Wastewater Infrastructure

Standard Details
Connections and Developer Services
Construction Requirements for Self-Lay Developments
December 2017 (Revision 03)

Document IW-CDS-5030-01
IW-CDS-5030-01

1 | Irish Water | [Type Document Title]


IW-CDS-5030-01 Rev. 03 December 2017

Revision Log
Date Details of Revision Revision Author Approver
April 2016 General revisions 01 T’OC M’OD
August 2016 General revisions & 02 TO’C MO’D
drawing added
December 2017 General revisions & 03 TO’C MO’D
drawing added
IW-CDS-5030-01 Rev. 03 December 2017

Background
Technical Documentation has been developed by Irish Water’s Connections and
Developer Services which outlines the requirements for wastewater services
infrastructure within developments.

These standard details have been developed to outline to developers Irish Water’s
requirements for the provision of wastewater infrastructure that is to be installed in
developments and that would be connected to Irish Water’s networks and subsequently
vested in Irish Water.

The standard details outline design and construction requirements to ensure


consistency in the provision of materials, equipment and workmanship, etc. They also
provide the basis for developers’ detailed design proposals for wastewater
infrastructure, leading to the provision of infrastructure that is suitable for connection to
Irish Water’s networks and easy operation and maintenance of the new infrastructure.

The standard details are based on best practice within the water industry. They take
account of the experience of Local Authorities in the provision of these services to new
developments. They have been successfully used by Irish Water’s own internal
functions for a variety of projects and they are in line with water utility industry norms.

There are 36 No Standard Details dealing with wastewater infrastructure covering all
aspects of such infrastructure.

These standard details are accompanied by a Design Risk Assessment (DRA)


(document number IW-CDS-5030-02), which outlines the residual health and safety
responsibilities of developers and their designers/contractors in the provision of such
infrastructure.

The use of the standard details is mandatory in all new Irish Water Connection
Agreement Offers issued after 1st June 2016.
.
IW-CDS-5030-01 Rev. 03 December 2017
Standard Details for Wastewater Networks
Index Sheet

Drawing No. Drawing Title Rev


STD-WW-01 Waste water service connection responsibility 1
STD-WW-02 Typical layout for sewer within new developments 1
STD-WW-03 Drain & service connection pipework 1
STD-WW-04 Typical sewer / service pipe connection 1
STD-WW-05 Typical service layout indicating separation distances 1
STD-WW-06 Restrictions on wastewater infrastructure adjacent to trees 2
STD-WW-06A Restrictions on new trees/shrubs planting adjacent to sewers 0
STD-WW-07 Trench backfill & bedding 1
STD-WW-08 Concrete bed, haunch & surround to wastewater pipes 0
STD-WW-09 Blockwork manhole (<450mm dia.) 2
STD-WW-10 Pre-cast concrete manhole 2
STD-WW-11 In-situ concrete manhole 2
STD-WW-12 Backdrop manholes 2
STD-WW-13 Private side inspection chamber 2
STD-WW-14 Thrust blocks for rising mains 1
STD-WW-15 Scour valve chamber (foul rising main <200mm dia.) 2
STD-WW-16 Sluice valve details for rising mains ductile iron (D.I.) pipe (<200mm 3
dia.) (sheet 1 of 2)
STD-WW-17 Sluice valve details for rising mains polyethylene (P.E.) pipe (<200mm 2
dia.) (sheet 2 of 2)
STD-WW-18 Air valve chamber (foul rising main <200mm dia.) 2
STD-WW-19 Duct chamber 2
STD-WW-20 Emergency overflow structure 1
STD-WW-21 Typical ditch/stream crossing for gravity main (sheet 1 of 2) 1
STD-WW-22 Typical ditch/stream crossing for rising main (sheet 2 of 2) 1
STD-WW-23 Typical bridge crossing for rising main (sheet 1 of 2) 1
STD-WW-24 Typical bridge crossing for rising main (sheet 2 of 2) 1
STD-WW-25 Security gate & fencing 2
STD-WW-26 Indicative pumping station layout 0
STD-WW-27 Flow meter chamber (foul rising main <200mm dia.) 2
STD-WW-28 Indicative submersible pumping station 2
STD-WW-28A Indicative pre-cast concrete submersible pumping station 1
STD-WW-29 Rising main discharge manhole 2
STD-WW-30 Kiosk type 1 pumping station & wet kiosk (sheet 1 of 2) 2
STD-WW-31 Kiosk type 2 + 3 pumping station & wet kiosk (sheet 2 of 2) 2
STD-WW-32 Hardstanding area pumping station (permeable & impermeable) 1
STD-WW-33 Lamp bollard & lamp standard 1
STD-WW-34 Vent stack 1

These Standard Details show the acceptable typical details and outline the minimum standards that are required by Irish Water for the
provision of wastewater pipes and related infrastructure which are to be connected to the Irish Water Network. They shall be used in
conjunction with the associated Design Risk Assessments that have been developed which identify the risks that designers shall take into
account in the detailed design of the wastewater pipes and related infrastructure to be connected to the Irish Water Network. The pipes
and related infrastructure to be put in place within developments shall comply fully with these Standard Details. Ultimate responsibility
(including, but not limited to, any losses, costs, demands, damages, actions, expenses, negligence and claims) for the detailed design,
construction and provision of such pipes and related infrastructure shall rest entirely with the Developer, his/her Designer(s), Contractor(s)
or other connected party. Irish Water assumes no responsibility for and gives no guarantees, undertakings or warranties in relation to the
pipes and related infrastructure to be provided in accordance with these Standard Details.
No part of the Standard Details shall be reproduced or transmitted in any form or stored in any retrieval system of any nature without the
prior written permission of Irish Water as copyright holder, except as agreed for use.
These Standard Details shall be used in conjunction with current Irish Water Codes of Practice, which will take precedence over the
Standard Details.
These Standard Details may also be used for the installation of wastewater infrastructure for Asset Delivery Works & Capital Project
Works Programmes at the discretion of Irish Water.
DEC. 2017
IW-CDS-5030-01 Rev. 03 December 2017

VENT STACK

CUSTOMER PROPERTY

SEE NOTE 2 ON
STD-WW-03
PROPERTY BOUNDARY

WITHIN
1m OF
BOUNDARY
FOOTPATH
ROAD

INSPECTION CHAMBER DRAIN


SERVICE CONNECTION

SEWER
( IRISH WATER RESPONSIBILITY )

PROPERTY OWNER RESPONSIBILITY PROPERTY OWNER RESPONSIBILITY

A/B C D

MAINTENANCE
RESPONSIBILITY

( A ) SEWER IRISH WATER

( B-C ) SERVICE CONNECTION


PROPERTY OWNER
( INCLUDING SADDLE )

INSPECTION CHAMBER PROPERTY OWNER

( C-D ) DRAIN PROPERTY OWNER

INTERNAL PLUMBING PROPERTY OWNER

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
WASTEWATER SERVICE
1 11/'17 JMC TOC Note reference added MOD CONNECTION RESPONSIBILITY STD-WW- 01 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. THE MINIMUM SIZE FOR A GRAVITY FOUL SERVICE CONNECTION SHALL BE 100mm DIAMETER.

2. THE MINIMUM SIZE OF GRAVITY FOUL SEWER SHALL BE 225mm DIAMETER IN GENERAL. GRAVITY SEWERS ON BRANCHES SERVING LESS THAN 20 PROPERTIES MAY BE 150mm DIAMETER SUBJECT TO
AGREEMENT WITH IRISH WATER.

3. THE MINIMUM SIZE FOR RISING MAINS SHALL NOT BE LESS THAN 80mm & THE DESIRED MINIMUM SIZE OF RISING MAIN SHALL BE 100mm DIAMETER.

4. EACH PROPERTY SHALL HAVE A SEPARATE WASTE WATER SERVICE CONNECTION. A CONNECTION SHALL NOT BE TAKEN FROM AN EXISTING SERVICE CONNECTION.

LEGEND

PROPOSED SEWER
PROPOSED MANHOLE
PROPOSED INSPECTION CHAMBER

EXISTING SEWER
EXISTING MANHOLE

TELECOMMUNICATIONS

STORM WATER
ELECTRICITY

WATER MAIN

FOUL SEWER
CABLE TV
GAS MAIN

BUILDING

ROAD
KERB

FOOTPATH
BOUNDARY

TYPICAL LAYOUT OF SERVICES IN FOOTPATH / ROAD


REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
TYPICAL LAYOUT FOR SEWER
1 11/'17 JMC TOC Updated Note 2 MOD WITHIN NEW DEVELOPMENTS STD-WW- 02 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.


2. AN INSPECTION CHAMBER SHOULD BE LOCATED AT OR WITHIN 1m OF THE
PROPERTY BOUNDARY AT THE UPSTREAM END OF EACH SERVICE
CONNECTION ON THE PRIVATE SIDE OF THE CURTILAGE, IF PRACTICABLE,
CONSULT WITH IRISH WATER ON ALTERNATIVE LOCATIONS.
3. ANY PIPE AND ASSOCIATED ACCESS UPSTREAM OF THE POINT OF
CONNECTION TO A PUBLIC SEWER WITHIN THE CONFINES OF A PRIVATE
BOUNDARY IS A PRIVATE DRAIN AND SHOULD BE CONSTRUCTED IN
ACCORDANCE WITH BUILDING REGULATIONS.

PROPERTY OWNER RESPONSIBILITY PROPERTY PROPERTY SEWER


OWNER OWNER IRISH WATER RESPONSIBILITY
BOUNDARY
PROPERTY

RESPONSIBILITY RESPONSIBILITY

WITHIN 1000mm
(SEE NOTE 2)

FOOTPATH
ROAD
MAX.150mm
VARIES

VARIES

SLIDING COUPLING
45° BEND
CONNECTION PIPE

45° ANGLE JUNCTION


OR OBLIQUE PIPE SADDLE.
SEE DRAWING STD-WW-04
FOR DETAILS

FOR DETAIL OF INSPECTION FOUL SEWER MAIN SURROUND


CHAMBER SEE DRAWING IN 150mm GRADE C25\30 CONCRETE
DRAIN TO BE INSTALLED STD-WW-13 AT SERVICE CONNECTIONS
TO RELEVANT BUILDING
REGULATION REQUIREMENTS GRANULAR
MATERIAL AS PER BACKFILLING
DRAWING STD-WW-07

PIPE SIZE (mm) GRADIENT

100 1 : 60

150 TO 225 1 : 150 MINIMUM

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

1 11/'17 JMC TOC Updated Notes MOL DRAIN AND SERVICE CONNECTION PIPEWORK STD-WW- 03 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. AS FAR AS PRACTICABLE, JUNCTIONS AND SERVICE CONNECTIONS SHALL


BE BUILT IN FOR ALL PLANNED USERS WHEN THE SEWER IS BEING
CONSTRUCTED. WHERE IT IS NECESSARY TO MAKE A POST-CONSTRUCTION
CONNECTION THE DEVELOPER SHALL BRING THE SEWER TO THE
INSPECTION CHAMBER, INSTALL THE INSPECTION CHAMBER AND SEAL
THE UPSTREAM END UNTIL THE CONNECTION IS REQUIRED.

3. THE VERTICAL ANGLE BETWEEN THE SERVICE CONNECTING PIPE AND


THE HORIZONTAL SHALL BE GREATER THAN 0° AND NOT MORE THAN 60°.

4. WHERE THE CONNECTION IS BEING MADE TO A SEWER WITH A NOMINAL


INTERNAL DIAMETER OF 300mm DIAMETER OR LESS, CONNECTIONS
SHALL BE MADE USING 45° ANGLE JUNCTIONS.

5. WHERE THE CONNECTION IS BEING MADE TO A SEWER WITH A NOMINAL


INTERNAL DIAMETER GREATER THAN 300mm :

A) IF THE DIAMETER OF THE CONNECTING PIPE IS GREATER THAN


HALF THE DIAMETER OF THE SEWER, AN ACCESS MANHOLE SHALL BE
CONSTRUCTED TO FORM THE CONNECTION POINT; OR,
B) IF THE DIAMETER OF THE CONNECTING PIPE IS LESS THAN OR
EQUAL TO HALF THE DIAMETER OF THE SEWER, THEN THE CONNECTION
SHALL BE MADE USING A PREFORMED SADDLE FITTING WITH A SLOW
BEND BETWEEN THE SADDLE AND THE CONNECTING SEWER/DRAIN .

6. CONNECTIONS MADE WITH SADDLE FITTINGS SHALL BE MADE BY


CUTTING AND SAFELY REMOVING A CORE FROM THE PIPE AND JOINTING
THE SADDLE FITTING TO THE PIPE IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS TO ENSURE A WATERTIGHT JOINT.
THE CONNECTING PIPE SHALL NOT PROTRUDE INTO THE SEWERS.
7. THE USE OF 90° CONNECTIONS TO THE SEWER MAY BE ALLOWED SUBJECT
TO IRISH WATER REVIEW, PROVIDED THE SADDLE OR BRANCH
INCORPORATES A SWEPT TEE CONNECTION TOWARDS THE DIRECTION OF
FLOW.
°
60

90°

°
45
SEE NOTE 7
CONNECTION PIPE

A
AC RAN
CE GE
PT
AB
LE

SEWER

FLOW

CROSS-SECTIONAL VIEW IN
VIEW OF SEWER DIRECTION OF ARROW A
90°
°
60

SEE NOTE 7
°
45

CONNECTION PIPE

A
AC RAN
CE GE
PT
AB
LE

SEWER
FLOW

CROSS-SECTIONAL VIEW IN
VIEW OF SEWER DIRECTION OF ARROW A

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
TYPICAL SEWER / SERVICE PIPE
1 11/'17 JMC TOC Updated connection detail & notes MOD CONNECTION STD-WW- 04 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. THE SEPARATION DISTANCES OUTLINED ARE MINIMUM REQUIREMENTS.

2. SPECIFIC SEPARATION CLEARANCE DISTANCES IN EXCESS OF THESE MINIMA SHALL BE PROVIDED FOR
SERVICES SUCH AS GAS, ELECTRICITY, FIBRE-OPTIC OR OIL FILLED CABLES AS THE CASE MAY BE.
THE PARTICULAR UTILITY PROVIDERS SHALL BE CONSULTED TO DETERMINE THESE MINIMUM SEPARATION
DISTANCES AND EVIDENCE OF THIS CONSULTATION, WITH THE SPECIFIED SEPARATION DISTANCES,
SHALL BE PROVIDED TO IRISH WATER AT DESIGN STAGE.

3. NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN THE FOLLOWING DISTANCES FROM AN EXISTING WATER MAIN OR WASTEWATER RISING MAIN:-

HORIZONTAL
1m AT EITHER SIDE OF AN EXISTING MAIN LESS THAN 200mm IN DIAMETER.
2m AT EITHER SIDE OF AN EXISTING MAIN OF 200mm TO 350mm IN DIAMETER.
5m AT EITHER SIDE OF AN EXISTING MAIN OF 350mm OR GREATER IN DIAMETER.

WHERE DUCTS OR PIPES ARE TO BE LAID CLOSE TO AN EXISTING WATERMAIN OR SEWER IN THE OWNERSHIP OF IRISH WATER,
NOTIFICATION IN WRITING SHALL BE PROVIDED A MINIMUM OF 10 DAYS AHEAD OF ADVANCEMENT OF THE WORK.

NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN 1.5m DISTANCE OF A WASTEWATER SEWER.

REQUIREMENTS SHALL ALSO APPLY TO TRIAL HOLES OR SLIT TRENCHES TO LOCATE THE MAIN OR GAIN GROUND INFO DATA.

LARGER DIAMETERS >350mm DISTRIBUTION AND TRUNK MAINS, IRISH WATER MUST BE NOTIFIED AT LEAST 1 MONTH IN ADVANCE.

DEVELOPERS SHALL ALSO COMPLY WITH ANY NOTIFICATION REQUIREMENTS OF OTHER UTILITY PROVIDERS (ESB, GAS MAIN, TELECOMMUNICATION ETC.).

4. DETAILED PROPOSALS, INCLUDING WORK METHOD STATEMENTS, INSURANCE CONFIRMATION AND DETAILS OF WORK COMPLETED OF A SIMILAR NATURE MUST
BE SUBMITTED TO IRISH WATER FOR ITS CONSIDERATION BEFORE AGREEMENT WILL ISSUE.ALL SUCH WORKS IN THE VICINITY OF ARTERIAL WATER MAINS AND SEWERS
(MAINS GREATER THAN 400mm) SHALL BE SUBJECT TO WRITTEN AGREEMENT WITH IRISH WATER BEFORE CONSTRUCTION COMMENCES ON SITE. THIS AGREEMENT
SHALL ALSO INCLUDE ANY NECESSARY PROTECTION FOR WATER MAINS.

5. ANY DAMAGE SHALL BE NOTIFIED IMMEDIATELY TO IRISH WATER. THE PERSON WHO CAUSES THE DAMAGE TO A SEWER MAIN OR FITTING WILL BE DEEMED TO HAVE
COMMITTED AN OFFENCE UNDER SECTION 45 OF THE WATER SERVICES ACT 2007.

6. UNDER NO CIRCUMSTANCES WILL IRISH WATER ACCEPT SEWER MAIN INSTALLATIONS UNDER STRUCTURES, EXISTING OR PROPOSED, OR IN CLOSE PROXIMITY TO
ANY EXISTING STRUCTURES OR FEATURES THAT WILL INHIBIT ACCESS FOR POST INSTALLATION MAINTENANCE AND ACCESS.

7. THE MINIMUM CLEAR DISTANCE WILL BE INCREASED IF THE SEWER IS GREATER THAN 3m DEEP OR IF THE DIAMETER IS GREATER THAN 375mm. THE MINIMUM CLEAR DISTANCE
IN THESE SITUATIONS SHALL BE > DEPTH TO INVERT OR 10 TIMES THE SEWER DIAMETER, WHICH EVER IS GREATER.

8. THE EXTERNAL FACES OF MANHOLE SHALL BE AT LEAST 0.5m FROM KERB LINE.

9. WHERE DESIGN DEVIATES FROM TYPICAL DETAILS, THE LAYOUT IS SUBJECT TO REVIEW BY IRISH WATER.

3000mm MINIMUM

BUILDING

BOUNDARY WALL FOOTPATH GRASS VERGE KERB

CABLE TV
TELECOMMUNICATIONS
MINIMUM 1200mm

ELECTRICITY

WATER MAIN

FOUNDATION

GAS MAIN

ELECTRICAL CORRIDOR
( DEPTH AND LAYOUT STORM WATER
REQUIREMENTS TO BE
CONFIRMED WITH SERVICE MIN. 1000mm
PROVIDER )

FOUL SEWER

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
TYPICAL SERVICE LAYOUT INDICATING
1 11/'17 JMC TOC Updated notes MOD SEPARATION DISTANCES STD-WW- 05 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

METHOD STATEMENTS:
ALL WORKS SHALL BE CARRIED
OUT IN ACCORDANCE WITH BS 5837 AND INFORMED BY
NJUG VOLUME 4

PRECAUTION AREA:

EXCAVATIONS FOR PIPEWORK SHOULD NOT BE


UNDERTAKEN WITHIN THIS AREA, UNLESS AGREED WITH
IRISH WATER.

