PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
INCOMING LINE-BAY-7&8 CONTRACTOR : M/S SHYAM INDUS Date- 05-10-2018
DOC. NO. :
SWITCH YARD
C6 6 FOR 66KV SWYD
1 FOR 11KV SWYD
BAY NUMBER
P
7/8 FOR INCOMING LINES
DRAWINGS OF BMK G719EA-KG9145-W601, F601 CONTROL & PROTECTION PANEL FOR LINE BAY (601R)
1 of 83 Control cable
REV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
INCOMING LINE-BAY-7&8 CONTRACTOR : M/S SHYAM INDUS Date- 05-10-2018
DOC. NO. :
Notes
1. if 6cx4 sqmm cable is not available at store, then only 4cx4 sqmm cable to be used
2. if cable mentioned in this cable schedule is not available in store, then suitable alternate cable can be used at site as per availability
CABLE
SPECIFIC FROM TO
ATION ROUTE
CABLE TAG NO. RUNS CABLE PURPOSE LENGTH REMARKS
SIZE EQUIPMENT EQUIPMENT Drawing No (IN Mtrs.)
(IN mm2)
CT CORE-1 AS PER
SITE
C6-X-P-01 1 6cx4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509N,SB,BS,S
R,Y REQUIREM
&B - PHASE ENT
CT CORE-2 AS PER
SITE
C6-X-P-02 1 6cx4 CT JB METERING CIRCUIT KE-66CT05509N,SB,BS,S
R,Y & REQUIREM
B - PHASE ENT
FOR 66 KV- VOLTAGE - RATIO-
750/1 SHALL BE TAKEN AND
CONSIDER ONE 6CX4 CABLE
AS A SPARE.
CT CORE-3 AS PER
SITE
C6-X-P-03 1 6cx4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509N,SB,BS,S
R,Y & REQUIREM
B - PHASE ENT
CT CORE-4 AS PER
SITE
C6-X-P-04 1 6cx4 CT JB SPARE KE-66CT05509N,SB,BS,S
R,Y & REQUIREM
B - PHASE ENT
PT CORE-1 AS PER
SITE
C6-X-P-05 1 6cx4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS,SB,N TAKE ONE 6CX4 AS A SPARE
R,Y & REQUIREM
B - PHASE ENT
2 of 83 Control cable
REV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
INCOMING LINE-BAY-7&8 CONTRACTOR : M/S SHYAM INDUS Date- 05-10-2018
DOC. NO. :
PT CORE-2 AS PER
SITE
C6-X-P-06 1 6cx4 PT JB DISTANCE PROTECTION KE-66PT05579BS,SB,N
R,Y & REQUIREM
B - PHASE ENT
PT CORE-3 AS PER
SITE
C6-X-P-07 1 6cx4 PT JB METERING CIRCUIT KE-66PT05579BS,SB,N
R,Y & REQUIREM
B - PHASE ENT
3 of 83 Control cable
1HYB905115
DOC. NO. :
4 of 83 Control cable
REV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED AS PER APPROVED BY: BND
INCOMING
C6-X-P-12 1 LINE-BAY-7&8
12cx2.5 ISO-29-L BMK-P
CONTRACTOR : M/S SHYAM INDUS 3UC0003/2927, 3C2G200/2927
SITE
REQUIREM Date- 05-10-2018
ENT
DOC. NO. :
CT JB AS PER
CORE-1 SITE
C6-Y-P-14 1 6cx4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9145-W601, F601
REQUIREM
ENT
CT JB AS PER
CORE-2 SITE
C6-Y-P-15 1 6cx4 CRP METERING CIRCUIT G719EA-KG9145-W601, F601
REQUIREM
ENT
5 of 83 Control cable
REV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
INCOMING LINE-BAY-7&8 CONTRACTOR : M/S SHYAM INDUS Date- 05-10-2018
DOC. NO. :
CT JB AS PER
CORE-3 SITE
C6-Y-P-16 1 6cx4 CRP DISTANCE PROTECTION
G719EA-KG9145-W601, F601 REQUIREM
ENT
CT JB AS PER
CORE-4 SITE
C6-Y-P-17 1 6cx4 CRP LINE DIFFERENTIAL RELAY G719EA-KG9145-W601, F601
REQUIREM
ENT
AS PER
PT JB CORE-1
SITE
C6-Y-P-18 1 6cx4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9145-W601, F601
REQUIREM
ENT
AS PER
PT JB CORE-2
SITE
C6-Y-P-19 1 6cx4 CRP DISTANCE PROTECTION G719EA-KG9145-W601, F601
REQUIREM
ENT
AS PER
PT JB CORE-3
SITE
C6-Y-P-20 1 6cx4 CRP METERING G719EA-KG9145-W601, F601
REQUIREM
ENT
TO CB CLOSING CIRCUIT
AS PER
G719EA-KG9145-W601, F601 SITE
C6-Y-P-21 1 6cx4 CB-P CRP
TRIP COIL-1 REQUIREM
ENT
6 of 83 Control cable
REV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
INCOMING LINE-BAY-7&8 CONTRACTOR : M/S SHYAM INDUS Date- 05-10-2018
DOC. NO. :
AS PER
SITE
C6-Y-P-22 1 6cx4 CB-P CRP G719EA-KG9145-W601, F601
TRIP COIL-2 REQUIREM
ENT
LINE PT SUPPLY
7 of 83 Control cable
AS PER
SITE
C6-Y-P-24 1 19cx2.5 BMK-P CRP G719EA-KG9145-W601, F601
REQUIREM
REV.
