5.0 S3 Integration at LDC Instation

You might also like

Download as pdf
Download as pdf
You are on page 1of 42
rnnace ED ann INSTATION SAT Integration of Outstation and End to End Testing Date: OF. 24 201s SETTLEMENT METERING SYSTEM for ‘Shuweihat S3 IPP 1. INTRODUCTION “This dacumontdeorbes he wok tobe cried ou in oder to ntgrte the metering points of new Ovation tothe Inston ad i alo documents the witnessing of Successful completion af hese tas “The work is cari out in the following step 1 Increase ofienced metering points and commonicaton lines if applicable 2. Adding anew communication ie for the Outstation 3 Adding the new Outstation metering points 4 5 Creating anew data acquisition job or modify an existing acquisition job Creating anew time synchronization ob ithe Outstation is synchronized via metering protocol eg, DLX, FAG datalogger) 6. Adding the new metering pont to the export ob 7 ‘Ading new user tothe file transfer server for the transmission of minstely files from the Ousation othe Instation/EDL if applicable ‘Asa ial step (End to End Testing) the data recorded by the Outstation shall be ‘compared with the data retieved bythe Inston, Following the Ineraion of new Outstation the existing dats revival and fle transfer have tobe checked to ensure that they are sill runing without eros, ‘The following documents shall e provided slong wit this document before or during SAT: ‘2 List of Metering Points (ofthe new Outstation) and Tag Keifer '. Definition and site of Tag denier Printout for comparision of readings rom the Oustaton 4. Copy ofthe Outstation SAT. in 2. SAT PROCEDURE FOR MAIN & CHECK INSTATIONS. Task Witnessed Remarks ‘OUTSTATIONSAT (Chock tha the Oxtsttion SAT hasbeen cased at (copy of SAT availabe) ok, License Check that Ficense adopted for the new Outstation: 8) Number of metering points inereased = 5) Comlne fr new Oxtstaton existing, ¢} Device Driver for Oustion ele. ‘COM Line ‘Check that the comin tobe assigned othe ‘metering points has been erated or aleady exists ue APs o A cm Gre Uincrenseal Definition of Metering Points ‘Check that al ofthe metering points of he new ‘Outstation ate defined inthe INSTATION, ‘Acquisition Job ‘Check tata new acquisition jb is define ‘cluding the new metering points ora existing acquisition obi modified inclde the new metering points ‘Time Synchronization Check that a new time syncronization jb is ‘ested o synchronize the Outstation devices (e DDLX, FAG) via meter protocol if applicable u/h Export Job ‘Check thatthe new metering points ar included inthe expo job ek, File Traner Server Check that new se is rated fr the Outstation ‘Operation of data acquisition ‘Check tha the data acquisition job sraning without err (data ofall metering pins acquired) 0.4. Ww ‘Operation of data export ‘Check thatthe new metering pont are ncded in the expo ile according tothe interface design specification ok. ‘Operation of le transter ‘Check thal the EDL (hourly) FDM files & (eonthly) PASS files are received atthe Insttion target dreories ake & Foe] | fies @ Data validation ‘Compare Cotstation dts with displayed station ats and wih exported Istation data ok.

You might also like