Sr. No. Beam Size Straight Straight Curt. Bar Extra Top Stirrups Stirrups
Group BxD Top Bar Bott. Bars Middle 0.6L Ends L/4 End zone L/4 Middle half
01 FB0 150 X 380 2 - 10 Dia 2 - 12 Dia --- --- 08 dia - 150 c/c 08 dia - 175 c/c
Min. Ld
02 FB1 150 X 380 2 - 10 Dia 2 - 12 Dia --- 1 - 12 Dia 08 dia - 150 c/c 08 dia - 200 c/c beyond column
Continue Extra tops at Internal
face
continous supports
03 FB2 150 X 380 2 - 12 Dia 2 - 12 Dia --- 1 - 12 Dia 08 dia - 150 c/c 08 dia - 200 c/c * Compulsary
Column links at
for All Top , Bottom & extra top column-beam junction
FB3 150 X 380 2 - 12 Dia 2 - 12 Dia 1 - 12 Dia 1 - 12 Dia 08 dia - 125 c/c 08 dia - 175 c/c end zone stirrups Remaining span
04 Extra Tops Bars
( upto L/4 ) stirrups upto L/4 400 mm are necessary
End Bent 400 mm
Min. 300mm
05 FB4 150 X 380 2 - 12 Dia 2 - 12 Dia 1 - 12 Dia 2 - 12 Dia 08 dia - 125 c/c 08 dia - 175 c/c
06 FB5 150 X 380 2 - 12 Dia 2 - 12 Dia 2 - 12 Dia --- 08 dia - 125 c/c 08 dia - 175 c/c
16mm dia
07 FB6 150 X 450 2 - 12 Dia 2 - 16 Dia --- 1 - 16 Dia 08 dia - 100 c/c 08 dia - 175 c/c Anchor Pin
50mm max Curtail Bar
first stirrup Position at Bottom middle 0.6L
08 FB7 230 X 380 2 - 16 Dia 3 - 16 Dia --- --- 08 dia - 150 c/c 08 dia - 150 c/c L=Length of Beam * IMPORTANT
09 FB8 230 X 380 3 - 12 Dia 3 - 12 Dia --- --- 08 dia - 150 c/c 08 dia - 150 c/c Column
50% Bottom bars are to be
Width/Depth Column
lapped at L/4 from support of column
(if Reqd.)
10 FB9 230 X 380 2 - 12 Dia 2 - 16 Dia 1 - 12 Dia 2 - 12 Dia 08 dia - 125 c/c 08 dia - 175 c/c
TYP. DETAILS OF LONGITUDINAL SECTION THROUGH BEAM.
11 FB10 230 X 450 2 - 16 Dia 3 - 16 Dia --- 3 - 16 Dia 08 dia - 100 c/c 08 dia - 150 c/c
12 FB11 230 X 450 2 - 16 Dia 3 - 16 Dia 1 - 16 Dia 3 - 16 Dia 08 dia - 100 c/c 08 dia - 150 c/c
13 FB12 230 X 530 3 - 16 Dia 3 - 16 Dia 2 - 16 Dia 3 - 16 Dia 08 dia - 100 c/c 08 dia - 125 c/c
Alt. bent up Steel continue from one span to other
14 FBR0 150 X 450 3 - 12 Dia 2 - 12 Dia --- --- 08 dia - 125 c/c 08 dia - 125 c/c
Alt. Bent up bars 0.3L1 0.3L2
15 FBR1 150 X 380 3 - 12 Dia 2 - 12 Dia --- --- 08 dia - 125 c/c 08 dia - 125 c/c
16 FBR2 150 X 380 4 - 16 Dia 2 - 12 Dia --- --- 08 dia - 125 c/c 08 dia - 125 c/c
17 FBR3 230 X 450 3 - 16 Dia 2 - 16 Dia --- --- 08 dia - 100 c/c 08 dia - 150 c/c
in cantilever portion in back beam portion 0.2L1 0.25L1 0.25L2
18 FBR4 230 X 450 4 - 16 Dia 2 - 16 Dia --- --- 08 dia - 100 c/c 08 dia - 150 c/c
in cantilever portion in back beam portion L1 L2
19 FBR5 230 X 450 5 - 16 Dia 3 - 16 Dia --- --- 08 dia - 100 c/c 08 dia - 100 c/c Slab Discontinuous end Slab continuous end
20 FBR6 230 X 380 3 - 16 Dia 2 - 12 Dia --- --- 08 dia - 125 c/c 08 dia - 125 c/c DETAILS OF BAR BENDING FOR SLABS
