10000174 1 70 Performing Work Center 1100 Inhouse
10000175 1 80 Performing Work Center 1100 Inhouse
10000176 1 90 Performing Work Center 1100 Inhouse
10000177 6 10 Performing Work Center 1100 Inhouse
10000177 6 20 Performing Work Center 1100 Inhouse
10000177 6 30 Performing Work Center 1100 Inhouse
10000177 6 40 Performing Work Center 1100 Inhouse
10000177 6 50 Performing Work Center 1100 Inhouse
10000177 6 60 Performing Work Center 1100 Inhouse
Air Handling Unit # 1,2 3,4,5,5,6,7,8,8,9,1 10 Performing Work Center 1100 Inhouse
10000254,10000266 1 20 Performing Work Center 1100 Inhouse
10000255,10000267 1 30 Performing Work Center 1100 Inhouse
10000256,10000268 1 40 Performing Work Center 1100 Inhouse
10000257,10000269 1 50 Performing Work Center 1100 Inhouse
10000258,10000270 1 60 Performing Work Center 1100 Inhouse
10000259,10000271 1 70 Performing Work Center 1100 Inhouse
10000260,10000272 1 80 Performing Work Center 1100 Inhouse
10000261,10000273 1 90 Performing Work Center 1100 Inhouse
10000262,10000274 1 100 Performing Work Center 1100 Inhouse
10000263,10000275 1 110 Performing Work Center 1100 Inhouse
10000264,10000276 1 120 Performing Work Center 1100 Inhouse
10000265,10000277 1 130 Performing Work Center 1100 Inhouse
Dehumidifier 1---7 (Non-Ceph) 10 Performing Work Center 1100 Inhouse
10000248,10000251,10000278, 1 20 Performing Work Center 1100 Inhouse
10000249,10000252, 1 30 Performing Work Center 1100 Inhouse
10000250,10000253, 1 40 Performing Work Center 1100 Inhouse
Air Handling Unit # 14--22 (Ceph) 10 Performing Work Center 1100 Inhouse
10000279 1 20 Performing Work Center 1100 Inhouse
10000280 1 30 Performing Work Center 1100 Inhouse
10000281 1 40 Performing Work Center 1100 Inhouse
10000282 1 50 Performing Work Center 1100 Inhouse
10000283 1 60 Performing Work Center 1100 Inhouse
10000284 1 70 Performing Work Center 1100 Inhouse
10000285 1 80 Performing Work Center 1100 Inhouse
10000286 1 90 Performing Work Center 1100 Inhouse
10000287 4 100 Performing Work Center 1100 Inhouse
10000287 4 110 Performing Work Center 1100 Inhouse
10000287 4 120 Performing Work Center 1100 Inhouse
10000287 4 130 Performing Work Center 1100 Inhouse
Dehumidifier 1---2 (Ceph) 10 Performing Work Center 1100 Inhouse
10000288 1 20 Performing Work Center 1100 Inhouse
10000289 2 30 Performing Work Center 1100 Inhouse
10000289 2 40 Performing Work Center 1100 Inhouse
Air Handling Unit # 1--14,20 (Nutra) (HVAC 10 Performing Work Center 1100 Inhouse
10000290,10000181 1 20 Performing Work Center 1100 Inhouse
10000291,10000182 1 30 Performing Work Center 1100 Inhouse
10000292,10000183 1 40 Performing Work Center 1100 Inhouse
10000293,10000184 1 50 Performing Work Center 1100 Inhouse
10000294,10000185 1 60 Performing Work Center 1100 Inhouse
10000295,10000186 1 70 Performing Work Center 1100 Inhouse
10000296,10000187 1 80 Performing Work Center 1100 Inhouse
10000297,10000188 1 90 Performing Work Center 1100 Inhouse
10000298,10000189 1 100 Performing Work Center 1100 Inhouse
10000299, 1 110 Performing Work Center 1100 Inhouse
10000300 1 120 Performing Work Center 1100 Inhouse
10000301 1 130 Performing Work Center 1100 Inhouse
10000302 1
10000303 1
10000305 1
Dehumidifier 1---5 (Nutra) 10 Performing Work Center 1100 Inhouse
10000306 1 20 Performing Work Center 1100 Inhouse
10000307 1 30 Performing Work Center 1100 Inhouse
10000308 1 40 Performing Work Center 1100 Inhouse
10000309 1 50 Performing Work Center 1100 Inhouse
10000310 1
Fan Coil Unit # 01----33 10 Performing Work Center 1100 Inhouse
10000190 1 20 Performing Work Center 1100 Inhouse
10000191 1 30 Performing Work Center 1100 Inhouse
10000192 1 40 Performing Work Center 1100 Inhouse
10000193 1 50 Performing Work Center 1100 Inhouse
10000194 1 60 Performing Work Center 1100 Inhouse
10000195 1 70 Performing Work Center 1100 Inhouse
10000196 1 80 Performing Work Center 1100 Inhouse
10000197 1 90 Performing Work Center 1100 Inhouse
10000198 1
10000199 1
10000200 1
10000201 1
10000202 1
10000203 1
10000204 1
10000205 1
10000206 1
10000207 1
10000208 1
10000209 1
10000210 1
10000211 1
10000212 1
10000213 1
10000214 1
10000215 1
10000216 1
10000217 1
10000218 1
10000219 1
10000220 1
10000221 1
10000222 1
Split Unit # 01----25 10 Performing Work Center 1100 Inhouse
10000223 1 20 Performing Work Center 1100 Inhouse
10000224 1 30 Performing Work Center 1100 Inhouse
10000225 1 40 Performing Work Center 1100 Inhouse
10000226 1 50 Performing Work Center 1100 Inhouse
10000227 1 60 Performing Work Center 1100 Inhouse
10000228 1 70 Performing Work Center 1100 Inhouse
10000229 1 80 Performing Work Center 1100 Inhouse
10000230 1 90 Performing Work Center 1100 Inhouse
10000231 1
10000232 1
10000233 1
10000234 1
10000235 1
10000236 1
10000237 1
10000238 1
10000239 1
10000240 1
10000241 1
10000242 1
10000243 1
10000244 1
10000245 1
10000246 1
10000247 2
10000247 2
Mobile Chiller 10 Performing Work Center 1100 Inhouse
10000157 5 20 Performing Work Center 1100 Inhouse
10000157 5 30 Performing Work Center 1100 Inhouse
10000157 5 40 Performing Work Center 1100 Inhouse
10000157 5 50 Performing Work Center 1100 Inhouse
10000157 5 60 Performing Work Center 1100 Inhouse
Water Cooler 1-4 10 Performing Work Center 1100 Inhouse
10000164 1 20 Performing Work Center 1100 Inhouse
10000165 1 30 Performing Work Center 1100 Inhouse
10000343 2 40 Performing Work Center 1100 Inhouse
10000343 2 50 Performing Work Center 1100 Inhouse
Pre Treatment Plant 10 Performing Work Center 1100 Inhouse
10000166 8 20 Performing Work Center 1100 Inhouse
10000166 8 30 Performing Work Center 1100 Inhouse
10000166 8 40 Performing Work Center 1100 Inhouse
10000166 8 50 Performing Work Center 1100 Inhouse
10000166 8 60 Performing Work Center 1100 Inhouse
10000166 8 70 Performing Work Center 1100 Inhouse
10000166 8 80 Performing Work Center 1100 Inhouse
10000166 8 90 Performing Work Center 1100 Inhouse
Change Room Exhaust (Ceph,Non-Ceph,Nut10 Performing Work Center 1100 Inhouse
10000167 1 20 Performing Work Center 1100 Inhouse
10000179 1 30 Performing Work Center 1100 Inhouse
10000180 2 40 Performing Work Center 1100 Inhouse
10000180 2 50 Performing Work Center 1100 Inhouse
R.O Water Plant 10 Performing Work Center 1100 Inhouse
10000158 11 20 Performing Work Center 1100 Inhouse
10000158 11 30 Performing Work Center 1100 Inhouse
10000158 11 40 Performing Work Center 1100 Inhouse
10000158 11 50 Performing Work Center 1100 Inhouse
10000158 11 60 Performing Work Center 1100 Inhouse
10000158 11 70 Performing Work Center 1100 Inhouse
10000158 11 80 Performing Work Center 1100 Inhouse
10000158 11 90 Performing Work Center 1100 Inhouse
10000158 11 100 Performing Work Center 1100 Inhouse
10000158 11 110 Performing Work Center 1100 Inhouse
10000158 11 120 Performing Work Center 1100 Inhouse
Package type Boiler 2.0 Ton 10 Performing Work Center 1100 Inhouse
10000159 12 20 Performing Work Center 1100 Inhouse
10000159 12 30 Performing Work Center 1100 Inhouse
10000159 12 40 Performing Work Center 1100 Inhouse
10000159 12 50 Performing Work Center 1100 Inhouse
10000159 12 60 Performing Work Center 1100 Inhouse
10000159 12 70 Performing Work Center 1100 Inhouse
10000159 12 80 Performing Work Center 1100 Inhouse
10000159 12 90 Performing Work Center 1100 Inhouse
10000159 12 100 Performing Work Center 1100 Inhouse
10000159 12 110 Performing Work Center 1100 Inhouse
10000159 12 120 Performing Work Center 1100 Inhouse
10000159 12 130 Performing Work Center 1100 Inhouse
Dust Collector (5) 10 Performing Work Center 1100 Inhouse
10000160 8 20 Performing Work Center 1100 Inhouse
10000160 8 30 Performing Work Center 1100 Inhouse
10000160 8 40 Performing Work Center 1100 Inhouse
10000160 8 50 Performing Work Center 1100 Inhouse
10000160 8 60 Performing Work Center 1100 Inhouse
10000160 8 70 Performing Work Center 1100 Inhouse
10000160 8 80 Performing Work Center 1100 Inhouse
10000160 8 90 Performing Work Center 1100 Inhouse
Fire Hydrant System 10 Performing Work Center 1100 Inhouse
10000161 4 20 Performing Work Center 1100 Inhouse
10000161 4 30 Performing Work Center 1100 Inhouse
10000161 4 40 Performing Work Center 1100 Inhouse
10000161 4 50 Performing Work Center 1100 Inhouse
Multi Effect Water Distillation plant 10 Performing Work Center 1100 Inhouse
10000162 8 20 Performing Work Center 1100 Inhouse
10000162 8 30 Performing Work Center 1100 Inhouse
10000162 8 40 Performing Work Center 1100 Inhouse
10000162 8 50 Performing Work Center 1100 Inhouse
10000162 8 60 Performing Work Center 1100 Inhouse
10000162 8 70 Performing Work Center 1100 Inhouse
10000162 8 80 Performing Work Center 1100 Inhouse
10000162 8 90 Performing Work Center 1100 Inhouse
ZP-19 compression Machine 10 Performing Work Center 1100 Inhouse
10000091 9 20 Performing Work Center 1100 Inhouse
10000091 9 30 Performing Work Center 1100 Inhouse
10000091 9 40 Performing Work Center 1100 Inhouse
10000091 9 50 Performing Work Center 1100 Inhouse
10000091 9 60 Performing Work Center 1100 Inhouse
10000091 9 70 Performing Work Center 1100 Inhouse
10000091 9 80 Performing Work Center 1100 Inhouse
10000091 9 90 Performing Work Center 1100 Inhouse
10000091 9 100 Performing Work Center 1100 Inhouse
Blister Machine Noack-760 10 Performing Work Center 1100 Inhouse
10000092 14 20 Performing Work Center 1100 Inhouse
10000092 14 30 Performing Work Center 1100 Inhouse
10000092 14 40 Performing Work Center 1100 Inhouse
10000092 14 50 Performing Work Center 1100 Inhouse
10000092 14 60 Performing Work Center 1100 Inhouse
10000092 14 70 Performing Work Center 1100 Inhouse
10000092 14 80 Performing Work Center 1100 Inhouse
10000092 14 90 Performing Work Center 1100 Inhouse
10000092 14 100 Performing Work Center 1100 Inhouse
10000092 14 110 Performing Work Center 1100 Inhouse
10000092 14 120 Performing Work Center 1100 Inhouse
10000092 14 130 Performing Work Center 1100 Inhouse
10000092 14 140 Performing Work Center 1100 Inhouse
10000092 14 150 Performing Work Center 1100 Inhouse
Four Head Sachet Machine & Conveyor Belt10 Performing Work Center 1100 Inhouse
10000093 10 20 Performing Work Center 1100 Inhouse
10000093 10 30 Performing Work Center 1100 Inhouse
10000093 10 40 Performing Work Center 1100 Inhouse
10000093 10 50 Performing Work Center 1100 Inhouse
10000093 10 60 Performing Work Center 1100 Inhouse
10000093 10 70 Performing Work Center 1100 Inhouse
10000093 10 80 Performing Work Center 1100 Inhouse
10000093 10 90 Performing Work Center 1100 Inhouse
10000093 10 100 Performing Work Center 1100 Inhouse
10000093 10 110 Performing Work Center 1100 Inhouse
Bottle Blowing Machine 10 Performing Work Center 1100 Inhouse
10000108 12 20 Performing Work Center 1100 Inhouse
10000108 12 30 Performing Work Center 1100 Inhouse
10000108 12 40 Performing Work Center 1100 Inhouse
10000108 12 50 Performing Work Center 1100 Inhouse
10000108 12 60 Performing Work Center 1100 Inhouse
10000108 12 70 Performing Work Center 1100 Inhouse
10000108 12 80 Performing Work Center 1100 Inhouse
10000108 12 90 Performing Work Center 1100 Inhouse
10000108 12 100 Performing Work Center 1100 Inhouse
10000108 12 110 Performing Work Center 1100 Inhouse
10000108 12 120 Performing Work Center 1100 Inhouse
10000108 12 130 Performing Work Center 1100 Inhouse
Automatic Gelatin Encapsulation Machine 10 Performing Work Center 1100 Inhouse
10000094 7 20 Performing Work Center 1100 Inhouse
10000094 7 30 Performing Work Center 1100 Inhouse
10000094 7 40 Performing Work Center 1100 Inhouse
10000094 7 50 Performing Work Center 1100 Inhouse
10000094 7 60 Performing Work Center 1100 Inhouse
10000094 7 70 Performing Work Center 1100 Inhouse
10000094 7 80 Performing Work Center 1100 Inhouse
Single head capping & sealing machine 10 Performing Work Center 1100 Inhouse
10000095 6 20 Performing Work Center 1100 Inhouse
10000095 6 30 Performing Work Center 1100 Inhouse
10000095 6 40 Performing Work Center 1100 Inhouse
10000095 6 50 Performing Work Center 1100 Inhouse
10000095 6 60 Performing Work Center 1100 Inhouse
10000095 6 70 Performing Work Center 1100 Inhouse
Cozolli liquid filling machine 10 Performing Work Center 1100 Inhouse
10000096 9 20 Performing Work Center 1100 Inhouse
10000096 9 30 Performing Work Center 1100 Inhouse
10000096 9 40 Performing Work Center 1100 Inhouse
10000096 9 50 Performing Work Center 1100 Inhouse
10000096 9 60 Performing Work Center 1100 Inhouse
10000096 9 70 Performing Work Center 1100 Inhouse
10000096 9 80 Performing Work Center 1100 Inhouse
10000096 9 90 Performing Work Center 1100 Inhouse
10000096 9 100 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 10 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 20 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 30 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 40 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 50 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 70 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 80 Performing Work Center 1100 Inhouse
Liquid Storage Vessel 90 Performing Work Center 1100 Inhouse
Liquid Manufacturing Vessel 10 Performing Work Center 1100 Inhouse
10000097 8 20 Performing Work Center 1100 Inhouse
10000097 8 30 Performing Work Center 1100 Inhouse
10000097 8 40 Performing Work Center 1100 Inhouse
10000097 8 50 Performing Work Center 1100 Inhouse
10000097 8 60 Performing Work Center 1100 Inhouse
10000097 8 70 Performing Work Center 1100 Inhouse
10000097 8 80 Performing Work Center 1100 Inhouse
10000097 8 90 Performing Work Center 1100 Inhouse
Conventional coating machine 10 Performing Work Center 1100 Inhouse
10000098 9 20 Performing Work Center 1100 Inhouse
10000098 9 30 Performing Work Center 1100 Inhouse
10000098 9 40 Performing Work Center 1100 Inhouse
10000098 9 50 Performing Work Center 1100 Inhouse
10000098 9 60 Performing Work Center 1100 Inhouse
10000098 9 70 Performing Work Center 1100 Inhouse
10000098 9 90 Performing Work Center 1100 Inhouse
10000098 9 100 Performing Work Center 1100 Inhouse
10000098 9 110 Performing Work Center 1100 Inhouse
Double Cone blender 100 Kg 10 Performing Work Center 1100 Inhouse
10000099 7 20 Performing Work Center 1100 Inhouse
10000099 7 30 Performing Work Center 1100 Inhouse
10000099 7 40 Performing Work Center 1100 Inhouse
10000099 7 50 Performing Work Center 1100 Inhouse
10000099 7 60 Performing Work Center 1100 Inhouse
10000099 7 70 Performing Work Center 1100 Inhouse
10000099 7 80 Performing Work Center 1100 Inhouse
Elanco Encapsulation machine (Semi Auto) 10 Performing Work Center 1100 Inhouse
10000100 9 20 Performing Work Center 1100 Inhouse
10000100 9 30 Performing Work Center 1100 Inhouse
10000100 9 40 Performing Work Center 1100 Inhouse
10000100 9 50 Performing Work Center 1100 Inhouse
10000100 9 60 Performing Work Center 1100 Inhouse
10000100 9 70 Performing Work Center 1100 Inhouse
10000100 9 80 Performing Work Center 1100 Inhouse
10000100 9 90 Performing Work Center 1100 Inhouse
10000100 9 100 Performing Work Center 1100 Inhouse
Packing belt # 01--02 10 Performing Work Center 1100 Inhouse
10000101 1 20 Performing Work Center 1100 Inhouse
10000102 9 30 Performing Work Center 1100 Inhouse
10000102 9 40 Performing Work Center 1100 Inhouse
10000102 9 50 Performing Work Center 1100 Inhouse
10000102 9 60 Performing Work Center 1100 Inhouse
10000102 9 70 Performing Work Center 1100 Inhouse
10000102 9 80 Performing Work Center 1100 Inhouse
10000102 9 90 Performing Work Center 1100 Inhouse
10000102 9 100 Performing Work Center 1100 Inhouse
10000102 9 110 Performing Work Center 1100 Inhouse
Fluid Bed Dryer (FBD) 60 Kg 10 Performing Work Center 1100 Inhouse
