DESIGN CONSIDERATIONS
Clear water at end user point (RURAL) 100 lpcd
Raw water (RURAL) 105 lpcd
POPULATION CONSIDERATION
Base Year 2018
Prospective Year 2033
Ultimate Year 2048
Asifabad
Jainoor
Kerameri
Rebbana
Sirpur-U
Tiryani
Wankidi
Bellampally Constituency
Bellampally
Bheemini
Kasipet
Nennel
Tandoor
Vemanpally
Sirpur-T Constituency
Bejjur
Dahegaon
Kahazanagar
Kowtala
Sirpur- T
Hours of supply
Req
Req
Say
Say
11 Clear water Sump for Wankidi
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3207 x 240
Capacity of Sump required
Say
12 OHBR for Wankidi
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3207 x 30
Say
13 Clear water Sump for Keremri
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2258 x 240
Capacity of Sump required
Say
14 OHBR for Keremri
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2258 x 30
Say
Say
17 Clear water Sump for Sirpur U
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2788 x 240
Capacity of Sump required
Say
18 OHBR for Sirpur U
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2788 x 30
Say
19 Clear water at Khagaz Nagar JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 66526 x 240
Capacity of Sump required
Say
20 OHBR 1 at Khagaznagar JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 7409 x 30
Say
21 OHBR 2 at Khagaznagar JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 7302 x 30
Say
22 OHBR at Khagaznagar JN towards Rebbena and Bellampally Constituency
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 20214 x 30
Say
Say
24 Clear water Sump for Sirpur T Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2810 x 240
Capacity of Sump required
Say
25 OHBR for Sirpur T Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2810 x 30
Say
26 Clear water Sump for Kowthala Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 4598 x 240
Capacity of Sump required
Say
27 OHBR for Kowthala Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 4598 x 30
Say
28 Clear water Sump for Bejjur Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 5265 x 240
Capacity of Sump required
Say
29 OHBR for Bejjur Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 5265 x 30
Say
30 Clear water Sump for DEhegaon Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3376 x 240
Capacity of Sump required
Say
31 OHBR for Dehegaon Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3376 x 30
Say
32 Clear water Sump for Rebbena Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3237 x 240
Capacity of Sump required
Say
33 OHBR for Rebbena Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3237 x 30
Say
34 Clear water Sump for Bheemini Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2373 x 240
Capacity of Sump required
Say
35 OHBR for Bheemini Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2373 x 30
Say
36 Clear water Sump for Tiryani Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2384 x 240
Capacity of Sump required
Say
37 OHBR for Tiryani Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2384 x 30
Say
38 Clear water Sump for Tandoor Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 3484 x 240
Capacity of Sump required
Say
39 OHBR for Tandoor Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 3484 x 30
Say
40 Clear water Sump at Bellampally JN
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 14016 x 240
Capacity of Sump required
Say
41 OHBR at Bellampally JN(To Kasipet, Nennel, Vemanpally)
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 14016 x 30
Say
42 OHBR for Bellampally
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 7172 x 30
Say
43 Clear water Sump for Kasipet
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2956 x 240
Capacity of Sump required
Say
44 OHBR for Kasipet Mandal Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2956 x 30
Say
45 Clear water Sump for Nennel
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 2124 x 240
Capacity of Sump required
Say
46 OHBR for Nennel Mandal Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 2124 x 30
Say
47 Clear water Sump for Vemanplly
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Considering 240 min storage 1763 x 240
Capacity of Sump required
Say
48 OHBR for Vemanpally Mandal Mandal
Prospective Water Demand 2033 (Rural +URBAN)
Prospective demand in LPM
Retention time
Capacity of OHBR for 30 minutes demand = 1763 x 30
Say
Asst Exe.Engineer Dy Executiev Engineer
RWS&S Asifabad
Population
49,239
31,453
30,724
35,859
26,097
26,410
35,523
26,939
26,285
32,749
23,534
32,617
19,532
49,284
34,712
52,495
50,938
31,130
615,520
105.00 lpcd
100.00 lpcd
55.00
45.00
142.00 lpcd
135.00 lpcd
70.00
65.00
63.00
60.00
63.00
60.00
22.00 Hours
138,028,573.00 Lts
1.779 TMC
116,269,761
116.27 MLD
116.27 MLD
105.00 MLD
116,269,761
88,084 LPM
13,212,600 Ltrs
13,212.60 KL
13,300.00 KL
94,664,741 Ltrs
71,716 LPM
30.00 Minutes
2,151,471 Ltrs.
