1. The document provides a bill of quantities for filling in plinth and floors with contractor's soil and providing and laying rough Shahabad stone flooring at a police station in Solapur City, Maharashtra, India.
2. It lists the quantities, rates, and amounts for filling in soil and laying stone flooring in 7 buildings (F/1 to F/7) on the site based on measurements of length, breadth, depth/height.
3. The total amount for the work comes to Rs. 5,55,784.11 for page 1, Rs. 5,65,820.62 for page 2 and Rs. 1,26,659.58 for page 3, adding up
1. The document provides a bill of quantities for filling in plinth and floors with contractor's soil and providing and laying rough Shahabad stone flooring at a police station in Solapur City, Maharashtra, India.
2. It lists the quantities, rates, and amounts for filling in soil and laying stone flooring in 7 buildings (F/1 to F/7) on the site based on measurements of length, breadth, depth/height.
3. The total amount for the work comes to Rs. 5,55,784.11 for page 1, Rs. 5,65,820.62 for page 2 and Rs. 1,26,659.58 for page 3, adding up
1. The document provides a bill of quantities for filling in plinth and floors with contractor's soil and providing and laying rough Shahabad stone flooring at a police station in Solapur City, Maharashtra, India.
2. It lists the quantities, rates, and amounts for filling in soil and laying stone flooring in 7 buildings (F/1 to F/7) on the site based on measurements of length, breadth, depth/height.
3. The total amount for the work comes to Rs. 5,55,784.11 for page 1, Rs. 5,65,820.62 for page 2 and Rs. 1,26,659.58 for page 3, adding up
NAME OF WORK :- Providing and Laying RSS Flooring at , Vasant Nager Police Vasahat .
Solapur City, Near C.P Office, Solapur.
DATE:- 24 /04 /2017 Page : 01 Sr no Discripation of Item No L B D/H Qty Unit Rate Amount 1 Filling in plinth and floors with contractor's soil Crush sand or murum in 15cm to 20cm layers including watering and compacting complete. ( Building F/1 , F/2 ) East Side 1 11.15 1.80 0.15 3.01 West Side 1 11.15 1.80 0.15 3.01 South Side 1 38.59 4.26 0.15 24.66 South Side Ent Passage 2 8.10 1.70 0.15 4.13 North Side 1 38.59 1.80 0.15 10.42 North Side MSEB Passage 2 8.10 2.70 0.15 6.56 51.79 Diducations MSEB Cabin 2 2.40 2.10 0.15 1.51 1.51 After Diducations 50.28 CUM 341.00 17145.24 ( Building F/3 , F/4 , F/5 ) East Side 1 11.15 1.80 0.15 3.01 West Side 1 11.15 8.23 0.15 13.76 South Side 1 47.34 1.80 0.15 12.78 North Side Ent Passage 2 8.10 1.70 0.15 4.13 North Side 1 47.34 4.26 0.15 30.25 South Side MSEB Passage 2 8.10 2.70 0.15 6.56 Building F/4 & F/5 Between Passage 1 8.32 11.15 0.15 13.92 84.41 Diducations MSEB Cabin 2 2.40 2.10 0.15 1.51 1.51 After Diducations 82.90 CUM 341.00 28269.73 ( Building F/6 ) East Side 1 11.15 1.80 0.15 3.01 West Side 1 11.15 1.80 0.15 3.01 South Side 1 18.17 4.26 0.15 11.61 South Side Ent Passage 1 8.10 1.70 0.15 2.07 North Side 1 18.17 1.80 0.15 4.91 North Side MSEB Passage 2 8.10 2.70 0.15 6.56 31.16 Diducations MSEB Cabin 1 2.40 2.10 0.15 0.76 0.76 After Diducations 30.41 CUM 341.00 10369.14 Page Total :- 55784.11 Page : 02 Sr no Discripation of Item No L B D/H Qty Unit Rate Amount 1 Filling in plinth and floors with contractor's soil Crush sand or murum in 15cm to 20cm layers including watering and compacting complete. ( Building F/7 ) East Side 1 15.64 1.80 0.15 4.22 West Side 1 15.64 1.80 0.15 4.22 South Side 1 19.17 1.80 0.15 