WORKS WITHIN THE PRECAUTION ZONE MUST BE


SUPERVISED BY A QUALIFIED ARBORIST. WORKS SHALL BE
SUBJECT OF A CLEAR METHOD STATEMENT OUTLINING ALL
WORKS ADJACENT TO THE TREES/SHRUBS WHICH IS TO BE
PREPARED & AGREED IN ADVANCE OF THE WORKS.

MATERIAL, PLANT & SPOIL SHALL NOT BE STORED WITHIN


THIS ZONE.

EXCLUSION AREA:

WORKS IN THIS AREA ARE TO BE AVOIDED, UNLESS


ABSOLUTELY NECESSARY & AGREED WITH IRISH WATER.

EXCAVATIONS FOR PIPEWORK SHOULD NOT BE


UNDERTAKEN WITHIN THIS AREA, UNLESS NECESSARY AND
NO OTHER OPTIONS AVAILABLE. WORKS WITHIN THE
EXCLUSION ZONE MUST BE SUPERVISED BY A QUALIFIED
ARBORIST AND AGREED WITH IRISH WATER. WORKS SHALL
BE SUBJECT OF AN ARBORICULTURAL IMPACT
ASSESSMENT AS PER BS 5837 & A CLEAR METHOD
STATEMENT OUTLINING ALL WORKS ADJACENT TO THE
TREES/SHRUBS IS TO BE PREPARED AND AGREED IN
ADVANCE OF THE WORKS.
MATERIAL, PLANT & SPOIL SHALL NOT BE STORED WITHIN
THIS ZONE.

OUTSIDE RADIUS OF PRECAUTION AREA = 4 x


GIRTH OF TREE
EXCLUSION AREA
PRECAUTION PRECAUTION GIRTH (CIRCUMFERENCE OF TREE
AREA 1m 1m AREA MEASURED AT 1.5m ABOVE GROUND LEVEL)

PREVENTION MEASURES
REQUIRED IN LINE WITH
LANDSCAPING DESIGN & SPECIAL
GIRTH x 4
PROTECTION REQUIRED. (e.g. BY NO WORKS PERMITTED
USE OF APPROPRIATE BARRIERS,
HIGH PERFORMANCE JOINTS, OR
BY USE OF POLYETHYLENE WITH
WELDED JOINTS). THE LANDSCAPE
DESIGN AND DETAILS OF THE
SPECAIL PROTECTION MEASURES
MUST BE AGREED WITH IRISH

EXISTING PLANTING:
WATER

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
RESTRICTIONS ON WASTEWATER
2 11/'17 JMC TOC Revised to suit ILI recommendations MOD
1 08/'16 JMC TOC Added new section & notes MOD INFRASTRUCTURE WORKS STD-WW- 06 2
0 09/'15 JMC TOC Initial Issue SL ADJACENT TO TREES
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. Develop detailed design


DIAGRAM 1: DECISION FLOW CHART of the tree planting with
Outcome Decision landscape architect.
2. Consult with arborist.
STEP 1 STEP 2 (DIAGRAM 2) 3. Carry out works under
supervision of Irish Water
Main Decision Check Table A.1. of BS 5837. Check Check STD-W12A for species & size representative.
1. Utility depth Depending on the choice of tree Yes
No Trees required in Yes Then Are root barriers &/or
Do 2. Final expected stem diameter species or shrubs:
proximity to Water protection measures
Nothing - Establish minimum distance from 1. Establish increased (or
Infrastructure to be used?
tree to utility decreased) distance from utility No
- Assume no protection measures 2. Assume no protection measures
1. Plant trees at required
distance (as per step 2).
2. Carry out works under
THE DISTANCES GIVEN IN TABLE A.1. OF BS 5837 MUST BE FURTHER INFORMED BY THE SPECIES & IN DIAGRAM 2 BELOW. DIAGRAM 1 ABOVE supervision of Irish Water
PROVIDES A FLOW CHART TO THE DECISION PROCESS WHILST DIAGRAM 2 BELOW IS TO BE USED TO INFORM THE PLANTING REGIME. representative.

PLEASE NOTE THAT TABLE A.1. OF BS 5837 (BELOW) IS TO BE USED TO CALCULATE THE ABSOLUTE MIMIMUM DISTANCE BETWEEN NEW TREE PLANTING
FROM THE WASTEWATER INFRASTRUCTURE (THE SERVICES). THE DISTANCE IS REQUIRED TO AVOID DIRECT DAMAGE TO THE INFRASTRUCTURE FROM
FUTURE GROWTH. THE DISTANCE IS A FUNCTION OF THE DEPTH OF THE SERVICES AND THE (FINAL EXPECTED) STEM DIAMETER OF THE TREE AT
MATURITY (i.e. FINAL EXPECTED GROWTH).
TABLE A.1. Minimum distance between young trees or new planting & structures, in metres (m)
BS 5837 Final stem dia. < 300mm Final stem dia. 300mm to 600mm Final stem dia. > 600mm
Services
< 1m deep 0.5 1.5 3.0
> 1m deep -- 1.0 2.0
THUS FOR EXAMPLE:
- FOR A SERVICE LESS THAN 1 METRE DEEP, THE MINIMUM DISTANCE IS TO BE 1.5m FOR A TREE BETWEEN 300 AND 600mm STEM DIAMETER AT MATURITY.
- FOR A SERVICE GREATER THAN 1 METRE DEEP, THE MINIMUM DISTANCE IS TO BE 1.0m FOR A TREE BETWEEN 300 AND 600mm STEM DIAMETER AT MATURITY.

NOTE: RESTRICTIONS RELATE TO INFRASTRUCTURE WITHOUT ROOT INTRUSION PROTECTION.


THE DESIGN OF LANDSCAPING SHALL BE UNDERTAKEN IN CONJUNCTION WITH THE DESIGN OF WASTEWATER INFRASTRUCTURE, ETC. THE TREE/BUSH/SHRUB SHALL NOT BE LOCATED
CLOSER TO THE WASTEWATER INFRASTRUCTURE THAN INDICATED ABOVE, EXCEPT WHERE SPECIAL PROTECTION MEASURES ARE PROVIDED. WHERE THERE IS A RISK OF TREE/ROOT
INTRUSION, THE WASTEWATER INFRASTRUCTURE SHALL BE RESISTANT TO TREE ROOT INGRESS (e.g. BY USE OF APPROPRIATE BARRIERS, HIGH PERFORMANCE JOINTS, OR BY USE OF
POLYETHYLENE WITH WELDED JOINTS FOR RISING MAINS). THE LANDSCAPE DESIGN AND DETAILS OF THE SPECIAL PROTECTION MEASURES MUST BE AGREED WITH IRISH WATER
A TREE SHALL NOT BE PLANTED DIRECTLY OVER WASTEWATER INFRASTRUCTURE WHERE EXCAVATION OF THE INFRASTRUCTURE WOULD REQUIRE REMOVAL OF THE TREE UNLESS SUCH
PLANTING IS AGREED WITH IRISH WATER AND IN GENERAL ONLY SHALLOW ROOTING SHRUBS SHALL BE PLANTED CLOSE TO WASTEWATER INFRASTRUCTURE.
PLEASE ENSURE THAT THESE DISTANCES ARE ADHERED TO IN ORDER TO PROTECT THE TREES FROM ANY FUTURE MAINTENANCE. REFERENCE SHOULD ALSO BE MADE TO BS 5837, BS 8545
AND THE NJUG GUIDELINES VOLUME 4 FOR FURTHER INFORMATION.

DIAGRAM 2: PLANTING DISTANCES FOR DIFFERENT SPECIES


WITHOUT BARRIER PROTECTION
Examples of Large Growing Species SEWER/DRAIN
NOTE THAT VALUES REFER TO PLANTING DISTANCES
Poplar, WITHOUT ROOT BARRIERS OR PROTECTION MEASURES
Willow.

Examples of Large Conifers & Deciduous Trees


Scots Pine, Black Pine, Cedar, Larch, Lawson's Cypress,
Ash, Beech, Sycamore, Horse Chestnut, Sweet
Chestnut, London Plane, Lime, Alder, Elm, Oak

Examples of Small SIze Amenity Trees


Mountain Ash, Whitebeam, Field Maple,Wild Cherry,
Cockspur Thorn, False Acacia, Crab Apple, Cobnut, Birch,
Hornbeam CV. Elder,Ornamental Pear.

Examples of shrubs and bushes


Holly, Laurel, Rhododendron, Dogwood,
Christmas Tree, Magnolia, Fruit bushes, Spindle
Tree, Guelder rose, Roses

Examples of hedge plants and ground covers including


herbaceous and annuals
NOTE: OTHER SPECIES NOT
NAMED TO BE PLANTED TO THE
Hedge plants and ground covers may be placed over the pipeline
SAME SPACINGS DEPENDING ON Privet, Blackthorn, Snowberry, Berberis, Heathers, Cotoneaster &
ROOT FORMATION. Groundcovers, Herbaceous & Annuals

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WATER NOT TO SCALE JUL. 2017
TITLE DRAWING No. REV

RESTRICTIONS ON NEW TREES / SHRUBS


PLANTING ADJACENT TO SEWERS STD-WW-06A 0
0 11/'17 JMC TOC Initial Issue MOD
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. THE MINIMUM DEPTH OF COVER FROM THE FINISHED SURFACE TO
THE CROWN OF GRAVITY PIPES WITHOUT PROTECTION SHOULD BE
AS FOLLOWS:
A) GARDENS AND PATHWAYS WITHOUT ANY
POSSIBILITY OF VEHICULAR ACCESS - DEPTH NOT LESS
THAN 0.5 M. (THIS WOULD NORMALLY RELATE TO DRAINS
IN PRIVATE PROPERTY, SHALLOW PIPES OF THIS NATURE
ARE UNDESIRABLE AND SHOULD BE INSTALLED IN
SEE NOTES 11 & 12. ACCORDANCE WITH THE CURRENT BUILDING REGULATIONS).
B) DRIVEWAYS, PARKING AREAS AND YARDS WITH
ROAD/FOOT PATH SURFACE HEIGHT RESTRICTIONS TO PREVENT ENTRY BY VEHICLES
WITH A GROSS VEHICLE WEIGHT IN EXCESS OF 7.5
TONNES - DEPTH NOT LESS THAN 0.75 M.
C) DRIVEWAYS, PARKING AREAS AND NARROW
STREETS WITHOUT FOOTWAYS (E.G. MEWS DEVELOPMENTS)
WITH LIMITED ACCESS FOR VEHICLES WITH A GROSS VEHICLE
BACKFILL REFER TO WEIGHT IN EXCESS OF 7.5 TONNES - DEPTH NOT LESS THAN 0.9 M.
NOTE 3 FOR DETAILS D) DEPTHS OF SEWERS IN GATED ESTATES SHALL BE SIMILAR TO
THAT OUTLINED ABOVE.
E) AGRICULTURAL LAND AND PUBLIC OPEN SPACE - DEPTH NOT
LESS THAN 0.9 M.
SEE NOTE 2

F) OTHER HIGHWAYS AND PARKING AREAS WITH UNRESTRICTED


ACCESS TO VEHICLES WITH A GROSS VEHICLE WEIGHT IN
EXCESS OF 7.5 TONNES - DEPTH NOT LESS THAN 1.2m.
MARKER TAPE REFER 3. CLAUSE 804 / 808 MATERIAL IN ACCORDANCE WITH THE NATIONAL ROADS
TO NOTE 9 FOR DETAILS AUTHORITY SPECIFICATION FOR ROAD WORKS IS TO BE USED AS
BACKFILL MATERIAL WHERE THE SEWER MAIN IS LOCATED IN ROADS,
FOOTPATHS OR WHEN THE NEAREST PART OF THE TRENCH IS WITHIN
1m OF THE PAVED EDGE OF THE ROADWAY. CLAUSE 804 / 808 IS TO BE
COMPACTED AS PER CLAUSE 802 OF THE NATIONAL ROADS AUTHORITY
SPECIFICATION FOR ROAD WORKS. CLAUSE 808 IS TO BE USED WITHIN
300mm

500mm OF CEMENT BOUND MATERIALS, CONCRETE PAVEMENTS,


CONCRETE STRUCTURES OR CONCRETE PRODUCTS. OTHERWISE CLAUSE
804 MAY BE USED. ALTERNATIVE BACKFILL MATERIAL TO THAT DESCRIBED
ABOVE (CLAUSE 804 OR CLAUSE 808) OF THE PIPE TRENCH WILL ONLY BE
ALLOWED BY IRISH WATER WHERE THE ROADS AUTHORITY IN WHOSE
FUNCTIONAL AREA THE DEVELOPMENT IS LOCATED, PROVIDES WRITTEN
APPROVAL TO THE DEVELOPER TO THE USE SUCH ALTERNATIVE
MATERIAL.
PIPE BEDDING REFER TO 4. SELECTED EXCAVATED MATERIAL MAY BE USED IN GREEN-FIELD
NOTE 5 FOR DETAILS AREAS ABOVE GRANULAR PIPE SURROUND MATERIAL SUBJECT TO
REVIEW BY IRISH WATER.
5. PIPE BEDDING SHALL COMPLY WITH WIS 4-08-02 AND IGN 4-08-01
GRANULAR MATERIAL SHALL BE 14mm TO 5mm GRADED
AGGREGATE OR 10mm SINGLE SIZED AGGREGATE IS EN 13242. CONCRETE
BED, HAUNCH & SURROUND, WHERE REQUIRED, SHALL BE TO STD-WW-08.
6. IN SOFT GROUND CONDITIONS (CBR < 5) THE MATERIAL SHOULD BE
EXCAVATED AND DISPOSED OF IN ACCORDANCE WITH THE WASTE
MANAGEMENT ACT AND CLAUSE 804 / 808 MATERIAL IN ACCORDANCE WITH
THE NATIONAL ROADS AUTHORITY SPECIFICATION FOR ROAD
'C'

WORKS SHALL REPLACE THE EXCAVATED MATERIAL, WRAPPED IN


GEO-TEXTILE WRAPPING. ALTERNATIVELY, SPECIAL PIPE SUPPORT
ARRANGEMENTS, INCLUDING PILING ETC. MAY BE REQUIRED WHERE
THE DEPTH OF SOFT MATERIAL IS EXCESSIVE. SUCH ARRANGEMENTS
SHALL BE SUBJECT TO ASSESSMENT BY IRISH WATER BEFORE
PIPE DIAMETER - 'A' ADVANCING WITH THE WORK.
7. IN GREEN FIELD AREAS, TYPE B BACKFILL (SELECTED EXCAVATED
MINIMUM TRENCH WIDTH - 'B' MATERIAL) WILL BE ALLOWED ABOVE THE SIDE HAUNCH GRANULAR
MATERIAL IN THE CASE OF RIGID PIPES. A GRANULAR SURROUND OF
CROSS SECTION IN ROADS A MINIMUM DEPTH OF 150mm ABOVE THE CROWN OF THE PIPE IS
REQUIRED FOR FLEXIBLE PIPES , AND TYPE B MATERIAL MAY BE USED
AS BACKFILL ABOVE THIS. ALL RISING MAINS IN GREENFIELD AREAS
SHALL HAVE A MINIMUM COVER OF 300mm OF GRANULAR MATERIAL
ABOVE THE EXTERNAL CROWN OF THE PIPE.
8. PIPES SHALL NOT BE SUPPORTED ON STONES, ROCKS OR ANY
HARD OBJECTS AT ANY POINT ALONG THE TRENCH. ROCK SHALL BE
EXCAVATED TO A DEPTH OF 150mm BELOW THE ACTUAL DEPTH OF
THE TRENCH WITH THE VOID FILLED WITH CLAUSE 804 / 808 MATERIAL IN
GRASSED AREAS ACCORDANCE WITH THE NATIONAL ROADS AUTHORITY SPECIFICATION
FOR ROAD WORKS. THE GRANULAR MATERIAL SHALL BE LAID ABOVE
DEPTH OF THIS VOID BACKFILL MATERIAL.
REINSTATED TOPSOIL 9. NON DEGRADABLE MARKER TAPE SHOULD BE INSTALLED AT TOP OF
TO MATCH EXISTING PIPE BEDDING LAYER. IN THE CASE OF NON METAL PIPE MATERIAL,
THE MARKER TAPE SHOULD INCORPORATE A TRACE WIRE WHICH IS
LINKED TO FITTINGS AND TERMINATED AT THE WASTE WATER PUMPING
SELECTED BACKFILL
STATION AND THE DISCHARGE MANHOLE.
REFER TO NOTE 4
FOR DETAILS 10. TRENCH WIDTHS FOR PIPE SIZES ≤80mm MAY BE <500mm, SUBJECT TO
SEE NOTE 2

CONSIDERATION BEING GIVEN TO THE TRENCH DEPTH, HEALTH &


SAFETY & CONSTRUCTION ACCESS REQUIREMENTS.
MARKER TAPE REFER
11. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
TO NOTE 9 FOR DETAILS
12. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT,
OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
SEE NOTE 7
VARIES

PIPE DIAMETER TRENCH WIDTH


'A' (mm) 'B' (mm)
≤ 80 RISING MAIN SEE NOTE 10.

100 500

150 600

PIPE BEDDING REFER TO 200 600


NOTE 5 FOR DETAILS
250 750

300 750

350 750

400 900

450 900
'C'

PIPE DIAMETER - 'A'


PIPE DIAMETER DEPTH OF BEDDING
'A' (mm) 'C' (mm)
MINIMUM TRENCH WIDTH - 'B' ≤100 100

150 - 450 200


CROSS SECTION IN GRASSED AREAS
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

1 11/'17 JMC TOC Updated & Added Notes MOD TRENCH BACKFILL AND BEDDING STD-WW- 07 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. SOLID BLOCKWORK TO BE OF HIGH STRENGTH (20N/mm²) TO IS EN 771.
3. MAXIMUM DEPTH OF BLOCK WORK MANHOLE IS 1.20m (THE USE OF BLOCK
WORK IN DEEPER MANHOLES WILL BE CONSIDERED BUT SUCH USE WILL
REQUIRE DETAILED STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER
REVIEW).
4. WALLS TO BE FLUSH POINTED AND NOT PLASTERED INTERNALLY, INTERNAL
LINING OF ENGINEERING BRICK TO IS EN 771-1 TO A HEIGHT OF 1m ABOVE
MANHOLE COVER AND FRAME SHALL COMPLY BENCHING. ENGINEERING BRICK TO BE BONDED TO BLOCKWORK USING
TO IS EN 124 AND BS 7903 (ALL CLASS D400 ENGLISH GARDEN WALL BOND.
COVERS SHALL HAVE MIN. FRAME DEPTH 100 5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS FOR ROOF AND BASE
OR 150mm) MIN. OPE. 600 x 600mm SLABS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER
SEE NOTES 10, 11 & 12. FOR REVIEW. MANHOLE ROOFS SHALL CONSIST OF A REINFORCED CONCRETE
SLAB OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm
COVER TO BE SET IN
DESIGNED TO CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY, APPROVED
C50\60 MORTAR
FINISHED GROUND LEVEL PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT TO IRISH WATER
REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.
1 No. COURSE MIN. 6. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
3 No. COURSES MAX OF CLASS CONDITIONS SUBJECT TO REVIEW FROM IRISH WATER.
B ENGINEERING BRICKS SET IN 7. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
C50/60 MORTAR GREEN AREAS.

