This document is a pre-placement checklist for a concrete pour at the Mallorca Villas Phase 3 project. It lists information about the structure, location, pour area and volume. It also checks that line and grade, sub-base course, formworks, rebar, embedded items, and necessary concrete tools are in place before requesting approval to pour concrete. The checklist is signed off on by the surveyor and project manager, with the contractor project manager preparing the document.
This document is a pre-placement checklist for a concrete pour at the Mallorca Villas Phase 3 project. It lists information about the structure, location, pour area and volume. It also checks that line and grade, sub-base course, formworks, rebar, embedded items, and necessary concrete tools are in place before requesting approval to pour concrete. The checklist is signed off on by the surveyor and project manager, with the contractor project manager preparing the document.
This document is a pre-placement checklist for a concrete pour at the Mallorca Villas Phase 3 project. It lists information about the structure, location, pour area and volume. It also checks that line and grade, sub-base course, formworks, rebar, embedded items, and necessary concrete tools are in place before requesting approval to pour concrete. The checklist is signed off on by the surveyor and project manager, with the contractor project manager preparing the document.
LOCATION : ______________________________________________ STRENGTH : ______________________________ STATION : _____________________________________________ SLUMP : ______________________________ AREA (sq.m ) : _____________________________________________ NO.SPECIMEN : _____________________________ VOLUME (cu.m ) : _____________________________________________ NO.TRUCKS/TRIPS : _________________________ TIME STARTED : _____________________________________________ DATE SAMPLED : _________________________ TIME FINISHED : _____________________________________________ AGE IN DAYS : ______________________________
LINE & GRADE/ELEVATION
SUB-BASE COURSE AGG.BASE COURSE EXCAVATION/COMPACTION SURFACE DEWATERING FIELD DENSITY TEST (FDT) FORMWORKS/SUPPORTS REBARS/DOWELS EMBEDDED ITEMS - Water - Sewer - Drainage - Electrical Others ____________________ APPROVED POURING REQUEST FORM CONCRETE TOOLS - Finishing Broom/Rakes - Shovel APPROVED FOR POURING : - Short/Long Screeds - Conc.floats Perry Sandoval - Trowels Surveyor - Conc.cutter - Levelling Rod Herman Bibon - Conc.Vibrator SE - Mallorca - Supply of Water - Pouring Lights Henry Romero - Traffic signs,warning devices,etc. PM - Mallorca City