5.18 South Side MSEB Passage 1 7.59 3.32 0.15 3.78 North Side 1 19.17 4.26 0.15 12.25 North Side Ent Passage 1 7.71 3.75 0.15 4.34 33.99 Diducations MSEB Cabin 2 2.40 2.10 0.15 1.51 1.51 After Diducations 32.48 CUM 341.00 11074.26 2 Providing and laying Rough shahabad stone flooring 40mm to 45mm thick & requierd width in plain diamond pattern on a bed of 1:6 CM including cement float,filling joints,with cement morter 1:3 curing and cleaning complete. ( Building F/1 , F/2 ) East Side 1 11.15 1.80 0.00 20.07 West Side 1 11.15 1.80 0.00 20.07 South Side 1 38.59 4.26 0.00 164.39 South Side Ent Passage 2 8.10 1.70 0.00 27.54 North Side 1 38.59 1.80 0.00 69.46 North Side MSEB Passage 2 8.10 2.70 0.00 43.74 345.28 Diducations MSEB Cabin 2 2.40 2.10 0.00 10.08 10.08 After Diducations 335.20 CUM 624.80 209430.09 ( Building F/3 , F/4 , F/5 ) East Side 1 11.15 1.80 0.00 20.07 West Side 1 11.15 8.23 0.00 91.76 South Side 1 47.34 1.80 0.00 85.21 North Side Ent Passage 2 8.10 1.70 0.00 27.54 North Side 1 47.34 4.26 0.00 201.67 South Side MSEB Passage 2 8.10 2.70 0.00 43.74 Building F/4 & F/5 Between Passage 1 8.32 11.15 0.00 92.77 562.76 Diducations MSEB Cabin 2 2.40 2.10 0.00 10.08 10.08 After Diducations 552.68 CUM 624.80 345316.28 Page Total :- 565820.62 Page : 03 Sr no Discripation of Item No L B D/H Qty Unit Rate Amount 2 Providing and laying Rough shahabad stone flooring 40mm to 45mm thick & requierd width in plain diamond pattern on a bed of 1:6 CM including cement float,filling joints,with cement morter 1:3 curing and cleaning complete. ( Building F/6 ) East Side 1 11.15 1.80 0.00 20.07 West Side 1 11.15 1.80 0.00 20.07 South Side 1 18.17 4.26 0.00 77.40 South Side Ent Passage 1 8.10 1.70 0.00 13.77 North Side 1 18.17 1.80 0.00 32.71 North Side MSEB Passage 2 8.10 2.70 0.00 43.74 207.76 Diducations MSEB Cabin 1 2.40 2.10 0.00 5.04 5.04 After Diducations 202.72 CUM 624.80 126659.58 ( Building F/7 ) East Side 1 15.64 1.80 0.00 28.15 West Side 1 15.64 1.80 0.00 28.15 South Side 1 19.17 1.80 0.00 34.51 South Side MSEB Passage 1 7.59 3.32 0.00 25.20 North Side 1 19.17 4.26 0.00 81.66 North Side Ent Passage 1 7.71 3.75 0.00 28.91 226.59 Diducations MSEB Cabin 2 2.40 2.10 0.00 10.08 10.08 After Diducations 216.51 CUM 624.80 135272.64 Page Total :- 261932.22 CALCULATION PAGE WISE P.NO Page Total 1 55784.11 2 565820.62 3 261932.22 883536.95 Say :- 8,83,536 . 00 Total Estimated Cost In Figures :- Rs.8,83,536.00 Total Estimated Cost In Words :- Eight Lakh EightyThree Thousand Five Hundred And Thirty Six Rupees Only. NAME OF WORK :- Providing and Fixing RSS Flooring at Vasant Nager Police Vasahat . Solapur City, Solapur.
Sr no Discripation of Item Qty Unit Rate Amount
1 Filling in plinth and floors with contractor's soil Crush sand or murum in 15cm to 20cm layers including watering and compacting complete. Building F/1 , F/2 50.28 CUM 376.00 18905.28 Building F/3 , F/4 , F/5 82.90 CUM 376.00 31170.40 Building F/6 30.41 CUM 376.00 11434.16 Building F/7 32.48 CUM 376.00 12212.48
2 Providing and laying Rough shahabad stone
flooring 40mm to 45mm thick & requierd width in plain diamond pattern on a bed of 1:6 CM including cement float,filling joints,with cement morter 1:3 curing and cleaning complete. Building F/1 , F/2 335.2 CUM 669.00 224248.80 Building F/3 , F/4 , F/5 552.68 CUM 669.00 369742.92 Building F/6 202.72 CUM 669.00 135619.68 Building F/7 216.51 CUM 669.00 144845.19 Total:- 948178.91