TELANGANA GRID FOR CHENNUR AND MANCHERIAL CONSTITUENCIES IN ADILABAD DISTRICT.

HYDRAULLIC DESIGN CALCULATIONS

DESIGN CONSIDERATIONS
Clear water at end user point (RURAL) 100 lpcd
Raw water (RURAL) 105 lpcd

Clear water at end user point (URBAN) 135 lpcd


Raw water (URBAN) 142 lpcd

POPULATION CONSIDERATION
Base Year 2018
Prospective Year 2033
Ultimate Year 2048

HOURS OF PUMPING: 22 Hours

EXISTING WATER SUPPLY FACILITIES


Muncipality, Mancherial 70 lpcd Not taken as urban 135 lpcd c
Muncipality, Mandamarri 70 lpcd Not taken as urban 135 lpcd c

1 Population as per 2011 census

Asifabad Constituency Rural

Asifabad

Jainoor

Kerameri

Rebbana

Sirpur-U

Tiryani

Wankidi

Bellampally Constituency

Bellampally

Bheemini

Kasipet

Nennel

Tandoor
Vemanpally

Sirpur-T Constituency

Bejjur

Dahegaon

Kahazanagar

Kowtala

Sirpur- T

No. of Mandals Covered in this Scheme 18


Asifabad Constituency Rural 7
Bellampally Constituency 6
Sirpur-T Constituency 5
Total : 18

2 Rate of Supply Demand


Raw water (Rural)
Clear water Supply (Rural)
Existing Clear water Supply (rural)
Required Clear Water supply (rural)
Raw water (Urban)
Clear water Supply (Urban)
Existing Clear water Supply (Urban)
Required Clear Water supply (urban)

3 Rate of Supply Demand for Habitations Covering under MVS


Covering with 40 LPCD
Raw Water Supply
Clear Water Supply
Covering with 40 LPCD
Raw Water Supply
Clear Water Supply

Hours of supply

4 Water requirement per annum


Ultimate Water demand (Rural + Urban+TSIICL) 2048
Ultimate demand (Rural + Urban+TSIICL) 2048

5 Source of supply : KOMARAM BHEEM PROJECT

6 Rapid sand filters for present population


Prospective Water Demand 2033 (Rural +URBAN)

Req
Req

7 Clear water Sump


Prospective Water Demand 2033 (Rural +URBAN)
LPM
Considering 150 min storage 88084 x 150
Capacity of Sump required
Say

8 OHBR at Head Works


Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 71716 x 30

Say

9 Clear water Sump for Asifabad


Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 1742 x 240
Capacity of Sump required
Say
10 OHBR for Asifabad
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 1742 x 30

Say
11 Clear water Sump for Wankidi
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3207 x 240
Capacity of Sump required
Say
12 OHBR for Wankidi
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3207 x 30

Say
13 Clear water Sump for Keremri
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2258 x 240
Capacity of Sump required
Say
14 OHBR for Keremri
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2258 x 30

Say

15 Clear water Sump for Jainoor


Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2469 x 240
Capacity of Sump required
Say
16 OHBR for Jainoor
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2469 x 30

Say
17 Clear water Sump for Sirpur U
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2788 x 240
Capacity of Sump required
Say
18 OHBR for Sirpur U
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2788 x 30

Say
19 Clear water at Khagaz Nagar JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 66526 x 240
Capacity of Sump required
Say
20 OHBR 1 at Khagaznagar JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 7409 x 30

Say
21 OHBR 2 at Khagaznagar JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 7302 x 30

Say
22 OHBR at Khagaznagar JN towards Rebbena and Bellampally Constituency
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 20214 x 30

Say

23 OHBR for Khagaznagar Mandal


Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 24488 x 30

Say
24 Clear water Sump for Sirpur T Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2810 x 240
Capacity of Sump required
Say
25 OHBR for Sirpur T Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2810 x 30

Say
26 Clear water Sump for Kowthala Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 4598 x 240
Capacity of Sump required
Say
27 OHBR for Kowthala Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 4598 x 30

Say
28 Clear water Sump for Bejjur Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 5265 x 240
Capacity of Sump required
Say
29 OHBR for Bejjur Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 5265 x 30

Say
30 Clear water Sump for DEhegaon Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3376 x 240
Capacity of Sump required
Say
31 OHBR for Dehegaon Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3376 x 30

Say
32 Clear water Sump for Rebbena Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3237 x 240
Capacity of Sump required
Say
33 OHBR for Rebbena Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3237 x 30

Say
34 Clear water Sump for Bheemini Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2373 x 240
Capacity of Sump required
Say
35 OHBR for Bheemini Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2373 x 30

Say
36 Clear water Sump for Tiryani Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2384 x 240
Capacity of Sump required
Say
37 OHBR for Tiryani Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2384 x 30

Say
38 Clear water Sump for Tandoor Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3484 x 240
Capacity of Sump required
Say
39 OHBR for Tandoor Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3484 x 30

Say
40 Clear water Sump at Bellampally JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 14016 x 240
Capacity of Sump required
Say
41 OHBR at Bellampally JN(To Kasipet, Nennel, Vemanpally)
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 14016 x 30

Say
42 OHBR for Bellampally
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 7172 x 30

Say
43 Clear water Sump for Kasipet
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2956 x 240
Capacity of Sump required
Say
44 OHBR for Kasipet Mandal Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2956 x 30

Say
45 Clear water Sump for Nennel
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2124 x 240
Capacity of Sump required
Say
46 OHBR for Nennel Mandal Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2124 x 30

Say
47 Clear water Sump for Vemanplly
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 1763 x 240
Capacity of Sump required
Say
48 OHBR for Vemanpally Mandal Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 1763 x 30

Say
Asst Exe.Engineer Dy Executiev Engineer
RWS&S Asifabad

Executive Engineer Superintending Engineer


RWS&S Division Mancherial RWS&S Circle Adilabad
ES IN ADILABAD DISTRICT.

Not taken as urban 135 lpcd consideration


Not taken as urban 135 lpcd consideration

Population

49,239

31,453

30,724

35,859

26,097

26,410

35,523

26,939

26,285

32,749

23,534

32,617
19,532

49,284

34,712

52,495

50,938

31,130
615,520

105.00 lpcd
100.00 lpcd
55.00
45.00
142.00 lpcd
135.00 lpcd
70.00
65.00

63.00
60.00

63.00
60.00

22.00 Hours

138,028,573.00 Lts
1.779 TMC
116,269,761
116.27 MLD
116.27 MLD
105.00 MLD

116,269,761
88,084 LPM
13,212,600 Ltrs
13,212.60 KL
13,300.00 KL

94,664,741 Ltrs
71,716 LPM
30.00 Minutes
2,151,471 Ltrs.
2,151.47
2,100.00 KL

.
5,749,860 Ltrs
1,742 LPM
418,172 Ltrs
418.17 KL
500.00 KL

5,749,860 Ltrs
1,742 LPM
30.00 Minutes
52,271 Ltrs.
52.27
60.00 KL
.
4,232,900 Ltrs
3,207 LPM
769,618 Ltrs
769.62 KL
700.00 KL