10000103 22 20 Performing Work Center 1100 Inhouse
10000103 22 30 Performing Work Center 1100 Inhouse
10000103 22 40 Performing Work Center 1100 Inhouse
10000103 22 50 Performing Work Center 1100 Inhouse
10000103 22 60 Performing Work Center 1100 Inhouse
10000103 22 70 Performing Work Center 1100 Inhouse
10000103 22 80 Performing Work Center 1100 Inhouse
10000103 22 90 Performing Work Center 1100 Inhouse
10000103 22 100 Performing Work Center 1100 Inhouse
10000103 22 110 Performing Work Center 1100 Inhouse
10000103 22 120 Performing Work Center 1100 Inhouse
10000103 22 130 Performing Work Center 1100 Inhouse
Gral Mixer 60kg 10 Performing Work Center 1100 Inhouse
10000104 9 20 Performing Work Center 1100 Inhouse
10000104 9 30 Performing Work Center 1100 Inhouse
10000104 9 40 Performing Work Center 1100 Inhouse
10000104 9 50 Performing Work Center 1100 Inhouse
10000104 9 60 Performing Work Center 1100 Inhouse
10000104 9 70 Performing Work Center 1100 Inhouse
10000104 9 80 Performing Work Center 1100 Inhouse
10000104 9 90 Performing Work Center 1100 Inhouse
10000104 9 100 Performing Work Center 1100 Inhouse
Induction Sealing Machine (LJYF-2000BX) 10 Performing Work Center 1100 Inhouse
10000105 3 20 Performing Work Center 1100 Inhouse
10000105 3 30 Performing Work Center 1100 Inhouse
10000105 3 40 Performing Work Center 1100 Inhouse
PVC Capping Machine 10 Performing Work Center 1100 Inhouse
10000109 8 20 Performing Work Center 1100 Inhouse
10000109 8 30 Performing Work Center 1100 Inhouse
10000109 8 40 Performing Work Center 1100 Inhouse
10000109 8 50 Performing Work Center 1100 Inhouse
10000109 8 60 Performing Work Center 1100 Inhouse
10000109 8 70 Performing Work Center 1100 Inhouse
10000109 8 80 Performing Work Center 1100 Inhouse
10000109 8 90 Performing Work Center 1100 Inhouse
Tablet Counter Machine 10 Performing Work Center 1100 Inhouse
10000106 4 20 Performing Work Center 1100 Inhouse
10000106 4 30 Performing Work Center 1100 Inhouse
10000106 4 40 Performing Work Center 1100 Inhouse
10000106 4 50 Performing Work Center 1100 Inhouse
Auto Labelling Machine 10 Performing Work Center 1100 Inhouse
10000110 6 20 Performing Work Center 1100 Inhouse
10000110 6 30 Performing Work Center 1100 Inhouse
10000110 6 40 Performing Work Center 1100 Inhouse
10000110 6 50 Performing Work Center 1100 Inhouse
10000110 6 60 Performing Work Center 1100 Inhouse
10000110 6 70 Performing Work Center 1100 Inhouse
Oscillator Granulator 10 Performing Work Center 1100 Inhouse
10000111 7 20 Performing Work Center 1100 Inhouse
10000111 7 30 Performing Work Center 1100 Inhouse
10000111 7 40 Performing Work Center 1100 Inhouse
10000111 7 50 Performing Work Center 1100 Inhouse
10000111 7 60 Performing Work Center 1100 Inhouse
10000111 7 70 Performing Work Center 1100 Inhouse
10000111 7 80 Performing Work Center 1100 Inhouse
Pallet Trucks 10 Performing Work Center 1100 Inhouse
10000107 4 20 Performing Work Center 1100 Inhouse
10000107 4 30 Performing Work Center 1100 Inhouse
10000107 4 40 Performing Work Center 1100 Inhouse
10000107 4 50 Performing Work Center 1100 Inhouse
Battery Operated Stacker F.G W/H (TCM) 10 Performing Work Center 1100 Inhouse
10000112 6 20 Performing Work Center 1100 Inhouse
10000112 6 30 Performing Work Center 1100 Inhouse
10000112 6 40 Performing Work Center 1100 Inhouse
10000112 6 50 Performing Work Center 1100 Inhouse
10000112 6 60 Performing Work Center 1100 Inhouse
10000112 6 70 Performing Work Center 1100 Inhouse
Electric Stacker F.G W/H (ES-16-16ET) 10 Performing Work Center 1100 Inhouse
10000113 6 20 Performing Work Center 1100 Inhouse
10000113 6 30 Performing Work Center 1100 Inhouse
10000113 6 40 Performing Work Center 1100 Inhouse
10000113 6 50 Performing Work Center 1100 Inhouse
10000113 6 60 Performing Work Center 1100 Inhouse
10000113 6 70 Performing Work Center 1100 Inhouse
Electric Stacker C.B W/H (ES-16-16ET) 10 Performing Work Center 1100 Inhouse
10000131 6 20 Performing Work Center 1100 Inhouse
10000131 6 30 Performing Work Center 1100 Inhouse
10000131 6 40 Performing Work Center 1100 Inhouse
10000131 6 50 Performing Work Center 1100 Inhouse
10000131 6 60 Performing Work Center 1100 Inhouse
10000131 6 70 Performing Work Center 1100 Inhouse
Domino Inkjet Printer A-200 10 Performing Work Center 1100 Inhouse
10000115 4 20 Performing Work Center 1100 Inhouse
10000115 4 30 Performing Work Center 1100 Inhouse
10000115 4 40 Performing Work Center 1100 Inhouse
10000115 4 50 Performing Work Center 1100 Inhouse
Willett Inkjet Printer 430Si 10 Performing Work Center 1100 Inhouse
10000116 4 20 Performing Work Center 1100 Inhouse
10000116 4 30 Performing Work Center 1100 Inhouse
10000116 4 40 Performing Work Center 1100 Inhouse
10000116 4 50 Performing Work Center 1100 Inhouse
Laser Printer (1) K1010+ 10 Performing Work Center 1100 Inhouse
10000117 4 20 Performing Work Center 1100 Inhouse
10000117 4 30 Performing Work Center 1100 Inhouse
10000117 4 40 Performing Work Center 1100 Inhouse
10000117 4 50 Performing Work Center 1100 Inhouse
Laser Printer (2) K1010SP 10 Performing Work Center 1100 Inhouse
10000118 4 20 Performing Work Center 1100 Inhouse
10000118 4 30 Performing Work Center 1100 Inhouse
10000118 4 40 Performing Work Center 1100 Inhouse
10000118 4 50 Performing Work Center 1100 Inhouse
Electric Pallet Stacker (Basement W/H) 10 Performing Work Center 1100 Inhouse
10000119 6 20 Performing Work Center 1100 Inhouse
10000119 6 30 Performing Work Center 1100 Inhouse
10000119 6 40 Performing Work Center 1100 Inhouse
10000119 6 50 Performing Work Center 1100 Inhouse
10000119 6 60 Performing Work Center 1100 Inhouse
10000119 6 70 Performing Work Center 1100 Inhouse
Strapper Packing Machine PW-316HS 10 Performing Work Center 1100 Inhouse
10000120 4 20 Performing Work Center 1100 Inhouse
10000120 4 30 Performing Work Center 1100 Inhouse
10000120 4 40 Performing Work Center 1100 Inhouse
10000120 4 50 Performing Work Center 1100 Inhouse
Wrapping Machine 10 Performing Work Center 1100 Inhouse
10000121 4 20 Performing Work Center 1100 Inhouse
10000121 4 30 Performing Work Center 1100 Inhouse
10000121 4 40 Performing Work Center 1100 Inhouse
10000121 4 50 Performing Work Center 1100 Inhouse
Lift # 1 ---4 10 Performing Work Center 1100 Inhouse
10000122 1 20 Performing Work Center 1100 Inhouse
10000123 1 30 Performing Work Center 1100 Inhouse
10000340 1 40 Performing Work Center 1100 Inhouse
10000341 11 50 Performing Work Center 1100 Inhouse
10000341 11 60 Performing Work Center 1100 Inhouse
10000341 11 70 Performing Work Center 1100 Inhouse
10000341 11 80 Performing Work Center 1100 Inhouse
10000341 11 90 Performing Work Center 1100 Inhouse
10000341 11 100 Performing Work Center 1100 Inhouse
10000341 11 110 Performing Work Center 1100 Inhouse
10000341 11 120 Performing Work Center 1100 Inhouse
10000341 11 130 Performing Work Center 1100 Inhouse
10000341 11 140 Performing Work Center 1100 Inhouse
10000341 11 150 Performing Work Center 1100 Inhouse
Dispensing booth 1--2 10 Performing Work Center 1100 Inhouse
10000124 1 20 Performing Work Center 1100 Inhouse
10000125 5 30 Performing Work Center 1100 Inhouse
10000125 5 40 Performing Work Center 1100 Inhouse
10000125 5 50 Performing Work Center 1100 Inhouse
10000125 5 60 Performing Work Center 1100 Inhouse
10000125 5 70 Performing Work Center 1100 Inhouse
Sampling Booth RAW 10 Performing Work Center 1100 Inhouse
10000126 6 20 Performing Work Center 1100 Inhouse
10000126 6 30 Performing Work Center 1100 Inhouse
10000126 6 40 Performing Work Center 1100 Inhouse
10000126 6 50 Performing Work Center 1100 Inhouse
10000126 6 60 Performing Work Center 1100 Inhouse
10000126 6 70 Performing Work Center 1100 Inhouse
Sampling Booth PKG 10 Performing Work Center 1100 Inhouse
10000132 6 20 Performing Work Center 1100 Inhouse
10000132 6 30 Performing Work Center 1100 Inhouse
10000132 6 40 Performing Work Center 1100 Inhouse
10000132 6 50 Performing Work Center 1100 Inhouse
10000132 6 60 Performing Work Center 1100 Inhouse
10000132 6 70 Performing Work Center 1100 Inhouse
Dispensing Booth ceph 10 Performing Work Center 1100 Inhouse
10000127 6 20 Performing Work Center 1100 Inhouse
10000127 6 30 Performing Work Center 1100 Inhouse
10000127 6 40 Performing Work Center 1100 Inhouse
10000127 6 50 Performing Work Center 1100 Inhouse
10000127 6 60 Performing Work Center 1100 Inhouse
10000127 6 70 Performing Work Center 1100 Inhouse
Dispensing Booth Nutra 10 Performing Work Center 1100 Inhouse
10000128 6 20 Performing Work Center 1100 Inhouse
10000128 6 30 Performing Work Center 1100 Inhouse
10000128 6 40 Performing Work Center 1100 Inhouse
10000128 6 50 Performing Work Center 1100 Inhouse
10000128 6 60 Performing Work Center 1100 Inhouse
10000128 6 70 Performing Work Center 1100 Inhouse
Solvent Room Exhaust 10 Performing Work Center 1100 Inhouse
10000133 5 20 Performing Work Center 1100 Inhouse
10000133 5 30 Performing Work Center 1100 Inhouse
10000133 5 40 Performing Work Center 1100 Inhouse
10000133 5 50 Performing Work Center 1100 Inhouse
10000133 5 60 Performing Work Center 1100 Inhouse
Battery Operated Stacker 40' W/H (Aisle) 10 Performing Work Center 1100 Inhouse
10000129 7 20 Performing Work Center 1100 Inhouse
10000129 7 30 Performing Work Center 1100 Inhouse
10000129 7 40 Performing Work Center 1100 Inhouse
10000129 7 50 Performing Work Center 1100 Inhouse
10000129 7 60 Performing Work Center 1100 Inhouse
10000129 7 70 Performing Work Center 1101 Inhouse
10000129 7 80 Performing Work Center 1100 Inhouse
Pallet Trucks 10 Performing Work Center 1100 Inhouse
10000130 4 20 Performing Work Center 1100 Inhouse
10000130 4 30 Performing Work Center 1100 Inhouse
10000130 4 40 Performing Work Center 1100 Inhouse
10000130 4 50 Performing Work Center 1100 Inhouse
Single Punch Tab Compression M/c 10 Performing Work Center 1100 Inhouse
10000134 9 20 Performing Work Center 1100 Inhouse
10000134 9 30 Performing Work Center 1100 Inhouse
10000134 9 40 Performing Work Center 1100 Inhouse
10000134 9 50 Performing Work Center 1100 Inhouse
10000134 9 60 Performing Work Center 1100 Inhouse
10000134 9 70 Performing Work Center 1100 Inhouse
10000134 9 80 Performing Work Center 1100 Inhouse
10000134 9 90 Performing Work Center 1100 Inhouse
10000134 9 100 Performing Work Center 1100 Inhouse
Flat Plate Type Blister Packing M/c 10 Performing Work Center 1100 Inhouse
10000135 14 20 Performing Work Center 1100 Inhouse
10000135 14 30 Performing Work Center 1100 Inhouse
10000135 14 40 Performing Work Center 1100 Inhouse
10000135 14 50 Performing Work Center 1100 Inhouse
10000135 14 60 Performing Work Center 1100 Inhouse
10000135 14 70 Performing Work Center 1100 Inhouse
10000135 14 80 Performing Work Center 1100 Inhouse
10000135 14 90 Performing Work Center 1100 Inhouse
10000135 14 100 Performing Work Center 1100 Inhouse
10000135 14 110 Performing Work Center 1100 Inhouse
10000135 14 120 Performing Work Center 1100 Inhouse
10000135 14 130 Performing Work Center 1100 Inhouse
10000135 14 140 Performing Work Center 1100 Inhouse
10000135 14 150 Performing Work Center 1100 Inhouse
Multi-Functional Machine 10 Performing Work Center 1100 Inhouse
10000136 4 20 Performing Work Center 1100 Inhouse
10000136 4 30 Performing Work Center 1100 Inhouse
10000136 4 40 Performing Work Center 1100 Inhouse
10000136 4 50 Performing Work Center 1100 Inhouse
Precision Tray Dryer 10 Performing Work Center 1100 Inhouse
10000142 8 20 Performing Work Center 1100 Inhouse
10000142 8 30 Performing Work Center 1100 Inhouse
10000142 8 40 Performing Work Center 1100 Inhouse
10000142 8 50 Performing Work Center 1100 Inhouse
10000142 8 60 Performing Work Center 1100 Inhouse
10000142 8 70 Performing Work Center 1100 Inhouse
10000142 8 80 Performing Work Center 1100 Inhouse
10000142 8 90 Performing Work Center 1100 Inhouse
ZP-198 Rotary Tablet Press Machine (8 stati 10 Performing Work Center 1100 Inhouse
10000141 9 20 Performing Work Center 1100 Inhouse
10000141 9 30 Performing Work Center 1100 Inhouse
10000141 9 40 Performing Work Center 1100 Inhouse
10000141 9 50 Performing Work Center 1100 Inhouse
10000141 9 60 Performing Work Center 1100 Inhouse
10000141 9 70 Performing Work Center 1100 Inhouse
10000141 9 80 Performing Work Center 1100 Inhouse
10000141 9 90 Performing Work Center 1100 Inhouse
10000141 9 100 Performing Work Center 1100 Inhouse
High shear mixer Granulator (GHL) 10 Performing Work Center 1100 Inhouse
10000137 6 20 Performing Work Center 1100 Inhouse
10000137 6 30 Performing Work Center 1100 Inhouse
10000137 6 40 Performing Work Center 1100 Inhouse
10000137 6 50 Performing Work Center 1100 Inhouse
10000137 6 60 Performing Work Center 1100 Inhouse
10000137 6 70 Performing Work Center 1100 Inhouse
High Efficiency Coater 10 Performing Work Center 1100 Inhouse
10000138 8 20 Performing Work Center 1100 Inhouse
10000138 8 30 Performing Work Center 1100 Inhouse
10000138 8 40 Performing Work Center 1100 Inhouse
10000138 8 50 Performing Work Center 1100 Inhouse
10000138 8 60 Performing Work Center 1100 Inhouse
10000138 8 70 Performing Work Center 1100 Inhouse
10000138 8 80 Performing Work Center 1100 Inhouse
10000138 8 90 Performing Work Center 1100 Inhouse
Conventional Coating Pan 10 Performing Work Center 1100 Inhouse
10000139 9 20 Performing Work Center 1100 Inhouse
10000139 9 30 Performing Work Center 1100 Inhouse
10000139 9 40 Performing Work Center 1100 Inhouse
10000139 9 50 Performing Work Center 1100 Inhouse
10000139 9 60 Performing Work Center 1100 Inhouse
10000139 9 70 Performing Work Center 1100 Inhouse
10000139 9 80 Performing Work Center 1100 Inhouse
10000139 9 90 Performing Work Center 1100 Inhouse
10000139 9 100 Performing Work Center 1100 Inhouse
Fluid Bed Dryer 10 Performing Work Center 1100 Inhouse
10000140 12 20 Performing Work Center 1100 Inhouse
10000140 12 30 Performing Work Center 1100 Inhouse
10000140 12 40 Performing Work Center 1100 Inhouse
10000140 12 50 Performing Work Center 1100 Inhouse
10000140 12 60 Performing Work Center 1100 Inhouse
10000140 12 70 Performing Work Center 1100 Inhouse
10000140 12 80 Performing Work Center 1100 Inhouse
10000140 12 90 Performing Work Center 1100 Inhouse
10000140 12 100 Performing Work Center 1100 Inhouse
10000140 12 110 Performing Work Center 1100 Inhouse
10000140 12 120 Performing Work Center 1100 Inhouse
10000140 12 130 Performing Work Center 1100 Inhouse
LT/ HT System 10 Performing Work Center 1100 Inhouse
10000311 3 20 Performing Work Center 1100 Inhouse
10000311 3 30 Performing Work Center 1100 Inhouse
10000311 3 40 Performing Work Center 1100 Inhouse
CCTV System 10 Performing Work Center 1100 Inhouse
10000316 1 20 Performing Work Center 1100 Inhouse
Card Access Control System 10 Performing Work Center 1100 Inhouse
10000317 4 20 Performing Work Center 1100 Inhouse
10000317 4 30 Performing Work Center 1100 Inhouse
10000317 4 40 Performing Work Center 1100 Inhouse
10000317 4 50 Performing Work Center 1100 Inhouse
CAT 810-KVA Generator-1---2 10 Performing Work Center 1100 Inhouse
10000312 1 20 Performing Work Center 1100 Inhouse
10000313 6 30 Performing Work Center 1100 Inhouse
10000313 6 40 Performing Work Center 1100 Inhouse
10000313 6 50 Performing Work Center 1100 Inhouse
10000313 6 60 Performing Work Center 1100 Inhouse
10000313 6 70 Performing Work Center 1100 Inhouse
10000313 6 80 Performing Work Center 1100 Inhouse
Diesel Transfer & Storage System 10 Performing Work Center 1100 Inhouse
10000314 3 20 Performing Work Center 1100 Inhouse
10000314 3 30 Performing Work Center 1100 Inhouse
10000314 3 40 Performing Work Center 1100 Inhouse
Inset-o-Cuter (22) 10 Performing Work Center 1100 Inhouse