225
8. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON
675mm MAX. TO FIRST STEP GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION MEASURES
20N/mm² CONCRETE BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
BLOCKS TO COMPLY
WITH IS EN 771-3 10. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S
ENGINEERING
REQUIREMENTS.
BRICK WORK LINING 1:3 SAND:CEMENT MORTAR 11. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

300 c/c's
1000mm ABOVE BENCHING WITH STEEL TROWEL FINISH 12. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
AT A 1:30 SLOPE TOWARDS MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
THE CHANNEL TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
FLEXIBLE JOINT
FLEXIBLE JOINT

Flow Flow

50
Max. 600 Max. 600
225

ROCKER PIPE
ROCKER PIPE (SEE TABLE OVER)
(SEE TABLE OVER)

SECTION A-A REINFORCED CONCRETE BASE GRADE C30/37

75mm GRADE C12/15 BLINDING CONCRETE

MANHOLE COVER AND FRAME


SHALL COMPLY TO EN 124 AND BS 7903
(ALL CLASS D400 COVERS SHALL HAVE MIN. FRAME
COVER TO BE SET IN
DEPTH 100-150mm) MIN. OPE. 600 x 600mm
C50\60 MORTAR

1 No. COURSE MIN. / 3 No. COURSES


MAX OF CLASS B ENGINEERING
BRICKS SET IN C50/60 MORTAR

675mm MAX. TO FIRST STEP

20N/mm² CONCRETE BLOCKS


TO COMPLY WITH IS EN 771-3
ENGINEERING MANHOLE STEPS TO COMPLY WITH IS EN 13101,
BRICK WORK LINING 120 TYPE D, CLASS 1, GALVANISED MILD STEEL &
1000mm ABOVE BENCHING PLASTIC ENCAPSULATED.

1: 3 SAND:CEMENT MORTAR WITH STEEL TROWEL


BENCHING SLOPE TO BE FINISH AT A 1:30 SLOPE TOWARDS THE CHANNEL
1:10 TO 1:30
RELIEVING ARCH FORMED BY 215x103x65
SOLID ENGINEERING BRICK CLASS A OR B.
(RELIEVING ARCHES USED IN BRICK OR BLOCK WORK
MANHOLES EXTEND OVER FULL THICKNESS OF WALLS)
50

225

REINFORCED CONCRETE
BASE GRADE C30/37 SECTION B-B
75mm GRADE C12/15
BLINDING CONCRETE
B

1760
215 1200 215
215

FLEXIBLE JOINT FLEXIBLE JOINT

MANHOLE ROCKER PIPE LENGTH


COVER &
1200
1760

MIN. OPE. 600


x 600mm
PIPE DIAMETER ROCKER PIPE
Flow Flow (mm) LENGTH (mm)

150 TO 600 600


A A
GREATER THAN 600 TO 750 1000
ROCKER PIPE ROCKER PIPE
215

(SEE TABLE OVER) (SEE TABLE OVER)


GREATER THAN 750 1250
PLAN
B

INVERT SHOULD BE FORMED WITH CAST-INSITU


CONCRETE, C25/30 20mm AGGREGATE FINISHED MINIMUM WIDTH OF BENCHING FOR
WITH A 1:3 CEMENT/SAND MORTAR LANDING AREA TO BE 500mm

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
Added rocker pipe table,
2 11/'17 JMC TOC added & updated notes MOD TITLE DRAWING No. REV

Added steps & revised


1 08/'16 JMC TOC access ope & cover notes MOD BLOCKWORK MANHOLE (< 450mm DIA.) STD-WW- 09 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF
IS EN 1917 AND BS 5911-PART 3.
3. THICKER MANHOLE BASES REQUIRED FOR SEWERS IN EXCESS OF
3m DEEP WHERE THE SIZE IS GREATER THAN THE STANDARD MINIMUM
COVER TO BE SET SIZE.
IN C50\60 MORTAR 4. APPROVED PRE-CAST CONCRETE BASES MAY BE USED INCORPORATING
CHANNELS, BENCHING ETC. SUBJECT TO IRISH WATER REVIEW AND
COMPLYING WITH BS 5911-PART 4 2002.
5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED
BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
MANHOLE COVER AND FRAME SHALL 6. MANHOLES GREATER THAN 3m IN DEPTH WILL REQUIRE A DETAILED
COMPLY TO IS EN 124 AND BS 7903 (ALL STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER REVIEW.
CLASS D400 COVERS SHALL HAVE MIN. 7. MANHOLE ROOFS SHALL CONSIST OF A RE-INFORCED CONCRETE SLAB
FRAME DEPTH 100-150mm) MIN. OPE. OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm
SEE NOTES 12, 13 & 14.
600x600mm DESIGNED TO CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY,
APPROVED PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT
FINISHED GROUND LEVEL
TO IRISH WATER REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.
8. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
1 No. COURSE MIN. 675mm MAX. TO FIRST STEP 9. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
3 No. COURSES MAX GREEN AREAS.

225
OF CLASS B 10. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED
ENGINEERING BRICKS MIN. 600 ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
SET IN C50/60 MORTAR MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW
BY IRISH WATER.
PRECAST CONCRETE 11. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
MANHOLE RINGS TO 12. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD
IS 420 IN CONJUNCTION AUTHORITY'S REQUIREMENTS.
WITH IS EN 1917 : 2004 120 13. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
14. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT,
ELASTOMETRIC JOINT SEAL OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
300 c/c's

TO EN 681 15. IF DEPTH FROM GROUND TO PIPE SOFFIT IS GREATER THAN 6m DEEP, A SITE SPECIFIC
ENGINEERED SOLUTION FOR ACCESS SHALL BE PROVIDED.
MANHOLE STEPS TO COMPLY WITH IS 16. PROPRIETARY WATERTIGHT PCC MANHOLE RING SYSTEMS WITH A WALL THICKNESS >
150mm GRADE C16/20 125mm, & A WATER TIGHT JOINT SEALING SYSTEM, MAY BE USED WITHOUT CONCRETE
EN 13101, TYPE D, CLASS 1,
IN-SITU CONCRETE SURROUND, SUBJECT TO THE GROUND WATER LEVEL AT THE MANHOLE BEING LOW, &
GALVANISED MILD STEEL & PLASTIC REFER TO TABLE FOR
SURROUND SUBJECT TO REVIEW BY IRISH WATER.
ENCAPSULATED. STEPS ARE REQUIRED PRE-CAST RING DIAMETER
IN MANHOLES UP TO A GROUND TO PIPE
SOFFIT DEPTH OF LESS THAN 3.0m. BOTTOM PRECAST SECTION
MAX. 300

TO BE BUILT INTO BASE


MIN. 50

MANHOLE LADDERS ARE REQUIRED


FOR MANHOLES WITH A DEPTH IN CONCRETE MINIMUM 75 mm 675mm MAX. TO
EXCESS OF 3.0m & ARE TO COMPLY CONSTRUCTION JOINT FGL FIRST LADDER
WITH IS EN 14396. RUNG
DISTANCE BETWEEN TOP
1: 3 CEMENT:SAND MORTAR WITH OF PIPE & UNDERSIDE OF
STEEL TROWEL FINISH AT A 1:30 COVER SLAB
PRECAST SECTION TO BE
SLOPE TOWARDS THE CHANNEL

225
MIN. 50mm TO MAX. 300mm MIN. 600
FIRST RING SUNK INTO
SELF CLEANING TOE HOLES TO BE IN-SITU CONCRETE BASE 1200mm SHAFT Ø
PROVIDED WHERE CHANNEL 900mm MIN. CLEAR
REINFORCED CONCRETE
EXCEEDS 600mm WIDE ACCESS BEHIND
BASE GRADE C30/37
LADDER
INVERT SHOULD BE
STAINLESS STEEL CHAIN IN "DOWN" PCC REDUCING SLAB
FORMED WITH CAST
POSITION SECURED TO RESTRAINING IN-SITU CONCRETE
225

HOOK, WHEN CHAMBER IS OCCUPIED C25/30 20mm AGGREGATE


WHERE THE PIPE DIAMETER IS 450mm FINISHED WITH A 1:3
OR MORE CEMENT SAND MORTAR 150 TO CL OF

2000 MIN.
75mm GRADE C12/15 STRINGER
BLINDING CONCRETE
SECTION A-A LADDERS IN
MANHOLES TO
TO BARREL OF PIPE
COMPLY WITH
IS EN 14396

MINIMUM WIDTH OF BENCHING FOR


A
LANDING AREA TO BE 500mm

FLEXIBLE JOINT FLEXIBLE JOINT

REFER TO TABLE FOR


Flow PC RING DIAMETER Flow

ROCKER PIPE ROCKER PIPE MANHOLE DETAIL > 3m & < 6m


325
Min.

(SEE TABLE BELOW) (SEE TABLE BELOW)


GROUND TO SOFFIT DEPTH
Max. 600 Max. 600
(NOTE: ON MANHOLES <1.5mØ, REDUCING SLAB NOT TO
BE USED & PCC RINGS TO CONTINUE UP TO COVER SLAB)
150mm GRADE C16/20 IN-SITU PIPE JOINT WITH CHANNEL TO BE
CONCRETE SURROUND A LOCATED MINIMUM 100mm INSIDE
FACE OF MANHOLE

PLAN
MINIMUM MANHOLE DIAMETERS ROCKER PIPE LENGTH

DIAMETER OF LARGEST PIPE IN INTERNAL DIAMETER OF


PIPE DIAMETER (mm) ROCKER PIPE LENGTH (mm)
MANHOLE (mm) MANHOLE (mm)

LESS THAN 375 1200 150 TO 600 600

375 TO 450 1350 GREATER THAN 600 TO 750 1000

500 TO 750 1500 GREATER THAN 750 1250

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
Added rocker pipe table,
2 11/'17 JMC TOC deep manhole detail, MOD TITLE DRAWING No. REV
added & updated notes
Added steps & revised
1 08/'16 JMC TOC access ope & cover notes MOD PRE-CAST CONCRETE MANHOLE STD-WW- 10 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
MANHOLE COVER AND FRAME SHALL COMPLY TO IS EN 2. IN-SITU MANHOLES TO HAVE A MINIMUM WALL AND FLOOR THICKNESS OF
124 AND BS 7903 (ALL CLASS D400 COVERS SHALL 225mm FOR MANHOLE DEPTHS UP TO 3.0m AND 300mm OR MORE WHEN THE
HAVE MIN. FRAME DEPTH 100-150mm) MIN. OPE. MANHOLE DEPTH EXCEEDS 3.0m.
600x600mm 3. STRUCTURAL DESIGN & REINFORCEMENT DETAILS TO BE PROVIDED BY THE
COVER TO BE SET DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW. MANHOLE
IN C50\60 MORTAR ROOFS SHALL CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU
SEE NOTES 9, 10 & 11. CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm DESIGNED TO
CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY, APPROVED PRE-CAST
FINISHED GROUND LEVEL CONCRETE ROOF SLABS MAY BE USED SUBJECT TO IRISH WATER
APPROVAL AND COMPLIANCE WITH BS 5911 PART 4: 2002.
4. MANHOLES GREATER THAN 3m IN DEPTH WILL REQUIRE A DETAILED
1 No. COURSE MIN. STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER REVIEW.
3 No. COURSES MAX OF CLASS B 5. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
ENGINEERING BRICKS SET IN MIN. 600 CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.

225
C50/60 MORTAR 6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
675mm MAX. GREEN AREAS.
TO FIRST STEP 25x25mm 7. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON
CHAMFER GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI-FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH
WATER.
8. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
120 9. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD
AUTHORITY'S REQUIREMENTS.
10. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
MANHOLE STEPS TO COMPLY WITH IS 11. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
EN 13101, TYPE D, CLASS 1, GALVANISED MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
CONCRETE GRADE
MILD STEEL & PLASTIC ENCAPSULATED. TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
C30/37 IN ROOF,
STEPS ARE REQUIRED IN MANHOLES 12. IF DEPTH FROM GROUND TO PIPE SOFFIT EXCEEDS 6m, A SITE SPECIFIC ENGINEERED
300 c/c's

WALLS AND BASE


WITH A GROUND TO PIPE SOFFIT DEPTH SOLUTION FOR ACCESS SHALL BE PROVIDED.
OF LESS THAN 3m. MANHOLE LADDERS
ARE REQUIRED FOR MANHOLES WITH A
DEPTH IN EXCESS OF 3.0m & ARE TO
COMPLY WITH IS EN 14396.

1: 3 CEMENT:SAND MORTAR WITH


STEEL TROWEL FINISH AT A SLOPE
OF 1:30 TOWARDS THE CHANNEL

INVERT SHOULD BE FORMED


WITH CAST IN-SITU CONCRETE STAINLESS STEEL CHAIN IN
C25/30 20mm AGGREGATE "DOWN" POSITION SECURED
FINISHED WITH A 1:3 CEMENT TO RESTRAINING HOOK,
225

SAND MORTAR WHEN CHAMBER IS OCCUPIED 675mm MAX. TO


50

WHERE THE PIPE DIAMETER IS FIRST LADDER


75mm GRADE C12/15 450mm OR MORE FGL RUNG
BLINDING CONCRETE
SECTION A-A
COVER SLAB

MIN. 600

225
225 D A 225

1200mm SHAFT
225

900mm MIN. CLEAR


LADDERS IN ACCESS BEHIND
MANHOLES TO LADDER
Max. 600 COMPLY WITH
Max. 600 IS EN 14396 REDUCING SLAB
D
MIN. 600

Flow Flow

2000 MIN.
230

MIN. 600
325

ROCKER PIPE ROCKER PIPE


225

(SEE TABLE BELOW) (SEE TABLE BELOW)

PLAN A

MIN. 600mm x
600mm
SQUARE OPE

MANHOLE DETAIL > 3m & < 6m


GROUND TO PIPE SOFFIT DEPTH
(NOTE: ON MANHOLES <1.5m SHAFT DIMENSION, REDUCING
ROOF PLAN SLAB NOT TO BE USED & SHAFT TO CONTINUE UP TO COVER
SLAB)

ROCKER PIPE LENGTH MINIMUM MANHOLE DIMENSION ''D''

PIPE DIAMETER ROCKER PIPE DIAMETER OF LARGEST PIPE IN INTERNAL DIMENSION OF


(mm) LENGTH (mm) MANHOLE (mm) MANHOLE (mm)

150 TO 600 600 LESS THAN 375 1200

GREATER THAN 600 TO 750 1000 375 TO 450 1350

GREATER THAN 750 1250 500 TO 750 1500

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
Added rocker pipe table,
2 11/'17 JMC TOC deep manhole detail, MOD TITLE DRAWING No. REV
added & updated notes.
Added steps & revised
1 08/'16 JMC TOC access ope & cover notes MOD IN-SITU CONCRETE MANHOLE STD-WW- 11 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. RODDING EYE CHAMBER SHALL BE COVERED WITH APPROVED HEAVY
DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL
HEAVY DUTY COVER AND FRAME BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS AND IS SUBJECT TO
D400 (TO SUIT 150mm OPE.) REVIEW BY IRISH WATER.
3. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED
ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH
WATER.
4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
5. MANHOLE DETAILS TO BE IN ACCORDANCE WITH STD-WW-09, 10 AND 11

150mm DIA. PVC PIPE

150mm CONCRETE CHAIN


SURROUND

STOPPER

Y - JUNCTION

45° BEND 150

150mm GRADE C25\30


CONCRETE SURROUND

90° BEND
225mm GRADE C25\30
CONCRETE SURROUND

TYPE No. 1
150mm - 450mm DIA. (INCL.) DROP GREATER THAN 1700mm
500mm - 900mm DIA. (INCL.) DROP GREATER THAN 2300mm

HEAVY DUTY COVER AND FRAME


D400 (TO SUIT 150mm OPE.)