4,232,900 Ltrs
3,207 LPM
30.00 Minutes
96,202 Ltrs.
96.20
90.00 KL
.
2,979,921 Ltrs
2,258 LPM
541,804 Ltrs
541.80 KL
700.00 KL

2,979,921 Ltrs
2,258 LPM
30.00 Minutes
67,725 Ltrs.
67.73
90.00 KL

.
3,258,444 Ltrs
2,469 LPM
592,444 Ltrs
592.44 KL
400.00 KL

3,258,444 Ltrs
2,469 LPM
30.00 Minutes
74,056 Ltrs.
74.06
60.00 KL
.
3,679,725 Ltrs
2,788 LPM
669,041 Ltrs
669.04 KL
700.00 KL

3,679,725 Ltrs
2,788 LPM
30.00 Minutes
83,630 Ltrs.
83.63
90.00 KL
.
87,814,081 Ltrs
66,526 LPM
15,966,197 Ltrs
15,966.20 KL
16,000.00 KL

9,779,300 Ltrs
7,409 LPM
30.00 Minutes
222,257 Ltrs.
222.26
250.00 KL

9,639,120 Ltrs
7,302 LPM
30.00 Minutes
219,071 Ltrs.
219.07
250.00 KL

26,683,000 Ltrs
20,214 LPM
30.00 Minutes
606,432 Ltrs.
606.43
600.00 KL

32,324,211 Ltrs
24,488 LPM
30.00 Minutes
734,641 Ltrs.
734.64
750.00 KL
.
3,709,500 Ltrs
2,810 LPM
674,455 Ltrs
674.45 KL
800.00 KL

3,709,500 Ltrs
2,810 LPM
30.00 Minutes
84,307 Ltrs.
84.31
90.00 KL
.
6,069,800 Ltrs
4,598 LPM
1,103,600 Ltrs
1,103.60 KL
1,000.00 KL

6,069,800 Ltrs
4,598 LPM
30.00 Minutes
137,950 Ltrs.
137.95
150.00 KL
.
6,949,215 Ltrs
5,265 LPM
1,263,494 Ltrs
1,263.49 KL
1,200.00 KL

6,949,215 Ltrs
5,265 LPM
30.00 Minutes
157,937 Ltrs.
157.94
150.00 KL
.
4,456,830 Ltrs
3,376 LPM
810,333 Ltrs
810.33 KL
900.00 KL

4,456,830 Ltrs
3,376 LPM
30.00 Minutes
101,292 Ltrs.
101.29
120.00 KL
.
4,273,000 Ltrs
3,237 LPM
776,909 Ltrs
776.91 KL
800.00 KL

4,273,000 Ltrs
3,237 LPM
30.00 Minutes
97,114 Ltrs.
97.11
120.00 KL
.
3,132,100 Ltrs
2,373 LPM
569,473 Ltrs
569.47 KL
600.00 KL
3,132,100 Ltrs
2,373 LPM
30.00 Minutes
71,184 Ltrs.
71.18
90.00 KL
.
3,147,000 Ltrs
2,384 LPM
572,182 Ltrs
572.18 KL
500.00 KL

3,147,000 Ltrs
2,384 LPM
30.00 Minutes
71,523 Ltrs.
71.52
60.00 KL
.
4,599,105 Ltrs
3,484 LPM
836,201 Ltrs
836.20 KL
1,000.00 KL

4,599,105 Ltrs
3,484 LPM
30.00 Minutes
104,525 Ltrs.
104.53
150.00 KL
.
18,500,550 Ltrs
14,016 LPM
3,363,736 Ltrs
3,363.74 KL
3,300.00 KL

18,500,550 Ltrs
14,016 LPM
30.00 Minutes
420,467 Ltrs.
420.47
400.00 KL

9,466,450 Ltrs
7,172 LPM
30.00 Minutes
215,147 Ltrs.
215.15
200.00 KL
.
3,902,400 Ltrs
2,956 LPM
709,527 Ltrs
709.53 KL
700.00 KL

3,902,400 Ltrs
2,956 LPM
30.00 Minutes
88,691 Ltrs.
88.69
90.00 KL
.
2,804,300 Ltrs
2,124 LPM
509,873 Ltrs
509.87 KL
600.00 KL

2,804,300 Ltrs
2,124 LPM
30.00 Minutes
63,734 Ltrs.
63.73
60.00 KL
.
2,327,400 Ltrs
1,763 LPM
423,164 Ltrs
423.16 KL
500.00 KL

2,327,400 Ltrs
1,763 LPM
30.00 Minutes
52,895 Ltrs.
52.90
60.00 KL
Dy Executiev Engineer
RWS&S Division Asifabad

Superintending Engineer
RWS&S Circle Adilabad
POPULATION CONSIDERATION AND WATER DEMAND CALCULATIONS
Population as per 2011 census Population
Asifabad Constituency Rural 2011
Asifabad 49,239
Jainoor 31,453
Kerameri 30,724
Rebbana 35,859
Sirpur-U 26,097
Tiryani 26,410
Wankidi 35,523
Bellampally Constituency
Bellampally 26,939
Bheemini 26,285
Kasipet 32,749
Nennel 23,534
Tandoor 32,617
Vemanpally 19,532
Sirpur-T Constituency
Bejjur 49,284
Dahegaon 34,712
Kahazanagar 52,495
Kowtala 50,938
Sirpur- T 31,130
Khanapur Constituency
Indravelly 47,506
Utnoor 63,465
Rural Population 726,491

Khazanagar Muncipility 57,583


Bellampally Muncipility 53,958
Urban Population 111,541

No. of Habitations Population

Total Mandal No. of Ongoing


Sl No Mandal Population habitationa Ongoing
100(Not Commissioned 100 LPCD(Not Commissioned (Covered
Covered under (Coverd with 40 Covered under (Coverd with with 55
any MVS) LPCD) any MVS) 40 LPCD) Bal : LPCD) Bal :45
60 lpcd lpcd
40 LPCD 100 LPCD

1 Asifabad 49,239 120 118 2 0 0 46,775 2464


2 Jainoor 31,453 83 83 0 46 0 10,593 20860
3 Kerameri 30,724 116 116 0 74 0 6,748 23976
4 Rebbana 35,859 61 61 0 0 0 35,859
5 Sirpur-U 26,097 135 135 0 0 0 26,097
6 Tiryani 26,410 145 145 0 0 0 26,410
7 Wankidi 35,523 92 92 0 0 0 35,523
8 Bellampally 26,939 35 35 0 0 0 26,939
9 Bheemini 26,285 50 50 0 0 0 26,285
10 Kasipet 32,749 57 57 0 0 0 32,749
11 Nennel 23,534 34 34 0 0 0 23,534
12 Tandoor 32,617 48 48 0 0 0 32,617
13 Vemanpally 19,532 34 34 0 0 0 19,532
14 Bejjur 49,284 82 82 0 0 0 49,284
15 Dahegaon 34,712 62 54 2 6 0 26,952 958 6802
16 Kahazanagar 52,495 101 101 0 0 0 52,495
17 Kowtala 50,938 65 65 0 0 0 50,938
18 Sirpur- T 31,130 49 49 0 0 0 31,130
19 Indravelly 47,506 146 146 0 0 0 47,506
20 Utnoor 63,465 155 155 0 0 0 63,465
Total 726,491 1,670 671,431 3,422 51,638

