Reservoir Design Switchboard

Demand Ex. Capacity OHT Capacity


(MLD) (Lakh Gallons) (Lakh Litres)
Zone 1 2.14 0.00 7.00
Zone 2 2.55 2.00 -1.00
Zone 3 3.96 0.00 13.00
Zone 4 3.14 0.00 11.00

Pumping Hours 16 Hrs Pump Roster Hrs 16 Hrs

Pumping Roster

✘ 0400-0500 ✘ 1600-1700

✘ 0500-0600 ✘ 1700-1800

✘ 0600-0700 ✘ 1800-1900

✘ 0700-0800 1900-2000

✘ 0700-0800 2000-2100

✘ 0900-1000 2100-2200

1000-1100 ✘ 2200-2300

1100-1200 ✘ 2300-0000

✘ 1200-1300 0000-0100

✘ 1300-1400 0100-0200

✘ 1400-1500 0200-0300

✘ 1500-1600 ✘ 0300-0400
Reservoirs Capacity Determination (OHT at Zone 1)
Total Water Requirement 2.14 mld = 0.09 ml/hr
Hence P = 0.09 ml/hr

Peak Factor 3
Supply Rate to distribution grid 0.27 ml/hr

Pumping hrs 16
Pumping Factor 1.5
Pump Rate 3.22 mld = 0.13 ml/hr

Time Demand Cum. Demand Pump Q Cum. Pump Q Short/Surplus


(hr) HD Factor (ml/hr) (ml) (ml/hr) (ml/hr) (ml/hr) Remark
04-05 0.20 0.018 0.02 0.13 0.13 0.12
05-06 0.50 0.045 0.06 0.13 0.27 0.21 Min Shortfall
06-07 3.00 0.268 0.33 0.13 0.40 0.07
07-08 3.00 0.268 0.60 0.13 0.54 -0.06
08-09 3.00 0.268 0.87 0.13 0.67 -0.20
09-10 3.00 0.268 1.13 0.13 0.80 -0.33
10-11 0.60 0.054 1.19 0.00 0.80 -0.38
11-12 0.60 0.054 1.24 0.00 0.80 -0.44
12-13 0.60 0.054 1.30 0.13 0.94 -0.36
13-14 3.00 0.268 1.56 0.13 1.07 -0.49 Max Shortfall
14-15 0.35 0.031 1.59 0.13 1.21 -0.39
15-16 0.35 0.031 1.63 0.13 1.34 -0.29
16-17 0.35 0.031 1.66 0.13 1.47 -0.18
17-18 3.00 0.268 1.93 0.13 1.61 -0.32
18-19 0.60 0.054 1.98 0.13 1.74 -0.24
19-20 0.60 0.054 2.03 0.00 1.74 -0.29
20-21 0.40 0.036 2.07 0.00 1.74 -0.33
21-22 0.40 0.036 2.10 0.00 1.74 -0.36
22-23 0.20 0.018 2.12 0.13 1.88 -0.25
23-00 0.05 0.004 2.13 0.13 2.01 -0.12
00-01 0.05 0.004 2.13 0.00 2.01 -0.12
01-02 0.05 0.004 2.14 0.00 2.01 -0.13
02-03 0.05 0.004 2.14 0.00 2.01 -0.13
03-04 0.05 0.004 2.14 0.13 2.14 0.00
24.00 0.00
Capacity of reservoir 0.70 ML 32.50 %
Pump Rating required 37.22 lps

Capacity of Reservoir = 6.97 Lakh Litres


= 1.53 Lakh Gallon
Existing capacity = 0.00 Lakh Gallon
Balance required capacity = 1.53 Lakh Gallon
= 6.97 Lakh Litre
~ 7.00 Lakh Litre

Page 195
Reservoirs Capacity Determination (OHT at Zone 2)
Total Water Requirement 2.55 mld = 0.11 ml/hr
Hence P = 0.11 ml/hr

