rnnace ED ann
INSTATION SAT
Integration of Outstation and End to End Testing
Date: OF. 24 201s
SETTLEMENT METERING SYSTEM
for
‘Shuweihat S3 IPP1. INTRODUCTION
“This dacumontdeorbes he wok tobe cried ou in oder to ntgrte the metering
points of new Ovation tothe Inston ad i alo documents the witnessing of
Successful completion af hese tas
“The work is cari out in the following step
1 Increase ofienced metering points and commonicaton lines if applicable
2. Adding anew communication ie for the Outstation
3 Adding the new Outstation metering points
4
5
Creating anew data acquisition job or modify an existing acquisition job
Creating anew time synchronization ob ithe Outstation is synchronized via
metering protocol eg, DLX, FAG datalogger)
6. Adding the new metering pont to the export ob
7 ‘Ading new user tothe file transfer server for the transmission of minstely
files from the Ousation othe Instation/EDL if applicable
‘Asa ial step (End to End Testing) the data recorded by the Outstation shall be
‘compared with the data retieved bythe Inston,
Following the Ineraion of new Outstation the existing dats revival and fle transfer
have tobe checked to ensure that they are sill runing without eros,
‘The following documents shall e provided slong wit this document before or during
SAT:
‘2 List of Metering Points (ofthe new Outstation) and Tag Keifer
'. Definition and site of Tag denier
Printout for comparision of readings rom the Oustaton
4. Copy ofthe Outstation SAT.in
2. SAT PROCEDURE FOR MAIN & CHECK INSTATIONS.
Task
Witnessed
Remarks
‘OUTSTATIONSAT
(Chock tha the Oxtsttion SAT hasbeen cased
at (copy of SAT availabe)
ok,
License
Check that Ficense adopted for the new
Outstation:
8) Number of metering points inereased =
5) Comlne fr new Oxtstaton existing,
¢} Device Driver for Oustion
ele.
‘COM Line
‘Check that the comin tobe assigned othe
‘metering points has been erated or aleady exists
ue APs o
A cm Gre
Uincrenseal
Definition of Metering Points
‘Check that al ofthe metering points of he new
‘Outstation ate defined inthe INSTATION,
‘Acquisition Job
‘Check tata new acquisition jb is define
‘cluding the new metering points ora existing
acquisition obi modified inclde the new
metering points
‘Time Synchronization
Check that a new time syncronization jb is
‘ested o synchronize the Outstation devices (e
DDLX, FAG) via meter protocol if applicable
u/h
Export Job
‘Check thatthe new metering points ar included
inthe expo job
ek,
File Traner Server
Check that new se is rated fr the Outstation
‘Operation of data acquisition
‘Check tha the data acquisition job sraning
without err (data ofall metering pins
acquired)
0.4.
Ww
‘Operation of data export
‘Check thatthe new metering pont are ncded
in the expo ile according tothe interface design
specification
ok.
‘Operation of le transter
‘Check thal the EDL (hourly) FDM files &
(eonthly) PASS files are received atthe Insttion
target dreories
ake & Foe]
| fies
@
Data validation
‘Compare Cotstation dts with displayed station
ats and wih exported Istation data
ok.