Rural Urban
POPULATION GROWTH CONSIDERED 0.80% 2.00%

Page 19 of 47
BASE YEAR 2018
PROSPECTIVE YEAR 2033
ULTIMATE YEAR 2048

PROSPECTIVE POPULATION FOR 2033


No. of Habitations Population
Ongoing
Total Mandal No. of Commissioned Commissioned Ongoing
Sl No Mandal 100(Not 100 LPCD(Not (Coverd with (Covered
Population habitationa Covered under (Coverd with 40 Covered under 40 LPCD) Bal : with 55
LPCD) Bal : 40 LPCD 100 LPCD
any MVS) 60lpcd any MVS) 60 lpcd LPCD) Bal :45
lpcd
1 Asifabad 58,673 120 118 2 0 0 55,737 2,936 0
2 Jainoor 37,479 83 83 0 46 0 12,623 0 24,857
3 Kerameri 36,611 116 116 0 74 0 8,041 0 28,570
4 Rebbana 42,730 61 61 0 0 0 42,730 0 0
5 Sirpur-U 31,097 135 135 0 0 0 31,097 0 0
6 Tiryani 31,470 145 145 0 0 0 31,470 0 0
7 Wankidi 42,329 92 92 0 0 0 42,329 0 0
8 Bellampally 32,101 35 35 0 0 0 32,101 0 0
9 Bheemini 31,321 50 50 0 0 0 31,321 0 0
10 Kasipet 39,024 57 57 0 0 0 39,024 0 0
11 Nennel 28,043 34 34 0 0 0 28,043 0 0
12 Tandoor 38,867 48 48 0 0 0 38,867 0 0
13 Vemanpally 23,274 34 34 0 0 0 23,274 0 0
14 Bejjur 58,727 82 82 0 0 0 58,727 0 0
15 Dahegaon 41,363 62 54 2 6 8 32,116 1,142 8,105
16 Kahazanagar 62,553 101 101 0 0 0 62,553 0 0
17 Kowtala 60,698 65 65 0 0 0 60,698 0 0
18 Sirpur- T 37,095 49 49 0 0 0 37,095 0 0
19 Indravelly 56,608 146 146 0 0 0 56,608 0 0
20 Utnoor 75,625 155 155 0 0 0 75,625 0 0
Total 865,688 1,369

ULTIMATE POPULATION FOR 2048


No. of Habitations Population
Ongoing
Ongoing
Total Mandal No. of 100(Not Commissioned 100 LPCD(Not Commissioned (Covered
Sl No Mandal Population habitationa Covered under (Coverd with 40 (Coverd with
Covered under with 55
any MVS) LPCD) Bal : 55 LPCD 100 LPCD any MVS) 40 LPCD) Bal : LPCD) Bal :45
60lpcd 60 lpcd lpcd

1 Asifabad 66,122 120 118 2 0 0 62,814 3,309 0


2 Jainoor 42,238 83 83 0 46 0 14,225 0 28,013
3 Kerameri 41,259 116 116 0 74 0 9,062 0 32,197
4 Rebbana 48,155 61 61 0 0 0 48,155 0 0
5 Sirpur-U 35,045 135 135 0 0 0 35,045 0 0
6 Tiryani 35,466 145 145 0 0 0 35,466 0 0
7 Wankidi 47,703 92 92 0 0 0 47,703 0 0
8 Bellampally 36,176 35 35 0 0 0 36,176 0 0
9 Bheemini 35,298 50 50 0 0 0 35,298 0 0
10 Kasipet 43,978 57 57 0 0 0 43,978 0 0
11 Nennel 31,604 34 34 0 0 0 31,604 0 0
12 Tandoor 43,801 48 48 0 0 0 43,801 0 0
13 Vemanpally 26,229 34 34 0 0 0 26,229 0 0
14 Bejjur 66,183 82 82 0 0 0 66,183 0 0
15 Dahegaon 46,614 62 54 2 6 8 36,194 1,286 9,134
16 Kahazanagar 70,495 101 101 0 0 0 70,495 0 0
17 Kowtala 68,404 65 65 0 0 0 68,404 0 0
18 Sirpur- T 41,804 49 49 0 0 0 41,804 0 0
19 Indravelly 63,795 146 146 0 0 0 63,795 0 0
20 Utnoor 85,226 155 155 0 0 0 85,226 0 0

Urban population
2011 2018 2033 2048
Bellampally 53,958 61981 83418 112270
Kahazanagar 57,583 66145 89022 119813

Page 20 of 47
2 Rate of Supply Demand
Raw water (Rural) 105.00 lpcd
Clear water Supply (Rural) 100.00 lpcd
Existing Clear water Supply (rural) 55.00
Required Clear Water supply (rural) 45.00
Raw water (Urban) 142.00 lpcd
Clear water Supply (Urban) 135.00 lpcd
Existing Clear water Supply (Urban) 60.00
Required Clear Water supply (urban) 75.00
Required Raw Water supply (urban) 79.00

3 Rate of Supply Demand for Habitations Covering under MVS


Covering with 40 LPCD
Raw Water Supply 63.00
Clear Water Supply 60.00
Covering with 55 LPCD
Raw Water Supply 48.00
Clear Water Supply 45.00

Hours of supply 22.00 Hours

Prospective Clear Water Demand 2033


Rural

Population demand population demand Population demand Total


Sl. No Name of the Total Total Prospective
Mandal Population Habitations Demand
100 LPCD(Not Coverd
Covered under with 40 Covered with 40
any MVS) At 100 LPCD LPCD supply@ 60 LPCD supply@ 60 LPCD
1 Asifabad 58,673 120 55,737 5573700 2,936 176160 0 0 5,749,860
2 Jainoor 37,479 83 12,623 1262300 0 0 24,857 1,491,420 2,753,720
3 Kerameri 36,611 116 8,041 804100 0 0 28,570 1,714,200 2,518,300
4 Rebbana 42,730 61 42,730 4273000 0 0 0 0 4,273,000
5 Sirpur-U 31,097 135 31,097 3109700 0 0 0 0 3,109,700
6 Tiryani 31,470 145 31,470 3147000 0 0 0 0 3,147,000
7 Wankidi 42,329 92 42,329 4232900 0 0 0 0 4,232,900
8 Bellampally 32,101 35 32,101 3210100 0 0 0 0 3,210,100
9 Bheemini 31,321 50 31,321 3132100 0 0 0 0 3,132,100
10 Kasipet 39,024 57 39,024 3902400 0 0 0 0 3,902,400
11 Nennel 28,043 34 28,043 2804300 0 0 0 0 2,804,300
12 Tandoor 38,867 48 38,867 3886700 0 0 0 0 3,886,700
13 Vemanpally 23,274 34 23,274 2327400 0 0 0 0 2,327,400
14 Bejjur 58,727 82 58,727 5872700 0 0 0 0 5,872,700
15 Dahegaon 41,363 62 32,116 3211600 1,142 68520 8,105 486,300 3,766,420
16 Kahazanagar 62,553 101 62,553 6255300 0 0 0 0 6,255,300
17 Kowtala 60,698 65 60,698 6069800 0 0 0 0 6,069,800
18 Sirpur- T 37,095 49 37,095 3709500 0 0 0 0 3,709,500
19 Indravelly 56,608 146 56,608 5660800 0 0 0 0 5,660,800
20 Utnoor 75,625 155 75,625 7562500 0 0 0 0 7,562,500
83,944,500
Required
Base year Prospective Supply@ 65
Urban Census 2011 2018 2033 LPCD
Bellampally 53,958 61981 83418 6256350
Kahaznagar 57,583 66145 89022 6676650
12933000 PROSPECTIVE CLEAR WATER