ENT PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
INCOMING LINE-BAY-7&8 CONTRACTOR : M/S SHYAM INDUS Date- 05-10-2018
DOC. NO. :
AS PER
SITE PART OF CRP INTER PANEL
C6-Z-P-26 1 6cx4 CRP EXISTING CRP LBB TRIP CIRCUIT
REQUIREM WIRING
ENT
AS PER
LINE CB AND ISOLATOR INTER LOCK WITH DC SITE
C6-Y-P-27 1 6cx4 CRP BMK-P
SUPPLY REQUIREM
ENT
AS PER
SITE
C6-Z-P-28 1 6cx4 CRP EXISTING CRP 220V DC SUPPLY
REQUIREM PART OF CRP INTER PANEL
ENT WIRING
AS PER
SITE
C6-Z-P-29 1 6cx4 CRP EXISTING CRP AC 1 PHASE SUPPLY
REQUIREM PART OF CRP INTER PANEL
ENT WIRING
AS PER
SITE
C6-X-P-30 1 6cx4 ISO-29-LE BMK-P AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
SITE
C6-X-P-31 1 6cx4 ISO-29-L BMK-P AC 1 PHASE SUPPLY
REQUIREM
ENT
8 of 83 Control cable
REV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT BCWW R2 CHECKED BY: AS
CABLE SCHEDULE FOR CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
INCOMING LINE-BAY-7&8 CONTRACTOR : M/S SHYAM INDUS Date- 05-10-2018
DOC. NO. :
AS PER
SITE
C6-X-P-32 1 6cx4 ISO-29-A BMK-P AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
SITE
C6-X-P-33 1 6cx4 ISO-29-B BMK-P AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
SITE
C6-X-P-34 1 6cx4 BMK-P PTJB AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
SITE
C6-X-P-35 1 6cx4 BMK-P CTJB AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
AC 1 PHASE SUPPLY FOR SPRING CHARGING SITE
C6-X-P-36 1 6cx4 BMK-P CRP
MOTOR REQUIREM
ENT
AS PER
SITE PART OF CRP INTERPANEL
C6-Z-P-37 1 6cx4 CRP EXISTING CRP BUS PT-1 SELECTION
REQUIREM WIRING
ENT
AS PER
SITE PART OF CRP INTERPANEL
C6-Z-P-38 1 6cx4 CRP EXISTING CRP BUS PT-2SELECTION
REQUIREM WIRING
ENT
9 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
SWITCH YARD
C3 3 FOR 33KV SWYD
1 FOR 11KV SWYD
BAY NUMBER
P
7/8 FOR INCOMING LINES
Notes
1. if 6cx4 sqmm cable is not available at store, then only 4cx4 sqmm cable to be used
2. if cable mentioned in this cable schedule is not available in store, then suitable alternate cable can be used at site as per availability
10 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
CABLE
SPECIFIC FROM TO
ATION ROUTE
CABLE TAG NO. RUNS CABLE PURPOSE LENGTH REMARKS
SIZE EQUIPMENT EQUIPMENT (IN Mtrs.)
(IN mm2)
CT CORE-1 AS PER
SITE
C3-X-P-01 1 6cx4 CT JB BCU CKT (BACK UP PROTECTION)
R- REQUIREM
PHASE ENT
CT CORE-2 AS PER
SITE
C3-X-P-02 1 6cx4 CT JB METERING CIRCUIT
R- REQUIREM
PHASE ENT
CT CORE-3 AS PER
SITE
C3-X-P-03 1 6cx4 CT JB LINE DIFFERENTIAL RELAY
R- REQUIREM
PHASE ENT
CT CORE-4 AS PER
SITE
C3-X-P-04 1 6cx4 CT JB SPARE
R- REQUIREM
PHASE ENT
11 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
CT CORE-1 AS PER
SITE
C3-X-P-05 1 6cx4 CT JB BCU CKT (BACK UP PROTECTION)
Y- REQUIREM
PHASE ENT
CT CORE-2 AS PER
SITE
C3-X-P-06 1 6cx4 CT JB METERING CIRCUIT
Y- REQUIREM
PHASE ENT
CT CORE-3 AS PER
SITE
C3-X-P-07 1 6cx4 CT JB LINE DIFFERENTIAL RELAY
Y- REQUIREM
PHASE ENT
CT CORE-4 AS PER
SITE
C3-X-P-08 1 6cx4 CT JB SPARE
Y- REQUIREM
PHASE ENT
CT CORE-1 AS PER
SITE
C3-X-P-09 1 6cx4 CT JB BCU CKT (BACK UP PROTECTION)
B- REQUIREM
PHASE ENT
12 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
CT CORE-2 AS PER
SITE
C3-X-P-10 1 6cx4 CT JB METERING CIRCUIT
B- REQUIREM
PHASE ENT
CT CORE-3 AS PER
SITE
C3-X-P-11 1 6cx4 CT JB LINE DIFFERENTIAL RELAY
B- REQUIREM
PHASE ENT
CT CORE-4 AS PER
SITE
C3-X-P-12 1 6cx4 CT JB SPARE
B- REQUIREM
PHASE ENT
PT CORE-1 AS PER
SITE
C3-X-P-13 1 6cx4 PT JB BCU CKT (BACK UP PROTECTION)
R- REQUIREM
PHASE ENT
PT CORE-2 AS PER
SITE
C3-X-P-14 1 6cx4 PT JB SPARE
R- REQUIREM