Peak Factor 3
Supply Rate to distribution grid 0.32 ml/hr

Pumping hrs 16
Pumping Factor 1.5
Pump Rate 3.82 mld = 0.16 ml/hr

Time Demand Cum. Demand Pump Q Cum. Pump Q Short/Surplus


(hr) HD Factor (ml/hr) (ml) (ml/hr) (ml/hr) (ml/hr) Remark
04-05 0.20 0.021 0.02 0.16 0.16 0.14
05-06 0.50 0.053 0.07 0.16 0.32 0.24 Min Shortfall
06-07 3.00 0.319 0.39 0.16 0.48 0.08
07-08 3.00 0.319 0.71 0.16 0.64 -0.07
08-09 3.00 0.319 1.03 0.16 0.80 -0.23
09-10 3.00 0.319 1.35 0.16 0.96 -0.39
10-11 0.60 0.064 1.41 0.00 0.96 -0.46
11-12 0.60 0.064 1.48 0.00 0.96 -0.52
12-13 0.60 0.064 1.54 0.16 1.11 -0.42
13-14 3.00 0.319 1.86 0.16 1.27 -0.58 Max Shortfall
14-15 0.35 0.037 1.90 0.16 1.43 -0.46
15-16 0.35 0.037 1.93 0.16 1.59 -0.34
16-17 0.35 0.037 1.97 0.16 1.75 -0.22
17-18 3.00 0.319 2.29 0.16 1.91 -0.38
18-19 0.60 0.064 2.35 0.16 2.07 -0.28
19-20 0.60 0.064 2.42 0.00 2.07 -0.35
20-21 0.40 0.042 2.46 0.00 2.07 -0.39
21-22 0.40 0.042 2.50 0.00 2.07 -0.43
22-23 0.20 0.021 2.52 0.16 2.23 -0.29
23-00 0.05 0.005 2.53 0.16 2.39 -0.14
00-01 0.05 0.005 2.53 0.00 2.39 -0.14
01-02 0.05 0.005 2.54 0.00 2.39 -0.15
02-03 0.05 0.005 2.54 0.00 2.39 -0.15
03-04 0.05 0.005 2.55 0.16 2.55 0.00
24.00
Capacity of reservoir 0.83 ML 32.50 %
Pump Rating required 44.24 lps

Capacity of Reservoir = 8.28 Lakh Litres


= 1.82 Lakh Gallon
Existing capacity = 2.00 Lakh Gallon
Balance required capacity = -0.18 Lakh Gallon
= -0.80 Lakh Litre
~ -1.00 Lakh Litre

Page 196
Reservoirs Capacity Determination (OHT at Zone 3)
Total Water Requirement 3.96 mld = 0.16 ml/hr
Hence P = 0.16 ml/hr

Peak Factor 3
Supply Rate to distribution grid 0.49 ml/hr

Pumping hrs 16
Pumping Factor 1.5
Pump Rate 5.94 mld = 0.25 ml/hr

Time Demand Cum. Demand Pump Q Cum. Pump Q Short/Surplus


(hr) HD Factor (ml/hr) (ml) (ml/hr) (ml/hr) (ml/hr) Remark
04-05 0.20 0.033 0.03 0.25 0.25 0.21
05-06 0.50 0.082 0.12 0.25 0.49 0.38 Min Shortfall
06-07 3.00 0.495 0.61 0.25 0.74 0.13
07-08 3.00 0.495 1.10 0.25 0.99 -0.12
08-09 3.00 0.495 1.60 0.25 1.24 -0.36
09-10 3.00 0.495 2.09 0.25 1.48 -0.61
10-11 0.60 0.099 2.19 0.00 1.48 -0.71
11-12 0.60 0.099 2.29 0.00 1.48 -0.81
12-13 0.60 0.099 2.39 0.25 1.73 -0.66
13-14 3.00 0.495 2.89 0.25 1.98 -0.91 Max Shortfall
14-15 0.35 0.058 2.94 0.25 2.23 -0.72
15-16 0.35 0.058 3.00 0.25 2.47 -0.53
16-17 0.35 0.058 3.06 0.25 2.72 -0.34
17-18 3.00 0.495 3.55 0.25 2.97 -0.59
18-19 0.60 0.099 3.65 0.25 3.22 -0.44
19-20 0.60 0.099 3.75 0.00 3.22 -0.54
20-21 0.40 0.066 3.82 0.00 3.22 -0.60
21-22 0.40 0.066 3.88 0.00 3.22 -0.67
22-23 0.20 0.033 3.92 0.25 3.46 -0.45
23-00 0.05 0.008 3.92 0.25 3.71 -0.21
00-01 0.05 0.008 3.93 0.00 3.71 -0.22
01-02 0.05 0.008 3.94 0.00 3.71 -0.23
02-03 0.05 0.008 3.95 0.00 3.71 -0.24
03-04 0.05 0.008 3.96 0.25 3.96 0.00
24.00
Capacity of reservoir 1.29 ML 32.50 %
Pump Rating required 68.70 lps

Capacity of Reservoir = 12.86 Lakh Litres


= 2.83 Lakh Gallon
Existing capacity = 0.00 Lakh Gallon
Balance required capacity = 2.83 Lakh Gallon
= 12.86 Lakh Litre
~ 13.00 Lakh Litre

Page 197
Reservoirs Capacity Determination (OHT at Zone 4)
Total Water Requirement 3.14 mld = 0.13 ml/hr
Hence P = 0.13 ml/hr