10000318,10000319,10000320,1 1 20 Performing Work Center 1100 Inhouse

10000326,10000327,10000328,1 1 30 Performing Work Center 1100 Inhouse


10000334,10000335,10000336,1 1 40 Performing Work Center 1100 Inhouse
Fire Alarm System 10 Performing Work Center 1100 Inhouse

10000315 8 20 Performing Work Center 1100 Inhouse

10000315 8 30 Performing Work Center 1100 Inhouse

10000315 8 40 Performing Work Center 1100 Inhouse

10000315 8 50 Performing Work Center 1100 Inhouse

10000315 8 60 Performing Work Center 1100 Inhouse

10000315 8 70 Performing Work Center 1100 Inhouse

10000315 8 80 Performing Work Center 1100 Inhouse

10000315 8 90 Performing Work Center 1100 Inhouse


Air Curtain 10 Performing Work Center 1100 Inhouse
10000342 4 20 Performing Work Center 1100 Inhouse
10000342 4 30 Performing Work Center 1100 Inhouse
10000342 4 40 Performing Work Center 1100 Inhouse
10000342 4 50 Performing Work Center 1100 Inhouse
Check leakage in steam,water and liquid (Q) 1000-Prod 0.5 HRS
Check gearbox for oil leakage.if leakage(Q) 1.0 HRS
Check stirrer for noise, vibration or (Q) 1.0 HRS
Check pressure gauges and replace if(Q) 0.5 HRS
Check oil level in gearbox. Top up SAE40(Y) 0.5 HRS
Check motor bearing for wear and play.(Q) 1.0 HRS
Check motor gearbox coupling for wear(Q) 1.0 HRS
Check discharge valve of vessels and (Q) 0.5 HRS
Inspect the stirrer coupling bolts for(Q) 0.5 HRS
Check dents and rust in the side of (Y) 0.5 HRS
Check gearbox for oil leakage.if leakage(Q) 1000-Prod 1.0 HRS
Check stirrer for noise, vibration or (Q) 1.0 HRS
Check pressure gauges and replace if(Q) 0.5 HRS
Check oil level in gearbox. Top up SAE40(Y) 0.5 HRS
Check motor bearing for wear and play.(Q) 1.0 HRS
Check motor gearbox coupling for wear(Q) 1.0 HRS
Check discharge valve of vessels and (Q) 0.5 HRS
Inspect the stirrer coupling bolts for(Q) 0.5 HRS
Check dents and rust in the side of (Y) 0.5 HRS
Check the seal performance in both(Q) 1000-Prod 1.0 HRS
Check pump coupling/drive belt for (Q) 0.5 HRS
Inspect the caster wheels for proper(Q) 0.5 HRS
Check dynamic balance of the entire(Q) 0.5 HRS
Check the status of wear rings,impeller(Y) 0.5 HRS
Inspect pumping parts for wear & damages(Y) 0.5 HRS
Inspect bearing of motor & pump. Replace(Y) 1.0 HRS
Dismantle the front cover of turret(Q) 1000-Prod 0.5 HRS
Inspect the bottle turret for wear and (Q) 0.5 HRS
Test the No bottle / No air solenoid (Q) 0.5 HRS
Inspect the driving motor, chain and(Q) 1.0 HRS
Lubricate the chain and sprockets of(Q) 0.5 HRS
Inspect all power transmission elements(Q) 0.5 HRS
Inspect the turn table gearbox for(Q) 0.5 HRS
Clean and replace main compressed air(Q) 0.5 HRS
Replace 0.2 micron filter(Q) 0.5 HRS
Note down the motor amperes after the(Q) 0.5 HRS
Inspect the central bearing of turret(Y) 0.5 HRS
Inspect the turn table motor and gearbox(Y) 1.0 HRS
Inspect the pressure regulator for (Y) 0.5 HRS
Check working of dosing / filling mechan(Q) 1000-Prod 0.5 HRS
Check the machine for liquid leakage(Q) 1.0 HRS
Lubricate all cams and cam follower (Q) 0.5 HRS
Check o-rings and seals of pump. (Q) 1.0 HRS
Inspect non-return valve balls,springs(Q) 1.0 HRS
Check condition of Teflon star wheel.(Q) 0.5 HRS
Check base plates and roller bearings(Q) 0.5 HRS
Inspect variable speed drive belt for (Q) 0.5 HRS
Inspect the scroll driving mechanism(Y) 0.5 HRS
Inspect star wheel shaft, sprockets, (Y) 0.5 HRS
Check main bearings of liquid filling(Y) 1.0 HRS
Check and clean electric connections and (Q) 0.5 HRS
Check main sealing head and its springs(Q) 1000-Prod 1.0 HRS
Inspect the gears of all head assemblies(Q) 0.5 HRS
Check condition of Teflon star wheel. (Q) 0.5 HRS
Check base plates and roller bearings for(Q) 0.5 HRS
Check capper head bearings for wear(Y) 1.0 HRS
Inspect V-belt for cracks and wear.(Q) 0.5 HRS
Inspect star wheel shaft,sprockets,gears(Y) 1.0 HRS
Check the tube infeed hight adjusting rod. (Q) 1000-Prod 0.5 HRS
Check the tube holder.(Q) 0.5 HRS
Check the nozzle.(Q) 0.5 HRS
Check the tube positioning gear. (Q) 1.0 HRS
Check the revolving platform.(Q) 0.5 HRS
Check the sealer of tube.(Q) 0.5 HRS
Oiling and greesing of all designated (Q) 1.0 HRS
Check and service the electrical pannel(Q) 1.0 HRS
Check the main motor pully and its(Y) 0.5 HRS
Check the agitator for proper working.(Q) 1000-Prod 0.5 HRS
Check the motor connections. (Q) 0.5 HRS
Check teflon scrappers.(Q) 0.5 HRS
Check the steam valves for proper(Y) 1.0 HRS
Check the steam lines for leakage. (Y) 0.5 HRS
Remove the trolley and check its mesh (Q) 1000-Prod 0.5 HRS
Remove the upper and lower gasket and(Q) 0.5 HRS
Remove the all filters and check its(Y) 2.0 HRS
Check the all solenoids of air purging(Q) 1.0 HRS
Check the water inlet solenoid and water 0.5 HRS
Clean the bag filters of fresh air units(Q) 1.0 HRS
Check the steam valve and leakage of (Q) 1.0 HRS
Check the hot air inlet damper and cold (Q) 0.5 HRS
Check the exhaust motor sound and noteQ) 0.5 HRS
Check the outlet air adjustment motorize(Q) 0.5 HRS
Check all temperatures indicator sensors.(Q) 0.5 HRS
Set the air pressure of gasket with air(Q) 0.5 HRS
Clean electrical panel and inspect all(Q) 1.0 HRS
Remove the main impeller and granulating(Q) 1000-Prod 2.0 HRS
Clean and inspect sealing areas of booth(Q) 0.5 HRS
Check discharge valve plug silicon seal(Q) 0.5 HRS
Pressurized the bowl cover seal and (Q) 0.5 HRS
Adjust the compound air unit against (Y) 0.5 HRS
Check all safety interlocks and mechanis(Q) 0.5 HRS
Replace granulator seals.(Y) 2.0 HRS
Inspect v-belts and check their tension(Q) 0.5 HRS
Inspect and tighten all electrical (Q) 0.5 HRS
Check all pneumatic pipes and its (Y) 0.5 HRS
Check the grinding unit and clean it.(Q) 1.0 HRS
Check the working of machine with HMI(Q) 0.5 HRS
Remove the granulating tool(chopper) and(Q) 1000-Prod 3.0 HRS
Inspect v-belts and check their tension(Y) 1.0 HRS
inspect main motor bearings , if found(Y) 1.0 HRS
inspect electrical panel and connections(Q) 0.5 HRS
Inspect the caster wheels for proper(Q) 1.0 HRS
Check the motor belt tension/condition(Q) 1000-Prod 0.5 HRS
Check the oil level of the gear box(Q) 0.5 HRS
Check the condition of gear strip teeth(Q) 1.0 HRS
Check the gear box condition, gears, and(Y) 1.0 HRS
Inspect the condition of Sieving router(Y) 1.0 HRS
Check the bearing & seal of sieving(Q) 1.0 HRS
Check the alignment of sieving router.(Q) 0.5 HRS
Check the condition of PVC side covers,(Y) 0.5 HRS
Check the steam valve for proper operati(Q) 1000-Prod 0.5 HRS
Check for the steam trap for proper (Q) 1.0 HRS
Check the safety valve for proper (Q) 0.5 HRS
Check the leakage in the steam lines.(Y) 0.5 HRS
Check for the leakage in steam jacket.(Y) 1.0 HRS
Check the oil seals.(Q) 1000-Prod 0.5 HRS
Check the oil.(Q) 0.5 HRS
Check the springs and pins. 1.0 HRS
Check the castor wheels and bearings(Q) 0.5 HRS
Check for the normal operations of the(Q) 0.5 HRS
Remove the trolley and check its mesh (Q) 1000-Prod 0.5 HRS
Remove the upper and lower gasket and(Q) 0.5 HRS
Remove the all filters and check its(Y) 1.0 HRS
Check the all solenoids of air purging(Q) 0.5 HRS
Check the water inlet solenoid and water(Q) 1.0 HRS
Clean the bag filters of fresh air units(Q) 1.0 HRS
Check the steam valve and leakage of (Q) 0.5 HRS
Check the hot air inlet damper and cold (Q) 0.5 HRS
Check the exhaust motor sound and noteQ) 0.5 HRS
Check the outlet air adjustment motorize(Q) 0.5 HRS
Check all temperatures indicator sensors.(Q) 0.5 HRS
Set the air pressure of gasket with air(Q) 1.0 HRS
Remove the main impeller and granulating(Q) 1000-Prod 2 HRS
Clean and inspect sealing areas of booth(Q) 1.0 HRS
Check operation of flush bottom discharg(Q) 1.0 HRS
Check discharge valve plug silicon seal(Q) 0.5 HRS
Inspect bowl cover seal,Replaced damaged(Q) 0.5 HRS
Adjust the compound air unit against(Q) 0.5 HRS
Check all safety interlock & mechanism(Q) 1.0 HRS
Replace granulator seals.(Y) 0.5 HRS
Inspect v-belts and check their tension(Y) 1.0 HRS
Inspect and tighten all elect.connection(Q) 1.0 HRS
Check oil in gear box.(Q) 1000-Prod 0.5 HRS
Inspect gear box thoroughly. Replace(Y) 2.0 HRS
Check bearing of motor. Replace if(Q) 2.0 HRS
Inspect lid cover seal, Replaced if (Q) 1.0 HRS
Inspect and tighten all elect.Connection(Q) 1.0 HRS
Inspect the HEPA filters for their (Q) 1000-Prod 1.0 HRS
Clean the air filter housing and ducts.(Q) 1.0 HRS
Inspect the blower against powder(Q) 1.0 HRS
Inspect the trays for leakage and joint(Y) 1.5 HRS
Inspect the tray rests for proper rigid(Y) 1.0 HRS
Inspect the motor for excessive noise(Q) 2.0 HRS
Check the door for smooth movement and(Q) 2.0 HRS
Lubricate the door hinges and inspect (Q) 0.5 HRS
Inspect the door lock and their movement(Y) 0.5 HRS
Check the condition of heating elements(Q) 0.5 HRS
Check all the controllers, timers and (Q) 1.0 HRS
Inspect the pressure rollers for wear(Q) 1000-Prod 1.5 HRS
Inspect the bearings of pressure rollers(Q) 1.0 HRS
Inspect the worm drive mechanism for(Q) 1.0 HRS
Inspect the mill blades for wear and(Q) 0.5 HRS
Inspect mill bearings for wear and noise(Q) 2.0 HRS
Check the motor sound against any (Q) 1.0 HRS
Check the drive belt 0.5 HRS
Inspect the gear box for leakage,replace(Q) 0.5 HRS
Top up the oil level of gear box and jog(Q) 0.5 HRS
Inspect al them if found improper. 0.5 HRS
Inspect all hydraulic and pneumatic(Y) 0.5 HRS
Check oil in gear box.(Q) 1000-Prod 0.5 HRS
Inspect gear box thoroughly. Replace(Y) 0.5 HRS
Check bearing of motor. Replace if worn(Q) 1.0 HRS
Inspect lid cover seal, Replaced if(Q) 0.5 HRS
Inspect and tighten all electrical(Q) 0.5 HRS
check chain and sprocket of gear box.(Q) 0.5 HRS
greasing of all bearings and chain (Q) 2.0 HRS
Tighten main shaft bolts (Q) 0.5 HRS
check motor for abnormal sound(Q) 1000-Prod 0.5 HRS
check vaccum pump pressure .(Q) 0.5 HRS
check cloth filter if worn out then repl(Q) 1.0 HRS
check powder transfer pipe , replace if(Q) 1.0 HRS
Inspect the powder hopper and dosing(Q) 1000-Prod 1.0 HRS
Inspect main drive motor for any noise(Q) 1.0 HRS
Inspect the heaters and efficiency of(Q) 1.0 HRS
Check the condition of sealing and(Q) 1.0 HRS
Check the operation of sensors.(Q) 0.5 HRS
Check the operation of printing unit and(Q) 0.5 HRS
Check all locking bolts and clean and(Y) 1.0 HRS
Check electric switches and connections.(Q) 0.5 HRS
Inspect the powder hopper and dosing (Q) 1000-Prod 1.0 HRS
Inspect main drive motor for any noise(Q) 1.0 HRS
Inspect the heaters and efficiency of(Q) 0.5 HRS
Check the condition of L-sealers.(Q) 1.5 HRS
Check the condition of cutters blades. (Q) 1.0 HRS
Check the operation of sensors.(Q) 0.5 HRS
Check he operation of printing rollers (Q) 0.5 HRS
Check all locking bolts and clean(Y) 0.5 HRS
Check electric switches and connections.(Q) 0.5 HRS
Check the working of pneumatic cylinders (Q) 0.5 HRS
Check and replace pneumatic pipes. (Q) 0.5 HRS
Check oil in gear box.(Q) 1000-Prod 0.5 HRS
Inspect gear box thoroughly. Replace(Y) 1.0 HRS
Check bearing of motor. Replace if worn(Q) 0.5 HRS
Inspect lid cover seal, Replaced if(Q) 0.5 HRS
Inspect and tighten all electrical(Q) 0.5 HRS
check chain and sprocket of gear box.(Q) 0.5 HRS
greasing of all bearings and chain (Q) 0.5 HRS
tighten main shaft bolts .(Q) 0.5 HRS
Check all oil points and greasing(Q) 1000-Prod 0.5 HRS
Visually check machines bushes and(Q) 0.5 HRS
Check the machine belt for wear and(Q) 1.0 HRS
Check the pulley and belt for wear(Q) 1.0 HRS
Clean the filters of vacuum pump, dust(Q) 1.0 HRS
Remove the dust from inside the elect.(Q) 0.5 HRS
Check the power connections as well as(Q) 0.5 HRS
Check the motor’s connection in motor(Q) 0.5 HRS
Inspect the motor’s bearing and machine(Y) 1.0 HRS
Check the grounding of control panel(Q) 0.5 HRS
Upper and bottom Cams are to be inspect(Q) 1000-Prod 1.0 HRS
Before starting up the roll contact surf(Q) 0.5 HRS
Visual inspection must be done during(Q) 0.5 HRS
Punch brake; fit the lower tools in the(Q) 1.0 HRS
Punch seals must be replaced when(Q) 1.0 HRS
When removing the die table, ensure(Q) 0.5 HRS
The oil level in pump must be checked(Q) 0.5 HRS