PHASE ENT
PT CORE-3 AS PER
SITE
C3-X-P-15 1 6cx4 PT JB METERING CIRCUIT
R- REQUIREM
PHASE ENT
13 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
PT CORE-1 AS PER
SITE
C3-X-P-16 1 6cx4 PT JB BCU CKT (BACK UP PROTECTION)
Y- REQUIREM
PHASE ENT
PT CORE-2 AS PER
SITE
C3-X-P-17 1 6cx4 PT JB SPARE
Y- REQUIREM
PHASE ENT
PT CORE-3 AS PER
SITE
C3-X-P-18 1 6cx4 PT JB METERING CIRCUIT
Y- REQUIREM
PHASE ENT
PT CORE-1 AS PER
SITE
C3-X-P-19 1 6cx4 PT JB BCU CKT (BACK UP PROTECTION)
B- REQUIREM
PHASE ENT
PT CORE-2 AS PER
SITE
C3-X-P-20 1 6cx4 PT JB SPARE
B- REQUIREM
PHASE ENT
PT CORE-2 AS PER
SITE
C3-X-P-21 1 6cx4 PT JB METERING CIRCUIT
B- REQUIREM
PHASE ENT
14 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
15 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
16 of 83 Control cable
REV. PREPARED BY: AM
AS PER
SITE
C3-X-P-26 1 12cx2.5 ISO-29-L BMK-POUT DOOR GRID SUBSTATION AT SHAZADABAGH
PROJECT: 33/11KV R0 CHECKED BY: AS
REQUIREM
CABLE SCHEDULE FOR ENT
INCOMING LINE-BAY CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: BND
DOC. NO. :
CT JB AS PER
CORE-1 SITE
C3-Y-P-28 1 6cx4 CRP BCU CKT (BACK UP PROTECTION)
REQUIREM
ENT
CT JB AS PER
CORE-2 SITE
C3-Y-P-29 1 6cx4 CRP METERING CIRCUIT
REQUIREM
ENT
17 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
CT JB AS PER
CORE-3 SITE
C3-Y-P-30 1 6cx4 CRP LINE DIFFERENTIAL RELAY
REQUIREM
ENT
CT JB AS PER
CORE-4 SITE
C3-Y-P-31 1 6cx4 CRP SPARE
REQUIREM
ENT
AS PER
PT JB CORE-1
SITE
C3-Y-P-32 1 6cx4 CRP BCU CKT (BACK UP PROTECTION)
REQUIREM
ENT
AS PER
PT JB CORE-2
SITE
C3-Y-P-33 1 6cx4 CRP DISTANCE PROTECTION
REQUIREM
ENT
AS PER
PT JB CORE-3
SITE
C3-Y-P-34 1 6cx4 CRP METERING
REQUIREM
ENT
18 of 83 Control cable
REV. PREPARED BY: AM
REMOTE-CLOSE
REMOTE-TRIP
PROTECTION TRIP-2
CB CLOSE INDICATION
19 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
AS PER
SITE PART OF CRP INTER PANEL
C3-Z-P-38 1 4cx2.5 CRP EXISTING CRP LBB TRIP CIRCUIT
REQUIREM WIRING
ENT
AS PER
C3-Z-P-40 1 4cx2.5 CRP EXISTING CRP 220V DC SUPPLY SITE PART OF CRP INTER PANEL
REQUIREM WIRING
ENT
AS PER
C3-Z-P-41 1 4cx2.5 CRP EXISTING CRP AC 1 PHASE SUPPLY SITE PART OF CRP INTER PANEL
REQUIREM WIRING
ENT
AS PER
ISO-29-LE SITE
C3-X-P-42 1 4cx2.5 BMK-P AC 1 PHASE SUPPLY
(ISOJB) REQUIREM
ENT
AS PER
ISO-29-L SITE
C3-X-P-43 1 4cx2.5 BMK-P AC 1 PHASE SUPPLY
(ISOJB) REQUIREM
ENT
20 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
AS PER
ISO-29-A SITE
C3-X-P-44 1 4cx2.5 BMK-P AC 1 PHASE SUPPLY
(ISOJB) REQUIREM
ENT
AS PER
ISO-29-B SITE
C3-X-P-45 1 4cx2.5 BMK-P AC 1 PHASE SUPPLY
(ISOJB) REQUIREM
ENT
AS PER
SITE
C3-X-P-46 1 4cx2.5 BMK-P PTJB AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
SITE
C3-X-P-47 1 4cx2.5 BMK-P CTJB AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
SITE
C3-X-P-48 1 4cx2.5 BMK-P CRP AC 1 PHASE SUPPLY
REQUIREM
ENT
AS PER
SITE PART OF CRP INTERPANEL
C3-Z-P-49 1 4cx2.5 CRP EXISTING CRP BUS PT-1 SELECTION
REQUIREM WIRING
ENT
AS PER
SITE PART OF CRP INTERPANEL
C3-Z-P-50 1 4cx2.5 CRP EXISTING CRP BUS PT-2SELECTION
REQUIREM WIRING
ENT
21 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
SWITCH YARD
C6 6 FOR 66KV SWYD
1 FOR 11KV SWYD
BAY NUMBER
P
7/8 FOR INCOMING LINES
Notes
1. if 6cx4 sqmm cable is not available at store, then only 4cx2.5 sqmm cable to be used
2. if cable mentioned in this cable schedule is not available in store, then suitable alternate cable can be used at site as per availability
CABLE
SPECIFIC FROM TO
ATION ROUTE
CABLE TAG NO. RUNS CABLE PURPOSE LENGTH REMARKS
SIZE EQUIPMENT EQUIPMENT (IN Mtrs.)