2033 Prospective Clear water Demand Rural 83944500 Lts 83.94 MLD 1.082 TMC
2033 Prospective Clear water Demand Urban 12933000 Lts 12.93 MLD 0.167 TMC
2033 TSIIC Req@0.25 TMC 19392261 Lts 19.39 MLD 0.250 TMC
2033 Total Clear Water Prospective Demand 2033(Rural+Urban) 116269761 Lts 116.27 MLD 1.499 TMC
LPM 88083.15227273
Ultimate Clear Water Demand 2048
Rural
Population Demand Population Demand Population Demand
Total Total Total
Sl. No Mandal UltimateDem
Population Habitations
and

Page 21 of 47
Total
Sl. No Mandal Total Total UltimateDem
Population Habitations 100 LPCD(Not Coverd
and
Covered under with 40 Covered with 40
any MVS) At 100 LPCD LPCD supply@ 60 LPCD supply@ 60 LPCD
1 Asifabad 66,122 120 62,814 6281400 3,309 198540 0 0 6,479,940
2 Jainoor 42,238 83 14,225 1422500 0 0 28,013 1,680,780 3,103,280
3 Kerameri 41,259 116 9,062 906200 0 0 32,197 1,931,820 2,838,020
4 Rebbana 48,155 61 48,155 4815500 0 0 0 0 4,815,500
5 Sirpur-U 35,045 135 35,045 3504500 0 0 0 0 3,504,500
6 Tiryani 35,466 145 35,466 3546600 0 0 0 0 3,546,600
7 Wankidi 47,703 92 47,703 4770300 0 0 0 0 4,770,300
8 Bellampally 36,176 35 36,176 3617600 0 0 0 0 3,617,600
9 Bheemini 35,298 50 35,298 3529800 0 0 0 0 3,529,800
10 Kasipet 43,978 57 43,978 4397800 0 0 0 0 4,397,800
11 Nennel 31,604 34 31,604 3160400 0 0 0 0 3,160,400
12 Tandoor 43,801 48 43,801 4380100 0 0 0 0 4,380,100
13 Vemanpally 26,229 34 26,229 2622900 0 0 0 0 2,622,900
14 Bejjur 66,183 82 66,183 6618300 0 0 0 0 6,618,300
15 Dahegaon 46,614 62 36,194 3619400 1,286 77160 9,134 548,040 4,244,600
16 Kahazanagar 70,495 101 70,495 7049500 0 0 0 0 7,049,500
17 Kowtala 68,404 65 68,404 6840400 0 0 0 0 6,840,400
18 Sirpur- T 41,804 49 41,804 4180400 0 0 0 0 4,180,400
19 Indravelly 63,795 146 63,795 6379500 0 0 0 0 6,379,500
20 Utnoor 85,226 155 85,226 8522600 0 0 0 0 8,522,600
94,602,040

Base year Required


Census 2011 Ultimate 2048 Supply@ 75
2018
Urban LPCD
Bellampally 53,958 61981 112270 8420250
Kahazanagar 57,583 66145 119813 8985975
17406225 ULTIMATE CLEAR WATER

2048 Ultimate Clear Demand Rural 94602040 Lts 94.60 MLD 1.219 TMC
2048 Ultimate Clear Demand Urban 17406225 Lts 17.41 MLD 0.224 TMC
2048 TSIIC Req@0.25 TMC 19392261 Lts 19.39 MLD 0.250 TMC
2048 Total Clear Water Ultimate Demand 2048(Rural+Urban) 131400526 Lts 131.40 MLD 1.694 TMC
` 99545.8530303 lpm 19392261
Prospective Raw Water Demand 2033
Rural
Population Demand Population Demand Population Demand
Total
Sl. No Mandal Total Total 100 LPCD(Not Coverd Prospective
Population Habitations Covered under At 105 LPCD with 40 Covered
supply@ 63 LPCD with 40 supply@ 63 LPCD Demand
any MVS) LPCD LPCD

1 Asifabad 58,673 120 55,737 5852385 2,936 184968 0 0 6,037,353


2 Jainoor 37,479 83 12,623 1325415 0 0 24,857 1,565,991 2,891,406
3 Kerameri 36,611 116 8,041 844305 0 0 28,570 1,799,910 2,644,215
4 Rebbana 42,730 61 42,730 4486650 0 0 0 0 4,486,650
5 Sirpur-U 31,097 135 31,097 3265185 0 0 0 0 3,265,185
6 Tiryani 31,470 145 31,470 3304350 0 0 0 0 3,304,350
7 Wankidi 42,329 92 42,329 4444545 0 0 0 0 4,444,545
8 Bellampally 32,101 35 32,101 3370605 0 0 0 0 3,370,605
9 Bheemini 31,321 50 31,321 3288705 0 0 0 0 3,288,705
10 Kasipet 39,024 57 39,024 4097520 0 0 0 0 4,097,520
11 Nennel 28,043 34 28,043 2944515 0 0 0 0 2,944,515
12 Tandoor 38,867 48 38,867 4081035 0 0 0 0 4,081,035
13 Vemanpally 23,274 34 23,274 2443770 0 0 0 0 2,443,770
14 Bejjur 58,727 82 58,727 6166335 0 0 0 0 6,166,335
15 Dahegaon 41,363 62 32,116 3372180 1,142 71946 8,105 510,615 3,954,741
16 Kahazanagar 62,553 101 62,553 6568065 0 0 0 0 6,568,065
17 Kowtala 60,698 65 60,698 6373290 0 0 0 0 6,373,290
18 Sirpur- T 37,095 49 37,095 3894975 0 0 0 0 3,894,975
19 Indravelly 56,608 49 56,608 5943840 0 0 0 0 5,943,840
20 Utnoor 75,625 49 75,625 7940625 0 0 0 0 7,940,625
88,141,725