150mm DIA. PVC PIPE

150mm CONCRETE CHAIN


SURROUND

STOPPER
TEE JUNCTION 150

150mm GRADE C25\30


CONCRETE SURROUND

90° BEND

225mm GRADE C25\30


CONCRETE SURROUND

TYPE No. 2
150mm - 450mm DIA. (INCL.) DROP GREATER THAN 900 AND LESS THAN 1700mm
500mm - 900mm DIA. (INCL.) DROP GREATER THAN 1300mm AND LESS THAN 2300mm

Y - JUNCTION CHAIN

STOPPER

150mm GRADE C25\30


CONCRETE SURROUND

45° BEND
225mm GRADE C25\30
CONCRETE SURROUND

TYPE No. 3
150mm - 450mm DIA. (INCL.) DROP GREATER THAN 600mm AND LESS THAN 900m
500mm - 900mm DIA. (INCL.) DROP GREATER THAN 600mm AND LESS THAN 1300mm

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

2 11/'17 JMC TOC Updated notes MOD


1 08/'16 JMC TOC Added steps MOD BACKDROP MANHOLES STD-WW- 12 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. AN INSPECTION CHAMBER SHOULD BE LOCATED AT OR WITHIN 1m OF
THE PROPERTY BOUNDARY AT THE UPSTREAM END OF EACH SERVICE
CONNECTION ON THE PRIVATE SIDE OF THE CURTILAGE, IF
SEALED MANHOLE COVER PRACTICABLE, CONSULT WITH IRISH WATER ON ALTERNATIVE
TO SUIT IS EN 124 LOADING MINIMUM LOCATIONS.
COVER TO BE SET AS PER MINIMUM 600mm x 600mm INTERNAL DIMENSIONS 3. ANY PIPE AND ASSOCIATED ACCESS UPSTREAM OF THE POINT OF
MANUFACTURER'S CLEAR OPENING 600mm DIAMETER CONNECTION TO A PUBLIC SEWER IS A PRIVATE DRAIN AND SHOULD BE
SPECIFICATION OR 600mm x 600mm CONSTRUCTED IN ACCORDANCE WITH THE BUILDING REGULATIONS.
4. ACCESS POINTS SHOULD BE LOCATED SO THAT THEY ARE ACCESSIBLE
AND APPARENT TO THE MAINTAINER AT ALL TIMES FOR USE. THEY
SHOULD AVOID REAR GARDENS OR ENCLOSED LOCATIONS AND THEY
1 No. COURSE MIN. SHOULD NEVER BE OVERLAIN WITH SURFACE DRESSING, TOPSOIL, ETC.
3 No. COURSES MAX 5. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
OF CLASS B ENGINEERING BRICKS CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS
PIPES BUILT INTO CHAMBER IN GREEN AREAS.
WALL OR JOINT FORMED 7. PROPRIETARY PREFABRICATED CHAMBER UNITS MAY ALSO BE USED,
600 SUBJECT TO REVIEW BY IRISH WATER.
WITH WATERTIGHT SEALS
8. CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm
REFER TO DRAWING PRECAST UNITS COMPACTED CLAUSE 804 OR CLAUSE 808 MATERIAL AS PER STD-WW-07.
STD-WW-07 FOR (REFER TO NOTE 7.)
BACKFILL AND
BEDDING DETAILS FLOW
FLOW

225mm PRECAST BASE OR


225mm IN-SITU CONCRETE C25/30 600mm
50mm CROSS FALL

SECTION

100 600 100

PRECAST UNITS
(REFER TO NOTE 7.)
BENCHING
100

FLOW FLOW
600

FLOOR PLAN
INSPECTION CHAMBER
(PRECAST CONCRETE CONSTRUCTION)
SEALED MANHOLE COVER
COVER TO BE SET AS PER TO SUIT IS EN 124 LOADING MINIMUM INTERNAL
MANUFACTURER'S MINIMUM 600mm x 600mm DIMENSIONS 600mm
SPECIFICATION CLEAR OPENING DIAMETER OR 600mm x 600mm
1 No. COURSE MIN.
3 No. COURSES MAX
OF CLASS B ENGINEERING BRICKS
PIPES BUILT INTO CHAMBER
WALL OR
JOINT FORMED WITH
WATERTIGHT SEALS 600

REFER TO DRAWING 215 THICK 20 N/mm² CONCRETE BLOCK WORK


STD-WW-07 FOR IN ACCORDANCE WITH IS EN 771-3
BACKFILL AND
BEDDING DETAILS FLOW
FLOW

225mm PRECAST BASE OR


50mm CROSS
225mm IN-SITU CONCRETE C25/30 600mm
FALL
SECTION
215 600 215
215

BENCHING

FLOW FLOW
600

215 THICK 20 N/mm²


CONCRETE BLOCK WORK
215

IN ACCORDANCE WITH
IS EN 771-3

FLOOR PLAN
INSPECTION CHAMBER
(BLOCK WORK CONSTRUCTION)

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

2 11/'17 JMC TOC Updated notes MOD


1 08/'16 JMC TOC Added Cl. 808 to note 8 MOD PRIVATE SIDE INSPECTION CHAMBER STD-WW- 13 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
A/2 A/2 B/2 B/2 (A or B)/2 (A or B)/2 STAINLESS
FLEXIBLE COMPRESSIBLE
STEEL STRAPS
FILLER MATERIAL

E
STAINLESS STEEL

E
ANCHOR BOLTS

G/2
2

NTS
25x25mm CHAMFER

1000

G/2

50 MIN.
50 MIN.
50 MIN.

G/2
50 MIN. GRADE C25 / 30
0 MASS CONCRETE
100

G/2
90 DEGREE BEND NTS SUPPORT BLOCK
45 DEGREE BEND BEND WITH EXTENSION PIECES
E DOWEL BARS

20
VARIES 50 MIN.

0
C/2 C/2 D/2 D/2 TEE VARIES
E THRUST E

VARIES (MIN. 300 + O.D.)


R FLANGE

E
TE CONCRETE

E
WA IN TEE WITH EXTENSION PIECES PIPE PLINTH SUPPORT (ABOVE GROUND)
PLINTH
MA

F/2
GROUND
ROAD SURFACE

VARIES
SURFACE

50 MIN.
50 MIN.
DN x 2.5
REINFORCEMENT 300
PROFILE

F/2
TO DEVELOPER'S
DETAILS 300

200
VARIES

22.5 DEGREE BEND SECTIONAL ELEVATION FOR BEND OR TEE 100 DN x 2.5 100
11.25 DEGREE BEND

F/2
TRENCH
G/2
500

LONGITUDINAL SECTION BOTTOM COLLAR


HORIZONTAL BENDS
DN / 2 DN DN / 2
DI PE DI PE

F/2
PIPE

PIPE SUPPORT DETAILS FOR


IW-CDS-5030-01 Rev. 03 December 2017

150
TRENCH

200
300 INCLINED SLOPES, FOR PIPE
300

GRADIENT > 10° TO HORIZONTAL. ELEVATION


300
G/2

300 SUPPORTS PLACED AT MAX. 5


RISING METER INTERVALS CENTRE TO SECTION
PLAN
300
MAIN CENTRE ALONG PIPE WHERE PIPE
THRUST BLOCK FOR
IS ON SLOPE. MIN. 1 SUPPORT

F/2
REQUIRED FOR PIPE DUCTILE IRON TO POLYETHYLENE CHANGE OVER

E
200
LENGTH > 3 METERS IN SLOPE.

H, J, or K
F/2
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
300

100 DN x 2 100
C 2. CONCRETE THRUST BLOCKS (ANCHORAGE) SHALL BE POSITIONED
PLAN
H, J or K ELEVATION CROSS - SECTION SYMMETRICALLY WITH RESPECT TO THE CONNECTING PIPE & BENDS.
ELEVATION
PIPE SUPPORT DETAILS FOR INCLINED SLOPES TAPER 3. TRENCH DIMENSIONS : REFER TO DRAWING No's. STD-WW-07.
STEEL ELEVATION 4. THRUST BLOCKS SHALL BEAR ON UNDISTURBED SOIL.
ANCHOR SURFACE BOX ROAD SURFACE IF FOR ANY REASON THEY CANNOT THEN THE DEVELOPER SHALL
E 300
STRAPS NOTIFY IRISH WATER IMMEDIATELY WITH A PROPOSED SOLUTION.
TRENCH 5. THRUST BLOCK REINFORCEMENT REQUIRES SPECIFIC DESIGN.

G/2
BOTTOM 6. FOR TEST PRESSURES GREATER THAN 18 BAR, THRUST BLOCK
VARIES

DESIGN IS TO BE SUBMITTED TO IRISH WATER FOR REVIEW.


THRUST
7. THRUST BLOCKS ARE DESIGNED FOR FOR AN AVERAGE BEARING
500

PIPE

G/2
FLANGE

TRENCH
PRESSURE OF 100 KN/m (TYPICAL FOR SOFT CLAY) FOR OTHER
CONDITIONS. ACTUAL DIMENSIONS MAY BE ALTERED ON INSTRUCTIONS

F/2 F/2
H, J, or K
FROM IRISH WATER.

G/2

G/2
PLAN PLAN NOTE: PLAN 8. CONCRETE IN THRUST BLOCKS SHALL BE GRADE C20/25 IN ACCORDANCE
ANTI-TORQUE
300

CONCAVE BEND CONVEX BEND H FOR 45 DEGREE BEND J DEAD END 500
SUPPORT 300 WITH IS EN 206.
FOR 22.5 DEGREE BEND K PLAN 9. COMPRESSIBLE FILLER FOR CONCRETE PROTECTION TO BE IN
VERTICAL BENDS FOR 11.25 DEGREE BEND DEAD END THRUST BLOCK FOR SLUICE VALVE / GATE VALVE SECTION ACCORDANCE WITH BS EN 622-1 AND BS EN 622-4. BITUMINOUS
FOR VALVE BOX ARRANGEMENT MATERIAL SHALL NOT BE PUT IN CONTACT WITH PLASTIC PIPES.
THE THICKNESS OF COMPRESSIBLE FILLER FOR MAINS < 450mm IN
< 12 BAR TEST PRESSURE 12 BAR TO 15 BAR TEST PRESSURE 15 BAR TO 18 BAR TEST PRESSURE DIAMETER IS TO BE 18mm.
10. CONCRETE THRUST BLOCKS FOR POLYETHYLENE PIPE TO COMPLY
NOM. DIMENSIONS NOM. DIMENSIONS NOM. DIMENSIONS
DIA. WITH THE MANUFACTURER'S REQUIREMENTS.
DIA. DIA.
(mm) A B C D E F G H J K (mm) A B C D E F G H J K (mm) A B C D E F G H J K
100 600 330 160 80 200 350 390 700 600 400 100 700 380 190 100 200 350 510 750 600 400 100 750 400 205 100 220 400 530 800 650 400
TABLE OF DIMENSIONS FOR STEEPLY INCLINED PIPELINES
150 950 510 260 130 225 450 660 900 750 600 150 1135 620 320 160 225 450 760 950 750 600 150 1250 700 350 180 250 500 890 1000 850 650
200 1150 600 310 160 300 650 790 1050 900 700 200 1400 750 380 190 300 650 980 1150 950 700 200 1650 890 450 230 320 700 1170 1250 1000 800 GRADIENT SPACING
250 1350 750 380 200 300 800 970 1200 1000 750 250 1730 940 480 240 320 800 1210 1350 1050 850 250 1960 1060 540 270 350 900 1370 1450 1150 900
1 IN 2 & STEEPER 5.5m
300 1580 850 450 220 320 950 1110 1300 1100 850 300 2090 1130 580 300 380 950 1480 1500 1200 950 300 2300 1200 640 320 500 1100 1630 1650 1300 1050
350 2100 1150 570 290 450 1000 1450 1550 1200 900 350 2600 1410 720 360 500 1050 1840 1700 1350 1050 350 2930 1580 830 410 750 1200 2070 1850 1500 1150 BELOW 1 IN 2 TO 1 IN 4 11.0m
400 2550 1400 700 350 500 1050 1800 1700 1250 1000 400 2980 1610 820 420 750 1200 2110 1850 1500 1150 400 3510 1900 970 190* 1000 1300 2490 2000 1600 1250
450 3000 1630 830 420 680 1100 2130 1800 1450 1150 450 3400 1840 940 470 900 1300 2330 2000 1600 1250 450 3810 2270 1160 580 1000 1350 2970 2150 1700 1350 1 IN 4 TO 1 IN 5 16.6m
500 3590 1950 990 500 800 1200 2540 1950 1600 1250 500 4090 2210 1130 570 1000 1400 2890 2200 1750 1350 500 4340* 2380 1210 610 1000 1400 3700 2250 1750 1400
1 IN 5 TO 1 IN 6 22.0m
600 4100 2200 1120 570 850 1400 2880 2100 1700 1300 600 5010* 2710* 1380 700 1000 1500 3550* 2350 1900 1500 600 6370* 3450* 1760 890 1000 1500 4500* 2400 2050 1650

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
THRUST BLOCKS
Anti-torque support note & thrust
1 11/'17 JMC TOC MOD FOR RISING MAINS
flange added & note 6 updated STD-WW- 14 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. VALVE SURFACE BOX TO BE IN ACCORDANCE WITH IS 261 OR BS 5834. SCOUR CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS EN
124 RATING D400. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY WITH THE
REQUIREMENTS OF IS EN 1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKING.
4. SCOUR CHAMBER TO BE IN ACCORDANCE WITH BS EN 1992-3.
5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW. ROOF SLABS SHALL BE
DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUM
THICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911 Part 4.
6. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND PIPES AT
STEEP SLOPES.
7. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.
8. ANTI CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.
9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
10. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION MEASURES BE
REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
12. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.
13. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
14. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT,
TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

HEAVY DUTY COVER AND FRAME,TO COMPLY TO IS


HEAVY DUTY EN 124 & BS 7903, STAMPED '' ScV '', CLASS D400 (TO
COVER & FRAME SUIT MIN. 600mm SQ. OPE). ALL CLASS D400 COVERS
SHALL HAVE MINIMUM FRAME DEPTH 100-150mm. SEE NOTES 12, 13 & 14.
PRECAST CONCRETE COVERS TO BE SET
ROOF SLAB IN C50\60 MORTAR FINISHED GROUND LEVEL

1 No. COURSE MIN.


D.I. FLANGED PLAIN ENDED PIPE
3 No. COURSES MAX

225
WITH THRUST FLANGE
OF CLASS B
( LENGTH CUT TO SUIT) PRECAST CONSTRUCTION

DEPTH TO SUIT
MIN. 600 ENGINEERING BRICKS
AS PER STD-WW-10
D.I. PLAIN ENDED PIPE SET IN C50/60 MORTAR
( LENGTH CUT TO SUIT)
300 150 MANHOLE STEPS TO COMPLY WITH
IS EN 13101, TYPE D, CLASS 1,
ALL FLANGED
GALVANISED MILD STEEL &
LEVEL INVERT TEE
PLASTIC ENCAPSULATED.
200

300 200
300
500

LONG BODY FLANGE ADAPTER

200
BLIND SCOUR CHAMBER TO
LONG BODY TO BE EMPTIED BY VACUUM 200 300 400 300 400 x 400 x 200mm
D.I. SLUICE VALVE DEEP SUMP
FLEXIBLE JOINT TANKER
1350 DIA. REINFORCED CONCRETE
75mm CONCRETE GRADE
BASE SLAB C30 / 37
C12/15 BLINDING
SECTION A-A SECTION B-B

HEAVY DUTY COVER AND FRAME,TO COMPLY TO IS EN 124 & BS 7903,


STAMPED '' ScV '', CLASS D400 (TO SUIT MIN. 600mm SQ. OPE)
ALL CLASS D400 COVERS SHALL HAVE MINIMUM FRAME DEPTH 100-150mm.
A

VALVE SPINDLE COVER

PRECAST CONSTRUCTION
D.I. SLUICE VALVE AS PER STD-WW-10

B 400 x 400 x 200mm


B SCOUR CHAMBER ROOF PLAN
DEEP SUMP

D.I. FLANGED PLAIN ENDED PIPE


WITH THRUST FLANGE REINFORCED CONCRETE
( LENGTH CUT TO SUIT) BASE SLAB C30/ 37
300

LONG BODY D.I. PIPE


FLEXIBLE JOINT (TO SCOUR CHAMBER)
D.I. PLAIN ENDED PIPE LONG BODY LONG BODY
( LENGTH CUT TO SUIT) FLANGE ADAPTER FLANGE ADAPTER

D.I. RISING MAIN D.I. RISING MAIN


FLEXIBLE JOINT FLEXIBLE JOINT
P.E. RISING MAIN P.E. RISING MAIN
FLANGED PLAIN ENDED FLANGED PLAIN ENDED
DI PIPE (LENGTH 500mm) DI PIPE (LENGTH 500mm)
FUSION WELD FUSION WELD
DISMANTLING JOINT DISMANTLING JOINT
A

STUB FLANGE STUB FLANGE


D.I. SLUICE VALVE D.I. SLUICE VALVE WITH BACKING RING WITH BACKING RING
SEE DRAWING SEE DRAWING
STD-WW-16/17 STD-WW-16/17 DISMANTLING JOINT DISMANTLING JOINT

ALL FLANGED D.I. SLUICE VALVE D.I. SLUICE VALVE SEE DRAWING
LEVEL INVERT TEE SEE DRAWING STD-WW-16/17
STD-WW-16/17
ALL FLANGED LEVEL INVERT TEE

PLAN (DUCTILE IRON RISING MAIN) PLAN (POLYETHYLENE RISING MAIN)

DIAMETER OF DIAMETER OF
RISING MAIN (mm) SCOUR (mm)

80 80

100 to 200 100

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
2 11/'17 JMC TOC Revised & added notes MOD SCOUR VALVE CHAMBER
Added steps, revised note
1 08/'16 JMC TOC 2, dims, cover & ope notes. MOD FOUL RISING MAIN (< 200mm DIA.) STD-WW- 15 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.


2. SLUICE VALVE CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS AND IS SUBJECT TO REVIEW BY IRISH WATER.
3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY WITH THE REQUIREMENTS OF IS EN
1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKINGS.
200 445 200
4. ALL SLUICE VALVES SHALL BE CLOCKWISE CLOSING.
5. VALVE CHAMBER TO BE CONSTRUCTED OF PRECAST CONCRETE UNITS OR HIGH DENSITY BLOCKWORK. ALTERNATIVELY PROPRIETARY PREFABRICATED CHAMBER UNITS MAY ALSO BE USED,
SUBJECT TO REVIEW BY IRISH WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE,
200

GRADE C30/37, WITH A MINIMUM THICKNESS OF 150mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.
6. CONCRETE CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm COMPACTED CLAUSE 808 MATERIAL AS PER STD-WW-07.
7. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
8. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
280

9. PE PIPES TO BE IN ACCORDANCE WITH IS EN 12201 : 2011.


10. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.
11. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.
12. ANTI-CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.
13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE SHOULD ANTI FLOATATION MEASURES BE REQUIRED THEY SHALL BE
200

SUBJECT TO REVIEW BY IRISH WATER.


14. ALL THRUST FLANGES TO BE ADEQUATELY RESTRAINED BY THRUST BLOCKS AS PER DRAWING No. STD-WW-14. THRUST BLOCKS NOT SHOWN FOR CLARITY.
15. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.
16. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
BULL NOSE
FINISH PLINTH DETAIL 17. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
IN GRASS AREAS
SEE NOTES 15, 16
MAX.

MAX.
300

300
FINISHED GROUND LEVEL & 17.
FINISHED GROUND LEVEL
COVER TO BE SET 1 No. COURSE MIN. COVER TO BE SET
IN C50\60 MORTAR 3 No. COURSES MAX. IN C50\60 MORTAR
OF CLASS B ENGINEERING BRICKS
CONCRETE ROOF SLAB SET IN C50/60 MORTAR
REFER TO NOTE 2 ON STD-WW-07

150

150
C30 / 37 REINFORCED SLAB CONCRETE ROOF SLAB
FOR MIN. DEPTH OF COVER

C30 / 37 REINFORCED SLAB


215mm THICK 20N/mm²
EXTENSION SPINDLE 445 THRUST 445 EXTENSION SPINDLE
CONCRETE BLOCKWORK REFER TO STD
PRECAST CONCRETE UNITS FLANGE IN ACCORDANCE WITH C25\30 PRECAST - W- 13
(REFER TO NOTE 5.) IS EN 771-3 CONCRETE BEARING FOR BEDDING
SLAB THRUST & BACKFILLING
C25\30 PRECAST
100

100
CONCRETE BEARING FLANGE DETAILS
SLAB
LOCALLY

LOCALLY
REFER TO STD-WW-07
MIN.