Lubricate the lube nipple.(Q) 0.5 HRS
Open the upper part of fill-o-matic(Q) 1.0 HRS
Magnet must be checked for freedom of (Q) 1.0 HRS
Check and ensure that the silicon spacer(Q) 0.5 HRS
Clean the window flaps and seals when(Q) 0.5 HRS
Visual inspection of oil in main gear(Y) 0.5 HRS
Every time the press is cleaned (batch (Q) 0.5 HRS
Check the connection lead for any signs(Q) 0.5 HRS
Check easy running of the spindles(Q) 0.5 HRS
Take out the filter mats and clean them(Y) 1.0 HRS
Check the movement of punches in sockets(Q) 1000-Prod 1.0 HRS
Check the lubrication of punches through(Q) 1.0 HRS
Check the leakage in lubricating circuit(Q) 0.5 HRS
Spray anti-friction solid lubricant over(Y) 1.0 HRS
Clean cam tracks and inspect for wear(Y) 1.0 HRS
Check pressure roller for free movement(Q) 1.0 HRS
Check lubricant over all lever linkage(Q) 0.5 HRS
Check the working of hydraulic pump(Q) 1.0 HRS
Check the pulley of oil pump and main(Q) 0.5 HRS
Check the working of gear box, top up(Q) 1.0 HRS
Check the main motor belt and pulley(Q) 0.5 HRS
Check the weight and thickness adjustmen(Q) 0.5 HRS
Check all the grease nipples for damage.(Y) 0.5 HRS
Check all the safety interlocks for(Q) 0.5 HRS
Check all the machine limit switches and(Q) 1.0 HRS
Check all the electrical panels and(Q) 1.0 HRS
Check the movement of punches in their(Q) 1000-Prod 0.5 HRS
Check the lubrication of punches through(Q) 1.0 HRS
Check the leakage in lubricating circuit(Q) 1.0 HRS
Spray anti-friction solid lubricant over(Y) 1.0 HRS
Clean cam tracks and inspect for wear(Q) 0.5 HRS
Check pressure roller for free movement (Q) 0.5 HRS
Check lubricant over all lever linkage(Q) 0.5 HRS
Check the smooth working of hydraulic(Q) 1.0 HRS
Check the working of hydraulic pump(Q) 0.5 HRS
Check the pulley of oil pump and main(Q) 1.0 HRS
Inspect the force feeder and complete(Q) 0.5 HRS
Dismantle the turret or maximum attachme(Y) 1.0 HRS
Check the scrapper strip of Teflon(Q) 0.5 HRS
Check the auto-feeder motor and its(Q) 0.5 HRS
Check all the grease nipples, replace if(Q) 0.5 HRS
Check all the safety interlocks for(Q) 0.5 HRS
Check the movement of punches in their (Q) 1.0 HRS
Check the movement of punches in their(Q) 1000-Prod 0.5 HRS
Check the lubrication of punches through(Q) 0.5 HRS
Check the leakage in lubricating circuit(Q) 0.5 HRS
Spray anti-friction solid lubricant over(Y) 1.0 HRS
Clean cam tracks and inspect for wear(Y) 1.0 HRS
Check pressure roller for free movement (Q) 0.5 HRS
Check lubricant over all lever linkage(Q) 1.0 HRS
Check the pulley of oil pump and main(Y) 1.5 HRS
Check all safety interlocks for proper(Q) 1.0 HRS
Check all grease nipples for damage(Y) 0.5 HRS
Check the movement of punches in their(Q) 1000-Prod 0.5 HRS
Check the lubrication of punches through(Q) 1.0 HRS
Check the leakage in lubricating circuit 1.5 HRS
Spray anti-friction solid lubricant over(Y) 0.5 HRS
Clean cam tracks and inspect for wear(Y) 0.5 HRS
Check pressure roller for free movement(Q) 1.0 HRS
Check lubricant over all lever linkage(Q) 0.5 HRS
Check the pulley of oil pump and main(Y) 0.5 HRS
Check all safety interlocks for proper(Q) 1.0 HRS
Check all grease nipples for damage(Y) 1.0 HRS
Check the movement of punches in their(Q) 1000-Prod 1.0 HRS
Check the lubrication of punches through(Q) 1.0 HRS
Check the leakage in lubricating circuit(Q) 1.0 HRS
Spray anti-friction solid lubricant over(Y) 0.5 HRS
Clean cam tracks and inspect for wear(Y) 0.5 HRS
Check pressure roller for free movement (Q) 1.0 HRS
Check lubricant over all lever linkage(Q) 0.5 HRS
Check the pulley of oil pump and main(Y) 1.5 HRS
Check all safety interlocks for proper(Q) 1.0 HRS
Check all grease nipples for damage(Y) 0.5 HRS
Check the movement of punches in their(Q) 1000-Prod 0.5 HRS
Check the lubrication of punches through(Q) 1.0 HRS
Check the leakage in lubricating circuit(Q) 0.5 HRS
Spray anti-friction solid lubricant over(Y) 0.5 HRS
Clean cam tracks and inspect for wear(Y) 1.0 HRS
Check pressure roller for free movement (Q) 0.5 HRS
Check lubricant over all lever linkage(Q) 1.0 HRS
Check the pulley of oil pump and main(Y) 1.5 HRS
Check all safety interlocks for proper(Q) 0.5 HRS
Check all grease nipples for damage(Y) 0.5 HRS
Check for the noise and damped vibration(Q) 1000-Prod 0.5 HRS
Check the electrical connectors for(Q) 0.5 HRS
Check for the proper movement of tablets(Q) 1.0 HRS
Check the castor wheels and its bearings(Y) 1.0 HRS
Check the electrical connections.(Y) 1000-Prod 1.0 HRS
Check the electrically operated flaps(Q) 0.5 HRS
Check the rejection flap mechanisam. 0.5 HRS
Check the castor wheels and its bearings(Y) 0.5 HRS
Check the motor bearing replace if noisy(Q) 1000-Prod 0.5 HRS
Check the gear box bearing, Replace if(Q) 0.5 HRS
Check oil level in gear box.(Q) 1.0 HRS
Check the up and down ratchet and lever.(Q) 1.0 HRS
Check the heater and motor of fresh air (Q) 1.0 HRS
Check the foam filter and bag filter of (Q) 1.0 HRS
Check the sound of exhaust motor bearing(Q) 0.5 HRS
Clean the wet scrubber and fill new (Q) 1.0 HRS
Check the pump seal of wet scrubber and (Q) 1.0 HRS
Check all electrical connections and (Q) 0.5 HRS
Check overall structure and paint it.(Y) 1.1 HRS
Check the motor bearing, replace if (Q) 1000-Prod 0.5 HRS
Check the gear box bearing, replace if (Q) 0.5 HRS
Check the bowl centric bearing and its (Q) 0.5 HRS
Inspect the door opening mechanism(Y) 1.0 HRS
Dismantle the bearings and cleaning its (Q) 1.0 HRS
Check the bowl light bulbs and make sure(Q) 1.0 HRS
Check the smooth working of solution (Q) 1.0 HRS
Check all the pneumatic connections, (Q) 0.5 HRS
Check the spray guns, service them if (Q) 1.0 HRS
Check the foam filter and bag filter (Q) 1.0 HRS
Check the sound of exhaust motor and (Q) 0.5 HRS
Check the wall mounted electrical panel (Q) 1.2 HRS
Check the auto washing system and drain (Q) 1.3 HRS
Check the side door seals, replace if (Q) 1.4 HRS
Check the peristaltic pump. (Q) 0.5 HRS
Check the inlet and outlet dumper motor (Q) 1.5 HRS
Check the leakage of steam line and(Y) 1.7 HRS
Check all the electrical panels and(Q) 1.8 HRS
Verify the RPM, noise and other function(Q) 0.5 HRS
Check the motor bearing, replace if(Q) 1000-Prod 0.5 HRS
Check the gear box bearing, replace if (Q) 0.5 HRS
Check the bowl centric bearing and its (Q) 0.5 HRS
Inspect the door opening mechanism(Y) 0.5 HRS
Dismantle the bearings and cleaning its (Q) 1.0 HRS
Check the bowl light bulbs and make sure(Q) 1.0 HRS
Check the smooth working of solution(Q) 1.0 HRS
Check all the pneumatic connections(Q) 0.5 HRS
Check the spray guns, service them if (Q) 1.0 HRS
Check the foam filter and bag filter and(Q) 1.0 HRS
Check the sound of exhaust motor and (Q) 0.5 HRS
Check the wall mounted electrical panel (Q) 1.2 HRS
Check the auto washing system and drain (Q) 1.3 HRS
Check the side door seals, replace if (Q) 1.4 HRS
Check the peristaltic pump. (Q) 0.5 HRS
Check the inlet and outlet dumper motor (Q) 1.0 HRS
Check the leakage of steam line and(Y) 1.7 HRS
Check all the electrical panels and(Q) 1.8 HRS
Verify the RPM, noise and other function(Q) 0.5 HRS
Check the motor bearing, replaced it if (Q) 1000-Prod 1.0 HRS
Check the smoothness of mixer rod.(Q) 1.0 HRS
Check the pneumatic pipe, replaced it if(Q) 1.0 HRS
Check the pipe connector, replaced it if(Q) 1.0 HRS
Check the blades of mixer, repaired if (Y) 1.0 HRS
Check the lubrication.(Q) 1000-Prod 0.5 HRS
Check the water of the battery.(Q) 1.0 HRS
Rectify any wear and tear found in the (Q) 1.0 HRS
Check the breaks function.(Q) 0.5 HRS
Check the wheel condition and replace if(Q) 1.0 HRS
Check all the electric wiring.(Q) 0.5 HRS
Check over all normal function of the(Q) 1.0 HRS
Lubricate all designated points with(Q) 1000-Prod 1.0 HRS
Check the maintained gearbox oil level (Q) 1.0 HRS
Visually check machine bushes and(Q) 0.5 HRS
clean the FRL and refill the pneumatic (Q) 1.0 HRS
Check the machine indexing system for we(Q) 1.0 HRS
Check the cams and main shaft of machine(Q) 1.0 HRS
Check the cooling water hoses and air (Q) 1.0 HRS
Check and remove dust from inside the(Q) 1.0 HRS
Check the power connections as well as(Q) 0.5 HRS
Check spring washers of all station(Q) 0.5 HRS
Check the conveyor belt for its proper (Q) 1.1 HRS
Dismantle and inspect forming, sealing(Y) 1.0 HRS
Lubricate all designated points with(Q) 1000-Prod 1.0 HRS
Check the maintained gearbox oil level(Q) 1.0 HRS
Visually check machine bushes and(Q) 0.5 HRS
clean the FRL and refill the pneumatic (Q) 1.0 HRS
Check the machine indexing system for we(Q) 1.0 HRS
Check the cams and main shaft of machine(Q) 1.0 HRS
Check the cooling water hoses and air(Q) 1.0 HRS
Check and remove dust from inside the(Q) 1.0 HRS
Check the power connections as well as (Q) 0.5 HRS
Check spring washers of all station(Q) 0.5 HRS
Check the conveyor belt for its proper (Q) 1.1 HRS
Dismantle and inspect forming, sealing(Y) 1.0 HRS
Check the heaters for any damage(Q) 0.5 HRS
Lubricate all uncovered gears with(Q) 1000-Prod 1.0 HRS
Check the maintained gearbox oil level(Q) 1.0 HRS
Visually check machine bushes and(Q) 0.5 HRS
Lubricate all chain drives with chain(Q) 0.5 HRS
Check the machine indexing system for (Y) 1.0 HRS
Check the chain sprocket for wear.(Q) 1.0 HRS
Check the cooling water hoses and air(Q) 1.0 HRS
Check and remove dust from inside the(Q) 1.0 HRS
Check the power connections as well as(Q) 1.0 HRS
Check the Cams and main splined shaft of 1.0 HRS
Check the variable speed drive system (Q) 0.5 HRS
Dismantle and inspect forming, sealing (Y) 1.0 HRS
Clean all stations.(Q) 1000-Prod 1.0 HRS
Lubricate all oiling and greasing points(Q) 1.0 HRS
Check oil level in pneumatic lubricator.(Q) 1.0 HRS
Dismantle and inspect forming, sealing (Y) 1.0 HRS
Particularly sealing cam, its bolt and (Y) 0.5 HRS
Lubricate all moving elements after(Y) 0.5 HRS
Check working of all safety interlocks. (Q) 1.1 HRS
Check working of foil roll movement(Q) 0.5 HRS
Check working of PVC/ALU roll movement(Q) 1.0 HRS
Check working of wastage roll movement(Q) 1.0 HRS
Inspect outlet conveyor and its bearing.(Q) 1.0 HRS
Open the magnetic clutch from gearbox(Q) 1.0 HRS
Check the oil level in gearbox. Top it (Q) 1.0 HRS
Lubricate the indexing shaft and of web (Q) 0.5 HRS
Check and clean electric connections.(Q) 0.5 HRS
Clean all stations.(Q) 1000-Prod 0.5 HRS
Lubricate all oiling and greasing points(Q) 0.5 HRS
Check oil level in pneumatic lubricator.(Q) 0.5 HRS
Dismantle and inspect forming, sealing(Y) 1.0 HRS
Check working of all safety interlocks. (Q) 0.5 HRS
Check working of foil roll movement(Q) 1.0 HRS
Check working of PVC roll movement(Q) 1.0 HRS
Check working of wastage roll movement(Q) 1.0 HRS
Inspect outlet conveyor and its bearing.(Q) 1.0 HRS
Open the magnetic clutch from gearbox(Q) 0.5 HRS
Check the oil level in gearbox. Top it (Q) 0.5 HRS
Lubricate the ratchet bearing of web (Q) 1.0 HRS
Check and clean electric connections(Q) 0.5 HRS
Check the heaters for any damage,(Q) 0.5 HRS
Check control parameters and adjust if (Q) 1000-Prod 1.0 HRS
Check the normal operation of the machin(Q) 0.5 HRS
Check is there any leakage or dripping (Q) 1.0 HRS
Check is there any choking in the system(Q) 1.0 HRS
Check the performance of the stabilizer.(Q) 1.0 HRS
Check control parameters and adjust if (Q) 1000-Prod 1.0 HRS
Check the normal operation of the machin(Q) 0.5 HRS
Check is there any leakage or dripping (Q) 1.0 HRS
Check is there any choking in the system(Q) 1.0 HRS
Check the performance of the stabilizer.(Q) 1.0 HRS
Check control parameters and adjust if (Q) 1000-Prod 1.0 HRS
Check the normal operation of the machin(Q) 0.5 HRS
Check is there any leakage or dripping a(Q) 1.0 HRS
Check is there any choking in the system(Q) 1.0 HRS
Check the performance of the stabilizer.(Q) 1.0 HRS
Uncover the conveyor and make its(Q) 1000-Prod 1.0 HRS
Inspect the v-belts chain & sproket(Q) 0.5 HRS
Inspect the motor gearbox against any(Y) 1.0 HRS
Inspect the mounting of motor and gear(Q) 1.0 HRS
Inspect the oil level of gearbox. Top(Q) 1.0 HRS
Inspect the chain wheels of conveyor(Q) 1.0 HRS