2,151.47
2,100.00 KL
.
5,749,860 Ltrs
1,742 LPM
418,172 Ltrs
418.17 KL
500.00 KL
5,749,860 Ltrs
1,742 LPM
30.00 Minutes
52,271 Ltrs.
52.27
60.00 KL
.
4,232,900 Ltrs
3,207 LPM
769,618 Ltrs
769.62 KL
700.00 KL
4,232,900 Ltrs
3,207 LPM
30.00 Minutes
96,202 Ltrs.
96.20
90.00 KL
.
2,979,921 Ltrs
2,258 LPM
541,804 Ltrs
541.80 KL
700.00 KL
2,979,921 Ltrs
2,258 LPM
30.00 Minutes
67,725 Ltrs.
67.73
90.00 KL
.
3,258,444 Ltrs
2,469 LPM
592,444 Ltrs
592.44 KL
400.00 KL
3,258,444 Ltrs
2,469 LPM
30.00 Minutes
74,056 Ltrs.
74.06
60.00 KL
.
3,679,725 Ltrs
2,788 LPM
669,041 Ltrs
669.04 KL
700.00 KL
3,679,725 Ltrs
2,788 LPM
30.00 Minutes
83,630 Ltrs.
83.63
90.00 KL
.
87,814,081 Ltrs
66,526 LPM
15,966,197 Ltrs
15,966.20 KL
16,000.00 KL
9,779,300 Ltrs
7,409 LPM
30.00 Minutes
222,257 Ltrs.
222.26
250.00 KL
9,639,120 Ltrs
7,302 LPM
30.00 Minutes
219,071 Ltrs.
219.07
250.00 KL
26,683,000 Ltrs
20,214 LPM
30.00 Minutes
606,432 Ltrs.
606.43
600.00 KL
32,324,211 Ltrs
24,488 LPM
30.00 Minutes
734,641 Ltrs.
734.64
750.00 KL
.
3,709,500 Ltrs
2,810 LPM
674,455 Ltrs
674.45 KL
800.00 KL
3,709,500 Ltrs
2,810 LPM
30.00 Minutes
84,307 Ltrs.
84.31
90.00 KL
.
6,069,800 Ltrs
4,598 LPM
1,103,600 Ltrs
1,103.60 KL
1,000.00 KL
6,069,800 Ltrs
4,598 LPM
30.00 Minutes
137,950 Ltrs.
137.95
150.00 KL
.
6,949,215 Ltrs
5,265 LPM
1,263,494 Ltrs
1,263.49 KL
1,200.00 KL
6,949,215 Ltrs
5,265 LPM
30.00 Minutes
157,937 Ltrs.
157.94
150.00 KL
.
4,456,830 Ltrs
3,376 LPM
810,333 Ltrs
810.33 KL
900.00 KL
4,456,830 Ltrs
3,376 LPM
30.00 Minutes
101,292 Ltrs.
101.29
120.00 KL
.
4,273,000 Ltrs
3,237 LPM
776,909 Ltrs
776.91 KL
800.00 KL
4,273,000 Ltrs
3,237 LPM
30.00 Minutes
97,114 Ltrs.
97.11
120.00 KL
.
3,132,100 Ltrs
2,373 LPM
569,473 Ltrs
569.47 KL
600.00 KL
3,132,100 Ltrs
2,373 LPM
30.00 Minutes
71,184 Ltrs.
71.18
90.00 KL
.
3,147,000 Ltrs
2,384 LPM
572,182 Ltrs
572.18 KL
500.00 KL
3,147,000 Ltrs
2,384 LPM
30.00 Minutes
71,523 Ltrs.
71.52
60.00 KL
.
4,599,105 Ltrs
3,484 LPM
836,201 Ltrs
836.20 KL
1,000.00 KL
4,599,105 Ltrs
3,484 LPM
30.00 Minutes
104,525 Ltrs.
104.53
150.00 KL
.
18,500,550 Ltrs
14,016 LPM
3,363,736 Ltrs
3,363.74 KL
3,300.00 KL
18,500,550 Ltrs
14,016 LPM
30.00 Minutes
420,467 Ltrs.
420.47
400.00 KL
9,466,450 Ltrs
7,172 LPM
30.00 Minutes
215,147 Ltrs.
215.15
200.00 KL
.
3,902,400 Ltrs
2,956 LPM
709,527 Ltrs
709.53 KL
700.00 KL
3,902,400 Ltrs
2,956 LPM
30.00 Minutes
88,691 Ltrs.