MIN.
150

150
FOR BEDDING AND
BACKFILLING DETAILS

DUCTILE IRON DUCTILE IRON


(D.I.) PIPE (D.I.) PIPE

LONG BODY FLANGED / PLAIN ENDED FLANGED / PLAIN ENDED FLANGED / PLAIN ENDED FLANGED / PLAIN ENDED
150

150
FLEXIBLE PIPE CUT TO SUIT PIPE CUT TO SUIT LONG BODY PIPE CUT TO SUIT PIPE CUT TO SUIT LONG BODY
COUPLING FLEXIBLE
FLANGED SLUICE VALVE DISMANTLING JOINT COUPLING FLANGED DISMANTLING JOINT FLEXIBLE
SLUICE VALVE CONCRETE ANTI-TORQUE SUPPORT COUPLING
CONCRETE ANTI-TORQUE
SUPPORT
SECTION SECTION
445
445
280

280

HEAVY DUTY COVER HEAVY DUTY COVER


AND FRAME, CLASS D400 AND FRAME, CLASS D400
(TO SUIT 445 x 280 OPE) (TO SUIT 445 x 280 OPE)

CONCRETE ROOF SLAB


C30 / 37 REINFORCED SLAB CONCRETE ROOF SLAB
C30 / 37 REINFORCED SLAB

ROOF PLAN ROOF PLAN


50 100 100 50 50 215 600 215 50
600
50

PRECAST
50

CONCRETE UNITS 215mm THICK 20N/mm²


(REFER TO NOTE 5.)
215

CONCRETE BLOCKWORK
100

IN ACCORDANCE WITH
IS EN 771-3
600

600
100

215
50

50

FLOOR PLAN FLOOR PLAN


SLUICE VALVE CHAMBER SLUICE VALVE CHAMBER
(PRECAST CONCRETE CONSTRUCTION) (BLOCKWORK CONSTRUCTION)

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
3 11/'17 JMC TOC Revised & Added Notes MOD SLUICE VALVE DETAILS FOR RISING MAINS
2 08/'16 JMC TOC Revised note 6 (Cl. 808) MOD
1 04/'16 JMC TOC Flexible couplings shown MOD DUCTILE IRON (D.I.) PIPE (< 200mm DIA.) STD-WW- 16 3
0 09/'15 JMC TOC Initial Issue SL (Sheet 1 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. SLUICE VALVE CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL BE
SUITABLE FOR ROAD AND TRAFFIC CONDITIONS AND IS SUBJECT TO REVIEW BY IRISH WATER.
3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY
200 445 200 WITH THE REQUIREMENTS OF IS EN 1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKINGS.
4. ALL SLUICE VALVES SHALL BE CLOCKWISE CLOSING.
5. VALVE CHAMBER TO BE CONSTRUCTED OF PRECAST CONCRETE UNITS OR HIGH DENSITY BLOCKWORK. ALTERNATIVELY PROPRIETARY PREFABRICATED
CHAMBER UNITS MAY ALSO BE USED, SUBJECT TO REVIEW BY IRISH WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, &
200

CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 150mm. ALTERNATIVELY, PRE-CAST
CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.
6. CONCRETE CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm COMPACTED CLAUSE 808 MATERIAL AS PER STD-WW-07.
7. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
280

BULL NOSE 8. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
FINISH 9. PE PIPES TO BE IN ACCORDANCE WITH IS EN 12201 : 2011.
10. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.
11. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND
PIPES AT STEEP SLOPES.
200

12. ANTI-CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.


13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE SHOULD ANTI FLOATATION MEASURES BE
REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
14. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.
15. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
PLINTH DETAIL 16. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF
TRANSPORT, TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

SEE NOTES 14, 15


FINISHED GROUND LEVEL & 16. FINISHED GROUND LEVEL

COVERS TO BE SET 1 No. COURSE MIN. COVERS TO BE SET


MAX.

MAX.
IN C50\60 MORTAR 3 No. COURSES MAX.OF IN C50\60 MORTAR
300

300
CLASS B ENGINEERING BRICKS
SET IN C50/60 MORTAR CONCRETE ROOF SLAB
REFER TO NOTE 2 ON STD-WW-07

150

150
CONCRETE ROOF SLAB C30 / 37 REINFORCED SLAB
FOR MIN. DEPTH OF COVER

C30 / 37 REINFORCED SLAB


EXTENSION SPINDLE EXTENSION SPINDLE
445 445
PRECAST CONCRETE UNITS 215mm THICK 20 N/mm² CONCRETE
(REFER TO NOTE 5.) BLOCKWORK IN ACCORDANCE
WITH IS EN 771-3
C25\30 PRECAST
100

100
CONCRETE BEARING C25\30 PRECAST
SLAB CONCRETE BEARING SLAB
LOCALLY

LOCALLY
REFER TO STD-WW-07 REFER TO STD-WW-07
MIN.

MIN.
150

150
FOR BEDDING AND FOR BEDDING AND
BACKFILLING DETAILS BACKFILLING DETAILS

POLYETHYLENE POLYETHYLENE
(P.E.) PIPE (P.E.) PIPE
150

150
FUSION WELD FUSION WELD FUSION WELD
STUB FLANGE STUB FLANGE STUB FLANGE
WITH BACKING RING WITH BACKING RING WITH BACKING RING
DISMANTLING JOINT FLANGED
DISMANTLING JOINT
FLANGED SLUICE VALVE SLUICE VALVE
CONCRETE ANTI-TORQUE SUPPORT CONCRETE ANTI-TORQUE SUPPORT

SECTION SECTION
445
445

HEAVY DUTY COVER HEAVY DUTY COVER


280

280

AND FRAME, CLASS D400 AND FRAME, CLASS D400


(TO SUIT 445 x 280 OPE) (TO SUIT 445 x 280 OPE)

CONCRETE ROOF SLAB CONCRETE ROOF SLAB


C30 / 37 REINFORCED SLAB C30 / 37 REINFORCED SLAB

ROOF PLAN
ROOF PLAN
50 100 100 50 50 50
600 215 600 215
50

PRECAST
50

CONCRETE UNITS
(REFER TO NOTE 5.)
215
100

215mm THICK 20 N/mm² CONCRETE


BLOCKWORK IN ACCORDANCE
WITH IS EN 771-3
600

600
100

215
50

50

FLOOR PLAN FLOOR PLAN


SLUICE VALVE CHAMBER SLUICE VALVE CHAMBER
(PRECAST CONCRETE CONSTRUCTION) (BLOCKWORK CONSTRUCTION)
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
SLUICE VALVE DETAILS FOR RISING MAINS
2 11/'17 JMC TOC Revised & Added Notes MOD
1 08/'16 JMC TOC Revised note 6 (Cl. 808) MOD POLYETHYLENE (P.E.) PIPE (< 200mm DIA.) STD-WW- 17 2
0 09/'15 JMC TOC Initial Issue SL (Sheet 2 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS AND ODOUR
UNIT MAY BE REQUIRED DEPENDING ON LOCATION.
3. ISOLATING VALVE TO BE IN ACCORDANCE WITH IS EN 1074-2.
4. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU
CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT
TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.
5. DOUBLE AIR VALVE CHAMBER SHALL BE COVERED WITH APPROVED HEAVY DUTY VENTILATED METAL COVER TO IS EN 124 RATING D400.
COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.
7. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS,
DEAD ENDS AND PIPES AT STEEP SLOPES.
8. PRE-CAST UNITS MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.
9. ANTI CORROSION TAPE TO BE PROVIDED AROUND ALL BURIED FLANGES.
10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
11. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
12. ALL PE PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 12201: 2011.
13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI
FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
14. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.
15. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
16. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM
& SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

225 MIN.
HEAVY DUTY COVER AND
FRAME SHALL COMPLY WITH IS COVERS TO BE
CONCRETE ROOF SLAB EN 124 AND BS 7903, CLASS SET IN C50\60
C30/37 REINFORCED SLAB D400 (TO SUIT 900 SQ. OPE) MORTAR SEE NOTES 14, 15 & 16.

FINISHED GROUND LEVEL

1 No. COURSE MIN.


3 No. COURSES MAX.
OF CLASS B ENGINEERING BRICKS
225

SET IN C50/60 MORTAR


900 SQ.
CONCRETE GRADE C30/37 IN
300 ROOF, WALLS AND BASE
AIR MIN. 400 LONG BODY
LONG BODY
400 VALVE FLEXIBLE JOINT
FLEXIBLE JOINT

FLOW FLOW
MIN.
300

ROCKER PIPE
ROCKER PIPE
300

D.I. FLANGED PLAIN ENDED PIPE


D.I. FLANGED WITH THRUST FLANGE
PLAIN ENDED PIPE (CUT TO SUIT)
WITH THRUST FLANGE
(CUT TO SUIT) 250 1500 250 DISMANTLING JOINT

D.I. TEE WITH 75mm CONCRETE


80mm FLANGE BRANCH BLINDING C12 / 15
CONCRETE CAST ISOLATING VALVE
IN-SITU CRADLE
SECTION
2000

CAST-IN RECESSED LIFTING EYES

400

HEAVY DUTY COVER AND FRAME,


CLASS D400 (TO SUIT 900 SQ. OPE)
PE DI
2000

1 No. COURSE MIN.


3 No. COURSES MAX.
OF CLASS B ENGINEERING BRICKS
SET IN C50/60 MORTAR
PE TO DI DETAIL
CONCRETE ROOF SLAB
C30/37 REINFORCED SLAB

ROOF PLAN
2000

250 1500 250


250

300
400 MIN. 400
1500
2000

FLOW FLOW
MIN.
300

THRUST FLANGE
250

WATER TIGHT SEAL

SUMP 400mm x 400mm DUCT TO VENT


STACK IN SENSITIVE AREAS
x 200mm DEEP FLOOR PLAN SEE DRAWING STD-WW-34

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
AIR VALVE CHAMBER
2 11/'17 JMC TOC Revised & added notes MOD
1 08/'16 JMC TOC Revised note 5 & cover notes MOD (FOUL RISING MAIN < 200mm DIA.) STD-WW- 18 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THE


TRENCH WIDTH TO BE MIN. 500mm
AND DEPENDENT ON
DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
DUCT NUMBERS
3. DUCT ARRANGEMENT MAY VARY DEPENDING ON REQUIREMENTS.
GROUND SURFACE
4. CABLE DUCTS TO BE IN ACCORDANCE WITH BS 4460 AND BS EN 1401. DUCTS FOR ESB
USE TO BE IN ACCORDANCE WITH ESB SPECIFICATION.
600 mm MIN.

TO DUCTS
COVER

REFER TO DRG. No.


STD-WW-07 FOR APPROVED MARKER TAPES 5. PROPRIETARY DUCT CHAMBER MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.
BACKFILL DETAILS

200
75
6. LONG RADIUS BENDS MAY BE USED FOR CHANGES IN DIRECTION OF UP TO 45°
DUCT CHAMBERS SHALL BE PROVIDED FOR ALL BENDS GREATER THAN 45°.

75
CABLE DUCTS
7. DUCT CHAMBERS TO BE LOCATED AT 50m INTERVALS MAXIMUM.

200
APPROVED SAND
8. APPROPRIATE MARKER TAPE SHALL BE LAID 200mm ABOVE THE EXTERNAL CROWN
OF THE DUCT AND SHOULD INCORPORATE REINFORCED TRACING WIRE.
TRACING WIRES SHALL BE CONNECTED ACROSS CHAMBERS.
ELECTRICAL MARKER TAPE TO BE USED IN ACCORDANCE WITH ESB SPECIFICATION.

9. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED


SECTION C - C ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.

10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

11. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS/ROPES, TO ALLOW THE PULL THROUGH
OF CABLES.

12. CABLE DUCT INTERFACE WITH CHAMBER WALL TO BE SEALED TO PREVENT INGRESS OF
GROUNDWATER TO CHAMBER.

C C
CABLE DUCT

75mm DIA. PVC DRAIN


TO NEAREST SURFACE
WATER OUTLET FITTED
WITH NON-RETURN VALVE
225

1350
900

A A

CABLE DUCT CABLE DUCT


225

225 900 225

1350

PLAN

COVER TO BE SET COVER TO BE SET


IN C50\60 MORTAR IN C50\60 MORTAR

COVER & FRAME COVER & FRAME


(CLASS D400), IN ACCORDANCE WITH (CLASS D400), IN ACCORDANCE WITH
IS EN124 AND BS7903 IS EN124 AND BS7903

GROUND SURFACE GROUND SURFACE


MINIMUM 600mm

CONCRETE GRADE CONCRETE GRADE


75 C 30/37 75 C 30/37

CABLE DUCTS CABLE DUCTS


75

75
150

150
225

75mm BLINDING 75mm BLINDING


GRADE C12/15 CONCRETE GRADE C12/15 CONCRETE

225 900 225 225 900 225

1350 1350

SECTION A - A SECTION B - B

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

2 11/'17 JMC TOC Revised notes MOD


1 08/'16 JMC TOC Revised notes to cover MOD DUCT CHAMBER STD-WW- 19 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE.

2. STRUCTURAL DESIGN & REINFORCEMENT DETAILS TO BE PROVIDED


BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

3. FULL FINAL DETAIL MUST BE REVIEWED BY IRISH WATER AND RELEVANT


REGULATORY AUTHORITIES.

4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

5. BACKFILL AND REINSTATEMENT OF THE RIVER BED AND BANK


TO BE SUBJECT TO AGREEMENT WITH RELEVANT AUTHORITY &
IRISH WATER.

225
HANDRAILING MAY BE REQUIRED TO
DESIGNERS RISK ASSESSMENT
DEVELOPMENT

PUDDLE FLANGE
TO MATCH

SIDE WALL SLOPES TO MATCH


FLEXIBLE COUPLINGS EXISTING EMBANKMENT

DUCK BILL
CHECK VALVE
150

SLOPE 1:50 WATER LEVEL


225

SIZE AS SPECIFIED IN CONTRACT ORIGINAL BED LEVEL

225
ROCKER PIPE
75 BLINDING C12/15

300
CONCRETE GRADE C 30/37
1000

SECTION

BANK EXISTING EMBANKMENT


2
1

225

PUDDLE FLANGE

FLEXIBLE COUPLINGS
PIPE DIA.
+ 450

ROCKER PIPE
225

1
2

1000

PLAN
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

1 11/'17 JMC TOC Notes revised MOD EMERGENCY OVERFLOW STRUCTURE STD-WW- 20 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

3. TWO FLEXIBLE JOINTS SHALL BE PROVIDED WITHIN A DISTANCE OF 1000mm OR 2x


DIAMETER OF PIPE (WHICHEVER IS THE GREATER) FROM BOTH ENDS OF CONCRETE
SURROUND.

4. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.

5. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

6. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THE BANK EDGE TO ALLOW
FOR FUTURE ACCESS.

7. BACKFILL AND REINSTATEMENT OF THE RIVER BED AND BANK TO BE SUBJECT TO


AGREEMENT WITH RELEVANT AUTHORITY & IRISH WATER.

8. PIPE BETWEEN MANHOLES AT DITCH / STREAM CROSSING TO BE DUCTILE IRON.

5000mm 5000mm
BANK EDGE

BANK EDGE
500mm MIN. OR TO REQUIREMENTS OF
RELEVANT AUTHORITY
BED OF STREAM

M.H. M.H.

FLEXIBLE JOINT

DUCTILE IRON GRAVITY SEWER

FULL CONCRETE
SEE DRAWING SURROUND 2x DIAMETER SEE DRAWING
STD-WW-10 AND GRADE C25/30 OR 1000mm MAX. STD-WW-10 AND
STD-WW-11 FOR DETAILS SEE STD-WW-11
FOR MANHOLE DRAWING STD-WW-08 FOR MANHOLE
DETAILS DETAILS

SECTION
5000mm
O.D. + 300mm

M.H. M.H.

FULL CONCRETE SURROUND GRADE C 25/30.

PLAN

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
TYPICAL DITCH / STREAM CROSSING
1 11/'17 JMC TOC Updated pipe depth dimension MOD FOR GRAVITY MAIN STD-WW- 21 1
0 09/'15 JMC TOC Initial Issue SL (Sheet 1 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

3. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THE


LONGITUDINAL SECTION DRAWING.

4. PIPEWORK THROUGH CROSSING TO BE POLYETHYLENE & JOINED


USING BUTT FUSION WELDING.

5. POLYETHYLENE PIPES SHALL BE WRAPPED IN PLASTIC SHEETING


HAVING A COMPOSITION IN ACCORDANCE WITH BS 6076 BEFORE BEING
CAST INTO CONCRETE.

6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,


BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.

7. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCE


WITH IS EN 598.

8. ALL PE PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITH


IS EN 12201 : 2011.

9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

10. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THE


BANK EDGE TO ALLOW FOR FUTURE ACCESS. MANHOLE LOCATIONS
MUST BE REVIEWED BY IRISH WATER & READILY ACCESSIBLE BY ALL
OPERATION & MAINTENANCE EQUIPMENT, INCLUDING A VACUUM
TANKER.

11. PIPEWORK OF RISING MAIN CAN BE EITHER DUCTILE IRON OR


POLYETHYLENE. PIPEWORK AT CROSSING TO BE PE IN BOTH CASES.
FOR AIR VALVE / CHAMBER
DETAILS REFER TO STD-WW-18 12. BACKFILL AND REINSTATEMENT OF RIVER BED AND BANK TO BE
AIR VALVE TO BE LOCATED SUBJECT TO AGREEMENT WITH RELEVANT REGULATORY AUTHORITIES
BOTH SIDES OF CROSSING & IRISH WATER.
BANK EDGE

500mm MIN. OR TO REQUIREMENTS OF


FOR SCOUR VALVE / CHAMBER

BANK EDGE
DETAILS REFER TO STD-WW-15

RELEVANT AUTHORITY
5000mm 5000mm

BED OF STREAM

REFER TO NOTE 3
FOR BENDS FUSION FUSION FLEXIBLE
WELD WELD COUPLING
FOR THRUST BLOCK DETAILS
REFER TO STD-WW-14

DI / PE PIPE
SEE NOTE 11
O.D. + 300mm

POLYETHYLENE
300 300 PIPEWORK 300 300 DI / PE PIPE
SEE NOTE 11
STUB FLANGE WITH CONCRETE SURROUND GRADE C 25/30. STUB FLANGE WITH
BACKING RING FOR FOR DETAILS SEE DRAWING STD-WW-08 BACKING RING FOR
DI/PE CONNECTION DI/PE CONNECTION
SECTION

FOR AIR VALVE / CHAMBER


DETAILS REFER TO STD-WW-18
AIR VALVE TO BE LOCATED
BOTH SIDES OF CROSSING
O.D. + 300mm

FOR SCOUR VALVE /


POLYETHYLENE PIPEWORK CHAMBER DETAILS
300 300
CONCRETE SURROUND GRADE C 25/30. REFER TO STD-WW-15
FOR THRUST BLOCK DETAILS
FOR DETAILS SEE DRAWING STD-WW-08
REFER TO STD-WW-14

SCOUR CHAMBER

PLAN

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
TYPICAL DITCH / STREAM CROSSING
Updated pipe depth dimension &
1 11/'17 JMC TOC note 10 revised MOD FOR RISING MAIN STD-WW- 22 1
0 09/'15 JMC TOC Initial Issue SL (Sheet 2 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
BRIDGE PARAPET 1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
TAPPING WITH TRANSITION
32mm O.D. 150 150 2. AT BRIDGE CROSSING DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE
90° ELBOW (MALE)
P.E. PIPE WITH IS EN 598.

3. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

4. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THE LONGITUDINAL SECTION


DRAWING.

150
5. THE DEVELOPER IS TO SEEK ADVICE FROM IRISH WATER AS TO WHETHER A DUPLICATE
RISING MAIN IS TO BE PROVIDED THROUGH THE BRIDGE CROSSING.
IF NECESSARY THE DEVELOPER WILL SUBMIT A DESIGN TO IRISH WATER FOR REVIEW.
SOCKET OUTLINE DUCTILE IRON
RISING MAIN 6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,
BENDS, TAPERS, DEAD ENDS AND PIPES ATE STEEP SLOPES.

7. THE QUALITY OF THE KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:

150
A) A THERMAL TRANSMITTANCE OF 1.5W PER m² K.
B) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION) EQUIVALENT TO
CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING
30 MINUTES.

8. KIOSK (MIN. 600 HIGH x 450 WIDE x 300mm DEEP) TO BE CONSTRUCTED FROM THERMOSETTING U.V. &
WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED STEEL (MIN. 4mm
THICKNESS) TO BS EN 1461. STAINLESS STEEL OR NON-METALLIC MATERIALS, SUCH AS GLASS
REINFORCED PLASTIC (GRP), MAY BE USED AS AN ALTERNATIVE KIOSK MATERIAL, PARTICULARLY IN
SEVERE ENVIRONMENTS, SUBJECT TO AGREEMENT WITH IRISH WATER. COLOUR TO BE HOLLY
GREEN BS 4800 14 C 39, TO HAVE HINGED, LOCKABLE ACCESS DOOR (HINGES AND LOCKS TO BE
STAINLESS STEEL).

9. THE KIOSK SHALL BE LOCATED OFF THE FOOTPATH SO AS NOT TO IMPEDE PEDESTRIANS
AND POSITIONED SO AS TO FACILITATE SAFE ACCESS FOR MAINTENANCE PERSONNEL.
SECTION A - A 10. KIOSK TO BE FITTED WITH A VENT STACK TO MANUFACTURERS DETAIL IN SENSITIVE AREAS.
(AIR VALVE CONNECTION) 11. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

12. IN INSENSITIVE AREAS A VENT STACK IS NOT REQUIRED. LOUVRE VENT TO BE PROVIDED IN KIOSK.
KIOSK
(SEE NOTES 7, 8 & 9)
13. DETAIL FOR RISING MAIN FOR PE PIPEWORK TO BE AS PER THIS DETAIL. BRIDGE CROSSING
PIPEWORK TO BE DUCTILE IRON IN BOTH CASES.
AIR VALVE
14. THE LOCATION OF THE SCOUR CHAMBER MUST BE REVIEWED BY IRISH WATER & READILY
ACCESSIBLE BY ALL OPERATION & MAINTENANCE EQUIPMENT, INCLUDING A VACUUM TANKER.
EXPOSED PIPEWORK DUCTILE IRON
TO BE INSULATED PIPEWORK
32mm DIA. P.E. PIPE
USING PIPE LAGGING
ROAD LEVEL

CONCRETE SURROUND
TAPPING POINT TO GRADE C 25/30.
BE LOCATED AT SEE DRAWING STD-WW-10
HIGH POINT
FLEXIBLE JOINT

POLYETHYLENE
OR DUCTILE IRON FLEXIBLE POLYETHYLENE
FOR SCOUR VALVE / PIPEWORK JOINT OR DUCTILE IRON
CHAMBER DETAILS PIPEWORK
REFER TO STD-WW-15

SECTION

A
POLYETHYLENE POLYETHYLENE
OR DUCTILE IRON OR DUCTILE IRON
PIPEWORK PIPEWORK

FOR SCOUR VALVE /


CHAMBER DETAILS AIR VALVE
REFER TO STD-WW-15

POLYETHYLENE
SERVICE PIPE BRIDGE PARAPET
CONCRETE PLINTH
(150 HIGH x 600 LONG
KIOSK
(600 HIGH x 450 WIDE
A (32mm DIA. P.E.)
x 450 WIDE) x 300 DEEP)

PLAN
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
TYPICAL
1 11/'17 JMC TOC Notes 5 & 14 revised MOD BRIDGE CROSSING FOR RISING MAIN STD-WW- 23 1
0 09/'15 JMC TOC Initial Issue SL (Sheet 1 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

3. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THE


LONGITUDINAL SECTION DRAWING.

4. PIPEWORK THROUGH CROSSING TO BE POLYETHYLENE & JOINED


USING BUTT FUSION WELDING.

5. POLYETHYLENE PIPES SHALL BE WRAPPED IN PLASTIC SHEETING


HAVING A COMPOSITION IN ACCORDANCE WITH BS 6076 BEFORE BEING
CAST INTO CONCRETE.

6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,


BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.

7. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCE


WITH IS EN 598.

8. ALL PE PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITH


IS EN 12201 : 2011.

9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

10. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THE


BANK EDGE TO ALLOW FOR FUTURE ACCESS.

11. BACKFILL AND REINSTATEMENT REQUIREMENTS OF THE RIVER BED


AND BANK IS SUBJECT TO AGREEMENT WITH RELEVANT REGULATORY
AUTHORITIES & IRISH WATER.

12. THE DEVELOPER IS TO SEEK ADVICE FROM IRISH WATER AS TO


WHETHER A DUPLICATE RISING MAIN IS TO BE PROVIDED THROUGH
THE BRIDGE CROSSING. IF NECESSARY THE DEVELOPER WILL SUBMIT
A DESIGN TO IRISH WATER FOR REVIEW.

500mm MIN. OR TO REQUIREMENTS OF


13. PIPEWORK OF RISING MAIN CAN BE EITHER DUCTILE IRON OR
POLYETHYLENE. PIPE AT CROSSING POINT TO BE PE IN BOTH CASES

RELEVANT AUTHORITY
FOR AIR VALVE / CHAMBER
DETAILS REFER TO STD-WW-18 14.THE LOCATION OF THE SCOUR CHAMBER MUST BE REVIEWED BY IRISH
AIR VALVE TO BE LOCATED WATER & READILY ACCESSIBLE BY ALL OPERATION & MAINTENANCE
BOTH SIDES OF CROSSING EQUIPMENT, INCLUDING A VACUUM TANKER.
BANK EDGE

BANK EDGE
FOR SCOUR VALVE / CHAMBER
DETAILS REFER TO STD-WW-15
5000mm
5000mm
O.D. COLLAR + 300mm

BED OF
STREAM
REFER TO NOTE 3
FOR BENDS
FLEXIBLE
FOR THRUST BLOCK JOINT
DETAILS REFER
TO STD-WW-14
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
300 300 POLYETHYLENE 300 300
PIPEWORK
POLYETHYLENE
FOR AIR VALVE / CHAMBER STUB FLANGE WITH FUSION FUSION STUB FLANGE WITH
CONCRETE SURROUND WELD OR DUCTILE IRON
DETAILS REFER TO STD-WW-18 BACKING RING WELD BACKING RING
GRADE C 25/30. FOR DETAILS PIPEWORK
AIR VALVE TO BE LOCATED
BOTH SIDES OF CROSSING SEE DRAWING STD-WW-08

SECTION

ROAD

BRIDGE PARAPET

POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
O.D. COLLAR + 300mm

300 300 FOR SCOUR VALVE /


CHAMBER DETAILS
POLYETHYLENE REFER TO STD-WW-15
OR DUCTILE IRON
PIPEWORK

PLAN
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
TYPICAL
Updated pipe depth dimension &
1 11/'17 JMC TOC revised notes MOD BRIDGE CROSSING FOR RISING MAIN STD-WW- 24 1
0 09/'15 JMC TOC Initial Issue SL (Sheet 2 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.


FENCE PILLAR SPACING AS PER
MANUFACTURERS SPECIFICATION 2. SECURITY FENCING SHALL COMPRISE 2.4m HIGH, CORROSION RESISTANT MILD STEEL
FENCING, GALVANISED AND PLASTIC COATED FINISHED, WITH SIMILAR TYPE ACCESS
GATES.
PVC INSERT CAP ANTI-CLIMB FEATURES
3. THE ACCESS GATES SHALL BE OF SUFFICIENT WIDTH TO ACCOMMODATE MAINTENANCE
VEHICLES, TANKERS, ETC. THE SECURITY GATES SHALL BE PROVIDED WITH SLIDE BOLTS,
SHOOTING BOLTS AND PADLOCKS. IF OPENING OUTWARDS, THE ACCESS GATES SHALL BE
SET BACK FROM PARKING AND ACCESS AREAS BY THE WIDTH OF THE LEAF OF THE GATE.
FENCE PILLARS
4. BOLTS - UNLESS TAMPER RESISTANT FIXINGS ARE USED, ALL BOLTS TO THE ACCESS
GATES & FENCING SHALL BE BURRED OVER.

5. GATE HINGES SHALL BE DESIGNED SO THAT IT IS IMPOSSIBLE TO REMOVE THE GATE BY


LIFTING WHEN IT IS IN A CLOSED & LOCKED POSITION. DROP BOLTS SHALL BE FITTED TO

2400
V-BEAM
REINFORCING PROFILE EACH GATE LEAF IN SUCH A WAY THAT THEY CANNOT BE REMOVED BUT ALLOW THE GATE
TO BE SECURED IN BOTH THE OPEN & CLOSED POSITION.

6. THE SECURITY RATING SHALL BE EITHER BASIC +, ENHANCED OR ENHANCED +. THE FENCE
STANDARD WILL BE BASED ON THE SECURITY RATING OF THE SITE & IS TO BE AGREED
WITH IRISH WATER.

7. CORNER BRACING AND POST DETAIL TO MANUFACTURER'S SPECIFICATION.

125mm WIDE x 150mm DEEP 8. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.


FOUNDATION DETAIL FOUNDATION DETAIL
TO MANUFACTURERS CONCRETE SILL UNDER TO MANUFACTURERS
FENCE TO IRISH WATER'S 9. ALL FENCE MATERIALS AND WORKMANSHIP TO BE IN ACCORDANCE WITH IS EN 1722-14 :
SPECIFICATION SPECIFICATION 2006.
REQUIREMENTS (ENHANCED
+ SECURITY RATING ONLY)
10. DIMENSIONS OF GATE PILLARS, GATE FRAME, FENCE PILLARS, FENCE RUNNERS,
GRADE C30/37 DIAGONALS, ETC. TO BE TO MANUFACTURER'S SPECIFICATION.
CONCRETE IN BASE 75 CONCRETE
BLINDING, GRADE C12/15 11. FENCE/GATE DESIGN AND DETAILS TO BE PROVIDED TO IRISH WATER FOR REVIEW/
VETTING BEFORE MANUFACTURE.
PANEL - ELEVATION
12. PEDESTRIAN GATE SHALL BE PROVIDED IF DEEMED NECESSARY BY IRISH WATER.

13. COLOUR TO BE HOLLY GREEN 14 C 39 IN ACCORDANCE WITH BS 4800:2011.


SECURITY MESH SPACING ADDITIONAL 14. A 125mm WIDE x 150mm DEEP CONCRETE SILL GRADE C20/25 CONCRETE SHALL BE
BAR THICKNESS HEIGHT
RATING AxB FEATURES PROVIDED TO IRISH WATER'S REQUIREMENTS (ENHANCED + SECURITY RATING ONLY).

BASIC + 150 x 50 Type: 868 5mm 2.4m ANTI-CLIMB

ENHANCED 150 x 50 Type: 868 5mm 2.4m ANTI-CLIMB

ANTI-CLIMB &
ENHANCED + 50 x 50 Type: 868 4mm 2.4m
ANTI-BURROW

B
A

4000 mm MINIMUM

METAL PILLARS
RHS FRAME

LOCKABLE
SLIPBOLT
2400

RSA
SLAMPLATE

FIN. GROUND LEVEL

DROPBOLTS

GRADE C30/37
CONCRETE IN BASE
FOUNDATION DETAIL FOUNDATION DETAIL
TO MANUFACTURERS TO MANUFACTURERS 75mm CONCRETE
SPECIFICATION SPECIFICATION BLINDING, GRADE C12/15

GATES & PIERS - ELEVATION


METAL PILLARS
OUTSIDE

GATES & PIERS - PLAN

ENTRANCE GATE DETAILS

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

2 11/'17 JMC TOC Fencing table updated MOD


1 08/'16 JMC TOC Revised notes & table MOD SECURITY GATE AND FENCING STD-WW- 25 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. TYPE 1 PUMPING STATIONS TO BE LOCATED NO CLOSER THAN
APPROX. 12000mm 5.0 METRES TO A PROPERTY BOUNDARY.
3. TYPE 2 PUMPING STATIONS TO BE LOCATED NO CLOSER THAN
10.0 METRES TO A PROPERTY BOUNDARY.
EMERGENCY 4. TYPE 3 PUMPING STATIONS TO BE LOCATED NO CLOSER THAN
PERMEABLE AREA WITH OVERFLOW 15.0 METRES TO A PROPERTY BOUNDARY.
APPROPRIATE WEED BARRIER PIPE 1:50 FALL 5. THERE SHALL BE A CLEAR OPENING IN FRONT OF THE GATES TO
REFER TO STD-WW-32 (IF APPROVED) TO SUMP ENSURE ADEQUATE ACCESS.
WET 6. THIS DETAIL IS INDICATIVE ONLY AND THE DEVELOPER SHALL SUBMIT A SITE
2.4m HIGH PLASTIC COATED
KIOSK SPECIFIC LAYOUT TO IRISH WATER FOR REVIEW.
WELDED MESH FENCE
7. KIOSKS TO STD-WW-30 AND STD-WW-31.
8. FENCE AND GATE TO STD-WW-25.
9. REFER TO STD-WW-32 FOR PERMEABLE, IMPERMEABLE ROADWAY AND
HARDSTANDING AREA DETAIL.
10. INDICATIVE LAYOUT RELATES TO SMALL PUMPING STATIONS AS PER
HARD STANDING EMERGENCY TYPE 1, TYPE 2 & TYPE 3 IN THE IRISH WATER CODE OF PRACTICE FOR
AREA OVERFLOW WASTEWATER INFRASTRUCTURE.
OR BALANCE WET VALVE 11. LAMP STANDARD & LAMP BOLLARD LOCATIONS TO BE SITE SPECIFIC & TO
STORAGE WELL CHAMBER IRISH WATER AGREEMENT. REFER TO STD-WW-33 FOR DETAILS.

APPROX. 8000mm
CONTROL
KIOSK GATES TO
OPEN INWARDS
2.4m HIGH PLASTIC COATED
WELDED MESH FENCE
INLET METER
IW-CDS-5030-01 Rev. 03 December 2017

PEDESTRIAN MANHOLE CHAMBER


ACCESS GATE
(IF DEEMED NECESSARY)

PRECAST KERB

4000
SEWER
RISING MAIN
TANKER IMPERMEABLE
HARD STANDING

POWER
FOOTPATH

WATER
GRASS VERGE

SEWER RISING MAIN


MANHOLE

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

INDICATIVE PUMPING STATION SITE LAYOUT STD-WW- 26 0


0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH
WATER FOR REVIEW. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A
REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm.
ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER APPROVAL, & COMPLIANCE
WITH BS 5911, Part 4.
3. METER CHAMBER SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVER TO IS EN 124 RATING D400. COVERS
AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
4. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.
5. PRECAST UNITS COMPLETED WITH RUBBER SEALING GASKET BETWEEN UNITS, COMPLYING WITH THE REQUIREMENTS OF IS EN 1917 AND BS
5911-PART 3, COMPLETE WITH 150mm CONCRETE SURROUND MAY BE USED AS AN ACCEPTABLE ALTERNATIVE. CONCRETE SURROUND TO BE
GRADE C16/20 IN ACCORDANCE WITH IS EN 206.
6. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598. PE PIPES AND FITTINGS TO BE IN
ACCORDANCE WITH IS EN 12201:2011.
7. ANTI CORROSION TAPE TO BE PROVIDED AROUND ALL BURIED FLANGES.
8. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE.
SHOULD ANTI FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
9. FLOW METERS REQUIRE A MINIMUM LENGTH OF PIPE ON EACH SIDE OF THE VALVE TO BE COMPLETELY FREE OF
FITTINGS, VALVES, REDUCER ETC. AS PER THE MANUFACTURERS INSTRUCTIONS.
10. ALL CONCRETE TO BE IN ACCORDANCEWITH IS EN 206.
11. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.
12. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
13. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT.
OF TRANSPORT, TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

HEAVY DUTY COVER AND FRAME,


CLASS D400 TO IS EN 124 (TO
COVERS TO BE SET
SUIT 900 SQ. OPE)
CONCRETE ROOF SLAB IN C50\60 MORTAR
C30/37 REINFORCED
SLAB

675 (MAX.)
SEE NOTES 11, 12 & 13.
FINISHED GROUND LEVEL
FOR MIN. DEPTH OF COVER

MANHOLE STEPS TO 1 No. MIN. / 3 No. COURSES MAX.OF CLASS


REFER TO NOTE 2 ON

COMPLY WITH IS EN 13101, B ENGINEERING BRICKWORK SET IN


225

TYPE D, CLASS 1, C50/60 MORTAR


STD-WW-07

GALVANISED MILD STEEL & CABLE DUCTS TO BE INSTALLED WITH DRAW


PLASTIC ENCAPSULATED. CORDS. SEE DRAWING STD-WW-30/31
900 SQ.
LONG BODY 400 LONG BODY
FLEXIBLE JOINT 300 FLEXIBLE JOINT
MIN.
FLOW FLOW
M
MIN.
300

ROCKER PIPE
ROCKER PIPE
D.I. FLANGED PLAIN
300

ENDED PIPE WITH THRUST


D.I. FLANGED FLANGE (CUT TO SUIT) 400
PLAIN ENDED PIPE
WITH THRUST FLANGE 250 1500 250 WATER TIGHT SEAL
(CUT TO SUIT)
PE DI
CONCRETE CAST DISMANTLING JOINT
75mm CONCRETE
IN-SITU CRADLE
BLINDING C12/15

SECTION

2000
PE TO DI DETAIL

CAST-IN RECESSED LIFTING EYES

HEAVY DUTY COVER AND FRAME,


CLASS D400 TO IS EN 124 (TO
SUIT 900 SQ. OPE)
2000

1 No. MIN.
3 No. COURSES MAX.OF CLASS B
ENGINEERING BRICKWORK
SET IN C50/60 MORTAR
CONCRETE ROOF SLAB
C30 / 37 REINFORCED CONCRETE SLAB

ROOF PLAN
2000

SUMP 400mm x 400mm 250 1500 250


x 200mm DEEP 100mm DIA. uPVC DRAIN
FROM FLOW METER CHAMBER TO VALVE CHAMBER.