Inspect the belt joints and its condi(Q) 0.5 HRS
Check the slat link pins for wear.(Q) 1.0 HRS
Check the driving and driven chain and(Q) 1.0 HRS
Inspect the balancing bolts located (Q) 1.0 HRS
Check the vacuum pump & clean it properl(Q) 1000-Prod 1.0 HRS
Check the motor bearing, replaced it if (Q) 1.0 HRS
Inspect the motor gearbox against any(Q) 0.5 HRS
Inspect the oil level in gearbox. Top it(Q) 0.5 HRS
Check the conveyor belt.(Q) 1.0 HRS
Check the sensors.(Q) 1.0 HRS
Inspect any leakage from compressed air (Q) 1.0 HRS
Cleaning and servicing of compressed air(Q) 1.0 HRS
Inspect all the electrical contacts and (Q) 0.5 HRS
Inspect the mounting of motor and gear(Y) 1.0 HRS
Check the Pneumatic cylinders, repair it(Y) 1.0 HRS
Check the driven and driving chain(Y) 1.0 HRS
Check the compound gauge and pressure (Y) 1.0 HRS
Inspect non-return valves and pressure (Y) 0.5 HRS
After completion of maintenance work,(Y) 1.0 HRS
Check the v-belt of motor, if found worn(Q) 1000-Prod 1.0 HRS
check the crusher blades sharpness, If (Q) 1.0 HRS
check the bearings of main motor.(Q) 1.0 HRS
check the bearing of crusher main shaft,(Y) 1.0 HRS
Check and replace the crusher bolts(Q) 1.0 HRS
Check the oil seals.(Q) 1000-Prod 0.5 HRS
Check the oil.(Q) 0.5 HRS
Check the springs and pins.(Q) 0.5 HRS
Check the castor wheels and its bearings(Y) 0.5 HRS
Check for the normal operations of the (Q) 1.0 HRS
Inspect chamber for any damage, special (Q) 1000-Prod 1.0 HRS
Inspect the jacket for any damage,(Q) 1.0 HRS
Inspect door gasket for infiltration,(Q) 1.0 HRS
Inspect the door handle for smooth(Q) 0.5 HRS
Check the door hinges for corrosion;(Q) 1.0 HRS
Check the integrity of steam supply and (Q) 1.0 HRS
Inspect the condition of steam generator(Q) 1.0 HRS
Inspect the gasket of steam generator(Q) 1.0 HRS
Inspect all the electrical contacts and (Q) 0.5 HRS
Inspect the feed water pump against leak(Y) 1.0 HRS
Inspect the feed water piping to steam (Y) 1.0 HRS
Measure the ampere of each phase of(Y) 1.0 HRS
Dismantle the steam generator and clean (Y) 1.0 HRS
Inspect all globe valves, gate valves (Y) 0.5 HRS
Inspect non-return valves and pressure (Y) 0.5 HRS
Inspect the operation of steam traps of (Y) 1.0 HRS
Check the lines insulation, piping(Y) 1.0 HRS
Check the compound gauge and pressure (Y) 1.0 HRS
Inspect the sequencer cam and its motor,(Y) 1.0 HRS
If using venture for vacuum generation (Y) 0.5 HRS
Inspect the door gasket for thermal wear(Q) 1000-Prod 1.0 HRS
Inspect the door locking lever and its (Q) 1.0 HRS
Inspect the heaters integrity and its (Q) 1.0 HRS
Inspect the blower rotation. Ensure the (Q) 1.0 HRS
Note down the blower amperes. (Q) 0.5 HRS
Inspect the integrity of filter and its (Y) 0.5 HRS
Inspect the electrical accessories and (Q) 1.0 HRS
Inspect the movement of tray trolley.(Q) 1.0 HRS
Check the various trolley holders for (Q) 1.0 HRS
Clean the housing of water filter, and (Q) 1000-Prod 1.0 HRS
Clean the needles of all stations till (Q) 1.0 HRS
Inspect / dismantle all the hoses from (Q) 1.0 HRS
Check all the hoses of stations and (Q) 1.0 HRS
Inspect the moisture trap and air lubric(Q) 0.5 HRS
Inspect the air cylinder for correct(Q) 1.0 HRS
Inspect the sprocket, ratchet and soleno(Q) 1.0 HRS
Inspect the sequencer cams for rigid(Q) 1.0 HRS
Inspect the bearing of sprocket wheels (Q) 1.0 HRS
Inspect the bearing of sequencer cam(Q) 1.0 HRS
Check all the pneumatic pipes, replace (Q) 1.0 HRS
Check the air pressure and water pressur(Q) 1.0 HRS
Check the main motor belt and its bearin(Q) 1.0 HRS
Inspect the pump (Y) 1.0 HRS
Check all the electrical panels and (Y) 1.5 HRS
Clean the housing of water filter, and i(Q) 1000-Prod 1.0 HRS
Clean the needles of all stations till a(Q) 1.0 HRS
Inspect the moisture trap and air lubric(Q) 1.0 HRS
Inspect the sprocket, ratchet and soleno(Q) 1.0 HRS
Inspect the sequencer cams for rigid(Q) 1.0 HRS
Check all the pneumatic pipes, replace (Q) 1.1 HRS
Check the main motor belt and its(Q) 1.2 HRS
Check all the electrical panels and (Y) 1.3 HRS
Inspect / dismantle all the hoses from (Q) 1.0 HRS
Check all the hoses of stations and (Q) 1.0 HRS
Inspect the air cylinder for correct(Q) 1.1 HRS
Inspect the bearing of sequencer cam(Q) 1.2 HRS
Check the air pressure and water pressur(Q) 1.3 HRS
Inspect the bearing of sprocket wheels (Q) 1.3 HRS
Inspect the pump (Y) 1.0 HRS
Inspect the turn table motor and gearbox(Q) 1000-Prod 1.0 HRS
Remove the conveyor and clean properly(Y) 1.1 HRS
Inspect the sprocket and chain of main (Q) 1.2 HRS
Check the dosing wheel cam and hopper(Q) 1.3 HRS
Clean the vacuum pump filter and top up (Q) 1.0 HRS
Check the no vial no filling system.(Q) 0.5 HRS
Check the rubber stopper vibrator and (Q) 1.0 HRS
Check the rubber stopper pressing roller(Q) 1.0 HRS
Check all safety guards’ switches.(Q) 0.5 HRS
Inspect solenoids of nitrogen purging.(Q) 0.5 HRS
Check vial stop wheel clutch and adjust (Q) 1.1 HRS
Clean and lubricate powder filling stati(Q) 1.2 HRS
Check electric switches and connection.(Q) 0.5 HRS
Remove the conveyor and clean properly (Y) 1000-Prod 1.0 HRS
Inspect the motor sound replace bearing (Q) 1.0 HRS
Inspect the oil level in gearbox. Top it(Q) 1.3 HRS
Check the driven and driving chain and (Q) 1.0 HRS
Inspect the heaters and efficiency of (Q) 1.0 HRS
Check the operation of sensors.(Q) 1.1 HRS
Check all safety guards switches.(Q) 1.2 HRS
Check vial stop wheel clutch and adjust (Q) 1.3 HRS
Check and clean the electric connections(Q) 1.0 HRS
Remove the glass scrape from the machine(Q) 1000-Prod 1.0 HRS
Open the lower compartment cover and (Q) 1.0 HRS
Dismantle the rollers and replace the(Y) 1.0 HRS
Check the ampoule rotating roller clean (Q) 1.3 HRS
Clean the cam follower.(Q) 1.0 HRS
Check the operation of catcher and align(Q) 1.0 HRS
Inspect the chain apply some grease.(Q) 1.1 HRS
Inspect the motor sound replace bearing (Y) 1.2 HRS
Inspect all the gas lines and regulators(Q) 1.3 HRS
Inspect the operation of filling cylinde(Q) 1.0 HRS
Check the operation of electric system.(Q) 1.1 HRS
Add oil to the bearings and the rotary (Q) 1000-Prod 1.0 HRS
Clean all the tops & cavities from powde(Q) 1.0 HRS
Check the feeding device, regulate it or(Q) 1.0 HRS
Inspect the sprocket and chain of the(Q) 0.5 HRS
Lubricate all the gears with multipurpos(Q) 0.5 HRS
Inspect the driving motor of the vibrato 1.0 HRS
Check the belt tension, tight if found (Q) 1.0 HRS
Inspect the gear box bearing, replace if(Y) 1.0 HRS
Inspect the driving motor of the vibrato(Q) 1.3 HRS
Check all the bolts & screws, if found l(Q) 1.0 HRS
Check the ruler of the conveyor, its(Y) 1.0 HRS
Check the movement of the conveyor belt (Q) 1.1 HRS
Check the gearbox of the turntable, if (Q) 1.2 HRS
Check the stirrer of the powder feeding (Y) 1.3 HRS
Check all the sensor of the machine & (Q) 1.5 HRS
Check the vibrator & its strip, replaced(Y) 1.6 HRS
Check the Teflon separator against wear (Y) 0.5 HRS
Check all the safety doors of the machin(Y) 1.8 HRS
Check all the electrical connections (Q) 1.9 HRS
Inspect the HEPA filters for their integ(Q) 1000-Prod 1.3 HRS
Clean the air filter housing and ducts.(Q) 1.0 HRS
Inspect the blower against powder deposi(Q) 1.0 HRS
Inspect the trays for leakage and joint(Y) 1.1 HRS
Inspect the tray rests for proper rigid(Y) 1.2 HRS
Inspect the motor for excessive noise(Q) 1.3 HRS
Check the door for smooth movement and (Q) 1.3 HRS
Lubricate the door hinges and inspect (Q) 1.0 HRS
Inspect the door locks and their movemen(Q) 1.0 HRS
Check the condition of heating elements (Q) 1.1 HRS
Check all the controllers, timers and (Q) 1.2 HRS
Remove the main impeller and granulating(Q) 1000-Prod 1.3 HRS
Clean and inspect sealing areas of booth(Q) 1.0 HRS
Check discharge valve plug silicon seal (Q) 1.3 HRS
Pressurized the bowl cover seal and (Q) 1.0 HRS
Adjust the compound air unit against (Y) 1.0 HRS
Check all safety interlocks and mechanis(Q) 1.1 HRS
Replace granulator seals.(Y) 1.2 HRS
Inspect v-belts and check their tension,(Q) 1.3 HRS
Inspect and tighten all electrical conne(Q) 1.3 HRS
Check all pneumatic pipes and its connec(Y) 1.0 HRS
Check the grinding unit and clean it.(Q) 1.0 HRS
Check the working of machine with HMI (Q) 1.1 HRS
Inspect gearbox thoroughly. Replace worn(Y) 1000-Prod 1.2 HRS
Check bearings of motor. Replace if worn(Q) 1.3 HRS
Check the V belt condition. Replace if (Y) 1.3 HRS
Check condition of plumber block bearing(Q) 1.0 HRS
Check lid tighten bolts threads.(Y) 1.0 HRS
Check all oil and greasing points / leve(Q) 1000-Prod 1.1 HRS
Visually check machine bushes and moveab(Q) 1.2 HRS
Inspect empty capsule loading and (Q) 1.3 HRS
Inspect dosing unit includes dosators, (Q) 1.0 HRS
Inspect locking system and locking pins (Q) 1.0 HRS
Inspect capsule rejection system and(Q) 1.0 HRS
Check the machine belt / chain for wear (Q) 1.0 HRS
Check the pulley for wear, replace if (Q) 1.0 HRS
Clean the filters of vacuum pump, dust (Q) 0.5 HRS
Check the overall machine cleanliness.(Q) 0.5 HRS
Remove the dust from inside the electric(Q) 1.1 HRS
Check the power connections as well as (Q) 0.5 HRS
Check the motor’s connection in motor (Q) 1.3 HRS
Inspect the motor’s bearing and machine (Q) 1.4 HRS
Do machine cleaning and remove spills oi(Y) 1.5 HRS
Check upper and lower die for easy runni(Y) 1.6 HRS
Clean guiding bore holes of the upper di(Y) 1.7 HRS
Remove dust from inside the electrical (Y) 1.8 HRS
Inspect all maintenance points and repla(Q) 0.5 HRS
Check the dust collector filter and moto(Y) 1.3 HRS
Top up oil level in gear box.(Q) 1000-Prod 1.0 HRS
Check drive belt for wear, Replace if wo(Q) 1.0 HRS
Check bearing of main shaft for wear, Re(Y) 1.1 HRS
Check powder seals for wear, Replace if (Q) 1.2 HRS
Check working of tilting mechanism, Repa(Y) 1.3 HRS
Check lid tighten bolts threads.(Y) 0.5 HRS
Dismantle the front cover of bottle turr(Q) 1000-Prod 1.3 HRS
Inspect the bottle turret for wear and (Q) 1.0 HRS
Test the No bottle / No air solenoid val(Q) 1.0 HRS
Inspect the driving motor, chain and spr(Q) 1.1 HRS
Lubricate the chain and sprockets of tur(Q) 1.2 HRS
Inspect all power transmission elements (Q) 1.3 HRS
Inspect the turn table gearbox for leaka(Q) 1.3 HRS
Clean and replace main compressed air (Q) 1.0 HRS
Replace 0.2 micron filter(Q) 1.0 HRS
Note down the motor amperes after the co(Q) 1.1 HRS
Inspect the central bearing of turret fo(Y) 1.2 HRS
Inspect the turn table motor and gearbox(Y) 1.3 HRS
Inspect the pressure regulator for prope(Y) 1.3 HRS
Check the motor bearing replace if noisy(Q) 1000-Prod 1.0 HRS
Check the gear box bearing, Replace if n(Q) 1.0 HRS
Check oil level in gear box.(Q) 1.1 HRS
Check the up and down ratchet and lever.(Q) 1.2 HRS
Check the heater and motor of fresh air (Q) 1.3 HRS
Check the foam filter and bag filter of (Q) 1.0 HRS
Check the sound of exhaust motor bearing(Q) 0.5 HRS
Clean the wet scrubber and fill new wate(Q) 1.0 HRS
Check the pump seal of wet scrubber and (Q) 1.0 HRS
Check all electrical connections and tem(Q) 0.5 HRS
Check overall structure and paint it.(Y) 1.1 HRS
Check the motor bearing, replaced it if (Q) 1000-Prod 1.0 HRS
Check the smoothness of mixer rod.(Q) 1.0 HRS
Check the pneumatic pipe, replaced it if(Q) 1.0 HRS
Check the pipe connector, replaced it if(Q) 1.0 HRS
Check the blades of mixer, repaired if n(Y) 1.0 HRS
Check the movement of punches in their(Q) 1000-Prod 1.0 HRS
Check the lubrication of punches through(Q) 1.3 HRS
Check the leakage in lubricating circuit(Q) 1.0 HRS
Spray anti-friction solid lubricant over(Y) 1.0 HRS
Clean cam tracks and inspect for wear (Q) 1.1 HRS
Check pressure roller for free movement (Q) 1.2 HRS
Check lubricant over all lever linkage (Q) 1.3 HRS
Check the pulley of oil pump and main (Q) 1.3 HRS
Check all safety interlocks for proper (Q) 1.0 HRS
Check all grease nipples for damage.(Y) 1.0 HRS
Remove the granulating tool (Q) 1000-Prod 1.1 HRS
Inspect v-belts and check their tension,(Q) 1.2 HRS
inspect main motor bearings , if found n(Q) 1.3 HRS
inspect electrical panel and its connect(Y) 1.0 HRS
Inspect the caster wheels for proper wor(Q) 1.3 HRS