Page 22 of 47
Base year Required
Census 2011 Ultimate 2048 Supply@ 69
2018
Urban LPCD
Bellampally 53,958 61981 83418 6590022
Khaznagar 57,583 66145 89022 7032738
13622760 PROSPECTIVE RAW WATER

2033 Prospective Raw Demand Rural 88141725 Lts 88.14 MLD 1.136 TMC
2033 Prospective Raw Demand Urban 13622760 Lts 13.62 MLD 0.176 TMC
2033 TSIIC Req@0.25 TMC 20361874 Lts 20.36 MLD 0.262 TMC
2033 Total Raw Water Prospective Demand 2033(Rural+Urban) 122126359 Lts 122.13 MLD 1.574 TMC
92519.96893939

Ultimate Raw Water Demand 2048


Rural
Population Demand Population Demand Population Demand
Total
Sl. No Mandal Total Total Coverd Prospective
Population Habitations 100 LPCD(Not At 105 LPCD with 40
Covered with 40
supply@ 63 LPCD LPCD supply@ 63 LPCD Demand
Covered under
any MVS) LPCD
1 Asifabad 66,122 120 62,814 6595470 3,309 208467 0 0 6,803,937
2 Jainoor 42,238 83 14,225 1493625 0 0 28,013 1,764,819 3,258,444
3 Kerameri 41,259 116 9,062 951510 0 0 32,197 2,028,411 2,979,921
4 Rebbana 48,155 61 48,155 5056275 0 0 0 0 5,056,275
5 Sirpur-U 35,045 135 35,045 3679725 0 0 0 0 3,679,725
6 Tiryani 35,466 145 35,466 3723930 0 0 0 0 3,723,930
7 Wankidi 47,703 92 47,703 5008815 0 0 0 0 5,008,815
8 Bellampally 36,176 35 36,176 3798480 0 0 0 0 3,798,480
9 Bheemini 35,298 50 35,298 3706290 0 0 0 0 3,706,290
10 Kasipet 43,978 57 43,978 4617690 0 0 0 0 4,617,690
11 Nennel 31,604 34 31,604 3318420 0 0 0 0 3,318,420
12 Tandoor 43,801 48 43,801 4599105 0 0 0 0 4,599,105
13 Vemanpally 26,229 34 26,229 2754045 0 0 0 0 2,754,045
14 Bejjur 66,183 82 66,183 6949215 0 0 0 0 6,949,215
15 Dahegaon 46,614 62 36,194 3800370 1,286 81018 9,134 575,442 4,456,830
16 Kahazanagar 70,495 101 70,495 7401975 0 0 0 0 7,401,975
17 Kowtala 68,404 65 68,404 7182420 0 0 0 0 7,182,420
18 Sirpur- T 41,804 49 41,804 4389420 0 0 0 0 4,389,420
19 Indravelly 63,795 146 63,795 6698475 0 0 0 0 6,698,475
20 Utnoor 85,226 155 85,226 8948730 0 0 0 0 8,948,730
99,332,142
Required
Census 2011 Base year Ultimate 2048 Supply@ 69
Urban 2018 LPCD
Bellampally 53,958 61981 112270 8869330
Kahaznagar 57,583 66145 119813 9465227
18334557 ULTIMATE RAW WATER

Ultimate Demand Rural 99332142 Lts 99.33 MLD 1.280 TMC


Ultimate Demand Urban 18334557 Lts 18.33 MLD 0.236 TMC
TSIIC Req@0.25 TMC 20361874 Lts 20.36 MLD 0.262 TMC 0.25
TotalRaw Water Ultimate Demand 2048(Rural+Urban) 138028573 Lts 138.03 MLD 1.779 TMC
104567.1007576
Asst Exe.Engineer Dy Executiev Engineer
RWS&S Adilabad RWS&S Adilabad

Executive Engineer Superintending Engineer


RWS&S Adilabad RWS&S Circle Adilabad

Page 23 of 47
DESIGN CONSIDERATIONS
Rural Urban URBAN ONSIDERATIONS
POPULATION GROWTH CONSIDERED 0.80% 2.00%
Year 2015 Year 2020 Year 2030 Year 2040 Year 2050
Raw water Raw water Raw water Raw water Raw water
requirement requirement requirement requirement requirement
Name in MLD in MLD in MLD in MLD in MLD
BASE YEAR (Commissioning year) 2018 Year --> 2015 2020 2030 2033 2040 2048 2050
PROSPECTIVE YEAR 2033 ADILABAD 13.55 16.63 22.77 24.61 28.90 35.05 36.59
ULTIMATE YEAR 2048 NIRMAL 9.41 11.02 14.24 15.21 17.46 20.83 21.67

DESIGN CONSIDERATIONS
Clear water at end user point (RURAL) NA lpcd
Clear water for transmission lines (RURAL) 100 lpcd
Raw water (RURAL) 105 lpcd

Clear water at end user point (URBAN) NA lpcd


Clear water for transmission lines (URBAN) 135 lpcd
Raw water (URBAN) 142 lpcd

HOURS OF PUMPING: 22 Hours

RETENTION TIME FOR OHBRS 30.00 Minutes


CLEAR WATER SUMP STORAGE TIME @Head Works 150.00 Minutes
CLEAR WATER SUMP STORAGE TIME @Intermediate Pumping Stations 240.00 Minutes
Growth rate: 2.00% Clear Water: 135 lpcd Raw Water: 142 lpcd

Census Base Year Prospective Year Ultimate year


Muncipality 2033 Prospective Demand in lpcd 2048 Ultimate Demand in lpcd
Population Population population population

2011 2018 2033 2048 RAW WATER CLEAR WATER RAW WATER CLEAR WATER

Adilabad 117,388 134,842 181,480 244,248 25,770,160 24,499,800 34,683,216 32,973,480


Adilabad Muncipality (as per CE(PH)) 24,609,000 23,437,143 35,052,000 33,382,858

INDUSTRIAL REQUIREMENT 2793000 2660000 2793000 2660000

25.78 MLD 24.50 MLD 34.69 MLD 32.98 MLD


Nirmal 88,205 101,320 136,364 183,527 8,863,688 8,409,140 15,560,834 14,776,145
Nirmal Muncipality (as per CE(PH)) 15,206,000 14,481,905 20,828,000 19,836,191
8.87 MLD 8.41 MLD 15.57 MLD 14.78 MLD

TOTAL (population basis & industrial) 37,426,848 35,568,940 53,037,050 50,409,625


