Reservoir Design Switchboard: Demand (MLD) Ex. Capacity (Lakh Gallons) OHT Capacity (Lakh Litres)
Reservoir Design Switchboard: Demand (MLD) Ex. Capacity (Lakh Gallons) OHT Capacity (Lakh Litres)
Pumping Roster
✘ 0400-0500 ✘ 1600-1700
✘ 0500-0600 ✘ 1700-1800
✘ 0600-0700 ✘ 1800-1900
✘ 0700-0800 1900-2000
✘ 0700-0800 2000-2100
✘ 0900-1000 2100-2200
1000-1100 ✘ 2200-2300
1100-1200 ✘ 2300-0000
✘ 1200-1300 0000-0100
✘ 1300-1400 0100-0200
✘ 1400-1500 0200-0300
✘ 1500-1600 ✘ 0300-0400
Reservoirs Capacity Determination (OHT at Zone 1)
Total Water Requirement 2.14 mld = 0.09 ml/hr
Hence P = 0.09 ml/hr
Peak Factor 3
Supply Rate to distribution grid 0.27 ml/hr
Pumping hrs 16
Pumping Factor 1.5
Pump Rate 3.22 mld = 0.13 ml/hr
Page 195
Reservoirs Capacity Determination (OHT at Zone 2)
Total Water Requirement 2.55 mld = 0.11 ml/hr
Hence P = 0.11 ml/hr
Peak Factor 3
Supply Rate to distribution grid 0.32 ml/hr
Pumping hrs 16
Pumping Factor 1.5
Pump Rate 3.82 mld = 0.16 ml/hr
Page 196
Reservoirs Capacity Determination (OHT at Zone 3)
Total Water Requirement 3.96 mld = 0.16 ml/hr
Hence P = 0.16 ml/hr
Peak Factor 3
Supply Rate to distribution grid 0.49 ml/hr
Pumping hrs 16
Pumping Factor 1.5
Pump Rate 5.94 mld = 0.25 ml/hr
Page 197
Reservoirs Capacity Determination (OHT at Zone 4)
Total Water Requirement 3.14 mld = 0.13 ml/hr
Hence P = 0.13 ml/hr
Peak Factor 3
Supply Rate to distribution grid 0.39 ml/hr
Pumping hrs 16
Pumping Factor 1.5
Pump Rate 4.72 mld = 0.20 ml/hr
Page 198
Sump Capacity Determination
Total Water Requirement 6.20 mld = 0.26
Hence P = 0.26 ml/hr
Peak Factor 3
Supply Rate to distribution grid 0.78 ml/hr
Pumping hrs 16
Pumping Factor 1.5
Pump Rate 9.30 mld = 0.39
ml/hr
Remark
Min Shortfall
Max Shortfall