This document outlines the proposed construction and completion schedule for infrastructure and roadway works for the Tun Razak Exchange from March 2018 to December 2018. It includes activities such as structure work involving zones 1 and 2, with zone 1 involving panels P99, P100 and P101 and zone 2 involving panels P89, P90 and P91. Structure work is scheduled to be completed by November 2018. Key milestones include completing sub-structure work by June 2018 and B1 level work by September 2018.
This document outlines the proposed construction and completion schedule for infrastructure and roadway works for the Tun Razak Exchange from March 2018 to December 2018. It includes activities such as structure work involving zones 1 and 2, with zone 1 involving panels P99, P100 and P101 and zone 2 involving panels P89, P90 and P91. Structure work is scheduled to be completed by November 2018. Key milestones include completing sub-structure work by June 2018 and B1 level work by September 2018.
This document outlines the proposed construction and completion schedule for infrastructure and roadway works for the Tun Razak Exchange from March 2018 to December 2018. It includes activities such as structure work involving zones 1 and 2, with zone 1 involving panels P99, P100 and P101 and zone 2 involving panels P89, P90 and P91. Structure work is scheduled to be completed by November 2018. Key milestones include completing sub-structure work by June 2018 and B1 level work by September 2018.
CONTRACT 2- PROPOSED CONSTRUCTION AND COMPLETION OF INFRASTRUCTURE AND
ROADWAY WORKS
# Activity ID Activity Name Original Start Finish 2018 2019
Duration Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 1 Total 268 30-Mar-18 A 22-Dec-18 22-Dec-18, Total
2 Section 12 Programme for Priority Infrastructure 268 30-Mar-18 A 22-Dec-18 22-Dec-18, Section 12 Progra
3 Structure Work 229 30-Mar-18 A 13-Nov-18 13-Nov-18, Structure Work
4 Zone 1 (Panel P99, P100, P101) 153 14-May-18 A 13-Oct-18 13-Oct-18, Zone 1 (Panel P99, P100, P101) 5 CBD Loop L2 46 29-Aug-18 13-Oct-18 13-Oct-18, CBD Loop L2 6 Super Structure 46 29-Aug-18 13-Oct-18 13-Oct-18, Super Structure 7 A29910 Pier / Column PF 1-1 (2 Nos) 7 29-Aug-18 04-Sep-18 Pier / Column PF 1-1 (2 Nos) 8 A29920 Pier / Column PF 1-2 (2 Nos) 7 29-Aug-18 04-Sep-18 Pier / Column PF 1-2 (2 Nos) 9 A29940 Cross Beam & Bearing Pad PF 1-1 14 05-Sep-18 18-Sep-18 Cross Beam & Bearing Pad PF 1-1 10 A29950 Cross Beam & Bearing Pad PF 1-2 14 05-Sep-18 18-Sep-18 Cross Beam & Bearing Pad PF 1-2 11 A29980 Launching M-Beam PF1-1 to PF 1-2 1 26-Sep-18 26-Sep-18 Launching M-Beam PF1-1 to PF 1-2 12 A29990 Launching M-Beam PF1-2 to PF 1-3 1 26-Sep-18 26-Sep-18 Launching M-Beam PF1-2 to PF 1-3 13 A31640 Diaphram M-Beam PF1-1 to PF1-2 