Check the oil seals.(Q) 1000-Prod 1.0 HRS
Check the oil.(Q) 1.0 HRS
Check the springs and pins.(Q) 1.1 HRS
Check the castor wheels and its bearings(Y) 1.2 HRS
Check for the normal operations of the m(Q) 1.3 HRS
Uncover the conveyor and make its inter(Q) 1000-Prod 1.0 HRS
Inspect the v-belts chain & spooks agai(Y) 1.3 HRS
Inspect the motor gearbox against any (Y) 1.0 HRS
Inspect the mounting of motor and gearbo(Q) 1.0 HRS
Inspect the oil level of gearbox. Top it(Q) 1.1 HRS
Inspect the chain wheels of conveyor (Q) 1.2 HRS
Inspect the slat bed fiber or PVC for (Q) 1.3 HRS
Check the slat link pins for wear. Repla(Q) 1.3 HRS
Check the driving and driven chain and (Y) 1.0 HRS
After completion of maintenance work, (Q) 1.0 HRS
Inspect the balancing bolts located at (Q) 1.1 HRS
Check the operation of label sensor.(Q) 1000-Prod 1.2 HRS
Check the function of compressed air reg(Q) 1.3 HRS
Check the operation of re-winding motor (Q) 1.0 HRS
Check operation of label sticking system(Q) 1.0 HRS
Check any wear and tear of conveyor and (Y) 1.0 HRS
Check the operation of printing system.(Q) 1.0 HRS
Check and clean the electric connections(Q) 1.0 HRS
Check the operation of label sensor.(Q) 1000-Prod 1.0 HRS
Check the function of compressed air reg(Q) 0.5 HRS
Check the operation of re-winding motor (Q) 1.0 HRS
Check operation of label sticking system(Q) 1.0 HRS
Check any wear and tear of conveyor and (Y) 1.0 HRS
Check the operation of printing system.(Q) 1.0 HRS
Check and clean the electric connections(Q) 1.0 HRS
Check heater connections(Q) 1000-Prod 0.5 HRS
Check the conveyor belt.(Q) 0.5 HRS
Check the fan motor, repaired it if requ(Y) 1.0 HRS
Check all electrical connections.(Q) 1.0 HRS
Lubricate all uncovered gears with multi(Q) 1000-Prod 1.0 HRS
Check the maintained gearbox oil level a(Q) 1.0 HRS
Visually check machine bushes and moveab(Q) 0.5 HRS
Lubricate all chain drives with chain lu(Q) 0.5 HRS
Check the machine indexing system for we(Y) 1.0 HRS
Check the chain sprocket for wear.(Q) 1.0 HRS
Check the cooling water hoses and air ho(Q) 1.0 HRS
Check and remove dust from inside the el(Q) 1.0 HRS
Check the power connections as well as c(Q) 0.5 HRS
Check he chain tension.(Q) 0.5 HRS
Check the variable speed drive system (Q) 1.1 HRS
Dismantle and inspect forming, sealing a(Y) 1.0 HRS
Check control parameters and adjust if (Q) 1000-Prod 0.5 HRS
Check the normal operation of the machin(Q) 0.5 HRS
Check is there any leakage or dripping (Q) 1.0 HRS
Check is there any choking in the system(Q) 1.0 HRS
Check the performance of stabilizer.(Q) 1.0 HRS
Check the bearings of main crusher shaft(Y) 1000-Prod 2.0 HRS
Check the v-belts of machine.(Q) 0.5 HRS
Check the crusher blades sharpness, (Q) 1.0 HRS
Check the electrical connections.(Q) 1.0 HRS
Check the main motor bearings and replac(Y) 2.0 HRS
Check the oil seals.(Q) 1000-Prod 1.0 HRS
Check the oil.(Q) 0.5 HRS
Check the springs and pins.(Q) 0.5 HRS
Check the castor wheels and its bearings(Y) 0.5 HRS
Check for the normal operations of the m(Q) 1.0 HRS
Motor insulation.(M) 1000- HVA 0.5 HRS
Compressor and motor vane operation..(M) 0.5 HRS
Compressor and motor protector insulatio(M) 0.5 HRS
Compressor and motor characteristics of (M) 1.0 HRS
Oil charging amount(M) 0.5 HRS
Chiller panel and main panel instruments(M) 0.5 HRS
Oil pump motor insulation(M) 0.5 HRS
Motor terminal fasten bolt check the loo(M) 0.5 HRS
Condenser Chemical analysis and check th(Q) 0.5 HRS
Evaporator Chemical analysis and check (Q) 0.5 HRS
Oil cooler cleaning(Y) 0.5 HRS
Ejector cleaning.(Y) 0.5 HRS
Oil Filter cleaning(Y) 0.5 HRS
Check the level relay sensor.(Y) 0.5 HRS
Oil tank cleaning(Y) 0.5 HRS
Check or replace the diaphragm or other (Y) 1.6 HRS
Oil replacing(Y) 0.5 HRS
Testing and treatment of cooling and chi(M) 1000- HVA 1.0 HRS
Clean the ignition electrodes, insulator(M) 1.0 HRS
Check and clean the oil/gas nozzle.(Q) 0.5 HRS
Dosing of chemical in cooling tower.(M) 1.0 HRS
Pressure testing of chiller with nitroge (Y) 0.5 HRS
Check purge chamber for non-considerable (Y) 0.5 HRS
Checking of combustion equipments. (Q) 0.5 HRS
Servicing of burner. (Y) 0.5 HRS
Servicing of generator. (Y) 0.5 HRS
Servicing of smoke tubes and eliminators (Y) 1.0 HRS
Servicing of absorber pump. (Y) 0.5 HRS
Checking of discharge and suction pressu (Q) 1000- HVA 1.0 HRS
Check the alignment of pump and motor.(Y) 0.5 HRS
Check the alignment of coupling.(Y) 0.5 HRS
Check the condition of seals.(Y) 0.5 HRS
Check the condition of bearings, replace(Y) 1.0 HRS
Check the suction strainer and discharge (Q) 1.0 HRS
Inspect any integrity and abnormality. (Q) 0.5 HRS
Check the condition of impeller.(Y) 0.5 HRS
Checking of discharge and suction pressu (Q) 1000- HVA 1.0 HRS
Check the alignment of pump and motor.(Y) 0.5 HRS
Check the alignment of coupling.(Y) 0.5 HRS
Check the condition of seals.(Y) 0.5 HRS
Check the condition of bearings, replace(Y) 1.0 HRS
Check the suction strainer and discharge (Q) 1.0 HRS
Inspect any integrity and abnormality. (Q) 0.5 HRS
Check the condition of impeller.(Y) 0.5 HRS
Checking of discharge and suction press (Q) 1000- HVA 1.0 HRS
Check the alignment of pump and motor.(Y) 0.5 HRS
Check the alignment of coupling.(Y) 0.5 HRS
Check the condition of seals.(Y) 0.5 HRS
Check the condition of bearings, replace(Y) 1.0 HRS
Check the suction strainer and discharge (Q) 1.0 HRS
Inspect any integrity and abnormality. (Q) 0.5 HRS
Check the condition of impeller.(Y) 0.5 HRS
Checking of discharge and suction pressu (Q) 1000- HVA 1.0 HRS
Check the alignment of pump and motor.(Y) 0.5 HRS
Check the alignment of coupling.(Y) 0.5 HRS
Check the condition of seals.(Y) 0.5 HRS
Check the condition of bearings, replace(Y) 1.0 HRS
Check the suction strainer and discharge (Q) 1.0 HRS
Inspect any integrity and abnormality. (Q) 0.5 HRS
Check the condition of impeller.(Y) 0.5 HRS
Check the tension of the V-belt. Adjust (M) 1000- HVA 1.0 HRS
Check the float valve for proper operati(Q) 0.5 HRS
Check lubrication of bearing hosing. Do (Q) 0.5 HRS
Check the tower for deposition of dirt, (M) 1.0 HRS
Blow down the tower. Check the last wate(M) 1.0 HRS
Recommended action if any. 1.0 HRS
Drain and clean cold water basing and su(Q) 1.0 HRS
Inspect V-belt and bearing wear. Replace(Q) 1.0 HRS
Note down amperes and CFM of the fan.(Q) 0.5 HRS
Maintain the TDS of operational water (M) 0.5 HRS
Check the status of oxidization in the (Q) 1.0 HRS
Check the nozzles of main spray louvers (Q) 1.0 HRS
Check the total running hours. (M) 1000- HVA 1.0 HRS
Check the total loaded hours. (M) 1.0 HRS
Check the running temperature on the (M) 1.0 HRS
Check the condition of air and oil filte (M) 1.0 HRS
Check the air and oil separator. (Q) 1.0 HRS
Check the total hours of oil changing. (Q) 0.5 HRS
Check the lubrication of motor bearings. (Q) 1.0 HRS
Checking of pressure sensors. (Q) 0.5 HRS
Checking of fan motor over load. (Q) 1.0 HRS
Checking of high pressure and high tempe (Q) 1.0 HRS
Check the differential pressure regulati(Y) 0.5 HRS
Check the condition of oil and air coole(Y) 1.2 HRS
Checking of intake turbine.(Y) 0.5 HRS
Check the level of oil. (Q) 0.5 HRS
Check the drainage cork. (Q) 0.5 HRS
Checking of oil return pipe and suction (Q) 1.6 HRS
Checking of oil radiator final coolant. (Q) 1.7 HRS
Checking of safety temperature test and (Y) 1.8 HRS
Check the total running hours. (M) 1000- HVA 1.0 HRS
Check the total loaded hours. (M) 1.0 HRS
Check the running temperature on the loa (M) 1.0 HRS
Check the condition of air and oil filte (M) 1.0 HRS
Check the air and oil separator. (Q) 1.0 HRS
Check the total hours of oil changing. (Q) 0.5 HRS
Check the lubrication of motor bearings. (Q) 1.0 HRS
Checking of pressure sensors. (Q) 0.5 HRS
Checking of fan motor over load. (Q) 1.0 HRS
Checking of high pressure and high tempe (Q) 1.0 HRS
Check the differential pressure regulati(Y) 0.5 HRS
Check the condition of oil and air coole(Y) 1.2 HRS
Checking of intake turbine.(Y) 0.5 HRS
Check the level of oil. (Q) 0.5 HRS
Check the drainage cork. (Q) 0.5 HRS
Checking of oil return pipe and suction (Q) 1.6 HRS
Checking of oil radiator final coolant. (Q) 1.7 HRS
Checking of safety temperature test and (Y) 1.8 HRS
Check the electrical load. Note down the(Q) 1000- HVA 0.5 HRS
Inspect the system sound for any abnorma(Q) 0.5 HRS
Check the temperature of dry air against(M) 1.0 HRS
Check the ambient temperature and RH.(Q) 1.0 HRS
Check the setting for Thermostat. Adjust(Q) 0.5 HRS
Inspect the piping for integrity and lea(M) 0.5 HRS
Inspect the compressor against overheati(Q) 1.0 HRS
Clean the evaporator and condenser of th(M) 1.0 HRS
Fill the maintenance job card after com(Q) 1.0 HRS
Check the magnetic switch.(Q) 1.0 HRS
Check the electrical contactor.(Q) 0.5 HRS
Note down the amperes of compressor. (M) 1000- HVA 1.0 HRS
Clean the condenser with air. (Q) 0.5 HRS
Inspect the vibration of fan motor of co (Q) 1.0 HRS
Check the normal chilled Air temperature (M) 1.0 HRS
Check the electrical controls and safety(Y) 1.0 HRS
Check the side glasses for refrigerant l (Q) 0.5 HRS
Check the expansion valves super heat. (Q) 1.0 HRS
Check the evaporator fan blowers. (M) 0.5 HRS
Check the pre-filters of return air. (M) 0.5 HRS
Note down the compressor amperes. 1000- HVA 0.5 HRS
Clean the condenser of the cooler. 1.0 HRS
Check the refrigerant pressure. 0.5 HRS
Inspect any leakage or abnormal sound. 1.0 HRS
Inspect all the refrigerant piping. 0.5 HRS
Inspect electric controlling wiring and 1.0 HRS
Check the condition of V-belt and blower(M) HVAC-Non 0.5 HRS
Replace filters if damage (M) 0.5 HRS
Wash G-4 filters (M) 1.0 HRS
Clean drain lines of the unit, also clea(M) 0.5 HRS
Check the V.F.D and motor amp and work o(Q) 1.0 HRS
Check blower(AHU,Fresh air,Exhaust air) (Q) 0.5 HRS
Check pulleys and their alignment .Align(Q) 1.0 HRS
Inspect the HEPA filter condition.(Q) 0.5 HRS
Wash cooling coils, check for any leaks.(Y) 0.5 HRS
Check and verify the electrical connecti(Y) 0.5 HRS
Inspect and calibration of all pressure (Y) 1.1 HRS
Inspect entire insulation, drain tray an(Y) 1.2 HRS
Inspect ducting and its insulation for a(Y) 0.5 HRS
Check G-4 filters and clean with water p (M) HVAC-Non 0.5 HRS
Check electric heater or steam coils and (Q) 1.0 HRS
Check electrical panel and clean with bl (Q) 0.5 HRS
Check timing belt and drum condition. (Y) 1.0 HRS
Check the condition of V-belt and blower(M) HVAC-Cep 0.5 HRS
Replace filters if damage (M) 1.0 HRS
Wash G-4 filters (M) 0.5 HRS
Clean drain lines of the unit, also clea (M) 0.5 HRS
Check the V.F.D and motor amp and work o(Q) 1.0 HRS
Check blower (Q) 0.5 HRS
Check pulleys and their alignment .Align(Q) 1.0 HRS
Inspect the HEPA filter condition.(Q) 0.5 HRS
Wash cooling coils, check for any leaks. (Y) 1.0 HRS
Check and verify the electrical connecti (Y) 0.5 HRS
Inspect and calibration of all pressure (Y) 1.1 HRS
Inspect entire insulation, drain tray an(Y) 1.2 HRS
Inspect ducting and its insulation for a(Y) 0.5 HRS
Check G-4 filters and clean with water p (M) HVAC-Cep 0.5 HRS
Check electric heater or steam coils and (Q) 1.0 HRS
Check electrical panel and clean with bl (Q) 0.5 HRS
Check timing belt and drum condition. (Y) 1.0 HRS
Check the condition of V-belt and blower(M) HVAC-Nutr 0.5 HRS
Replace filters if damage (M) 1.0 HRS
Wash G-4 filters (M) 0.5 HRS
Clean drain lines of the unit, also clea(M) 0.5 HRS
Check the V.F.D and motor amp and work o(Q) 1.0 HRS
Check blower (Q) 0.5 HRS
Check pulleys and their alignment .Align(Q) 1.0 HRS
Inspect the HEPA filter condition.(Q) 0.5 HRS
Wash cooling coils, check for any leaks.(Y) 1.0 HRS
Check and verify the electrical connecti(Y) 0.5 HRS
Inspect and calibration of all pressure (Y) 1.1 HRS
Inspect entire insulation, drain tray an(Y) 1.2 HRS
Inspect ducting and its insulation for a(Y) 0.5 HRS
Check G-4 filters and clean with water p (M) HVAC-Nutr 0.5 HRS
Check electric heater or steam coils and (Q) 1.0 HRS
Check electrical panel and clean with bl (Q) 0.5 HRS
Check timing belt and drum condition. (Y) 1.0 HRS
Check the condition of V-belt and blower 0.5 HRS