CABLE DUCTS TO BE INSTALLED WITH DRAW CORDS


250

SEE DRAWING STD-WW-30/31


2000

400
1500

300 400
MIN. WATER TIGHT SEAL

FLOW FLOW
M
MIN.
300

THRUST FLANGE
250

C30/37 CONCRETE TO
FLOOR PLAN WALLS AND BASE

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
2 11/'17 JMC TOC Revised & added notes MOD

1 08/'16 JMC TOC Added steps, revised cover MOD


FLOW METER CHAMBER
notes & note 3
STD-WW- 27 2
0 09/'15 JMC TOC Initial Issue SL (FOUL RISING MAIN <200mm DIA.)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. PUMPS SHALL BE INSTALLED TO IRISH WATER REQUIREMENTS. REFER
100mm SURFACE BOX TO PART 5 OF THE CODE OF PRACTICE FOR WASTEWATER
INFRASTRUCTURE .
LIFTING DAVIT & SOCKET
3. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE
WITH IS EN 598.
4. PRE-CAST CONCRETE CHAMBERS MAY BE USED SUBJECT TO REVIEW
BY IRISH WATER. REFER TO DRG. No. WW-28A FOR DETAILS.
5. ALL GATE VALVES TO BE CLOCKWISE CLOSING.
6. WET WELL TO BE IN ACCORDANCE WITH BS EN 1992-3.
7. COVERS TO BE SIZED TO ALLOW ADEQUATE SPACE FOR PUMP REMOVAL
MINIMUM 1400 x 800mm.
8. CHAMBER ACCESS COVERS WITH A CLEAR OPENING EXCEEDING 1m
SHALL CONFORM TO BS 9124.
9. WALL THICKNESS AND REINFORCEMENT SHALL BE SELECTED BASED ON
SITE SPECIFIC DESIGN AND SHALL BE SUBJECT TO REVIEW BY IRISH
WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS &
DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU
CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm.
ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT
TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4

A A 10. THE PUMPING STATION SHOULD NOT BE LOCATED IN AREAS THAT ARE
SUSCEPTIBLE TO FLOODING AT MORE THAN A 1:30 YEAR RECURRENCE.
THE PUMPING STATION FACILITY SHALL BE DESIGNED FOR INUNDATION.
THE FINISHED SLAB LEVEL SHALL BE POSITIONED ABOVE THE 1:100 YEAR
FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER
RESISTANT AND POSITIONED ABOVE 1:200 YEAR FLOOD LEVEL.
11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED

ROOF PLAN ASSIST LIFT ACCESS COVER


WITH SAFETY GRID
ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH
WATER.
AND INCORPORATED
12. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
HAND RAILS
13. THIS DRAWING IS INDICATIVE ONLY AND THE DEVELOPER SHALL SUBMIT
APPROPRIATE DAVIT A SITE SPECIFIC LAYOUT TO IRISH WATER FOR REVIEW.
FOR PUMP REMOVAL 14. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS.
(SUBJECT TO REVIEW 15. A 24 HOUR STORAGE CAPACITY BASED ON DRY WEATHER FLOW, SHALL
BY IRISH WATER) BE PROVIDED AT THE PUMPING STATION.
16. EMERGENCY OVERFLOW MAY BE PROVIDED SUBJECT TO APPROVAL
FROM THE RELEVANT REGULATORY AUTHORITIES.
17. SURGE EQUIPMENT TO BE PROVIDED IF DEEMED NECESSARY.
18. INDICATIVE LAYOUT RELATES TO SMALL PUMPING STATIONS AS PER
TYPE 1, TYPE 2 & TYPE 3 IN THE IRISH WATER CODE OF PRACTICE FOR
ULTRA SONIC SENSOR WASTEWATER INFRASTRUCTURE.

SEALED DUCTS

BAUER FITTING ON
GATE VALVE ON TEE EMERGENCY OVERFLOW (IF
3No.150 DIA. APPROVED) AND/OR 24 HOUR
TO ALLOW EMPTYING CABLE OPESØ100 PIPE FROM
OF THE RISING MAIN STORAGE TO BE PROVIDED
WASH DOWN
LOW LEVEL MECHANICAL
VENT OVERFLOW
HIGH SCREEN
LEVEL
100mm DIA. uPVC DRAIN VENT
FROM FLOW METER
CHAMBER TO VALVE MINIMUM 225mm DIA. EMERGENCY OVERFLOW PIPE
CHAMBER. OR SIZE TO MATCH CAPACITY OF INCOMING SEWER
IF ALLOWED.
FLAP VALVE
CONC. THRUST BLOCK VALVE CHAMBER
TO BEND (REFER TO DRAIN 80mm DIA
DRG. No. STD-WW-14 DUCTILE IRON
FOR DETAILS)
INCOMING FOUL SEWER (I.L. TO BE LOCATED
100mm ABOVE THE CUT-IN LEVEL OF THE PUMPS).
MAX.

GRADE C30/37
CONCRETE TO WALLS,
BASE AND ROOF

75mm BLINDING
GRADE C12/15
SECTION A-A
RISING MAIN

INCOMING FOUL VENT


SEWER PIPES
1000

Ø100 PIPE FROM


PROPOSED INLET WASH DOWN
BAFFLE PLATE
3 No. 150 DIA. CABLE OPES
350

( WATER TIGHT SEAL )

BAUER FITTING ON EMERGENCY OVERFLOW (IF


FLAP VALVE 80
mm DIA.
GATE VALVE ON TEE APPROVED) AND/OR 24 HOUR
150 DIA. DUCTILE IRON DRAIN
TO ALLOW EMPTYING STORAGE TO BE PROVIDED
CABLE OPE
2500 MINIMUM

OF THE RISING MAIN


MECHANICAL
OVERFLOW SCREEN
GATE VALVE

A A
CONC. THRUST BLOCK 150 DIA. CABLE OPE
TO BEND (REFER TO
DRG. No. STD-WW-14
FOR DETAILS)
1800 MINIMUM 1800 MINIMUM 1000 MINIMUM
REFER TO DRG. No.
STD-WW-09 FOR NON RETURN
PLAN
DETAILS TO STEP IRONS VALVE MINIMUM 225mm DIA. EMERGENCY OVERFLOW PIPE
OR SIZE TO MATCH CAPACITY OF INCOMING SEWER
IF ALLOWED.

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
2 11/'17 JMC TOC Revised notes 2,4,9 & 11 MOD TITLE DRAWING No. REV
Revised note 4, incoming
sewer note & added thrust MOD
1 08/'16 JMC TOC block & step irons to valve
chamber
INDICATIVE SUBMERSIBLE PUMPING STATION STD-WW- 28 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.


2. PUMPS SHALL BE INSTALLED TO IRISH WATER REQUIREMENTS. REFER TO PART 5 OF THE CODE OF PRACTICE FOR WASTEWATER
INFRASTRUCTURE .
3. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
4. PRE-CAST CONCRETE CHAMBERS MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.
5. ALL GATE VALVES TO BE CLOCKWISE CLOSING.
6. WET WELL TO BE IN ACCORDANCE WITH BS EN 1992-3.
7. COVERS TO BE SIZED TO ALLOW ADEQUATE SPACE FOR PUMP REMOVAL MINIMUM 1400 x 800mm.
8. CHAMBER ACCESS COVERS WITH A CLEAR OPENING EXCEEDING 1m SHALL CONFORM TO BS 9124.
9. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF IS EN 1917 AND BS 5911-PART 3. ROOF SLABS SHALL BE DESIGNED
TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH
A MINIMUM THICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, &
COMPLIANCE WITH BS 5911, Part 4.
10. THE PUMPING STATION SHOULD NOT BE LOCATED IN AREAS THAT ARE SUSCEPTIBLE TO FLOODING AT MORE THAN A 1:30 YEAR
RECURRENCE. THE PUMPING STATION FACILITY SHALL BE DESIGNED FOR INUNDATION. THE FINISHED SLAB LEVEL SHALL BE
POSITIONED ABOVE THE 1:100 YEAR FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND
POSITIONED ABOVE 1:200 YEAR FLOOD LEVEL.
11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD
ANTI-FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
12. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
13. THIS DRAWING IS INDICATIVE ONLY AND THE DEVELOPER SHALL SUBMIT A SITE SPECIFIC LAYOUT TO IRISH WATER FOR REVIEW.
14. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS.
15. A 24 HOUR STORAGE CAPACITY BASED ON DRY WEATHER FLOW, SHALL BE PROVIDED AT THE PUMPING STATION.
16. EMERGENCY OVERFLOW MAY BE PROVIDED SUBJECT TO APPROVAL FROM THE RELEVANT REGULATORY AUTHORITIES.
17. SURGE EQUIPMENT TO BE PROVIDED IF DEEMED NECESSARY.
18. INDICATIVE LAYOUT RELATES TO SMALL PUMPING STATIONS AS PER TYPE 1, TYPE 2 & TYPE 3 IN THE IRISH WATER CODE OF PRACTICE
FOR WASTEWATER INFRASTRUCTURE.

APPROPRIATE LIFTING
DAVIT & SOCKET FOR
PUMP REMOVAL VALVE CHAMBER MAY BE
(SUBJECT TO REVIEW CONSTRUCTED WITH PRE-CAST
BY IRISH WATER) CONCRETE UNITS OF A SIZE TO
LIFT ASSISTED COVER ACCOMMODATE THE FITTINGS
WITH SAFETY GRID & SHOWN (MIN. 1800mmØ).
INCORPORATED
PUMPING STATION VALVE CHAMBER
HANDRAILS
LIFTING LIFT ASSISTED
ULTRA SONIC COVER
DAVIT

150
SENSOR
SEALED DUCTS SOCKET GL

PRECAST CONCRETE MALE BAUER FITTING ON


MANHOLE RINGS TO IS GATE VALVE ON TEE TO
2 No.150 Ø SPIGOT ALLOW EMPTYING OF
420 IN CONJUNCTION PIPE
CABLE OPES THE RISING MAIN
WITH IS EN 1917 : 2004
Ø100 PIPE FROM CORBEL
WASH DOWN
WATER RESISTANT LOW
JOINTS TO IS EN 1992 HIGH LEVEL
LEVEL VENT
VENT 100mm DIA. uPVC DRAIN
FROM FLOW METER
6000mm MAX.

FLEXIBLE
CHAMBER TO VALVE
COUPLINGS
CHAMBER.
FLAP VALVE ON VALVE CHAMBER GRADE C30/37 CONC. THRUST BLOCK
DRAIN 80mmØ DUCTILE IRON TO CONCRETETO IS 206 TOTO BEND (REFER TO
DISCHARGE ABOVE PUMP CUT-IN WALLS, BASE AND ROOFDRG. No. STD-WW-14
INCOMING FOUL SEWER LEVEL (AS PER PUMP SUPPLIER'S FOR DETAILS)
(I.L. TO BE LOCATED RECOMMENDATIONS)
ABOVE THE CUT-IN LEVEL 100mm
OF THE PUMPS). MAX. BOTTOM PRECAST SECTION TO BE
BUILT INTO BASE CONCRETE
MIN. 150mm GRADE MINIMUM 75mm
C20/25 IN-SITU FIRST RING BUILT INTO
CONCRETE IN-SITU CONCRETE BASE
SURROUND
REINFORCED CONCRETE
CONSTRUCTION BASE GRADE C30/37
300

JOINT
RISING MAIN
75mm GRADE C12/15 1800 (MIN.)
BLINDING CONCRETE TO SUIT PUMP INSTALLATION
1000

BENCHING 45°
MIN. SLOPE
SECTION A-A
VENTS FLANGE
350

FLAP VALVE TO VALVE ADAPTOR


START OF CHAMBER DRAIN
100mmØ PIPE BENCHING 80mmØ DUCTILE IRON
FROM WASHDOWN
AREA

BAUER FITTING ON
PROPOSED INLET 150 DIA. 150 DIA. GATE VALVE ON TEE
BAFFLE PLATE CABLE OPE CABLE OPE TO ALLOW EMPTYING
2500 MINIMUM

OF THE RISING MAIN

GATE VALVE

A INCOMING A
FOUL SEWER 150 DIA.
CABLE OPE
MIN. 150mm GRADE CONC. THRUST BLOCK
C20/25 IN-SITU CONCRETE TO BEND (REFER TO
SURROUND DRG. No. STD-WW-14
1800 MINIMUM
STAINLESS STEEL FOR DETAILS)
OVERFLOW BAFFLE
NON RETURN REFER TO DRG. No.
PLATE
VALVE STD-WW-09 FOR
EMERGENCY OVERFLOW (IF DETAILS TO STEP IRONS
APPROVED) AND/OR 24 HOUR
STORAGE TO BE PROVIDED

PLAN
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE JUL. 2016
TITLE DRAWING No. REV
INDICATIVE PRE-CAST CONCRETE
1 11/'17 JMC TOC Revised notes 2,4,9 & 11 MOD SUBMERSIBLE PUMPING STATION STD-WW- 28A 1
0 08/'16 JMC TOC Initial Issue MOD
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF
IS EN 1917 AND BS 5911-PART 3.
3. THICKER MANHOLE BASES REQUIRED FOR SEWERS IN EXCESS OF
3m DEEP WHERE THE SIZE IS GREATER THAN THE STANDARD MINIMUM SIZE.
4. PRE-CAST CONCRETE BASES MAY BE USED INCORPORATING
CHANNELS, BENCHING ETC. SUBJECT TO IRISH WATER REVIEW AND
COMPLYING WITH BS 5911-PART 4 2002.
5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY
THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
6. MANHOLE ROOFS SHOULD CONSIST OF A REINFORCED CONCRETE SLAB
OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm
DESIGNED TO CARRY ALL LIVE AND DEAD LOADS, ALTERNATIVELY,
APPROVED PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT
TO IRISH WATER REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.
7. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
8. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
GREEN AREAS.
9. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED
ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
COVER TO BE SET MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY
IN GRADE C50\60 IRISH WATER.
MORTAR 10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
11. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD
COVER TO BE SEALED & LOCKABLE AUTHORITY'S REQUIREMENTS.
12. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
MANHOLE COVER AND FRAME SHALL 13. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
COMPLY TO IS EN 124 AND BS 7903 SEE NOTES 11, 12 & 13. MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
(ALL CLASS D400 COVERS SHALL HAVE
MIN. FRAME DEPTH 100-150mm) MIN.
OPE. 600 x 600mm FINISHED GROUND LEVEL

1 No. MIN.,
3 No. MAX. OF CLASS B WATER TIGHT SEAL
225

ENGINEERING BRICK
SET IN C50/60 MORTAR 100mm Ø PIPE TO VENT STACK
150mm GRADE C16/20 IN-SITU MIN. 600 SEALED JOINT
CONCRETE SURROUND
ELASTOMERIC JOINTSEAL TO EN 681
500
ALL PRECAST CHAMBER RINGS TO BE REINFORCED
PRECAST CONCRETE MANHOLE RINGS TO IS 420 SLOPE 1:1 BOTTOM PRECAST SECTION TO BE BUILT INTO BASE
0
IN CONJUNCTION WITH IS EN 1917: 2004 CONCRETE MINIMUM 75 mm
BENCHING CONCRETE GRADE C25/30 FINISHED
WITH A 1:3 CEMENT SAND MORTAR
500

Flow
SLOPE
1:10
250

REINFORCED CONCRETE BASE GRADE C30/37

75mm GRADE C12/15 BLINDING CONCRETE

REFER TO TABLE FOR


PRE-CAST RING DIAMETER

SECTION A-A

A MINIMUM WIDTH OF BENCHING FOR


REFER TO TABLE FOR LANDING AREA TO BE 500mm
PC RING DIAMETER

FLEXIBLE JOINT

Flow

ROCKER PIPE
(SEE TABLE BELOW)
Max. 600

150mm GRADE C16/20 IN-SITU PIPE JOINT WITH CHANNEL TO BE


CONCRETE SURROUND A LOCATED MINIMUM 100mm INSIDE
FACE OF MANHOLE

PLAN

MINIMUM MANHOLE DIAMETERS ROCKER PIPE LENGTH

DIAMETER OF LARGEST PIPE IN INTERNAL DIAMETER OF PIPE DIAMETER ROCKER PIPE


MANHOLE (mm) MANHOLE (mm) (mm) LENGTH (mm)

LESS THAN 375 1200 150 TO 600 600

375 TO 450 1350 GREATER THAN 600 TO 750 1000

500 TO 700 1500 GREATER THAN 750 1250

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
2 11/'17 JMC TOC Added rocker pipe table, MOD TITLE DRAWING No. REV
added & updated notes.
RISING MAIN
1 08/'16 JMC TOC Revised cover note & MOD DISCHARGE MANHOLE
access ope dim.
STD-WW- 29 2
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. KIOSKS TO BE CONSTRUCTED FROM THERMOSETTING U.V. & WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED MILD STEEL PLATE (MINIMUM 4mm THICKNESS) TO BS EN 1461. STAINLESS STEEL OR
NON-METALLIC MATERIALS, SUCH AS GLASS REINFORCED PLASTIC (GRP), MAY BE USED AS AN ALTERNATIVE KIOSK MATERIAL, PARTICULARLY IN SEVERE ENVIRONMENTS, SUBJECT TO AGREEMENT WITH IRISH WATER.
3. COLOUR TO BE HOLLY GREEN BS 4800 14 C39. INTERIOR FINISH TO BE WHITE UNLESS APPROVED BY IRISH WATER.
4. THE QUALITY OF KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:
A) A THERMAL TRANSMITTANCE OF 1.5W PER m²K
B) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION) EQUIVALENT TO CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING 30 MINUTES.
C) AN IP RATING OF IP65 OR EQUIVALENT.
5. KIOSK TO HAVE SINGLE OR DOUBLE STEEL/GRP DOORS WITH MULTIPLE LOCKS TO LPS 1175 SR4 OR EN 1627. MINIMUM DOUBLE LOCKS WITH BOLTS THAT ENGAGE INTO THE SILL & HEADER AS WELL AS BETWEEN THE TWO
LEAVES OR LEAF & FRAME. LEADING EDGE OF LEAVES TO HAVE EITHER REBATED EDGES OR FITTED WITH ASTRAGALS.
6. KIOSK TO BE BOLTED TO THE PLINTH THROUGH A BOTTOM FLANGE WITH GALVANISED MILD STEEL OR STAINLESS STEEL ANCHOR BOLTS.
7. THE BOTTOM FLANGE SHALL BE SEATED ON A NEOPRENE GASKET AND SEALED WITH MASTIC.
8. REAR WALL SHALL BE REINFORCED WITH STAINLESS STEEL SECTIONS TO WHICH A MARINE PLY WOOD , 18mm THICK BOARD IS FIXED.
9. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE ULTIMATE SIZING OF THE KIOSK TO ENSURE ADEQUATE SPACE REQUIREMENTS.
10. TELEMETRY DUCTING TO BE IN ACCORDANCE WITH BS 4660 AND BS EN 1401.
11. ELECTRICAL REQUIREMENTS TO BE IN ACCORDANCE WITH ESB SPECIFICATION.
12. THE ROOF OF THE KIOSK SHALL BE REMOVABLE (BOLTS) TO FACILITATE BACKBOARD REMOVAL.
13. ALL EXPOSED PIPEWORK TO BE ADEQUATELY INSULATED WITH PIPE LAGGING.
14. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
15. WATER TIGHT SEALS ARE TO BE PROVIDED WHERE DUCTING ENTERS DUCT CHAMBERS AND KIOSKS. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS.
16. THE KIOSK SHALL NOT BE LOCATED IN AREAS THAT ARE SUSCEPTABLE TO FLOODING AT A FREQUENCY OF MORE THAN 1:30 YEARS RECURRENCE. THE KIOSK FACILITY SHOULD BE DESIGNED FOR INUNDATION. THE FINISHED
SLAB LEVEL SHOULD BE POSITIONED ABOVE THE 1:100 YEARS FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND POSITIONED ABOVE THE 1:200 YEAR FLOOD LEVEL.
17. ALL DIMENSIONS ARE MINIMUM DIMENSIONS AND MAY VARY TO SUIT THE KIOSK REQUIREMENT.