3 27-Sep-18 29-Sep-18 Diaphram M-Beam PF1-1 to PF1-2 14 A31650 Diaphram M-Beam PF1-2 to PF1-3 3 27-Sep-18 29-Sep-18 Diaphram M-Beam PF1-2 to PF1-3 15 A30000 Deck Slab PF1-1 to PF1-2 14 30-Sep-18 13-Oct-18 Deck Slab PF1-1 to PF1-2 16 A30010 Deck Slab PF1-2 to PF1-3 14 30-Sep-18 13-Oct-18 Deck Slab PF1-2 to PF1-3 17 A30020 Parapet PF1-1 to PF1-2 (Left & Right Side) 14 30-Sep-18 13-Oct-18 Parapet PF1-1 to PF1-2 (Left & Right Side) 18 A30030 Parapet PF1-2 to PF1-3 (Left & Right Side) 14 30-Sep-18 13-Oct-18 Parapet PF1-2 to PF1-3 (Left & Right Side) 19 L0 Level 128 14-May-18 A 18-Sep-18 18-Sep-18, L0 Level 20 Underground Road Tunnel - Section 10 128 14-May-18 A 18-Sep-18 18-Sep-18, Underground Road Tunnel - Section 10 21 Sub-Structure 30 14-May-18 A 12-Jun-18 12-Jun-18, Sub-Structure 22 A29800 Rock Excavation at Section 10 Panel P99, P100, P101 30 14-May-18 A 12-Jun-18 Rock Excavation at Section 10 Panel P99, P100, P101 23 B2 Level 28 13-Jun-18 10-Jul-18 10-Jul-18, B2 Level 24 A29880 B2 Raft Slab Panel P99 14 13-Jun-18 26-Jun-18 B2 Raft Slab Panel P99 25 A29890 B2 Raft Slab Panel P100 14 13-Jun-18 26-Jun-18 B2 Raft Slab Panel P100 26 A29900 B2 Raft Slab Panel P101 14 13-Jun-18 26-Jun-18 B2 Raft Slab Panel P101 27 A30600 B2 Wall Panel P99 14 27-Jun-18 10-Jul-18 B2 Wall Panel P99 28 A30610 B2 Wall Panel P100 14 27-Jun-18 10-Jul-18 B2 Wall Panel P100 29 A30620 B2 Wall Panel P101 14 27-Jun-18 10-Jul-18 B2 Wall Panel P101 30 B1 Level 63 18-Jul-18 18-Sep-18 18-Sep-18, B1 Level 31 A30660 B1 Slab Panel P99 14 18-Jul-18 31-Jul-18 B1 Slab Panel P99 32 A30670 B1 Slab Panel P100 14 18-Jul-18 31-Jul-18 B1 Slab Panel P100 33 A30680 B1 Slab Panel P101 14 18-Jul-18 31-Jul-18 B1 Slab Panel P101 34 A30630 B1 Wall Panel P99 14 08-Aug-18 21-Aug-18 B1 Wall Panel P99 35 A30640 B1 Wall Panel P100 14 08-Aug-18 21-Aug-18 B1 Wall Panel P100 36 A30650 B1 Wall Panel P101 14 08-Aug-18 21-Aug-18 B1 Wall Panel P101 37 A32060 Backfilling Above Tunnel P99, P100, P101 up to L0 Level 14 05-Sep-18 18-Sep-18 Backfilling Above Tunnel P99, P100, P101 up to L0 Level 38 Zone 2 (Panel P89, P90, P91) 211 10-Apr-18 A 06-Nov-18 06-Nov-18, Zone 2 (Panel P89, P90, P91) 39 Vehicle Ramp L0 to B3 142 10-Apr-18 A 29-Aug-18 29-Aug-18, Vehicle Ramp L0 to B3 40 Underground Road Tunnel - Section 12 142 10-Apr-18 A 29-Aug-18 29-Aug-18, Underground Road Tunnel - Section 12 41 Sub-Structure 85 10-Apr-18 A 03-Jul-18 03-Jul-18, Sub-Structure 42 A29810 Ground Anchor at Section 12 Panel P89 (8 Points, SP126 to SP140) 8 10-Apr-18 A 17-Apr-18 A Ground Anchor at Section 12 Panel P89 (8 Points, SP126 to SP140) 43 A29870 Ground Anchor at Section 12 Panel P91 (3 Points, SP189 to SP193) 3 18-Apr-18 A 20-Apr-18 A Ground Anchor at Section 12 Panel P91 (3 Points, SP189 to SP193) 44 A29850 Capping