Open the filters cover and dismantle the(M) 1000- HVA 1.0 HRS
Wash filters with water if they are wash(M) 1.0 HRS
Clean the evaporator fins with soft brus(Q) 1.0 HRS
Inspect chilled line insulation, make ne(Y) 1.0 HRS
After cleaning the filters re-fix them o(M) 1.0 HRS
Positioning of filters that is left or r(Q) 1.0 HRS
Clean filters cover, air swing flap and (M) 1.0 HRS
Clean the condenser fins incase of split(Q) 1.0 HRS
After cleaning of both indoor and outdoo(Y) 1.0 HRS

Open the filters cover and dismantle the(M) 1000- HVA 1.0 HRS
Wash filters with water if they are wash(M) 0.5 HRS
Clean the evaporator fins with soft brus(Q) 0.5 HRS
Inspect chilled line insulation, make ne(Y) 1.0 HRS
After cleaning the filters re-fix them o(M) 0.5 HRS
Positioning of filters that is left or r(M) 1.0 HRS
Clean filters cover, air swing flap and (M) 0.5 HRS
Clean the condenser fins incase of split(Q) 1.0 HRS
After cleaning of both indoor and outdoo(Y) 1.0 HRS

Note down the amperes of compressor.(M) 1000- HVA 1.0 HRS


Clean the condenser with air.(M) 0.5 HRS
Inspect the vibration of fan motor of co(Q) 1.0 HRS
Inspect the vibration and abnormal sound(Q) 1.0 HRS
Check the normal chilled water temperatu(Y) 1.0 HRS
Check the electrical controls and safety(Y) 1.0 HRS
Check the compressor amperes.(Q) 1000- HVA 0.5 HRS
Clean the condenser of the cooler.(M) 1.0 HRS
Check the refrigerant pressure.(Q) 0.5 HRS
Inspect any leakage or abnormal sound.(Q) 1.0 HRS
Inspect all the refrigerant piping.(Y) 0.5 HRS
Check the proper dozing of chlorine. (M) 1000- HVA 1.0 HRS
Check the back wash system. (M) 0.5 HRS
Check the rinse system. (M) 0.5 HRS
Check the leakage and noise of pump. (Q) 0.5 HRS
Check the status of cartridge filters. (Q) 1.0 HRS
Checking of all electrical controls. (Q) 0.5 HRS
Checking of daily storage of water. (Y) 1.0 HRS
Cleaning and servicing of media filter. (Y) 1.0 HRS
Checking of all pneumatic controls. (Y) 0.5 HRS
Check the proper ventilation of change r (M) 1000- HVA 0.5 HRS
Condition of intake air filter.(M) 0.5 HRS
Cleaning status of blower fan. (Y) 0.5 HRS
Cleaning status of supply and exhaust ai (Q) 1.0 HRS
Check the motor ampere and condition. (Q) 1.0 HRS
Check the pumps for leakage. 1000- HVA 0.5 HRS
Check the electrical connections of pump 0.5 HRS
Check the leakage from the triclover cla 1.0 HRS
Check the leakage in tanks, repair if fo 1.0 HRS
Check the leakage in product transfer li 0.5 HRS
Check the leakage in RO membrane. Repair 1.0 HRS
Check the steam lines for leakage and pr 1.0 HRS
Check the pressure guage for proper work 0.5 HRS
Check the temperature guage for proper w 0.5 HRS
Check the steam solenoid for proper oper 1.0 HRS
Check the gate valve for its proper oper 1.0 HRS
Check and service the control pannel of 0.5 HRS
Clean the pilot flame nozzle and service(Q) 1000- HVA 1.0 HRS
Service the gauge glass and clean it tho(M) 1.0 HRS
Check the operation of softening plant a(M) 1.0 HRS
Check the insulation on steam pipes and (M) 1.0 HRS
Open the front cover of boiler for clean(Y) 1.0 HRS
Check and verify performance of steam re(M) 1.0 HRS
Dismantle the steam glove valve, clean a(Q) 1.0 HRS
Scrap the inner walls of tank and wash w(Y) 1.0 HRS
Check any leakage in boiler tank and pip(M) 1.0 HRS
Check and verify safeties, door locking,(Y) 1.0 HRS
Check electric connections and clean pro(y) 1.1 HRS
Check operation performance of feed wate(Y) 0.5 HRS
Paint the external surface as required.(Y) 1.3 HRS
Inspect the motors bearing; assembly (Q) 1000- HVA 0.5 HRS
Inspect and clean the motor for any kin (M) 1.0 HRS
Inspect the blower wheel for any materia (M) 1.0 HRS
Clean the blower wheel with a wire brush (Q) 1.0 HRS
Spin the wheel by hand to make sure it I (M) 1.0 HRS
Empty and clean the dust bag, also shake (Q) 1.0 HRS
Check dynamic balance of the entire rota (Q) 1.0 HRS
Check motors voltage, phase and frequenc (Q) 1.0 HRS
Apply water-resistant paint if needed.(Y) (Y) 1.0 HRS
Check the operation of fire hydrant (Q) 1000- HVA 1.0 HRS
Check the battery for proper charging.(Q) 1.0 HRS
Check the couplings of pump. (Q) 0.5 HRS
Check the Engine Oil level using dipstic(Q) 0.5 HRS
Check the fuel level. Refil it when it (Q) 1.5 HRS
Dismantle the plant and inspect the stea 1000- HVA 1.0 HRS
Cleaning and servicing of distill water 0.5 HRS
Cleaning and servicing of heat exchanger 1.0 HRS
Checking of pneumatic valves and control 1.0 HRS
Checking of proper supply of steam. 1.0 HRS
Check the temperature of storage tank. 1.0 HRS
Inspect the electrical and control syste 1.0 HRS
Inspect the steam flow and any leakage i 1.0 HRS
Before fitting inspect all the gaskets 1.0 HRS
Check the movement of punches in their (Q) 1000-Prod 1.0 HRS
Check the lubrication of punches through(Q) 1.0 HRS
Check the leakage in lubricating circuit(Q) 1.0 HRS
Spray anti-friction solid lubricant over(Y) 1.0 HRS
Clean cam tracks and inspect for wear (Q) 1.0 HRS
Check pressure roller for free movement (Q) 1.0 HRS
Check lubricant over all lever linkage (Q) 1.0 HRS
Check the pulley of oil pump and main (Y) 0.5 HRS
Check all safety interlocks for proper (Q) 1.0 HRS
Check all grease nipples for damage(Y) 1.0 HRS
Clean stations(forming,sealin &cutting)(Q) 1000-Prod 1.0 HRS
Lubricate all oil and greasing points (Q) 1.0 HRS
Check the forming and sealing heater and(Q) 1.0 HRS
Check working of foil roll movement mech(Q) 1.0 HRS
Check working of wastage roll movement (Q) 1.0 HRS
Check the indexing cam, gear and indexin(Q) 0.5 HRS
Open the magnetic clutch from gear box(Q) 1.0 HRS
Lubricate the ratchet bearing of web (Q) 1.0 HRS
Check the variable pulley, service it if(Q) 1.0 HRS
Check the working of chain and chain (Q) 1.0 HRS
Check the main motor belt, if wear is (Q) 1.1 HRS
Check all the electrical panels and (Q) 1.2 HRS
Check the hydraulic pump and oil level(Q) 1.0 HRS
Check the working of the gear box and (Q) 1.0 HRS
Dismantle and inspect forming, sealing (Y) 1.0 HRS
Inspect the powder hopper and dosing (Q) 1000-Prod 1.0 HRS
Inspect main drive motor for any noise (Y) 1.0 HRS
Inspect the heaters and efficiency of (Q) 1.0 HRS
Check the condition of L-sealers.Repalce(Q) 0.5 HRS
check the condition of cutters blades. (Q) 1.0 HRS
Check the operation of sensors.(Q) 0.5 HRS
Check he operation of printing rollers(Q) 1.0 HRS
Check all locking bolts and clean and (Q) 1.0 HRS
Check electric switches and connections.(Q) 0.5 HRS
check the working of pneumatic cylinders(Q) 1.0 HRS
check and replace pneumatic pipes. (Q) 0.5 HRS
Dismantle the front cover of bottle turr(Q) 1000-Prod 0.5 HRS
Inspect the bottle turret for wear and c(Q) 0.5 HRS
Test the No bottle / No air solenoid val(Q) 0.5 HRS
Inspect the driving motor, chain and spr(Q) 1.0 HRS
Lubricate the chain and sprockets of tur(Q) 0.5 HRS
Inspect all power transmission elements (Q) 0.5 HRS
Inspect the turn table gearbox for leaka(Q) 0.5 HRS
Clean and replace main compressed air fi(Q) 0.5 HRS
Replace 0.2 micron filter(Q) 0.5 HRS
Note down the motor amperes after the (Q) 0.5 HRS
Inspect the central bearing of turret fo(Y) 0.5 HRS
Inspect the turn table motor and gearbox(Y) 1.0 HRS
Inspect the pressure regulator for prope(Y) 0.5 HRS
Check maim electrial connections of mach(Q) 1000-Prod 1.0 HRS
Check medicine pump for proper working.(Q) 1.0 HRS
Check wedge for wear and tear. (Q) 1.0 HRS
Check die roll for proper working.(Q) 1.0 HRS
Check lubrication roller. (Q) 0.5 HRS
Check tumbler dryer motor and its rotaio(Q) 0.5 HRS
Check and service button pannel of machi(Q) 0.5 HRS
Check main body of machine for any damag(Q) 1.0 HRS
Check main sealing head and its springs.(Q) 1000-Prod 1.0 HRS
Inspect the gears of all head assemblies(Q) 1.0 HRS
Check condition of Teflon star wheel.(Q) 1.0 HRS
Check base plates and roller bearings (Y) 1.0 HRS
Check capper head bearings for wear. (Y) 1.0 HRS
Inspect V-belt for cracks and wear. (Q) 0.5 HRS
Inspect star wheel shaft, sprockets, (Q) 0.5 HRS
Check working of dosing / filling mechan(Q) 1000-Prod 0.5 HRS
Check the machine for liquid leakage. (Q) 1.0 HRS
Lubricate all cams and cam follower (Q) 1.0 HRS
Check o-rings and seals of pump. (Q) 1.0 HRS
Inspect non-return valve balls and sprin(Q) 1.0 HRS
Check condition of Teflon star wheel. (Q) 1.0 HRS
Check base plates and roller bearings (Y) 1.0 HRS
Inspect variable speed drive belt for (Q) 0.5 HRS
Inspect the scroll driving mechanism. (Q) 0.5 HRS
Inspect star wheel shaft, sprockets,(Y) 0.5 HRS
Check gearbox for oil leakage.if leakage(Q) 1000-Prod 1.0 HRS
Check stirrer for noise, vibration or (Q) 1.0 HRS
Check pressure gauges and replace if(Q) 1.0 HRS
Check oil level in gearbox. Top up if (Q) 1.0 HRS
Check motor bearing for wear and play. (Y) 0.5 HRS
Check discharge valve of vessels and (Q) 0.5 HRS
Inspect the stirrer coupling bolts for (Q) 1.0 HRS
Check dents and rust in the side of (Q) 1.0 HRS
Check gearbox for oil leakage.if leakage(Q) 1000-Prod 1.0 HRS
Check stirrer for noise, vibration or (Q) 1.0 HRS
Check pressure gauges and replace if (Q) 1.0 HRS
Check oil level in gearbox. Top up if (Q) 0.5 HRS
Check motor bearing for wear and play. (Y) 0.5 HRS
Check motor gearbox coupling for wear. (Q) 0.5 HRS
Check discharge valve of vessels and (Q) 1.0 HRS
Inspect the stirrer coupling bolts for (Q) 1.0 HRS
Check dents and rust in the side of vess(Q) 1.0 HRS
Check the motor bearing replace if (Y) 1000-Prod 1.0 HRS
Check the gear box bearing, Replace if (Q) 0.5 HRS
Check oil level in gear box.(Q) 1.0 HRS
Check the up and down ratchet and lever.(Q) 1.0 HRS
Check the heater and motor of fresh air (Q) 1.0 HRS
Check the foam filter and bag filter of (Q) 1.0 HRS
Check the sound of exhaust motor bearing(Y) 0.5 HRS
Check the pump seal (Q) 1.0 HRS
Check all electrical connections and (Q) 0.5 HRS
Check overall structure and paint it.(Y) 1.0 HRS
Check Oil in Gear box(Q) 1000-Prod 0.5 HRS
Inspect gear box thoroughly. Replace wor(Y) 0.5 HRS
Check bearing of motor. Replace if worn (Q) 0.5 HRS
Inspect lid cover seal, Replaced if dama(Q) 0.5 HRS
Inspect and tighten all electrical conne(Q) 1.0 HRS
check chain and sprocket of gear box.(Q) 0.5 HRS
greasing of all bearings and chain sproc(Q) 0.5 HRS
Tighten main shaft bolts.(Q) 0.5 HRS
Check all oil points and greasing points(Q) 1000-Prod 0.5 HRS
Visually check machines bushes and (Q) 0.5 HRS
Check the machine belt for wear and dama(Q) 0.5 HRS
Check the pulley and belt for wear. Repl(Q) 0.5 HRS
Clean the filters of vacuum pump, dust (Q) 0.5 HRS
Remove the dust from inside the electric(Q) 0.5 HRS
Check the power connections as well as (Q) 1.0 HRS
Check the motor’s connection in motor (Q) 1.0 HRS
Inspect the motor’s bearing and machine (Y) 1.0 HRS
Check the grounding of control panel mac(Q) 1.0 HRS
Uncover the conveyor and make its inter(Q) 1000-Prod 1.0 HRS
Inspect the v-belts chain & spooks agai(Y) 0.5 HRS
Inspect the motor gearbox against any (Y) 0.5 HRS
Inspect the mounting of motor and gearbo(Q) 0.5 HRS
Inspect the oil level of gearbox. Top it(Q) 1.0 HRS
Inspect the chain wheels of conveyor (Q) 1.0 HRS
Inspect the slat bed fiber or PVC for (Q) 1.0 HRS
Check the slat link pins for wear. Repla(Q) 1.0 HRS
Check the driving and driven chain and (Y) 0.5 HRS
After completion of maintenance work, (Q) 0.5 HRS
Inspect the balancing bolts located at (Q) 0.5 HRS
Remove the trolley and check its mesh(Q) 1000-Prod 1.0 HRS
Remove the upper and lower gasket and (Q) 1.0 HRS
Remove the all filters and check its (Y) 1.0 HRS
Check the all solenoids of air purging (Q) 1.0 HRS
Check the water inlet solenoids and (Q) 1.0 HRS
Clean the bag filters of fresh air units(Q) 1.0 HRS
Check the steam valve and leakage of (Q) 1.0 HRS
Check the hot air inlet damper and cold (Q) 1.0 HRS
Check the exhaust motor sound and note(Q) 1.0 HRS
Check the outlet air adjustment motorize(Q) 0.5 HRS
Check all temperatures indicator sensors(Q) 0.5 HRS
Set the air pressure of gasket with air (Q) 1.0 HRS
Clean electrical panel and inspect all(Q) 0.5 HRS
Remove the main impeller and granulating(Q) 1000-Prod 1.0 HRS
Clean and inspect sealing areas of booth(Q) 1.0 HRS
Check operation of flush bottom discharg(Q) 0.5 HRS
Check discharge valve plug silicon seal(Q) 0.5 HRS
Inspect bowl cover seal,Replaced damaged(Q) 0.5 HRS
Adjust the compound air unit against(Q) 0.5 HRS
Check all safety interlock & mechanism(Q) 1.0 HRS
Replace granulator seals.(Y) 1.0 HRS
Inspect v-belts and check their tension(Y) 1.0 HRS
Inspect and tighten all elect.connection(Q) 1.0 HRS
Check heater connections(Q) 1000-Prod 0.5 HRS
Check the conveyor belt.(Q) 0.5 HRS
Check the fan motor, repaired it if requ(Y) 1.0 HRS
Check all electrical connections.(Q) 1.0 HRS
Check the slat conveyor belt.(Q) 1000-Prod 0.5 HRS
Check the condition of star wheel.(Q) 1.0 HRS
Check the vibrating hopper and its elect(Q) 1.0 HRS
Check and service of screwing capper hea(Q) 0.5 HRS
Check v-belts and pulley. Replace if fou(Q) 0.5 HRS
Check the main mechanical drive of machi(Q) 0.5 HRS
Oiling and greesing on all chain drives(Q) 0.5 HRS
Check & service the electrical panel.(Q) 1.0 HRS
Check and service all solenoid valves of(Y) 1.0 HRS
Check counting plate and hopper (Y) 1000-Prod 1.0 HRS
Check vibration intensity adjustement (Q) 1.0 HRS
Check vibrator power switch (Q) 0.5 HRS
Check micro swtiches. (Q) 0.5 HRS
Check counting pannel and its power swit(Q) 0.5 HRS
Check the operation of label sensor(Q) 1000-Prod 1.0 HRS