Peak Factor 3
Supply Rate to distribution grid 0.39 ml/hr

Pumping hrs 16
Pumping Factor 1.5
Pump Rate 4.72 mld = 0.20 ml/hr

Time Demand Cum. Demand Pump Q Cum. Pump Q Short/Surplus


(hr) HD Factor (ml/hr) (ml) (ml/hr) (ml/hr) (ml/hr) Remark
04-05 0.20 0.026 0.03 0.20 0.20 0.17
05-06 0.50 0.065 0.09 0.20 0.39 0.30 Min Shortfall
06-07 3.00 0.393 0.48 0.20 0.59 0.10
07-08 3.00 0.393 0.88 0.20 0.79 -0.09
08-09 3.00 0.393 1.27 0.20 0.98 -0.29
09-10 3.00 0.393 1.66 0.20 1.18 -0.48
10-11 0.60 0.079 1.74 0.00 1.18 -0.56
11-12 0.60 0.079 1.82 0.00 1.18 -0.64
12-13 0.60 0.079 1.90 0.20 1.38 -0.52
13-14 3.00 0.393 2.29 0.20 1.57 -0.72 Max Shortfall
14-15 0.35 0.046 2.34 0.20 1.77 -0.57
15-16 0.35 0.046 2.38 0.20 1.96 -0.42
16-17 0.35 0.046 2.43 0.20 2.16 -0.27
17-18 3.00 0.393 2.82 0.20 2.36 -0.47
18-19 0.60 0.079 2.90 0.20 2.55 -0.35
19-20 0.60 0.079 2.98 0.00 2.55 -0.43
20-21 0.40 0.052 3.03 0.00 2.55 -0.48
21-22 0.40 0.052 3.08 0.00 2.55 -0.53
22-23 0.20 0.026 3.11 0.20 2.75 -0.36
23-00 0.05 0.007 3.12 0.20 2.95 -0.17
00-01 0.05 0.007 3.12 0.00 2.95 -0.18
01-02 0.05 0.007 3.13 0.00 2.95 -0.18
02-03 0.05 0.007 3.14 0.00 2.95 -0.19
03-04 0.05 0.007 3.14 0.20 3.14 0.00
24.00
Capacity of reservoir 1.02 ML 32.50 %
Pump Rating required 54.58 lps

Capacity of Reservoir = 10.22 Lakh Litres


= 2.25 Lakh Gallon
Existing capacity = 0.00 Lakh Gallon
Balance required capacity = 2.25 Lakh Gallon
= 10.22 Lakh Litre
~ 11.00 Lakh Litre

Page 198
Sump Capacity Determination
Total Water Requirement 6.20 mld = 0.26
Hence P = 0.26 ml/hr

Peak Factor 3
Supply Rate to distribution grid 0.78 ml/hr

Pumping hrs 16
Pumping Factor 1.5
Pump Rate 9.30 mld = 0.39

Time HD Factor Demand Cum. Demand Pump Q Cum. Pump Q Short/Surplus


(hr) (ml/hr) (ml) (ml/hr) (ml/hr) (ml/hr)
04-05 0.20 0.052 0.05 0.39 0.39 0.34
05-06 0.50 0.129 0.18 0.39 0.78 0.59
06-07 3.00 0.775 0.96 0.39 1.16 0.21
07-08 3.00 0.775 1.73 0.39 1.55 -0.18
08-09 3.00 0.775 2.51 0.39 1.94 -0.57
09-10 3.00 0.775 3.28 0.39 2.33 -0.96
10-11 0.60 0.155 3.44 0.00 2.33 -1.11
11-12 0.60 0.155 3.59 0.00 2.33 -1.27
12-13 0.60 0.155 3.75 0.39 2.71 -1.03
13-14 3.00 0.775 4.52 0.39 3.10 -1.42
14-15 0.35 0.090 4.61 0.39 3.49 -1.12
15-16 0.35 0.090 4.70 0.39 3.88 -0.83
16-17 0.35 0.090 4.79 0.39 4.26 -0.53
17-18 3.00 0.775 5.57 0.39 4.65 -0.92
18-19 0.60 0.155 5.72 0.39 5.04 -0.68
19-20 0.60 0.155 5.88 0.00 5.04 -0.84
20-21 0.40 0.103 5.98 0.00 5.04 -0.94
21-22 0.40 0.103 6.08 0.00 5.04 -1.05
22-23 0.20 0.052 6.14 0.39 5.43 -0.71
23-00 0.05 0.013 6.15 0.39 5.81 -0.34
00-01 0.05 0.013 6.16 0.00 5.81 -0.35
01-02 0.05 0.013 6.17 0.00 5.81 -0.36
02-03 0.05 0.013 6.19 0.00 5.81 -0.37
03-04 0.05 0.013 6.20 0.39 6.20 0.00
24.00
Capacity of reservoir 2.02 ML 32.50 %
Pump Rating required 107.64 lps

Capacity of Reservoir = 20.15 Lakh Litres


= 4.44 Lakh Gallon
Existing capacity = 0.00 Lakh Gallon
Balance required capacity = 4.44 Lakh Gallon
= 20.15 Lakh Litre
~ 20.00 Lakh Litre
Sump Capacity Determination
ml/hr

ml/hr

Remark

Min Shortfall

Max Shortfall