Beam at Section 12 Panel P89, P90, P91 (West to East) 14 21-Apr-18 A 04-May-18 A Capping Beam at Section 12 Panel P89, P90, P91 (West to East) 45 A29860 Ground Anchor at Section 12 Panel P90 (11 Points, SP157 to SP177) 11 02-Jun-18 12-Jun-18 Ground Anchor at Section 12 Panel P90 (11 Points, SP157 to SP177) 46 A30710 Rock Excavation at Section 12 Panel P89, P90, P91 21 13-Jun-18 03-Jul-18 Rock Excavation at Section 12 Panel P89, P90, P91 47 Ramp 57 04-Jul-18 29-Aug-18 29-Aug-18, Ramp 48 A30720 Ramp Raft Slab - Panel P89 14 04-Jul-18 17-Jul-18 Ramp Raft Slab - Panel P89 49 A30730 Ramp Raft Slab - Panel P90 14 04-Jul-18 17-Jul-18 Ramp Raft Slab - Panel P90 50 A30740 Ramp Raft Slab - Panel P91 14 04-Jul-18 17-Jul-18 Ramp Raft Slab - Panel P91 51 A30750 Ramp Wall - Panel P89 10 18-Jul-18 27-Jul-18 Ramp Wall - Panel P89 52 A30760 Ramp Wall - Panel P90 10 18-Jul-18 27-Jul-18 Ramp Wall - Panel P90 53 A30770 Ramp Wall - Panel P91 10 18-Jul-18 27-Jul-18 Ramp Wall - Panel P91 54 A30780 Ramp Top Slab - Panel P89 14 04-Aug-18 17-Aug-18 Ramp Top Slab - Panel P89 55 A30790 Ramp Top Slab - Panel P90 14 04-Aug-18 17-Aug-18 Ramp Top Slab - Panel P90 56 A30800 Ramp Top Slab - Panel P91 14 04-Aug-18 17-Aug-18 Ramp Top Slab - Panel P91 57 A30810 Backfilling Above Tunnel at Panel P89, P90, P91 5 25-Aug-18 29-Aug-18 Backfilling Above Tunnel at Panel P89, P90, P91 58 CBD U-Turn 112 18-Jul-18 06-Nov-18 06-Nov-18, CBD U-Turn 59 Foundation CBD 14 18-Jul-18 31-Jul-18 31-Jul-18, Foundation CBD 60 A30690 Pile Cap C11 14 18-Jul-18 31-Jul-18 Pile Cap C11 61 A30700 Pile Cap C7 14 18-Jul-18 31-Jul-18 Pile Cap C7 62 Super Structure 98 01-Aug-18 06-Nov-18 06-Nov-18, Super Structure 63 A30820 Ramp Pier / Column C7 (1 Nos) 10 01-Aug-18 10-Aug-18 Ramp Pier / Column C7 (1 Nos) 64 A30870 Ramp Pier / Column C11 (1 Nos) 10 01-Aug-18 10-Aug-18 Ramp Pier / Column C11 (1 Nos) 65 A30830 Ramp Head stock bridge C7 10 18-Aug-18 27-Aug-18 Ramp Head stock bridge C7 66 A30880 Ramp Head Stock bridge C11 10 18-Aug-18 27-Aug-18 Ramp Head Stock bridge C11 67 A30840 Ramp Box Girder at PF1-1 to C7 14 03-Oct-18 16-Oct-18 Ramp Box Girder at PF1-1 to C7 68 A30890 Ramp Box Girder at C7 to C11 14 03-Oct-18 16-Oct-18 Ramp Box Girder at C7 to C11 69 A30860 Ramp Parapet PF1-1 to C7 (Left & Right Side) 7 17-Oct-18 23-Oct-18 Ramp Parapet PF1-1 to C7 (Left & Right Side) 70 A31040 Ramp Box Girder at C11 to C13 14 17-Oct-18 30-Oct-18 Ramp Box Girder at C11 to C13 71 A30910 Ramp Parapet C7 to C11 (Left & Right Side) 7 24-Oct-18 30-Oct-18 Ramp Parapet C7 to C11 (Left & Right Side) 72 A31050 Ramp Parapet C11 to C13 (Left & Right Side) 7 31-Oct-18 06-Nov-18 Ramp Parapet C11 to C13 (Left & Right Side 73 Zone 3 (Mulia Old Gate, Panel P86, P87) 163 04-Apr-18 A 13-Sep-18 13-Sep-18, Zone 3 (Mulia