88.69
90.00 KL
.
2,804,300 Ltrs
2,124 LPM
509,873 Ltrs
509.87 KL
600.00 KL
2,804,300 Ltrs
2,124 LPM
30.00 Minutes
63,734 Ltrs.
63.73
60.00 KL
.
2,327,400 Ltrs
1,763 LPM
423,164 Ltrs
423.16 KL
500.00 KL
2,327,400 Ltrs
1,763 LPM
30.00 Minutes
52,895 Ltrs.
52.90
60.00 KL
Dy Executiev Engineer
RWS&S Division Asifabad
Superintending Engineer
RWS&S Circle Adilabad
POPULATION CONSIDERATION AND WATER DEMAND CALCULATIONS
Population as per 2011 census Population
Asifabad Constituency Rural 2011
Asifabad 49,239
Jainoor 31,453
Kerameri 30,724
Rebbana 35,859
Sirpur-U 26,097
Tiryani 26,410
Wankidi 35,523
Bellampally Constituency
Bellampally 26,939
Bheemini 26,285
Kasipet 32,749
Nennel 23,534
Tandoor 32,617
Vemanpally 19,532
Sirpur-T Constituency
Bejjur 49,284
Dahegaon 34,712
Kahazanagar 52,495
Kowtala 50,938
Sirpur- T 31,130
Khanapur Constituency
Indravelly 47,506
Utnoor 63,465
Rural Population 726,491
Rural Urban
POPULATION GROWTH CONSIDERED 0.80% 2.00%
Page 19 of 47
BASE YEAR 2018
PROSPECTIVE YEAR 2033
ULTIMATE YEAR 2048
Urban population
2011 2018 2033 2048
Bellampally 53,958 61981 83418 112270
Kahazanagar 57,583 66145 89022 119813
Page 20 of 47
2 Rate of Supply Demand
Raw water (Rural) 105.00 lpcd
Clear water Supply (Rural) 100.00 lpcd
Existing Clear water Supply (rural) 55.00
Required Clear Water supply (rural) 45.00
Raw water (Urban) 142.00 lpcd
Clear water Supply (Urban) 135.00 lpcd
Existing Clear water Supply (Urban) 60.00
Required Clear Water supply (urban) 75.00
Required Raw Water supply (urban) 79.00
2033 Prospective Clear water Demand Rural 83944500 Lts 83.94 MLD 1.082 TMC
2033 Prospective Clear water Demand Urban 12933000 Lts 12.93 MLD 0.167 TMC
2033 TSIIC Req@0.25 TMC 19392261 Lts 19.39 MLD 0.250 TMC
2033 Total Clear Water Prospective Demand 2033(Rural+Urban) 116269761 Lts 116.27 MLD 1.499 TMC
LPM 88083.15227273
Ultimate Clear Water Demand 2048
Rural
Population Demand Population Demand Population Demand
Total Total Total
Sl. No Mandal UltimateDem
Population Habitations
and
Page 21 of 47
Total
Sl. No Mandal Total Total UltimateDem
Population Habitations 100 LPCD(Not Coverd
and
Covered under with 40 Covered with 40
any MVS) At 100 LPCD LPCD supply@ 60 LPCD supply@ 60 LPCD
1 Asifabad 66,122 120 62,814 6281400 3,309 198540 0 0 6,479,940
2 Jainoor 42,238 83 14,225 1422500 0 0 28,013 1,680,780 3,103,280
3 Kerameri 41,259 116 9,062 906200 0 0 32,197 1,931,820 2,838,020
4 Rebbana 48,155 61 48,155 4815500 0 0 0 0 4,815,500
5 Sirpur-U 35,045 135 35,045 3504500 0 0 0 0 3,504,500
6 Tiryani 35,466 145 35,466 3546600 0 0 0 0 3,546,600
7 Wankidi 47,703 92 47,703 4770300 0 0 0 0 4,770,300
8 Bellampally 36,176 35 36,176 3617600 0 0 0 0 3,617,600
9 Bheemini 35,298 50 35,298 3529800 0 0 0 0 3,529,800
10 Kasipet 43,978 57 43,978 4397800 0 0 0 0 4,397,800
11 Nennel 31,604 34 31,604 3160400 0 0 0 0 3,160,400
12 Tandoor 43,801 48 43,801 4380100 0 0 0 0 4,380,100
13 Vemanpally 26,229 34 26,229 2622900 0 0 0 0 2,622,900
14 Bejjur 66,183 82 66,183 6618300 0 0 0 0 6,618,300
15 Dahegaon 46,614 62 36,194 3619400 1,286 77160 9,134 548,040 4,244,600
16 Kahazanagar 70,495 101 70,495 7049500 0 0 0 0 7,049,500