(IN mm2)
22 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
CT CORE-1 AS PER
SITE consider one spare cable for
C6-X-P-01 1 4CX2.5 CT JB BCU CKT (BACK UP PROTECTION)
R- REQUIREM CT & PT of 4cx2.5
PHASE ENT
CT CORE-2 AS PER
SITE
C6-X-P-02 1 4CX2.5 CT JB METERING CIRCUIT
R- REQUIREM
PHASE ENT
CT CORE-3 AS PER
SITE
C6-X-P-03 1 4CX2.5 CT JB LINE DIFFERENTIAL RELAY
R- REQUIREM
PHASE ENT
CT CORE-4 AS PER
SITE
C6-X-P-04 1 4cx2.5 CT JB SPARE
R- REQUIREM
PHASE ENT
CT CORE-1 AS PER
SITE
C6-X-P-05 1 4cx2.5 CT JB BCU CKT (BACK UP PROTECTION)
Y- REQUIREM
PHASE ENT
CT CORE-2 AS PER
SITE
C6-X-P-06 1 4cx2.5 CT JB METERING CIRCUIT
Y- REQUIREM
PHASE ENT
23 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
CT CORE-3 AS PER
SITE
C6-X-P-07 1 4cx2.5 CT JB LINE DIFFERENTIAL RELAY
Y- REQUIREM
PHASE ENT
CT CORE-4 AS PER
SITE
C6-X-P-08 1 4cx2.5 CT JB SPARE
Y- REQUIREM
PHASE ENT
CT CORE-1 AS PER
SITE
C6-X-P-09 1 4cx2.5 CT JB BCU CKT (BACK UP PROTECTION)
B- REQUIREM
PHASE ENT
CT CORE-2 AS PER
SITE
C6-X-P-10 1 4cx2.5 CT JB METERING CIRCUIT
B- REQUIREM
PHASE ENT
CT CORE-3 AS PER
SITE
C6-X-P-11 1 4cx2.5 CT JB LINE DIFFERENTIAL RELAY
B- REQUIREM
PHASE ENT
CT CORE-4 AS PER
SITE
C6-X-P-12 1 4cx2.5 CT JB SPARE
B- REQUIREM
PHASE ENT
24 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
PT CORE-1 AS PER
SITE
C6-X-P-13 1 4cx2.5 PT JB BCU CKT (BACK UP PROTECTION)
R- REQUIREM
PHASE ENT
PT CORE-2 AS PER
SITE
C6-X-P-14 1 4cx2.5 PT JB DISTANCE PROTECTION
R- REQUIREM
PHASE ENT
PT CORE-3 AS PER
SITE
C6-X-P-15 1 4cx2.5 PT JB METERING CIRCUIT
R- REQUIREM
PHASE ENT
PT CORE-1 AS PER
SITE
C6-X-P-16 1 4cx2.5 PT JB BCU CKT (BACK UP PROTECTION)
Y- REQUIREM
PHASE ENT
PT CORE-2 AS PER
SITE
C6-X-P-17 1 4cx2.5 PT JB DISTANCE PROTECTION
Y- REQUIREM
PHASE ENT
PT CORE-3 AS PER
SITE
C6-X-P-18 1 4cx2.5 PT JB METERING CIRCUIT
Y- REQUIREM
PHASE ENT
PT CORE-1 AS PER
SITE
C6-X-P-19 1 4cx2.5 PT JB BCU CKT (BACK UP PROTECTION)
B- REQUIREM
PHASE ENT
PT CORE-2 AS PER
SITE
C6-X-P-20 1 4cx2.5 PT JB DISTANCE PROTECTION
B- REQUIREM
PHASE ENT
25 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
PT CORE-2 AS PER
SITE
C6-X-P-21 1 4cx2.5 PT JB METERING CIRCUIT
B- REQUIREM
PHASE ENT
REMOTE-CLOSE
REMOTE-TRIP
POST CLOSE SUPERVISION-1
PROTECTION TRIP
DOC. NO. :
COMMON +VE OF BCU
NO CONTACT FOR STATUS IN BCU
NC CONTACT FOR STATUS IN BCU
27 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
COMMON +VE OF BCU
NO CONTACT FOR STATUS IN BCU
CT JB AS PER
CORE-1 SITE
C6-Y-P-29 1 4cx2.5 CRP BCU CKT (BACK UP PROTECTION)
REQUIREM
ENT
CT JB AS PER
CORE-2 SITE
C6-Y-P-30 1 4cx2.5 CRP METERING CIRCUIT
REQUIREM
ENT
CT JB AS PER
CORE-3 SITE
C6-Y-P-31 1 4cx2.5 CRP DISTANCE PROTECTION
REQUIREM
ENT
CT JB AS PER
CORE-4 SITE
C6-Y-P-32 1 4cx2.5 CRP LINE DIFFERENTIAL RELAY
REQUIREM
ENT
28 of 83 Control cable
REV. PREPARED BY: AM
AS PER
PT JB CORE-1
SITE
C6-Y-P-33 1 4cx2.5 CRP BCU CKT (BACK UP PROTECTION)
REQUIREM
ENT
AS PER
PT JB CORE-2
SITE
C6-Y-P-34 1 4cx2.5 CRP DISTANCE PROTECTION
REQUIREM
ENT
AS PER
PT JB CORE-3
SITE
C6-Y-P-35 1 4cx2.5 CRP METERING
REQUIREM
ENT
TO CB CLOSING CIRCUIT
AS PER
SITE
C6-Y-P-36 1 12cx2.5 CB-P CRP
TRIP COIL-1 REQUIREM
ENT
AS PER
SITE
C6-Y-P-37 1 12cx2.5 CB-P CRP
TRIP COIL-2 REQUIREM
ENT
29 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
COMMON +VE OF BCU
LINE PT SUPPLY
30 of 83 Control cable
REV. PREPARED BY: AM
DOC. NO. :
AS PER
SITE PART OF CRP INTER PANEL
C6-Z-P-41 1 4cx2.5 CRP EXISTING CRP LBB TRIP CIRCUIT
REQUIREM WIRING
ENT
AS PER
C6-Z-P-43 1 4cx2.5 CRP EXISTING CRP 220V DC SUPPLY SITE PART OF CRP INTER PANEL
REQUIREM WIRING
ENT
AS PER
C6-Z-P-44 1 4cx2.5 CRP EXISTING CRP AC 1 PHASE SUPPLY SITE PART OF CRP INTER PANEL
REQUIREM WIRING
ENT
AS PER
AC 1 PHASE SUPPLY FOR SPRING CHARGING SITE
C6-X-P-45 1 4cx2.5 BMK-P CRP
MOTOR REQUIREM
ENT
AS PER
SITE PART OF CRP INTERPANEL
C6-Z-P-46 1 4cx2.5 CRP EXISTING CRP BUS PT-1 SELECTION
REQUIREM WIRING
ENT
AS PER
SITE PART OF CRP INTERPANEL
C6-Z-P-47 1 4cx2.5 CRP EXISTING CRP BUS PT-2SELECTION
REQUIREM WIRING
ENT
31 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
SWITCH YARD
C6 6 FOR 66KV SWYD
1 FOR 11KV SWYD
BAY NUMBER
P
9/10 FOR INCOMING LINE-2-
REFERENCE DRAWING :
2K9-645-100-02 DRAWINGS OF BMK G719EA-KG9032-E601 CONTROL & PROTECTION PANEL FOR LINE BAY (602R)
Notes
1. if 6cx4 sqmm cable is not available at store, then only 4cx4 sqmm cable to be used
2. if cable mentioned in this cable schedule is not available in store, then suitable alternate cable can be used at site as per availability
CABLE
FROM TO
SPECIFICATION
REFERENCE ROUTE
TER
CABLE TAG NO. RUNS CABLE TERM PURPOSE DRAWINNG & SHEET LENGTH REMARKS
CABLE MIN
SIZE EQUIPMENT INAL EQUIPMENT NO. (IN Mtrs.)
CORE ID AL
(IN mm2) NO.
NO.