37.43 MLD 35.57 MLD 53.04 MLD 50.41 MLD
RAW WATER REQUIREMENT FOR NIRMAL, BOATH ADILABAD GRID

Mandal Census Base Year Prospective Ultimate 2033 Prospective Demand in litres per day 2048 Ultimate Demand in litres per day
Population Year
Population population year
population
2011 2018 2033 2048 RAW WATER CLEAR WATER RAW WATER CLEAR WATER
NIRMAL CONSTITUENCY
Sarangapur 48,820 51620 58174 65560 6,108,270 5,817,400 6,883,800 6,556,000
Deduct coverage (877,965) (877,965) (877,965) (877,965)
Sarangapur Net 5,230,305 4,939,435 6,005,835 5,678,035
Dilawarpur 35,780 37832 42636 48049 4,476,780 4,263,600 5,045,145 4,804,900
Mamda 32,303 34156 38492 43379 4,041,660 3,849,200 4,554,795 4,337,900
Nirmal Muncipality 15,206,000 14,481,905 20,828,000 19,836,191
NIRMAL CONSTITUENCY TOTAL 28,954,745 27,534,140 36,433,775 34,657,026
28.96 MLD 27.54 MLD 36.44 MLD 34.66 MLD
BOATH & ADILABAD CONSTITUENCY
Neredigonda 29,633 31333 35311 39794 3,707,655 3,531,100 4,178,370 3,979,400
Boath 48,216 50982 57454 64749 6,032,670 5,745,400 6,798,645 6,474,900
Deduct coverage (1,059,025) (1,059,025) (1,059,025) (1,059,025)
Boath Net 4,973,645 4,686,375 5,739,620 5,415,875
Ichoda 52,840 55871 62964 70958 6,611,220 6,296,400 7,450,590 7,095,800
Bazarhatnoor 28,911 30569 34450 38824 3,617,250 3,445,000 4,076,520 3,882,400
Gudihatnoor 30,339 32079 36152 40742 3,795,960 3,615,200 4,277,910 4,074,200
Talamadugu 34,632 36619 41268 46507 4,333,140 4,126,800 4,883,235 4,650,700
Tamsi 39,631 41904 47224 53220 4,958,520 4,722,400 5,588,100 5,322,000
Adilabad 58,955 62337 70251 79170 7,376,355 7,025,100 8,312,850 7,917,000
Jainath 47,904 50652 57083 64330 5,993,715 5,708,300 6,754,650 6,433,000
Deduct coverage (204,160) (204,160) (204,160) (204,160)
Jainath Net 5,789,555 5,504,140 6,550,490 6,228,840
Bela 38,318 40516 45660 51457 4,794,300 4,566,000 5,402,985 5,145,700
Deduct coverage (380,710) (380,710) (380,710) (380,710)
Bela Net 4,413,590 4,185,290 5,022,275 4,764,990
Adilabad Muncipality incl. Indusrial requirement 27,402,000 26,097,143 37,845,000 36,042,858
BOATH & ADILABAD CONSTITUENCY TOTAL 76,978,890 73,234,948 93,924,960 89,374,063
76.98 MLD 73.24 MLD 93.93 MLD 89.38 MLD
GRAND TOTAL 105,933,635 100,769,088 130,358,735 124,031,089
105.94 MLD 100.77 MLD 130.36 MLD 124.04 MLD
1.366 TMC 1.299 TMC 1.681 TMC 1.599 TMC

ADILABAD SEGMENT SOURCE: SRSP


LPD 2033 RAW 2033 CLEAR 2048 RAW 2048 CLEAR
Rural 63,325,635 60,190,040 71,685,735 68,152,040
Muncipal 34,633,848 32,908,940 50,244,050 47,749,625
Industrial 2,793,000 2,660,000 2,793,000 2,660,000
Total: 100,752,483 95,758,980 124,722,785 118,561,665

MLD 2033 RAW 2033 CLEAR 2048 RAW 2048 CLEAR


Rural 63.33 60.19 71.69 68.15
Muncipal 34.63 32.91 50.24 47.75
Industrial 2.79 2.66 2.79 2.66
Total: 100.750 95.760 124.720 118.560

TMC 2033 RAW 2033 CLEAR 2048 RAW 2048 CLEAR


Rural 0.817 0.776 0.924 0.879
Muncipal 0.447 0.425 0.648 0.616
Industrial 0.036 0.035 0.036 0.035
Total: 1.300 1.236 1.608 1.530

LPM 2033 RAW 2033 CLEAR 2048 RAW 2048 CLEAR


Rural 47,974 45,599 54,307 51,630
Muncipal 26,238 24,931 38,064 36,174
Industrial 2,116 2,015 2,116 2,015
Total: 76,328 72,545 94,487 89,819

POPULATION 2011 2018 2033 2048


Rural 526,282 556,470 627,119 706,739
Muncipal 205,593 236,162 317,844 427,775
Industrial - - - -
Total: 731,875 792,632 944,963 1,134,514
TELANGANA JALAJALAM
HYDRAULIC DESIGNS OF ADILABAD SEGMENT IN ADILABAD
DISTRICT
Name of the work : Providing safe drinking water to all habitations in
Adilabad segment in Adilabad District

Demografic data
Base year : 2018
Design period : 30 years
Prospective year : 2033
Ultimate year : 2048 Rural Urban
Population growth rate : 0.8 % As Per PH Demand
Raw water demand : 105 LPCD
Clear water demand : 100 LPCD
Pumping duration in hours : 22 Hours
Sump Capacity : 2.5 hours at Head works and 4 hours at IPS
OHBR/GLBR Capacity : 30 Minutes

1 Design data
Population details/Habitations covered habitations
No.of Habitations : 869 habitations
No of Mandals Covered : 13
Adilabad constituency : Adilabad, Bela, Jainath
Boath Constituency : Boath, Neredigonda, Ichoda, Bazarhatnoor,
Gudihatnoor, Talamadugu & Tamsi
Nirmal Constituency : Sarangapur, Dilawarpur & Mamada

No of Municipalities 2 ( Adilabad, Nirmal )

Rural Urban in MLD


Population as per 2011 Census : 526282 Adilabad Nirmal
Prospective Population (2033) : 627119 28.13 16.13
Ultimate Population (2048) : 706737 37.86 23.44

For Industries (TSIIC) MLD TMC LPM


Prospective Clear water Demand from Grid : 10.88 0.138 8242
Ultimate Clear water Demand from Grid : 13.40 0.174 10152

Demand of GRID incl., Industries MLD TMC LPM


Prospective Clear water Demand from Grid : 119.70 1.543 89802
Prospective Raw water Demand from Grid : 125.69 1.62 94293
Ultimate Clear water Demand from Grid : 147.42 1.900 110719
Ultimate Raw water Demand from Grid : 154.79 1.995 116255

Total Demand at Intake well


Prospective Raw water Demand from Grid : 1.620 94293
Ultimate Raw water Demand from Grid : 1.995 116255

2 DETAILS OF THE SOURCE


Source : SRI RAMA SAGAR PROJECT
Location : NEAR
Page 28 of 47
River :
TBL : 337.72 m
Full resrvoir level : 332.53 m
Maximum water level : 333.14 m
Dead storage level : 318.60 m
Dead storage capacity : 6.00 TMC
Full Capacity : 90.00 TMC