Check the function of compressed air (Q) 0.5 HRS
Check the operation of re-winding motor (Q) 1.0 HRS
Check operation of label sticking system(Q) 1.0 HRS
Check any wear and tear of conveyor and (Y) 1.0 HRS
Check the operation of printing system.(Q) 1.0 HRS
Check and clean the electric connections(Q) 1.0 HRS
Check the motor belt tension/condition (Q) 1000-Prod 0.5 HRS
Check the oil level of the gear box, top(Q) 0.5 HRS
Check the condition of gear strip teeth (Q) 1.0 HRS
Check the gear box condition, gears, and(Y) 1.0 HRS
Inspect the condition of Sieving router (Y) 1.0 HRS
Check the bearing & seal of sieving rout(Q) 1.0 HRS
Check the alignment of sieving router.(Q) 0.5 HRS
Check the condition of PVC side covers, (Y) 0.5 HRS
Check the oil seals.(Q) 1000-Prod 0.5 HRS
Check the oil.(Q) 0.5 HRS
Check the springs and pins.(Q) 0.5 HRS
Check the castor wheels and its bearings(Q) 0.5 HRS
Check for the normal operations of the m(Y) 1.0 HRS
Check the lubrication. (Q) 1000-Ware 0.5 HRS
Check the water of the battery.(Q) 1.0 HRS
Rectify any wear and tear found in the m(Q) 1.0 HRS
Check the breaks function.(Q) 0.5 HRS
Check the wheel condition and replace if(Q) 1.0 HRS
Check all the electric wiring.(Q) 0.5 HRS
Check over all normal function of the ma(Q) 1.0 HRS
Check the lubrication.(Q) 1000-Ware 0.5 HRS
Check the water of the battery.(Q) 1.0 HRS
Rectify any wear and tear found in the m(Q) 1.0 HRS
Check the breaks function.(Q) 0.5 HRS
Check the wheel condition and replace if(Q) 1.0 HRS
Check all the electric wiring.(Q) 0.5 HRS
Check over all normal function of the ma(Q) 1.0 HRS
Check the lubrication.(Q) 1000-Ware 0.5 HRS
Check the water of the battery.(Q) 1.0 HRS
Rectify any wear and tear found in the m(Q) 1.0 HRS
Check the breaks function.(Q) 0.5 HRS
Check the wheel condition and replace if(Q) 1.0 HRS
Check all the electric wiring.(Q) 0.5 HRS
Check over all normal function of the (Q) 1.0 HRS
Check control parameters and adjust if (Q) 1000-Ware 1.0 HRS
Check the normal operation of the machin(Q) 0.5 HRS
Check is there any leakage or dripping (Q) 1.0 HRS
Check is there any choking in the system(Q) 1.0 HRS
Check the performance of the stabilizer.(Q) 1.0 HRS
Check control parameters and adjust if (Q) 1000-Ware 1.0 HRS
Check the normal operation of the machin(Q) 0.5 HRS
Check is there any leakage or dripping (Q) 1.0 HRS
Check is there any choking in the system(Q) 1.0 HRS
Check the performance of the stabilizer.(Q) 1.0 HRS
Cleaning the area under the toner cartri(Q) 1000-Ware 1.0 HRS
clean and inspect interior and exterior (Q) 0.5 HRS
clean and inspect air cooling system(Q) 1.0 HRS
check laser parameters. (Q) 0.5 HRS
check optical alignment of laser system.(Q) 1.0 HRS
Cleaning the area under the toner cartri(Q) 1000-Ware 1.0 HRS
clean and inspect interior and exterior (Q) 0.5 HRS
clean and inspect air cooling system(Q) 1.0 HRS
check laser parameters. (Q) 0.5 HRS
check optical alignment of laser system.(Q) 1.0 HRS
Check the lubrication.(Q) 1000-Ware 0.5 HRS
Check the water of the battery.(Q) 1.0 HRS
Rectify any wear and tear found in the m(Q) 1.0 HRS
Check the breaks function.(Q) 0.5 HRS
Check the wheel condition and replace if(Q) 1.0 HRS
Check all the electric wiring.(Q) 0.5 HRS
Check over all normal function of the ma(Q) 1.0 HRS
Clean and inspect the machine.(Q) 1000-Ware 0.5 HRS
Check strap seal head and strap accumula(Q) 1.0 HRS
Check around the strap track and the(Q) 1.0 HRS
Check the air cylinders, valves and guid(Q) 0.5 HRS
The grippers should be removed from the (Y) 1.0 HRS
Check heater. Repair or replace if not (Q) 1000-Ware 0.5 HRS
Check controller. Replace if not proper (Q) 0.5 HRS
Remove the conveyer and clean properly.(Y) 0.5 HRS
Check Electrical Switch & Connection(Q) 1.0 HRS
Check the gear box filled oil if require(Y) 1.0 HRS
Check Cabin pulley and its bearings.(M) 1000-Ware 1.0 HRS
Check Control cards.(M) 0.5 HRS
Check doors and its sensors.(M) 0.5 HRS
Check and service its electrical panel.(M) 1.0 HRS
Check guide rails and grease it.(M) 1.0 HRS
Check its cop.(M) 0.5 HRS
Check inverters for proper working.(M) 0.5 HRS
Check motor and its bearings.(M) 0.5 HRS
Check for proper oiling on all designate(M) 1.0 HRS
Check brakes for proper working.(M) 0.5 HRS
Check cabin pulley(M) 0.5 HRS
Check counter weight pulley(M) 0.5 HRS
Check cabin shoes(M) 0.5 HRS
Check counter weight shoes(M) 0.5 HRS
Check for Pit cleaning(M) 0.5 HRS
Inspect the filter against choking & int 1000-Ware 1.0 HRS
Inspect the blower bearings against wear 1.0 HRS
Test the pressure differential across th 0.5 HRS
Inspect the mesh pre filter & clean it t 0.5 HRS
Inspect the motor bearings against exces 0.5 HRS
During the re-installation of HEPA filte 1.0 HRS
Check the electrical system & clean. 1.0 HRS
Inspect the filter against choking & int 1000-Ware 1.0 HRS
Inspect the blower bearings against wear 1.0 HRS
Test the pressure differential across th 0.5 HRS
Inspect the mesh pre filter & clean it t 0.5 HRS
Inspect the motor bearings against exces 0.5 HRS
During the re-installation of HEPA filte 1.0 HRS
Check the electrical system & clean. 1.0 HRS
Inspect the filter against choking & int 1000-Ware 1.0 HRS
Inspect the blower bearings against wear 1.0 HRS
Test the pressure differential across th 0.5 HRS
Inspect the mesh pre filter & clean it t 0.5 HRS
Inspect the motor bearings against exces 0.5 HRS
During the re-installation of HEPA filte(Y) 1.0 HRS
Check the electrical system & clean. 1.0 HRS
Inspect the filter against choking & int 1000-Ware 1.0 HRS
Inspect the blower bearings against wear 1.0 HRS
Test the pressure differential across th 0.5 HRS
Inspect the mesh pre filter & clean it t 0.5 HRS
Inspect the motor bearings against exces 0.5 HRS
During the re-installation of HEPA filte 1.0 HRS
Check the electrical system & clean. 1.0 HRS
Inspect the filter against choking & int 1000-Ware 1.0 HRS
Inspect the blower bearings against wear 1.0 HRS
Test the pressure differential across th 1.0 HRS
Inspect the mesh pre filter & clean it t 0.5 HRS
Inspect the motor bearings against exces 0.5 HRS
During the re-installation of HEPA filte 0.5 HRS
Check the electrical system & clean. 1.0 HRS
Check the electrical connections of blow 1000-Ware 1.0 HRS
Check for abnormal sound in blower. 1.0 HRS
Check motor ampere and condition. 1.0 HRS
Check and service the blower. 0.5 HRS
Check motor and its bearings. Replace 0.5 HRS
Check blower and its bearing. Replace 0.5 HRS
Check battery electrolyte level(M) 1000-Ware 0.5 HRS
Check hydraulic oil.(M) 0.5 HRS
Check transmission oil.(M) 0.5 HRS
Check break fluid level.(M) 0.5 HRS
Check tyres for cracks & debris(M) 0.5 HRS
Check all electrical connections(M) 0.5 HRS
Check steering operation (M) 0.5 HRS
Check Drive system (M) 0.5 HRS
Check the oil seals.(Q) 1000-Ware 0.5 HRS
Check the oil.(Q) 0.5 HRS
Check the springs and pins.(Q) 0.5 HRS
Check the castor wheels and its bearings(Q) 0.5 HRS
Check for the normal operations of the (Y) 1.0 HRS
Check all oil points and greasing points(Q) 1000-Prod 1.0 HRS
Check the machine belt for wear and (Q) 1.0 HRS
Check the pulley for wear.(Q) 0.5 HRS
Remove the dust from inside the electric(Q) 1.0 HRS
Check the power connections as well as (Q) 0.5 HRS
Check the motor’s connection in motor (Q) 1.0 HRS
Change the motor’s bearing and machine(Y) 1.0 HRS
Check the grounding of control panel and (Q) 1.0 HRS
Check upper and lower punches for easy (Q) 1.0 HRS
Clean guiding bore holes of the upper (Q) 1.0 HRS
Lubricate all un-covered gears with mult(Q) 1000-Prod 1.0 HRS
Check the maintained gearbox oil level.(Q) 1.0 HRS
Lubricate all chain drives with chain (Q) 0.5 HRS
Check the machine belt tension & for (Q) 1.0 HRS
Check chilled water houses & air houses (Q) 1.0 HRS
Check and remove the dust from inside th(Q) 1.0 HRS
Check the power connections as well as (Q) 0.5 HRS
Check house coupling of cooling inlet & (Q) 1.0 HRS
Change the motor’s bearing and machine(Y) 1.0 HRS
Check the grounding of control panel and(Q) 1.0 HRS
Inspect visually heater station for dama(Q) 1.1 HRS
Check the pressure of forming station (Q) 1.2 HRS
Check the drive flanges and couplings (Q) 1.3 HRS
Check pneumatic piping & ensure that (Q) 1.4 HRS
Check or adjust all air pressure regulat(Q) 1.5 HRS
Check and service electrical pannel of (Q) 1000-Prod 0.5 HRS
Check and lubricate all moving parts of (Q) 1.0 HRS
Check the main motor for abnormal sound.(Q) 0.5 HRS
Check upper and lower punches for easy (Q) 1.0 HRS
Check main motor and pully bearings (Y) 1.0 HRS
Inspect the blower against powder depos(Q) 1000-Prod 0.5 HRS
Inspect the motor for excessive noise (Q) 0.5 HRS
Check the heater, repaired/replaced if (Q) 0.5 HRS
Check the temperature controller.(Q) 1.0 HRS
Check the Electrical system and clean (Q) 1.0 HRS
Lubricate the door hinges and inspect (Q) 1.0 HRS
Inspect the door locks and their movemen(Y) 1.0 HRS
Inspect the trays for leakage and joint (Y) 0.5 HRS
Inspect the tray rests for proper rigidi(Y) 0.5 HRS
Check the movement of punches in their(Q) 1000-Prod 1.0 HRS
Check the lubrication of punches through(Q) 1.0 HRS
Check the leakage in lubricating circuit(Q) 1.0 HRS
Spray anti-friction solid lubricant over(Q) 1.0 HRS
Clean cam tracks and inspect for wear (Q) 0.5 HRS
Check pressure roller for free movement (Q) 0.5 HRS
Check lubricant over all lever linkage (Q) 0.5 HRS
Check the pulley of oil pump and main (Y) 1.0 HRS
Check all safety interlocks for proper (Q) 1.0 HRS
Check all grease nipples for damage.(Q) 1.0 HRS
Check the contianer seals for any (Q) 1000-Prod 1.0 HRS
Check the seals of material discharge (Q) 0.5 HRS
Check all safety interlocks and mech(Q) 1.0 HRS
Check the cutting cutter for any (Y) 1.0 HRS
Check motor for any abnormal sound.(Q) 1.0 HRS
Check gear box oil level. Refill if need(Q) 0.5 HRS
Check the working of machine with HMI (Q) 0.5 HRS
Check its main control system for electr(Q) 1000-Prod 0.5 HRS
Check and service the intake and exhaust(Q) 1.0 HRS
Check and service the peristaltic pump.(Q) 1.0 HRS
Check the leakage of steam line (Q) 1.0 HRS
Check the motor bearing, replace if (Y) 1.0 HRS
Check the gear box bearing, replace if (Y) 0.5 HRS
Check the bag filtes and replace if (Q) 1.0 HRS
Check all the pneumatic connections,(Q) 0.5 HRS
Check the spray guns, service them if (Q) 1.0 HRS
Check the motor bearing replace if (Y) 1000-Prod 0.5 HRS
Check the gear box bearing, Replace if (Q) 0.5 HRS
Check oil level in gear box.(Q) 1.0 HRS
Check the up and down ratchet and lever.(Q) 1.0 HRS
Check the heater and motor of fresh air (Q) 1.0 HRS
Check the foam filter and bag filter of (Q) 1.0 HRS
Check the sound of exhaust motor bearing(Y) 0.5 HRS
Check the pump seal (Q) 1.0 HRS
Check all electrical connections and (Q) 0.5 HRS
Check overall structure and paint it.(Y) 1.1 HRS
Remove the trolley and check its mesh(Q) 1000-Prod 1.0 HRS
Remove the upper and lower gasket and (Q) 1.0 HRS
Remove the all filters and check its (Y) 1.0 HRS
Check the all solenoids of air purging (Q) 1.0 HRS
Check the water inlet solenoids and (Q) 1.0 HRS
Clean the bag filters of fresh air units(Q) 1.0 HRS
Check the steam valve and leakage of (Q) 1.0 HRS
Check the hot air inlet damper and cold (Q) 1.0 HRS
Check the exhaust motor sound and note(Q) 1.0 HRS
Check the outlet air adjustment motorize(Q) 0.5 HRS
Check all temperatures indicator sensors(Q) 0.5 HRS
Set the air pressure of gasket with air (Q) 1.2 HRS
Clean electrical panel and inspect all(Q) 1.3 HRS
Cleaning of panels with blower (M) 1000-Electr 0.5 HRS
Check all breaker terminals (M) 0.5 HRS
Check panel earthing.(M) 0.5 HRS
Tightening all cable connections(M) 0.5 HRS
Cleaning of all camera.(M) 1000-Electr 0.5 HRS
Check the power supply of camera.(M) 1.0 HRS
Visual inspection of system installed at(M) 1000-Electr 1.0 HRS
Main power supply inspection(M) 0.5 HRS
Cleaning of control components(M) 0.5 HRS
Check the backup UPS for proper working.(M) 1.0 HRS
Check network connection between door co(M) 1.0 HRS
Replacement of Engine Oil at 200 hrs 1000-Electr 1.0 HRS
Repl of Air,fuel,oil & water seprator at 200hrs 0.5 HRS
Check physical appearance of Genset.(D) 0.5 HRS
Check water coolant. (D) 0.5 HRS
Check Oil Leakage.(D) 1.0 HRS
Check oil level. (D) 1.0 HRS
Check battery’s voltage. (D) 1.0 HRS
Clean radiator. (M) 1.0 HRS
Check the leakage of fuel in tank.(D) 1000-Electr 0.5 HRS
Check the integrity of fuel supply piping(D) 1.0 HRS
Check the cleaning status of diesel stor(D) 1.0 HRS
Check the operation of diesel pump.(D) 1.0 HRS
Inspect the insect-o-cuter against prope(M) 1000-Electr 1.0 HRS
Inspect
the
equipmen
t against
cleanlines
(M) 1.0 HRS

Check
the
illuminatio
n of Ultra
Violet (M)
1.0 HRS
Replace Ultra Violet Light. (Y) 2.0 HRS
Establish
whether
light /
LED on
each (Q) 1000-Electr 0.5 HRS
Check
whether
all the
detectors
are
prop(Q) 1.0 HRS
Check all
the
detectors
for any
sign of
(Q) 2.0 HRS
Clean
each
detector
with
blower
and
soft(Q) 2.0 HRS
Check
Alarm
functions
of the
panel (Q) 2.0 HRS
Test and
calibrate
alarm
sensors,
includ(Q) 2.0 HRS
Visually
inspect
the
control
panel
for(Q) 1.0 HRS
Visually
check all
cable
fittings
and (Q) 1.0 HRS
Check
the
battery
for
corrosion
and
expi(Q) 0.5 HRS
Check air intake grill.(Q) 1000-Electr 0.5 HRS
Check air discharge grill.(Q) 0.5 HRS
Check electrical connections.(Q) 0.5 HRS
Check main motor & blower bearing. (Y) 3.0 HRS
Check blower bolts.(Y) 1.0 HRS