"Belgrade North Tangent Roads Project" The Zemun - Borča Bridge P.C. Corporation Serbia Branch 11000 Belgrade Construction Site

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Savski Nasip 1-3, 11070 Beograd

Tel: +381 11 318-02-01


Tel/Fax: +381 11 318-67-24/318-67-26
Email: office@ratkomitrovic.rs
Web: www.ratkomitrovic.rs

“Belgrade North Tangent Roads Project”


the Zemun – Borča Bridge

P.C. ″CHINA ROAD AND BRIDGE


CORPORATION SERBIA BRANCH″
11000 Belgrade
Construction Site

Subject: Evaluation of the quality of concrete elements for all objects on section III

Dear Sirs,

Please find enclosed the evaluation of the quality of concrete elements for the Bridges at 10+751.458
and 13+369.47, overpass at 11+885.03, culvert at 12+128.35 and 15+382.16, pipe culvert at
0+434.84, drainage works and pipeline foundations.

Best regards,

Prepared by Subcontractor's Representative

Vladimir Tijanić, BSc, CEng Djuro Grbić, MSc, CEng

Enclosure:

- (1 copy)
- Statistic evaluation of compressive strenght for all objects (1 copy)

Received by CRBC:
Date:

Tekući računi: 205-145442-68 Komercijalna banka a.d. Beograd / 275-220017405-41 Société Générale Banka Srbija a.d. Beograd
Matični broj: 06971601 / PIB: 100002661

You might also like