32 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-02 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-03 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-04 1 4CX4 CT JB SPARE KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-05 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-06 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
33 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-08 1 4CX4 CT JB SPARE KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-09 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-10 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-11 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-12 1 4CX4 CT JB SPARE KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1 PT CORE-1 AS PER
2 SITE
C6-X-P-13 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-14 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 R- REQUIREM
PHASE ENT
34 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10
PT CORE-2
CONTRACTOR : M/S SURYA
AS PER
SITE
C6-X-P-14 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
R- DOC. NO. : ND-W-221-M-026 REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-15 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
35 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 PT CORE-1 AS PER
2 SITE
C6-X-P-16 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-17 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-18 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-1 AS PER
2 SITE
C6-X-P-19 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-20 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-21 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
36 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
9 1HYB905115-3
10
37 of 83 Control cable
DATE RIV. PREPARED BY: AM
AS PER
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2
SITE CHECKED BY: AS
CABLE
C6-X-P-24
SCHEDULE
1 10CX2.5
FOR INCOMING
ISO-29-A BMK-P
CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED
REQUIREM
ENT
APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
38 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
AUX NO FOR BKR CLOSING I/L CKT
9
10
12
63.5V AC SUPPLY FROM PT
13
14-19
1
2 CT JB AS PER
3 CORE-1 SITE
C6-Y-P-28 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
39 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2
3 CT JB AS PER
CORE-2 SITE
C6-Y-P-29 1 4CX4 4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
5 ENT
40 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10CT JB CONTRACTOR : M/S SURYA AS PER
CORE-2 SITE
C6-Y-P-29 1 4CX4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
DOC. NO. : ND-W-221-M-026 ENT
6
6
1
2 CT JB AS PER
3 CORE-3 SITE
C6-Y-P-30 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1
2 CT JB AS PER
3 CORE-4 SITE
C6-Y-P-31 1 4CX4 CRP LINE DIFFERENTIAL RELAY G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1 AS PER
2 PT JB CORE-1
SITE
C6-Y-P-32 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-2
SITE
C6-Y-P-33 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-3
SITE
C6-Y-P-34 1 4CX4 CRP METERING G719EA-KG9032-E601
3 REQUIREM
4 ENT
1
TO CB CLOSING CIRCUIT
2
3 AS PER
SITE
C6-Y-P-35 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-1 REQUIREM
5 ENT
6
7-12
1
2
3 AS PER
SITE
C6-Y-P-36 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-2 REQUIREM
5 ENT
6
7-12
41 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
11-12
42 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
LINE PT SUPPLY
9
10-12
1 AS PER
2 SITE PART OF CRP INTER PANEL
C6-Z-P-40 1 4CX4 CRP EXISTING CRP LBB TRIP CIRCUIT
3 REQUIREM WIRING
4 ENT
AS PER
1
LINE CB AND ISOLATOR INTER LOCK WITH DC SITE
C6-Y-P-41 1 4CX4 CRP BMK-P
SUPPLY REQUIREM
2
ENT
1
AS PER
SITE PART OF CRP INTER PANEL
C6-Z-P-43 1 4CX4 CRP EXISTING CRP 220V DC SUPPLY
2 REQUIREM WIRING
ENT
43 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 AS PER
2 AC 1 PHASE SUPPLY FOR SPRING CHARGING SITE
C6-X-P-45 1 4CX4 BMK-P CRP
3 MOTOR REQUIREM
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-47 1 4CX4 CRP EXISTING CRP BUS PT-1 SELECTION
3 REQUIREM WIRING
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-48 1 4CX4 CRP EXISTING CRP BUS PT-2SELECTION
3 REQUIREM WIRING
4 ENT
44 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
SWITCH YARD
C6 6 FOR 66KV SWYD
1 FOR 11KV SWYD
BAY NUMBER
P
9/10 FOR INCOMING LINE-2-
REFERENCE DRAWING :
DRAWINGS OF BMK CONTROL & PROTECTION PANEL FOR LINE BAY (602R)
Notes
1. if 6cx4 sqmm cable is not available at store, then only 4cx4 sqmm cable to be used
2. if cable mentioned in this cable schedule is not available in store, then suitable alternate cable can be used at site as per availability
CABLE
FROM TO
SPECIFICATION
REFERENCE ROUTE
TER
CABLE TAG NO. RUNS CABLE TERM PURPOSE DRAWINNG & SHEET LENGTH REMARKS
CABLE MIN
SIZE EQUIPMENT INAL EQUIPMENT NO. (IN Mtrs.)