Page 29 of 47
A INTAKE WELL
4 Details of Intake well
Location of Intake well : Near Local Velmal in Dilawarpur Mandal
Ground level near Intake well : 326.60 m
FV L of Pumps in Intake well (Considering 2.0m 311.00 m
water head on Pump bowl) :
Bottom of Intake well (invert level) (Considering 309.00 m
2.0m for Silting) :
Floor level of Intake well : 335.25 m
Top of Intake well : 347.25 m
Height of well : 26.25 m
Height of pump room : 12.00 m
No Of Pump sets : 2.00 Nos
Perovision For Ultimate Pump sets : 2.00 Nos
Total No of Pump sets : 4.00 Nos
Center to Center Distance of pumps : 4.50 m
Length of Pump room Required : 18.00 m
Lets Provide Length of Intake well : 34.00 m
Width of Intake well : 12.00 m

7 Raw water Pump sets at Intake well for Lifting Raw water to Aerator in Filter head
works

FVL of Pumpset : 311.00 m


End level (Aerator in Filter beds) : 425.00 m
Static head : 114.00 m
Prospective Clear water LPM : 94293 lpm
Length of Pumping main : 21.92 kms
Internal Diameter of Pumping main 1400 mm
Frictional Losses with 10% other Losses : 10.89 m
Driving head : 6m
pumping station Losses : 3m
Total head : 134 m
Efficiancy : 75%
Total HP required : 3741 HP
Type of P/set : VT Pump sets ( HT Pumps)
No of Pump sets : 4 Nos (2 No Stand By)
Prvide : 1000 HP VT pumpsets.
FILTER HEAD WORKS NEAR ADA VILLAGE

8 Details of Filter head works near Ada village


Location : Near Madegaon in Dilawarpur Mandal
App Ground level : 420.00 m
Top of Aerator : 430.00 m
Prospective clear water lpm : 89802 lpm
Prospective clear water lpm with 2 % Losses : 91598 lpm
Prospective clear water demand : 120.9 MLD
Filters capacity required : 129.15 MLD
Provide Filter beds capacity : 130 MLD Rapid Sand Filters

9 Clear water Sump


Page 30 of 47
ProspectiveClear water demand : 91598 lpm
Storage capacity : 150 Minutes
Capacity of sump required : 15114 cum
Capacity of sump provided : 15000 cum

Asst Executive Engineer Dy Executive Engineer


TDWSP Nirmal SD TDWSP Nirmal SD

Executive Engineer Superintending Engineer


TDWSP Nirmal Division TDWSP Nirmal Circle

Page 31 of 47
Prospective Ultimate
2011 Population 2033 Population 2048 Population LPCD 2033 LPM 2048 LPM

Tamsi OHBR HS 74436 88699 99961 100 6720 7573

BPT ( GLBR ) on TAMSI ( SUNKIDI ) GUTTA total: 6720 7573

Indusrial@10% 672 757

7392 8330

Adilabad Muncipality
Prospective 28.13MLD
Ultimate 37.86MLD 117388 181480 244249 135 21311 28682

Indusrial@10% 2131 2868

23442 31550

Adilabad Mandal HS 70348 83827 94470 100 6351 7157

Jainath-Bela HS 75445 89901 101315 100 6811 7676

Indusrial@10% 1317 1484

BPT ( OHBR ) m Staging on ADILABAD @ GL 320.00 total: 14479 16317

Prospective Ultimate

Main Trunk upto Adilabad Gutta BPT Jn 45313 56197

Prospective Ultimate
Bazarhatnoor & Ichoda
HS 79752 95033 107099 100 7200 8114

Gudihatnoor HS 34426 41023 46232 100 3108 3503

SUMP @ BABULDHOLE total: 10308 11617

Indusrial@10% 1031 1162

11339 12779

Prospective Ultimate

Main Trunk upto Babuldole SUMP 56652 68976


(Main trunk from Arepally GLBR to Babuldole Gutta Jn)

Prospective Ultimate

Previous LPM 56652 68976

Neredigonda & Both HS 80605 96050 108245 100 7277 8201

Indusrial@10% 728 820

8005 9021

Mamada HS 32415 38626 43530 100 2927 3298


Indusrial@10% 293 330

3220 3628

0 0

GLBR Capacity on AREPALLY GUTTA total: 67877 81625


(Pumping Main from WTP Sump to Arepally Gutta GLBR)

Prospective Ultimate
Nirmal Muncipality
Prospective 16.13MLD
Ultimate 23.44 MLD 88205 136364 183528 135 12220 17758

Indusrial@10% 1222 1776

13442 19534

Prospective Ultimate
Sarangapur-Dilawarpur
HS 85421 101788 114711 100 7712 8691

OHBR at WTP for Sarangapur & Dilawarpur total: 7712 8691


LITRES PER DAY MLD
Base Year 2018 Prospective Year 2033 Ultimate Year 2048 Base Year 2018 Prospective Year 2033 Ultimate Year 2048
Clear Raw Clear Raw Clear Raw Clear Raw Clear Raw Clear
Rural 83944500 88141725 94602040 99332142 Rural 83.94 88.14 94.6
Urban 12933000 13622760 17406225 18334557 Urban 12.93 13.62 17.41
TSIIC 19392261 20361874 19392261 20361874 TSIIC 19.39 20.36 19.39
Total 116269761 122126359 131400526 138028573 Total 116.27 122.13 131.4

TMC LPM FOR 22 HRS


Base Year 2018 Prospective Year 2033 Ultimate Year 2048 Base Year 2018 Prospective Year 2033 Ultimate Year 2048
Clear Raw Clear Raw Clear Raw Clear Raw Clear Raw Clear
Rural 1.082 1.136 1.219 1.28 Rural 63594 66774 71668
Urban 0.167 0.176 0.224 0.236 Urban 9798 10320 13187
TSIIC 0.25 0.262 0.250 0.262 TSIIC 14691 15426 14691
Total 1.499 1.574 1.694 1.779 Total 88083 92520 99546
Ultimate Year 2048
Raw
99.33
18.33
20.36
138.03

Ultimate Year 2048


Raw
75252
13890
15426
104567
2011 Census
Adilabad 58,955
Jainad 47,904
Bela 38,318

Tamsi 39,631
Talamadugu 34,632
Gudihathnoor 30,339
Ichoda 52,840
Bazarhathnoor 28,911
Boath 48,216
Neradigonda 29,633

Sarangapur 48,820
Dilawarpur 35,780
Mamda 32,303

526,282

Urban Demand

Adilabad Muncipality
Prospective 28.17MLD
Ultimate 37.92MLD

Nirmal Muncipality
Prospective 16.17MLD
Ultimate 23.49 MLD

Rural Demand
Urban Demand
Industrial Demand
Total
Rural Demand
Urban Demand
Industrial Demand
Total
2018 Demand 2033 Demand MLD
62,337.00 6,233,700.00 70,251.00 7,025,100.00 7.03
50,652.00 5,065,200.00 57,083.00 5,708,300.00 5.71
40,516.00 4,051,600.00 45,660.00 4,566,000.00 4.57
- - -
41,904.00 4,190,400.00 47,224.00 4,722,400.00 4.72
36,619.00 3,661,900.00 41,268.00 4,126,800.00 4.13
32,079.00 3,207,900.00 36,152.00 3,615,200.00 3.62
55,871.00 5,587,100.00 62,964.00 6,296,400.00 6.30
30,569.00 3,056,900.00 34,450.00 3,445,000.00 3.45
50,982.00 5,098,200.00 57,454.00 5,745,400.00 5.75
31,333.00 3,133,300.00 35,311.00 3,531,100.00 3.53
- - - - -
51,620.00 5,162,000.00 58,174.00 5,817,400.00 5.82
37,832.00 3,783,200.00 42,636.00 4,263,600.00 4.26
34,156.00 3,415,600.00 38,492.00 3,849,200.00 3.85