17 Kowtala 68,404 65 68,404 6840400 0 0 0 0 6,840,400
18 Sirpur- T 41,804 49 41,804 4180400 0 0 0 0 4,180,400
19 Indravelly 63,795 146 63,795 6379500 0 0 0 0 6,379,500
20 Utnoor 85,226 155 85,226 8522600 0 0 0 0 8,522,600
94,602,040
2048 Ultimate Clear Demand Rural 94602040 Lts 94.60 MLD 1.219 TMC
2048 Ultimate Clear Demand Urban 17406225 Lts 17.41 MLD 0.224 TMC
2048 TSIIC Req@0.25 TMC 19392261 Lts 19.39 MLD 0.250 TMC
2048 Total Clear Water Ultimate Demand 2048(Rural+Urban) 131400526 Lts 131.40 MLD 1.694 TMC
` 99545.8530303 lpm 19392261
Prospective Raw Water Demand 2033
Rural
Population Demand Population Demand Population Demand
Total
Sl. No Mandal Total Total 100 LPCD(Not Coverd Prospective
Population Habitations Covered under At 105 LPCD with 40 Covered
supply@ 63 LPCD with 40 supply@ 63 LPCD Demand
any MVS) LPCD LPCD
Page 22 of 47
Base year Required
Census 2011 Ultimate 2048 Supply@ 69
2018
Urban LPCD
Bellampally 53,958 61981 83418 6590022
Khaznagar 57,583 66145 89022 7032738
13622760 PROSPECTIVE RAW WATER
2033 Prospective Raw Demand Rural 88141725 Lts 88.14 MLD 1.136 TMC
2033 Prospective Raw Demand Urban 13622760 Lts 13.62 MLD 0.176 TMC
2033 TSIIC Req@0.25 TMC 20361874 Lts 20.36 MLD 0.262 TMC
2033 Total Raw Water Prospective Demand 2033(Rural+Urban) 122126359 Lts 122.13 MLD 1.574 TMC
92519.96893939
Page 23 of 47
DESIGN CONSIDERATIONS
Rural Urban URBAN ONSIDERATIONS
POPULATION GROWTH CONSIDERED 0.80% 2.00%
Year 2015 Year 2020 Year 2030 Year 2040 Year 2050
Raw water Raw water Raw water Raw water Raw water
requirement requirement requirement requirement requirement
Name in MLD in MLD in MLD in MLD in MLD
BASE YEAR (Commissioning year) 2018 Year --> 2015 2020 2030 2033 2040 2048 2050
PROSPECTIVE YEAR 2033 ADILABAD 13.55 16.63 22.77 24.61 28.90 35.05 36.59
ULTIMATE YEAR 2048 NIRMAL 9.41 11.02 14.24 15.21 17.46 20.83 21.67
DESIGN CONSIDERATIONS
Clear water at end user point (RURAL) NA lpcd
Clear water for transmission lines (RURAL) 100 lpcd
Raw water (RURAL) 105 lpcd
2011 2018 2033 2048 RAW WATER CLEAR WATER RAW WATER CLEAR WATER
Mandal Census Base Year Prospective Ultimate 2033 Prospective Demand in litres per day 2048 Ultimate Demand in litres per day
Population Year
Population population year
population
2011 2018 2033 2048 RAW WATER CLEAR WATER RAW WATER CLEAR WATER
NIRMAL CONSTITUENCY
Sarangapur 48,820 51620 58174 65560 6,108,270 5,817,400 6,883,800 6,556,000
Deduct coverage (877,965) (877,965) (877,965) (877,965)
Sarangapur Net 5,230,305 4,939,435 6,005,835 5,678,035
Dilawarpur 35,780 37832 42636 48049 4,476,780 4,263,600 5,045,145 4,804,900
Mamda 32,303 34156 38492 43379 4,041,660 3,849,200 4,554,795 4,337,900
Nirmal Muncipality 15,206,000 14,481,905 20,828,000 19,836,191
NIRMAL CONSTITUENCY TOTAL 28,954,745 27,534,140 36,433,775 34,657,026
28.96 MLD 27.54 MLD 36.44 MLD 34.66 MLD
BOATH & ADILABAD CONSTITUENCY
Neredigonda 29,633 31333 35311 39794 3,707,655 3,531,100 4,178,370 3,979,400
Boath 48,216 50982 57454 64749 6,032,670 5,745,400 6,798,645 6,474,900
Deduct coverage (1,059,025) (1,059,025) (1,059,025) (1,059,025)