CORE ID AL
(IN mm2) NO.
NO.
45 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-02 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-03 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-04 1 4CX4 CT JB SPARE KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-05 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-06 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
46 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-08 1 4CX4 CT JB SPARE KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-09 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-10 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-11 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-12 1 4CX4 CT JB SPARE KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1 PT CORE-1 AS PER
2 SITE
C6-X-P-13 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-14 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 R- REQUIREM
PHASE ENT
47 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10
PT CORE-2
CONTRACTOR : M/S SURYA
AS PER
SITE
C6-X-P-14 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
R- DOC. NO. : ND-W-221-M-026 REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-15 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
48 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 PT CORE-1 AS PER
2 SITE
C6-X-P-16 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-17 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-18 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-1 AS PER
2 SITE
C6-X-P-19 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-20 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-21 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
49 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
9 1HYB905115-3
10
50 of 83 Control cable
DATE RIV. PREPARED BY: AM
AS PER
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2
SITE CHECKED BY: AS
CABLE
C6-X-P-24
SCHEDULE
1 10CX2.5
FOR INCOMING
ISO-29-A BMK-P
CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED
REQUIREM
ENT
APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
51 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
AUX NO FOR BKR CLOSING I/L CKT
9
10
12
63.5V AC SUPPLY FROM PT
13
14-19
1
2 CT JB AS PER
3 CORE-1 SITE
C6-Y-P-28 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
4 REQUIREM
5 ENT
52 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10CT JB
CORE-1 CONTRACTOR : M/S SURYA
AS PER
SITE
C6-Y-P-28 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
REQUIREM
DOC. NO. : ND-W-221-M-026 ENT
6
1
2
3 CT JB AS PER
CORE-2 SITE
C6-Y-P-29 1 4CX4 4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
5 ENT
53 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10CT JB CONTRACTOR : M/S SURYA AS PER
CORE-2 SITE
C6-Y-P-29 1 4CX4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
DOC. NO. : ND-W-221-M-026 ENT
6
6
1
2 CT JB AS PER
3 CORE-3 SITE
C6-Y-P-30 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1
2 CT JB AS PER
3 CORE-4 SITE
C6-Y-P-31 1 4CX4 CRP LINE DIFFERENTIAL RELAY G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1 AS PER
2 PT JB CORE-1
SITE
C6-Y-P-32 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-2
SITE
C6-Y-P-33 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-3
SITE
C6-Y-P-34 1 4CX4 CRP METERING G719EA-KG9032-E601
3 REQUIREM
4 ENT
1
TO CB CLOSING CIRCUIT
2
3 AS PER
SITE
C6-Y-P-35 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-1 REQUIREM
5 ENT
6
7-12
1
2
3 AS PER
SITE
C6-Y-P-36 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-2 REQUIREM
5 ENT
6
7-12
54 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
11-12
55 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
LINE PT SUPPLY
9
10-12
1 AS PER
2 SITE PART OF CRP INTER PANEL
C6-Z-P-40 1 4CX4 CRP EXISTING CRP LBB TRIP CIRCUIT
3 REQUIREM WIRING
4 ENT
AS PER
1
LINE CB AND ISOLATOR INTER LOCK WITH DC SITE
C6-Y-P-41 1 4CX4 CRP BMK-P
SUPPLY REQUIREM
2
ENT
1
AS PER
SITE PART OF CRP INTER PANEL
C6-Z-P-43 1 4CX4 CRP EXISTING CRP 220V DC SUPPLY
2 REQUIREM WIRING
ENT
56 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 AS PER
2 AC 1 PHASE SUPPLY FOR SPRING CHARGING SITE
C6-X-P-45 1 4CX4 BMK-P CRP
3 MOTOR REQUIREM
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-47 1 4CX4 CRP EXISTING CRP BUS PT-1 SELECTION
3 REQUIREM WIRING
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-48 1 4CX4 CRP EXISTING CRP BUS PT-2SELECTION
3 REQUIREM WIRING
4 ENT
57 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
SWITCH YARD
C6 6 FOR 66KV SWYD
1 FOR 11KV SWYD
BAY NUMBER
P
9/10 FOR INCOMING LINE-2-
REFERENCE DRAWING :
DRAWINGS OF BMK CONTROL & PROTECTION PANEL FOR LINE BAY (602R)
Notes
1. if 6cx4 sqmm cable is not available at store, then only 4cx4 sqmm cable to be used
2. if cable mentioned in this cable schedule is not available in store, then suitable alternate cable can be used at site as per availability
CABLE
FROM TO
SPECIFICATION
REFERENCE ROUTE
TER
CABLE TAG NO. RUNS CABLE TERM PURPOSE DRAWINNG & SHEET LENGTH REMARKS
CABLE MIN
SIZE EQUIPMENT INAL EQUIPMENT NO. (IN Mtrs.)