Rural Total 62.71

Urban Demand 2033

Adilabad Muncipality
Prospective 28.17MLD
Ultimate 37.92MLD 28.17

Nirmal Muncipality
Prospective 16.17MLD
Ultimate 23.49 MLD 16.17

44.34

Clear Water Demand


2033 LPM 2048 LPM
Rural Demand 62.71 47509 70.67 53541
Urban Demand 44.34 33591 61.41 46523
Industrial Demand 10.70519 8110 13.20839 10006
117.76 89,210.00 145.29 110,070.00
Raw Water Demand
2033 LPM 2048 LPM
Rural Demand 63.03 47747 74.21 56218
Urban Demand 44.5617 33759 64.4805 48849
Industrial Demand 10.76 8151 13.87 10507
118.35 89,657.00 152.56 115,574
2048 MLD
79,170.00 7,917,000.00 7.92
64,330.00 6,433,000.00 6.43
51,457.00 5,145,700.00 5.15
- -
53,220.00 5,322,000.00 5.32
46,507.00 4,650,700.00 4.65
40,742.00 4,074,200.00 4.07
70,958.00 7,095,800.00 7.10
38,824.00 3,882,400.00 3.88
64,749.00 6,474,900.00 6.47
39,794.00 3,979,400.00 3.98
- - -
65,560.00 6,556,000.00 6.56
48,049.00 4,804,900.00 4.80
43,379.00 4,337,900.00 4.34

70.67

2048

37.92

23.49

61.41
TELANGANA JALAJALAM
HYDRAULIC DESIGNS OF ADILABAD SEGMENT IN ADILABAD
DISTRICT
Name of the work : Providing safe drinking water to all habitations in
Adilabad segment in Adilabad District

Demografic data
Base year : 2018
Design period : 30 years
Prospective year : 2033
Ultimate year : 2048 Rural Urban
Population growth rate : 0.8 % 2
Raw water demand : 105 LPCD 142
Clear water demand : 100 LPCD 135
Pumping duration in hours : 22 Hours
Sump Capacity : 2.5 hours at Head works and 4 hours at IPS
OHBR/GLBR Capacity : 15-30 Minutes

1 Design data
Population details/Habitations covered habitations
No.of Habitations : 930 habitations
No of Mandals Covered : 13
Adilabad constituency : Adilabad, Bela, Jainoor
Boath Constituency : Boath, Neredigonda, Ichoda, Bazarhatnoor,
Gudihatnoor, Talamadugu & Tamsi
Nirmal Constituency : Sarangapur, Dilawarpur & Mamada

No of Municipalities 2 ( Adilabad, Nirmal )

Rural Urban Total


Population as per 2011 Census : 526282 205593 731875
Prospective Population (2033) : 627119 317843 944962
Ultimate Population (2048) : 706737 427775 1134512

For Industries (TSIIC) MLD TMC LPM


Prospective Clear water Demand from Grid : 10.88 0.138 8242
Ultimate Clear water Demand from Grid : 13.40 0.174 10152

Demand of GRID incl., Industries MLD TMC LPM


Prospective Clear water Demand from Grid : 119.70 1.543 89,210.00
Prospective Raw water Demand from Grid : 125.69 1.62 89,657.00
Ultimate Clear water Demand from Grid : 147.42 1.9 110,070.00
Ultimate Raw water Demand from Grid : 154.79 1.995 115574

Total Demand at Intake well


Prospective Raw water Demand from Grid : 1.620 89657
Ultimate Raw water Demand from Grid : 1.995 115574

Page 41 of 47
2 DETAILS OF THE SOURCE
Source : SRI RAMA SAGAR PROJECT
Location : NEAR
River :
TBL : 337.72 m
Full resrvoir level : 332.53 m
Maximum water level : 333.14 m
Dead storage level : 318.60 m
Dead storage capacity : 6.00 TMC
Full Capacity : TMC

Page 42 of 47
A INTAKE WELL

4 Details of Intake well


Location of Intake well : Near Local Velmal in Dilawarpur Mandal
Ground level near Intake well : 326.60 m
FV L of Pumps in Intake well (Considering 2.0m 311.00 m
water head on Pump bowl) :
Bottom of Intake well (invert level) (Considering 309.00 m
2.0m for Silting) :
Floor level of Intake well : 335.25 m
Top of Intake well : 347.25 m
Height of well : 26.25 m
Height of pump room : 12.00 m
No Of Pump sets : 2.00 Nos
: Nos
Perovision For Ultimate Pump sets : 2.00 Nos
Total No of Pump sets : 4.00 Nos
Center to Center Distance of pumps : 4.50 m
Length of Pump room Required : 18.00 m
Lets Provide Length of Intake well : 34.00 m
Width of Intake well : 12.00 m

7 Raw water Pump sets at Intake well for Lifting Raw water to Aerator in Filter head
works

FVL of Pumpset : 311.00 m


End level (Aerator in Filter beds) : 425.00 m
Static head : 114.00 m
Prospective Clear water LPM : 89657 lpm
Length of Pumping main : 21.92 kms
Internal Diameter of Pumping main 1400 mm
Frictional Losses with 10% other Losses : 9.94 m
Driving head : 6m
pumping station Losses : 3m
Total head : 133 m
Efficiancy : 75%
Total HP required : 3532 HP
Type of P/set : VT Pump sets ( HT Pumps)
No of Pump sets : 4 Nos (2 No Stand By)
Prvide : 890 HP VT pumpsets.

FILTER HEAD WORKS NEAR ADA VILLAGE

8 Details of Filter head works near Ada village


Location : Near Madegaon in Dilawarpur Mandal
App Ground level : 420.00 m

Page 43 of 47
Top of Aerator : 430.00 m
Prospective clear water lpm : 90994 lpm
Prospective clear water demand : 120.1 MLD
Filters capacity required : 128.30 MLD
Provide Filter beds capacity : 130 MLD Rapid Sand Filters

9 Clear water Sump


ProspectiveClear water demand : 90994 lpm
Storage capacity : 150 Minutes
Capacity of sump required : 15014 cum
Capacity of sump provided : 15000 cum

Page 44 of 47
N ADILABAD

r to all habitations in
d District

%
LPCD
LPCD

4 hours at IPS

azarhatnoor,

Page 45 of 47
ator in Filter head

2 No Stand By)

Page 46 of 47
Sand Filters

Page 47 of 47