Old Gate, Panel P86, P87) 74 Vehicle Ramp L0 to B3 142 04-Apr-18 A 23-Aug-18 23-Aug-18, Vehicle Ramp L0 to B3 75 Underground Road Tunnel - Section 12 142 04-Apr-18 A 23-Aug-18 23-Aug-18, Underground Road Tunnel - Section 12 76 Sub-Structure 96 04-Apr-18 A 08-Jul-18 08-Jul-18, Sub-Structure 77 A29830 Secant Pile Wall at Section 12 Panel P86, P87 (23 Nos) 40 04-Apr-18 A 13-May-18 A Secant Pile Wall at Section 12 Panel P86, P87 (23 Nos) 78 A30110 Capping Beam at Section Panel P86, P87 7 03-Jun-18 09-Jun-18 Capping Beam at Section Panel P86, P87 79 A30100 Ground Anchor at Section 12 Panel P86, P87 (8 Nos, SP68 to SP82) 8 10-Jun-18 17-Jun-18 Ground Anchor at Section 12 Panel P86, P87 (8 Nos, SP68 to SP82) 80 A31100 Rock Excavation at Section 12 Panel P86, P87 21 18-Jun-18 08-Jul-18 Rock Excavation at Section 12 Panel P86, P87 81 Ramp 46 09-Jul-18 23-Aug-18 23-Aug-18, Ramp 82 A31110 Ramp Raft Slab - Panel P86 (Half Panel) 10 09-Jul-18 18-Jul-18 Ramp Raft Slab - Panel P86 (Half Panel) 83 A31120 Ramp Raft Slab - Panel P87 (Half Panel) 10 09-Jul-18 18-Jul-18 Ramp Raft Slab - Panel P87 (Half Panel) 84 A31130 Ramp Wall - Panel P86 (Half Panel) 7 19-Jul-18 25-Jul-18 Ramp Wall - Panel P86 (Half Panel) 85 A31140 Ramp Wall - Panel P87 (Half Panel) 7 19-Jul-18 25-Jul-18 Ramp Wall - Panel P87 (Half Panel) 86 A31150 Ramp Top Slab - Panel P86 (Half Panel) 10 02-Aug-18 11-Aug-18 Ramp Top Slab - Panel P86 (Half Panel) 87 A31160 Ramp Top Slab - Panel P87 (Half Panel) 10 02-Aug-18 11-Aug-18 Ramp Top Slab - Panel P87 (Half Panel) 88 A31170 Backfilling Above Tunnel at Panel P86, P87 5 19-Aug-18 23-Aug-18 Backfilling Above Tunnel at Panel P86, P87 89 CBD Loop L2 88 18-Jun-18 13-Sep-18 13-Sep-18, CBD Loop L2 90 Foundation CBD 21 18-Jun-18 08-Jul-18 08-Jul-18, Foundation CBD 91 A30120 Rock Excavation at Section 12 Panel P86, P87 (Partial Inner CBD Side) 21 18-Jun-18 08-Jul-18 Rock Excavation at Section 12 Panel P86, P87 (Partial Inner CBD Side) 92 Super Structure 11 03-Sep-18 13-Sep-18 13-Sep-18, Super Structure 93 A30280 Launching M-Beam PF1-4 to PF 1-5 1 03-Sep-18 03-Sep-18 Launching M-Beam PF1-4 to PF 1-5 94 A30290 Deck Slab PF1-4 to PF1-5 10 04-Sep-18 13-Sep-18 Deck Slab PF1-4 to PF1-5 95 A30300 Parapet PF1-4 to PF1-5 (Left & Right Side) 10 04-Sep-18 13-Sep-18 Parapet PF1-4 to PF1-5 (Left & Right Side) 96 L0 Level 14 30-Jul-18 12-Aug-18 12-Aug-18, L0 Level 97 A32160 Backfilling area above between C17 & C19 up to L0 Level 14 30-Jul-18 12-Aug-18 Backfilling area above between C17 & C19 up to L0 Level 98 Zone 4 (Panel P84, P85, P86) 218 30-Mar-18 A 02-Nov-18 02-Nov-18, Zone 4 (Panel P84, P85, P86)
Actual Level of Effort Remaining Work Date Revision Checked Approved
Page 1 of 3 Actual Work Critical Remaining Work TUN RAZAK EXCHANGE CONTRACT 2- PROPOSED CONSTRUCTION AND COMPLETION OF INFRASTRUCTURE AND ROADWAY WORKS