CORE ID AL
(IN mm2) NO.
NO.
58 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-02 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-03 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-04 1 4CX4 CT JB SPARE KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-05 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-06 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
59 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-08 1 4CX4 CT JB SPARE KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-09 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-10 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-11 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-12 1 4CX4 CT JB SPARE KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1 PT CORE-1 AS PER
2 SITE
C6-X-P-13 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-14 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 R- REQUIREM
PHASE ENT
60 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10
PT CORE-2
CONTRACTOR : M/S SURYA
AS PER
SITE
C6-X-P-14 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
R- DOC. NO. : ND-W-221-M-026 REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-15 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
61 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 PT CORE-1 AS PER
2 SITE
C6-X-P-16 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-17 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-18 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-1 AS PER
2 SITE
C6-X-P-19 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-20 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-21 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
62 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
9 1HYB905115-3
10
63 of 83 Control cable
DATE RIV. PREPARED BY: AM
AS PER
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2
SITE CHECKED BY: AS
CABLE
C6-X-P-24
SCHEDULE
1 10CX2.5
FOR INCOMING
ISO-29-A BMK-P
CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED
REQUIREM
ENT
APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
64 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
AUX NO FOR BKR CLOSING I/L CKT
9
10
12
63.5V AC SUPPLY FROM PT
13
14-19
1
2 CT JB AS PER
3 CORE-1 SITE
C6-Y-P-28 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
4 REQUIREM
5 ENT
65 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10CT JB
CORE-1 CONTRACTOR : M/S SURYA
AS PER
SITE
C6-Y-P-28 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
REQUIREM
DOC. NO. : ND-W-221-M-026 ENT
6
1
2
3 CT JB AS PER
CORE-2 SITE
C6-Y-P-29 1 4CX4 4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
5 ENT
66 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10CT JB CONTRACTOR : M/S SURYA AS PER
CORE-2 SITE
C6-Y-P-29 1 4CX4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
DOC. NO. : ND-W-221-M-026 ENT
6
6
1
2 CT JB AS PER
3 CORE-3 SITE
C6-Y-P-30 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1
2 CT JB AS PER
3 CORE-4 SITE
C6-Y-P-31 1 4CX4 CRP LINE DIFFERENTIAL RELAY G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1 AS PER
2 PT JB CORE-1
SITE
C6-Y-P-32 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-2
SITE
C6-Y-P-33 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-3
SITE
C6-Y-P-34 1 4CX4 CRP METERING G719EA-KG9032-E601
3 REQUIREM
4 ENT
1
TO CB CLOSING CIRCUIT
2
3 AS PER
SITE
C6-Y-P-35 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-1 REQUIREM
5 ENT
6
7-12
1
2
3 AS PER
SITE
C6-Y-P-36 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-2 REQUIREM
5 ENT
6
7-12
67 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
11-12
68 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
LINE PT SUPPLY
9
10-12
1 AS PER
2 SITE PART OF CRP INTER PANEL
C6-Z-P-40 1 4CX4 CRP EXISTING CRP LBB TRIP CIRCUIT
3 REQUIREM WIRING
4 ENT
AS PER
1
LINE CB AND ISOLATOR INTER LOCK WITH DC SITE
C6-Y-P-41 1 4CX4 CRP BMK-P
SUPPLY REQUIREM
2
ENT
1
AS PER
SITE PART OF CRP INTER PANEL
C6-Z-P-43 1 4CX4 CRP EXISTING CRP 220V DC SUPPLY
2 REQUIREM WIRING
ENT
69 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 AS PER
2 AC 1 PHASE SUPPLY FOR SPRING CHARGING SITE
C6-X-P-45 1 4CX4 BMK-P CRP
3 MOTOR REQUIREM
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-47 1 4CX4 CRP EXISTING CRP BUS PT-1 SELECTION
3 REQUIREM WIRING
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-48 1 4CX4 CRP EXISTING CRP BUS PT-2SELECTION
3 REQUIREM WIRING
4 ENT
70 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
SWITCH YARD
C6 6 FOR 66KV SWYD
1 FOR 11KV SWYD
BAY NUMBER
P
9/10 FOR INCOMING LINE-2-
REFERENCE DRAWING :
DRAWINGS OF BMK CONTROL & PROTECTION PANEL FOR LINE BAY (602R)
Notes
1. if 6cx4 sqmm cable is not available at store, then only 4cx4 sqmm cable to be used
2. if cable mentioned in this cable schedule is not available in store, then suitable alternate cable can be used at site as per availability
CABLE
FROM TO
SPECIFICATION
REFERENCE ROUTE
TER
CABLE TAG NO. RUNS CABLE TERM PURPOSE DRAWINNG & SHEET LENGTH REMARKS
CABLE MIN
SIZE EQUIPMENT INAL EQUIPMENT NO. (IN Mtrs.)
CORE ID AL
(IN mm2) NO.
NO.
