A. PURPOSE
The purpose of this document is to ensure that dimensional control is maintained, verified and
performed throughout fabrication process as per project drawing and specification.
B. SCOPE
This procedure is applicable to PT Asianfast Marine Industries and its subcontractors for the
construction of the marine construction or parts.
C. RESPONSIBILITY
a. Supervisor in charge is responsible for:
Monitoring and ensuring the compliance with defined tolerances through all phases of
fabrication (material cutting, fit-up, post welding etc.) and erection activities on the
materials, sub-assembled items, assembled items, final structure etc.
Defining and implementing the remedial actions in case of out of tolerance results
found after dimensional control inspection.
Identifying and requesting additional dimensional inspection (if necessary) during all
phases of fabrication activities.
1. EQUIPMENT
All measuring equipment shall be controlled and calibrated. Typical equipment used is as
follows:
METER TAPE to measure the length of tubular and others such as squareness, height,
ovality etc.;
THEODOLITE to determine the angle, measure the straightness and verticality. It may
also measure the length of beam, pipe, tubular and etc.;
WELDING GAUGE to check and measure the weld size, high-low of tubular, pipe and
all others such as under-cut, material thickness etc.;
TRI-SQUARE to use for marking and measure the squareness;
WATER LEVEL to measure and check the levelness and verticality;
Page 1 of 4
AMI-WI-P-QAC-2 Rev. 00
2. MEASUREMENT
All dimensions shall be measured and reported in metric, and all angles shall be reported
in degrees.
Page 2 of 4
AMI-WI-P-QAC-2 Rev. 00
Page 3 of 4
AMI-WI-P-QAC-2 Rev. 00
F. RECORDS
1. Form AMI-WI-P-QAC-1-1 Internal Inspection Report/Acceptance Report
2. Form AMI-WI-P-QAC-1-2 Inspection Report / Acceptance Report
3. Approved ITP
4. All Material Certificates
5. All NDT reports
6. Project drawing
Page 4 of 4