Boath Net 4,973,645 4,686,375 5,739,620 5,415,875
Ichoda 52,840 55871 62964 70958 6,611,220 6,296,400 7,450,590 7,095,800
Bazarhatnoor 28,911 30569 34450 38824 3,617,250 3,445,000 4,076,520 3,882,400
Gudihatnoor 30,339 32079 36152 40742 3,795,960 3,615,200 4,277,910 4,074,200
Talamadugu 34,632 36619 41268 46507 4,333,140 4,126,800 4,883,235 4,650,700
Tamsi 39,631 41904 47224 53220 4,958,520 4,722,400 5,588,100 5,322,000
Adilabad 58,955 62337 70251 79170 7,376,355 7,025,100 8,312,850 7,917,000
Jainath 47,904 50652 57083 64330 5,993,715 5,708,300 6,754,650 6,433,000
Deduct coverage (204,160) (204,160) (204,160) (204,160)
Jainath Net 5,789,555 5,504,140 6,550,490 6,228,840
Bela 38,318 40516 45660 51457 4,794,300 4,566,000 5,402,985 5,145,700
Deduct coverage (380,710) (380,710) (380,710) (380,710)
Bela Net 4,413,590 4,185,290 5,022,275 4,764,990
Adilabad Muncipality incl. Indusrial requirement 27,402,000 26,097,143 37,845,000 36,042,858
BOATH & ADILABAD CONSTITUENCY TOTAL 76,978,890 73,234,948 93,924,960 89,374,063
76.98 MLD 73.24 MLD 93.93 MLD 89.38 MLD
GRAND TOTAL 105,933,635 100,769,088 130,358,735 124,031,089
105.94 MLD 100.77 MLD 130.36 MLD 124.04 MLD
1.366 TMC 1.299 TMC 1.681 TMC 1.599 TMC
Demografic data
Base year : 2018
Design period : 30 years
Prospective year : 2033
Ultimate year : 2048 Rural Urban
Population growth rate : 0.8 % As Per PH Demand
Raw water demand : 105 LPCD
Clear water demand : 100 LPCD
Pumping duration in hours : 22 Hours
Sump Capacity : 2.5 hours at Head works and 4 hours at IPS
OHBR/GLBR Capacity : 30 Minutes
1 Design data
Population details/Habitations covered habitations
No.of Habitations : 869 habitations
No of Mandals Covered : 13
Adilabad constituency : Adilabad, Bela, Jainath
Boath Constituency : Boath, Neredigonda, Ichoda, Bazarhatnoor,
Gudihatnoor, Talamadugu & Tamsi
Nirmal Constituency : Sarangapur, Dilawarpur & Mamada
Page 29 of 47
A INTAKE WELL
4 Details of Intake well
Location of Intake well : Near Local Velmal in Dilawarpur Mandal
Ground level near Intake well : 326.60 m
FV L of Pumps in Intake well (Considering 2.0m 311.00 m
water head on Pump bowl) :
Bottom of Intake well (invert level) (Considering 309.00 m
2.0m for Silting) :
Floor level of Intake well : 335.25 m
Top of Intake well : 347.25 m
Height of well : 26.25 m
Height of pump room : 12.00 m
No Of Pump sets : 2.00 Nos
Perovision For Ultimate Pump sets : 2.00 Nos
Total No of Pump sets : 4.00 Nos
Center to Center Distance of pumps : 4.50 m
Length of Pump room Required : 18.00 m
Lets Provide Length of Intake well : 34.00 m
Width of Intake well : 12.00 m
7 Raw water Pump sets at Intake well for Lifting Raw water to Aerator in Filter head
works
Page 31 of 47
Prospective Ultimate
2011 Population 2033 Population 2048 Population LPCD 2033 LPM 2048 LPM
7392 8330
Adilabad Muncipality
Prospective 28.13MLD
Ultimate 37.86MLD 117388 181480 244249 135 21311 28682
23442 31550
Prospective Ultimate
Prospective Ultimate
Bazarhatnoor & Ichoda
HS 79752 95033 107099 100 7200 8114
11339 12779
Prospective Ultimate
Prospective Ultimate
8005 9021
3220 3628
0 0
Prospective Ultimate