SLOPED ROOF
MIN.1200
HIGH LEVEL VENTILATION
MIN. 300
ON OTHER SIDE

LOW LEVEL VENTILATION

MIN. 1800
REMOVABLE
MIN. 1200

WATER - TIGHT
CAP ON PVC DUCT

150 150 150 150


450

450
150

150
450mm THICK 600 75mm THICK 600 1500
CONCRETE
CONCRETE
PLINTH
BLINDING SLOW BEND
GRADE C25/ 30
GRADE C12/15
PVC DUCTING WITH
75mm THICK DRAW - CORD
CONCRETE
CROSS SECTION BLINDING CROSS SECTION
GRADE C12/15
(WET KIOSK) (TELEMETRY KIOSK)

HEAVY DUTY
MIN. 600 STEEL HINGES MIN. 1200

TELEMETRY
KIOSK
WET KIOSK
MIN. 1800

RECESS
MIN. 1200

DOUBLE
DOORS
150 150
150 150
450

450
150

150

900
1500
450mm THICK 450mm THICK
CONCRETE 75mm THICK 75mm THICK
CONCRETE
PLINTH CONCRETE CONCRETE
PLINTH
GRADE C25/ 30 BLINDING BLINDING
GRADE C25/ 30
GRADE C12/15 GRADE C12/15
FRONT ELEVATION
FRONT ELEVATION (CONTROL KIOSK)
(WET KIOSK) 150 MIN. 1200 150
MIN. 1200

REMOVABLE
WATER - TIGHT
300

CAP ON PVC DUCT


600

MIN. 600
POWER IN
PLAN DUCT

REFER TO
STD-WW-19 FOR
NOTE: PLAN DUCT CHAMBER DETAILS
ALL KIOSK DIMENSIONS ARE MINIMUM DIMENSIONS & MAY
VARY TO SUIT THE KIOSK REQUIREMENT.
WET KIOSK CONTROL KIOSK

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
KIOSK TYPE 1 PUMPING STATION
2 11/'17 JMC TOC Updated note 9 MOD
1 08/'16 JMC TOC Added note 5 (kiosk doors) MOD AND WET KIOSK STD-WW- 30 2
0 09/'15 JMC TOC Initial Issue SL (Sheet 1 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. CONTROL KIOSK TO BE CONSTRUCTED FROM 215mm THICK CONCRETE BLOCKS IN ACCORDANCE WITH IS EN 771-3, WITH SMOOTH RENDER FINISH INTERNALLY AND EXTERNALLY. WET KIOSK TO BE CONSTRUCTED FROM THERMOSETTING U.V. &
WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED MILD STEEL PLATE (MINIMUM 4mm THICK) TO BS EN 1461. ALTERNATIVE MATERIAL, STAINLESS STEEL IN HARSH ENVIRONMENTS, NON-METALLIC (GRP, POLYESTER, ETC.)
MAY BE ALLOWED FOR WET KIOSK SUBJECT TO AGREEMENT WITH IRISH WATER.
3. KIOSK TO HAVE SINGLE OR DOUBLE STEEL/GRP DOORS WITH MULTIPLE LOCKS TO LPS 1175 SR4 OR EN 1627. MINIMUM DOUBLE LOCKS WITH BOLTS THAT ENGAGE INTO THE SILL & HEADER AS WELL AS BETWEEN THE TWO LEAVES OR LEAF &
FRAME. LEADING EDGE OF LEAVES TO HAVE EITHER REBATED EDGES OR FITTED WITH ASTRAGALS.
4. COLOUR TO BE HOLLY GREEN BS 4800 14 C39. INTERIOR FINISH TO BE WHITE UNLESS APPROVED BY IRISH WATER.
5. THE QUALITY OF KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:
A) A THERMAL TRANSMITTANCE OF 1.5W PER m²K.
B) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION), EQUIVALENT TO CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING 30 MINUTES.
C) AN IP RATING OF IP65 OR EQUIVALENT.
6. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE ULTIMATE SIZING OF THE KIOSK TO ENSURE ADEQUATE SPACE REQUIREMENTS.
7. CABLE DUCTING TO BE IN ACCORDANCE WITH BS 4660 AND BS EN 1401.
8. ELECTRICAL REQUIREMENTS TO BE IN ACCORDANCE WITH ESB SPECIFICATION.
9. ALL EXPOSED PIPEWORK TO BE ADEQUATELY INSULATED WITH PIPE LAGGING.
10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
11. WATER TIGHT SEALS ARE TO BE PROVIDED WHERE DUCTING ENTERS DUCT CHAMBERS AND KIOSKS. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS.
12. THE KIOSK SHALL NOT BE LOCATED IN AREAS THAT ARE SUSCEPTABLE TO FLOODING AT A FREQUENCY OF MORE THAN 1:30 YEARS RECURRENCE. THE KIOSK FACILITY SHOULD BE DESIGNED FOR INUNDATION. THE FINISHED SLAB LEVEL SHOULD
BE POSITIONED ABOVE THE 1:100 YEAR FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND POSITIONED ABOVE THE 1:200 YEAR FLOOD LEVEL.
13. ALL DIMENSIONS ARE MINIMUM DIMENSIONS AND MAY VARY TO SUIT THE KIOSK REQUIREMENT.

150mm REINFORCED
1800
CONCRETE ROOF SLAB
TO GRADE C30/37
WITH WEATHER PROOF
ASPHALT FINISH

HIGH LEVEL VENTILATION


ON OTHER SIDE
(LOUVRED GRILLE)

2400
LOW LEVEL VENTILATION
300 (LOUVRED GRILLE)

REMOVABLE
WATER - TIGHT 150 150
CAP ON PVC DUCT

450
1200

150
150 150
600 2100
450

SLOW BEND
150

PVC DUCTING WITH


450mm THICK 75mm THICK DRAW - CORD
600 75mm THICK CONCRETE
CONCRETE
PLINTH CONCRETE BLINDING CROSS SECTION
BLINDING GRADE C12/15
GRADE C25/ 30
GRADE C12/15 (TELEMETRY KIOSK)
CROSS SECTION
1800
(WET KIOSK) 215mm CONCRETE BLOCKS IN
150

ACCORDANCE WITH IS EN 771-3


COMPLETE
HEAVY DUTY WITH INTERNAL AND
600 EXTERNAL RENDER
STEEL HINGES

HOT DIPPED POWDER


WET KIOSK
COATED MILD STEEL
2400

GALVANISED DOORS TO BS
729
1200

150 150
150 150
450

450
150

900
150

450mm THICK
CONCRETE 2100
450mm THICK 75mm THICK PLINTH 75mm THICK
CONCRETE CONCRETE GRADE C25/ 30 CONCRETE
PLINTH BLINDING BLINDING
GRADE C25/ 30 GRADE C12/15 FRONT ELEVATION GRADE C12/15

(CONTROL KIOSK)
FRONT ELEVATION 215 215

(WET KIOSK) 150 1370 150


215

900
300

2100
600

1585

600
REMOVABLE
WATER - TIGHT
CAP ON PVC DUCT
PLAN

POWER IN
DUCT

REFER TO
NOTE: STD-WW-19 FOR
ALL KIOSK DIMENSIONS ARE MINIMUM DIMENSIONS & MAY
VARY TO SUIT THE KIOSK REQUIREMENT.
PLAN DUCT CHAMBER DETAILS

WET KIOSK CONTROL KIOSK


REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV
KIOSK TYPE 2 + 3 PUMPING STATION
2 11/'17 JMC TOC Updated note 6 MOD
1 08/'16 JMC TOC added note 3 (kiosk doors) MOD AND WET KIOSK STD-WW- 31 2
0 09/'15 JMC TOC Initial Issue SL (Sheet 2 of 2)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. REGULATING COURSE TO BE REVIEWED BY IRISH WATER.

3. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY


THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

5. PRECAST KERBS TO BE IN ACCORDANCE WITH IS EN 1340:2003.

4000mm

100mm OF DENSE BITUMEN MACADAM


(14mm AGGREGATE) PRECAST KERB

1:40 FALL

500mm DEEP CLAUSE 804 MATERIAL COMPACTED AS PER STD-WW-07


WITH 75mm REGULATING COURSE CONCRETE C25/30

75mm THICKNESS OF
10mm SINGLE SIZED CROSS SECTION
AGGREGATE GEOTEXTILE
WEED BARRIER OF MACADAM SURFACE
400mm 75mm

CLAUSE 804

PERMEABLE AREA

4000mm

200mm THICK REINFORCED


CONCRETE GRADE C35/45 PRECAST KERB

1:40 FALL

500mm DEEP CLAUSE 804 MATERIAL COMPACTED AS PER STD-WW-07


CONCRETE C25/30

CROSS SECTION
CONCRETE SLAB

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

1 11/'17 JMC TOC Updated notes 2 & 3 MOD HARDSTANDING AREA PUMPING STATION STD-WW- 32 1
0 09/'15 JMC TOC Initial Issue SL (PERMEABLE AND IMPERMEABLE)
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
510
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. LAMP BOLLARD TO BE REVIEWED BY IRISH WATER.

470
3. LAMP STANDARD TO BE REVIEWED BY IRISH WATER.

4. ELECTRICAL DUCTING TO BE IN ACCORDANCE WITH ESB SPECIFICATION.

LAMP STANDARD

SHAFT

4000 OR 5000 AS SPECIFIED

INSPECTION DOOR 610 x 108


LAMP BOLLARD

CONCRETE GRADE C30/37


200
GROUND LEVEL

100
305

762

CABLE ENTRY SLOT 152 x 76


150 DIA. CABLE DUCT

CONCRETE GRADE C30/37

75 BLINDING
ARMOURED CABLING TO DUCT
600 100mm DIA. T.PIECE 100mm DIA. DUCT

SECTION SECTION
600 300

LAMP BOLLARD
CONCRETE GRADE C30/37
300
600

600 x 450 CABLE JUNCTION BOX MIN. 100 DIA. CABLE DUCT
(SIMILAR TO DUCT CHAMBER
DETAIL ON DRG. No. STD-WW-19)

PLAN
PLAN
LAMP STANDARD LAMP BOLLARD
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

1 11/'17 JMC TOC Updated notes 2 & 3 MOD LAMP BOLLARD & LAMP STANDARD STD-WW- 33 1
0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
IW-CDS-5030-01 Rev. 03 December 2017
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY


THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

3. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206

7600mm HIGH 150Ø


GALVANISED STEEL
DECORATIVE VENT
SHAFT WITH
PROTECTIVE GRILL

7.600
1200
800

150Ø VENT PIPE


900

CONCRETE C30/37

900

VENT DETAIL
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SCALE DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE SEPT. 2015
TITLE DRAWING No. REV

1 11/'17 JMC TOC Updated note 2 MOD VENT STACK STD-WW- 34 1


0 09/'15 JMC TOC Initial Issue SL
No. Date Drn Chk Description App
STANDARD DETAILS FOR WASTEWATER NETWORKS: REVISION LOG – 03 (1st Dec. 2017)
DRG No. DRAWING TITLE MATERIAL CHANGE EDITORIAL CHANGE REV COMMENTS
STD-WW-01 WASTE WATER SERVICE CONNECTION RESPONSIBILITY Added note reference 1 Drawing revised
STD-WW-02 TYPICAL LAYOUT FOR SEWER WITHIN NEW DEVELOPMENTS Updated Note 2 1 Drawing revised
STD-WW-03 DRAIN & SERVICE CONNECTION PIPEWORK Updated notes 1 Drawing revised
STD-WW-04 TYPICAL SEWER / SERVICE PIPE CONNECTION Updated connection detail Updated notes 1 Drawing revised
STD-WW-05 TYPICAL SERVICE LAYOUT INDICATING SEPARATION DISTANCES Updated notes 1 Drawing revised
IW-CDS-5030-01 Rev. 03 December 2017

STD-WW-06 RESTRICTIONS ON WASTEWATER INFRASTRUCTURE WORKS ADJACENT TO Revised to suit ILI recommendations 2 Drawing revised
TREES
STD-WW-06A RESTRICTIONS ON NEW TREES/SHRUBS PLANTING ADJACENT TO SEWERS 0 New Drawing
STD-WW-07 TRENCH BACKFILL & BEDDING Updated & added Notes 1 Drawing revised
STD-WW-08 CONCRETE BED, HAUNCH & SURROUND TO WASTEWATER PIPES 0 No change
STD-WW-09 BLOCKWORK MANHOLE (<450mm DIA.) Added rocker pipe table Updated & added Notes 2 Drawing revised
STD-WW-10 PRE-CAST CONCRETE MANHOLE Added rocker pipe table & deep Updated & added Notes 2 Drawing revised
manhole detail
STD-WW-11 IN-SITU CONCRETE MANHOLE Added rocker pipe table & deep Updated & added Notes 2 Drawing revised
manhole detail
STD-WW-12 BACKDROP MANHOLES Updated notes 2 Drawing revised
STD-WW-13 PRIVATE SIDE INSPECTION CHAMBER Updated notes 2 Drawing revised
STD-WW-14 THRUST BLOCKS FOR RISING MAINS Anti-torque support note & thrust flange Note 6 updated 1 Drawing revised
added
STD-WW-15 SCOUR VALVE CHAMBER (FOUL RISING MAIN <200mm DIA.) Revised & added notes 2 Drawing revised
STD-WW-16 SLUICE VALVE DETAILS FOR RISING MAINS DUCTILE IRON (D.I.) PIPE (<200mm Revised & added notes 3 Drawing revised
DIA.) (Sheet 1 of 2)
STD-WW-17 SLUICE VALVE DETAILS FOR RISING MAINS POLYETHYLENE (P.E.) PIPE Revised & added notes 2 Drawing revised
(<200mm DIA.) (Sheet 2 of 2)
STD-WW-18 AIR VALVE CHAMBER (FOUL RISING MAIN <200mm DIA.) Revised & added notes 2 Drawing revised
STD-WW-19 DUCT CHAMBER Revised notes 2 Drawing revised
STD-WW-20 EMERGENCY OVERFLOW STRUCTURE Notes revised 1 Drawing revised
STD-WW-21 TYPICAL DITCH/STREAM CROSSING FOR GRAVITY MAIN (Sheet 1 of 2) Updated pipe depth dimension 1 Drawing revised
STD-WW-22 TYPICAL DITCH/STREAM CROSSING FOR RISING MAIN (Sheet 2 of 2) Updated pipe depth dimension Note 10 revised 1 Drawing revised
STD-WW-23 TYPICAL BRIDGE CROSSING FOR RISING MAIN (Sheet 1 of 2) Notes 5 & 14 revised 1 Drawing revised
STD-WW-24 TYPICAL BRIDGE CROSSING FOR RISING MAIN (Sheet 2 of 2) Updated pipe depth dimension Revised notes 12 & 14 1 Drawing revised
STD-WW-25 SECURITY GATE & FENCING Fencing table updated 2 Drawing revised
STD-WW-26 INDICATIVE PUMPING STATION LAYOUT 0 No change
STD-WW-27 FLOW METER CHAMBER (FOUL RISING MAIN <200mm DIA.) Revised & added notes 2 Drawing revised
STD-WW-28 INDICATIVE SUBMERSIBLE PUMPING STATION Revised notes 2,4,9 & 11 Revised notes 2 Drawing revised
STD-WW-28A INDICATIVE PRE-CAST CONCRETE SUBMERSIBLE PUMPING STATION Revised notes 2,4,9 & 11 Revised notes 1 Drawing revised
STD-WW-29 RISING MAIN DISCHARGE MANHOLE Added rocker pipe table Updated & added Notes 2 Drawing revised
STD-WW-30 KIOSK TYPE 1 PUMPING STATION & WET KIOSK (Sheet 1 of 2) Updated note 9 2 Drawing revised
STD-WW-31 KIOSK TYPE 2 + 3 PUMPING STATION & WET KIOSK (Sheet 2 of 2) Updated note 6 2 Drawing revised
STD-WW-32 HARDSTANDING AREA PUMPING STATION (PERMEABLE & IMPERMEABLE) Updated notes 2 & 3 1 Drawing revised
STD-WW-33 LAMP BOLLARD & LAMP STANDARD Updated notes 2 & 3 1 Drawing revised
STD-WW-34 VENT STACK Updated note 2 1 Drawing revised
/ INDEX SHEET Inclusion of STD-WW-06A Drawing revisions updated Nov 2017 Drawing revisions updated
/ Design Risk Assessment for Wastewater Standard Details Inclusion of STD-WW-06A General Amendments v4.01 Document revised