71 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-02 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-03 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-04 1 4CX4 CT JB SPARE KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-5 AS PER
3 SITE
C6-X-P-05 1 4CX4 CT JB SPARE KE-66CT05509
4 R- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-06 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-07 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
72 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-09 1 4CX4 CT JB SPARE KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-5 AS PER
3 SITE
C6-X-P-10 1 4CX4 CT JB SPARE KE-66CT05509
4 Y- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-1 AS PER
3 SITE
C6-X-P-11 1 4CX4 CT JB BCU CKT (BACK UP PROTECTION) KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-2 AS PER
3 SITE
C6-X-P-12 1 4CX4 CT JB METERING CIRCUIT KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-3 AS PER
3 SITE
C6-X-P-13 1 4CX4 CT JB LINE DIFFERENTIAL RELAY KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-4 AS PER
3 SITE
C6-X-P-14 1 4CX4 CT JB SPARE KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1
2 CT CORE-5 AS PER
3 SITE
C6-X-P-15 1 4CX4 CT JB SPARE KE-66CT05509
B- REQUIREM
PHASE ENT
73 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
CT CORE-5 AS PER
DOC. NO. : ND-W-221-M-026 SITE
C6-X-P-15 1 4CX4 CT JB SPARE KE-66CT05509
4 B- REQUIREM
5 PHASE ENT
6
1 PT CORE-1 AS PER
2 SITE
C6-X-P-16 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-17 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-18 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 R- REQUIREM
4 PHASE ENT
74 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 PT CORE-1 AS PER
2 SITE
C6-X-P-19 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-20 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-3 AS PER
2 SITE
C6-X-P-21 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 Y- REQUIREM
4 PHASE ENT
1 PT CORE-1 AS PER
2 SITE
C6-X-P-22 1 4CX4 PT JB BCU CKT (BACK UP PROTECTION) KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-23 1 4CX4 PT JB DISTANCE PROTECTION KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
1 PT CORE-2 AS PER
2 SITE
C6-X-P-24 1 4CX4 PT JB METERING CIRCUIT KE-66PT05579BS
3 B- REQUIREM
4 PHASE ENT
75 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
9 1HYB905115-3
10
76 of 83 Control cable
DATE RIV. PREPARED BY: AM
AS PER
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2
SITE CHECKED BY: AS
CABLE
C6-X-P-27
SCHEDULE
1 10CX2.5
FOR INCOMING
ISO-29-A BMK-P
CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED
REQUIREM
ENT
APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
77 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
AUX NO FOR BKR CLOSING I/L CKT
9
10
12
63.5V AC SUPPLY FROM PT
13
14-19
1
2 CT JB AS PER
3 CORE-1 SITE
C6-Y-P-31 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
4 REQUIREM
5 ENT
78 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10CT JB
CORE-1 CONTRACTOR : M/S SURYA
AS PER
SITE
C6-Y-P-31 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
REQUIREM
DOC. NO. : ND-W-221-M-026 ENT
6
1
2
3 CT JB AS PER
CORE-2 SITE
C6-Y-P-32 1 4CX4 4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
5 ENT
79 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10CT JB CONTRACTOR : M/S SURYA AS PER
CORE-2 SITE
C6-Y-P-32 1 4CX4 CRP METERING CIRCUIT G719EA-KG9032-E601
REQUIREM
DOC. NO. : ND-W-221-M-026 ENT
6
6
1
2 CT JB AS PER
3 CORE-3 SITE
C6-Y-P-33 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1
2 CT JB AS PER
3 CORE-4 SITE
C6-Y-P-34 1 4CX4 CRP LINE DIFFERENTIAL RELAY G719EA-KG9032-E601
4 REQUIREM
5 ENT
6
1 AS PER
2 PT JB CORE-1
SITE
C6-Y-P-35 1 4CX4 CRP BCU CKT (BACK UP PROTECTION) G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-2
SITE
C6-Y-P-36 1 4CX4 CRP DISTANCE PROTECTION G719EA-KG9032-E601
3 REQUIREM
4 ENT
1 AS PER
2 PT JB CORE-3
SITE
C6-Y-P-37 1 4CX4 CRP METERING G719EA-KG9032-E601
3 REQUIREM
4 ENT
1
TO CB CLOSING CIRCUIT
2
3 AS PER
SITE
C6-Y-P-38 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-1 REQUIREM
5 ENT
6
7-12
1
2
3 AS PER
SITE
C6-Y-P-39 1 10CX2.5 4 CB-P CRP G719EA-KG9032-E601
TRIP COIL-2 REQUIREM
5 ENT
6
7-12
80 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
11-12
81 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
8
LINE PT SUPPLY
9
10-12
1 AS PER
2 SITE PART OF CRP INTER PANEL
C6-Z-P-43 1 4CX4 CRP EXISTING CRP LBB TRIP CIRCUIT
3 REQUIREM WIRING
4 ENT
AS PER
1
LINE CB AND ISOLATOR INTER LOCK WITH DC SITE
C6-Y-P-44 1 4CX4 CRP BMK-P
SUPPLY REQUIREM
2
ENT
1
AS PER
SITE PART OF CRP INTER PANEL
C6-Z-P-45 1 4CX4 CRP EXISTING CRP 220V DC SUPPLY
2 REQUIREM WIRING
ENT
82 of 83 Control cable
DATE RIV. PREPARED BY: AM
PROJECT: 66/11KV OUT DOOR GRID SUBSTATION AT RG-DC-1 2/27/2018 R2 CHECKED BY: AS
CABLE SCHEDULE FOR INCOMING CLIENT: TATA POWER DELHI DISTRIBUTION LIMITED APPROVED BY: SRC
LINE-BAY-9&10 CONTRACTOR : M/S SURYA
1 AS PER
2 AC 1 PHASE SUPPLY FOR SPRING CHARGING SITE
C6-X-P-47 1 4CX4 BMK-P CRP
3 MOTOR REQUIREM
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-48 1 4CX4 CRP EXISTING CRP BUS PT-1 SELECTION
3 REQUIREM WIRING
4 ENT
1 AS PER
2 SITE PART OF CRP INTERPANEL
C6-Z-P-49 1 4CX4 CRP EXISTING CRP BUS PT-2SELECTION
3 REQUIREM WIRING
4 ENT
83 of 83 Control cable