Nirmal Muncipality
Prospective 16.13MLD
Ultimate 23.44 MLD 88205 136364 183528 135 12220 17758
13442 19534
Prospective Ultimate
Sarangapur-Dilawarpur
HS 85421 101788 114711 100 7712 8691
Tamsi 39,631
Talamadugu 34,632
Gudihathnoor 30,339
Ichoda 52,840
Bazarhathnoor 28,911
Boath 48,216
Neradigonda 29,633
Sarangapur 48,820
Dilawarpur 35,780
Mamda 32,303
526,282
Urban Demand
Adilabad Muncipality
Prospective 28.17MLD
Ultimate 37.92MLD
Nirmal Muncipality
Prospective 16.17MLD
Ultimate 23.49 MLD
Rural Demand
Urban Demand
Industrial Demand
Total
Rural Demand
Urban Demand
Industrial Demand
Total
2018 Demand 2033 Demand MLD
62,337.00 6,233,700.00 70,251.00 7,025,100.00 7.03
50,652.00 5,065,200.00 57,083.00 5,708,300.00 5.71
40,516.00 4,051,600.00 45,660.00 4,566,000.00 4.57
- - -
41,904.00 4,190,400.00 47,224.00 4,722,400.00 4.72
36,619.00 3,661,900.00 41,268.00 4,126,800.00 4.13
32,079.00 3,207,900.00 36,152.00 3,615,200.00 3.62
55,871.00 5,587,100.00 62,964.00 6,296,400.00 6.30
30,569.00 3,056,900.00 34,450.00 3,445,000.00 3.45
50,982.00 5,098,200.00 57,454.00 5,745,400.00 5.75
31,333.00 3,133,300.00 35,311.00 3,531,100.00 3.53
- - - - -
51,620.00 5,162,000.00 58,174.00 5,817,400.00 5.82
37,832.00 3,783,200.00 42,636.00 4,263,600.00 4.26
34,156.00 3,415,600.00 38,492.00 3,849,200.00 3.85
Adilabad Muncipality
Prospective 28.17MLD
Ultimate 37.92MLD 28.17
Nirmal Muncipality
Prospective 16.17MLD
Ultimate 23.49 MLD 16.17
44.34
70.67
2048
37.92
23.49
61.41
TELANGANA JALAJALAM
HYDRAULIC DESIGNS OF ADILABAD SEGMENT IN ADILABAD
DISTRICT
Name of the work : Providing safe drinking water to all habitations in
Adilabad segment in Adilabad District
Demografic data
Base year : 2018
Design period : 30 years
Prospective year : 2033
Ultimate year : 2048 Rural Urban
Population growth rate : 0.8 % 2
Raw water demand : 105 LPCD 142
Clear water demand : 100 LPCD 135
Pumping duration in hours : 22 Hours
Sump Capacity : 2.5 hours at Head works and 4 hours at IPS
OHBR/GLBR Capacity : 15-30 Minutes
1 Design data
Population details/Habitations covered habitations
No.of Habitations : 930 habitations
No of Mandals Covered : 13
Adilabad constituency : Adilabad, Bela, Jainoor
Boath Constituency : Boath, Neredigonda, Ichoda, Bazarhatnoor,
Gudihatnoor, Talamadugu & Tamsi
Nirmal Constituency : Sarangapur, Dilawarpur & Mamada
Page 41 of 47
2 DETAILS OF THE SOURCE
Source : SRI RAMA SAGAR PROJECT
Location : NEAR
River :
TBL : 337.72 m
Full resrvoir level : 332.53 m
Maximum water level : 333.14 m
Dead storage level : 318.60 m
Dead storage capacity : 6.00 TMC
Full Capacity : TMC
Page 42 of 47
A INTAKE WELL
7 Raw water Pump sets at Intake well for Lifting Raw water to Aerator in Filter head
works
Page 43 of 47
Top of Aerator : 430.00 m
Prospective clear water lpm : 90994 lpm
Prospective clear water demand : 120.1 MLD
Filters capacity required : 128.30 MLD
Provide Filter beds capacity : 130 MLD Rapid Sand Filters
Page 44 of 47
N ADILABAD
r to all habitations in
d District
%
LPCD
LPCD
4 hours at IPS
azarhatnoor,
Page 45 of 47
ator in Filter head
2 No Stand By)
Page 46 of 47
Sand Filters
Page 47 of 47