21 HB 200 X 125 2 - 10 Dia 2 - 12 Dia --- --- 08 dia - 175 c/c 08 dia - 175 c/c
22 HB1 200 X 125 2 - 12 Dia 2 - 12 Dia --- --- 08 dia - 150 c/c 08 dia - 150 c/c
DETAILS OF SLAB - AT SECOND SLAB LEVEL
Slab Thick Steel along Extra Top. Remark
Width (short) Length (long)
one way End bent 08 mm @ 125 c/c LEGENDS :
S1 125 08 mm @ 150 c/c 08 mm @ 150 c/c ---- plain jali Bent back Chimta
Min.300mm
S2 125 08 mm @ 100 c/c 08 mm @ 100 c/c ---- one way
300mm
plain jali
125 08 mm @ 175 c/c 08 mm @ 125 c/c 08 mm @ 250 c/c one way Beam As
S3 Slab at Beam Bottom
per schdule
125
S4 125 08 mm @ 175 c/c 08 mm @ 175 c/c 08 mm @ 300 c/c Two Way
S5 125 08 mm @ 150 c/c 08 mm @ 175 c/c 08 mm @ 300 c/c Two Way
CS 125 08 mm @ 150 c/c 08 mm @ 175 c/c Cantilever 08 mm @ 175 c/c TYPICAL STIRRUP
Bent back Chimta ---- SECTION A-B
SS1 150 08 mm @ 175 c/c 12 mm @ 150 c/c ---- Stairs / RING
Note :Alternate bent up of one span shall go to L/4 of other span.
> Provide extra tops at discontinuous ends.
IMP NOTES :- 6. No concreting shall be done without seeking Structural Engineer's Structural Consultants
comment in writing.
Client : NORTH Sheet Title :
1. All work shall be strictly executed as per the drawing. 7. Clear Cover to R/F bars shall be - Footing 50mm, Column 40mm ,Beams 30mm,
2. Structure designed for G+4 Including Future Provision (5 Slabs only). Slabs 20mm. Mr. S.A.G. Qureshi Sahab
if not found at site, foundations must be redesigned. 8. Developement/Lap length shall be used as 50 times dia of bar for beams , Structural Design Details Er. Shaikh Imran
3. Concrete Grade M20 and Steel Fe500 shall be used.
4. Fe500 grade Steel shall only be used if 14.5 % elongation is assured
Where bent used it shall be 42 times dia of bar.
9. Stripping time Shall be as per I.S.456-2000. N At SECOND slab level (DCE, M.E. Structure)
as per Codel Provisions. 10. False work/ Shuttering Stability, supervision is responsibility of contractor.
5. Concrete Mix design shall be followed. 11. Top bars are to be lapped at center of beam & Project Title : ( 02 of 02)
Reg.No. E-725/18
bottom bars at L/4 from column face (lap length =50xbar diameter).
12. Column bars lapping should be done at center of the column.
02 - Structural Schedule Aurangabad
13. If crush sand used for concreting work, it shall have proper mix design from lab. Proposed Apartment Building, & Detailing +91 88 55 866 787
14. Structural analysis & design is done for Gravity loadings only.
15. Any discrepancy shall be asked and discussed to Structural Engineer. At Beed Bypass, Aurangabad.
*** THIS DRAWING SHALL BE USED FOR SECOND SLAB LEVEL ONLY. Drawing No. 07-b Date : 13/02/2019 Revision No : 0