# Activity ID Activity Name Original Start Finish 2018 2019
Duration Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 99 Vehicle Ramp L0 to B3 164 30-Mar-18 A 09-Sep-18 09-Sep-18, Vehicle Ramp L0 to B3 100 Underground Road Tunnel - Section 11 164 30-Mar-18 A 09-Sep-18 09-Sep-18, Underground Road Tunnel - Section 11 101 Sub-Structure 85 30-Mar-18 A 22-Jun-18 22-Jun-18, Sub-Structure 102 A29820 Ground Anchor at Section 11 Panel P85, P86 (22 Points, SP2 t o SP66) 34 30-Mar-18 A 02-May-18 A Ground Anchor at Section 11 Panel P85, P86 (22 Points, SP2 t o SP66) 103 A31590 Capping Beam at Panel P86 7 08-Apr-18 A 14-Apr-18 A Capping Beam at Panel P86 104 A31180 Rock Excavation at Section 11 Panel P86, P85 21 02-Jun-18 22-Jun-18 Rock Excavation at Section 11 Panel P86, P85 105 B3 Level 38 03-Jul-18 09-Aug-18 09-Aug-18, B3 Level 106 A31200 Ramp Raft Slab - Panel P85 14 03-Jul-18 16-Jul-18 Ramp Raft Slab - Panel P85 107 A31190 Ramp Raft Slab - Panel P86 (Half Panel) 10 17-Jul-18 26-Jul-18 Ramp Raft Slab - Panel P86 (Half Panel) 108 A31220 Ramp Wall - Panel P85 10 24-Jul-18 02-Aug-18 Ramp Wall - Panel P85 109 A31210 Ramp Wall - Panel P86 ( Half Panel) 7 03-Aug-18 09-Aug-18 Ramp Wall - Panel P86 ( Half Panel) 110 B2 Level 17 10-Aug-18 26-Aug-18 26-Aug-18, B2 Level 111 A31240 Ramp Top Slab - Panel P85 14 10-Aug-18 23-Aug-18 Ramp Top Slab - Panel P85 112 A31230 Ramp Top Slab - Panel P86 (Half Panel) 10 17-Aug-18 26-Aug-18 Ramp Top Slab - Panel P86 (Half Panel) 113 Ramp 14 27-Aug-18 09-Sep-18 09-Sep-18, Ramp 114 A31250 Backfilling Above Tunnel at Panel P86 14 27-Aug-18 09-Sep-18 Backfilling Above Tunnel at Panel P86 115 CBD Loop L2 138 18-Jun-18 02-Nov-18 02-Nov-18, CBD Loop L2 116 Foundation CBD 44 18-Jun-18 31-Jul-18 31-Jul-18, Foundation CBD 117 A30080 Rock Excavation at Section 11 Panel P85, P86 (Partial Inner CBD Side) 14 18-Jun-18* 01-Jul-18 Rock Excavation at Section 11 Panel P85, P86 (Partial Inner CBD Side) 118 A30090 Pile Cap C18 & C19 14 02-Jul-18 15-Jul-18 Pile Cap C18 & C19 119 A30200 Foundation for PF1-6 (Raft Foundation) 30 02-Jul-18 31-Jul-18 Foundation for PF1-6 (Raft Foundation) 120 A30340 Foundation for PF 1-7 (Raft Foundation) 30 02-Jul-18 31-Jul-18 Foundation for PF 1-7 (Raft Foundation) 121 Super Structure 110 16-Jul-18 02-Nov-18 02-Nov-18, Super Structure 122 A30210 Pier / Column PF 1-5 (2 Nos) 14 16-Jul-18 29-Jul-18 Pier / Column PF 1-5 (2 Nos) 123 A30220 Pier / Column PF 1-6 (2 Nos) 14 01-Aug-18 14-Aug-18 Pier / Column PF 1-6 (2 Nos) 124 A30350 Pier / Column PF 1-7 (2 Nos) 14 01-Aug-18 14-Aug-18 Pier / Column PF 1-7 (2 Nos) 125 A30230 Cross Beam & Bearing Pad PF 1-5 14 13-Aug-18 26-Aug-18 Cross Beam & Bearing Pad PF 1-5 126 A30240 Cross Beam & Bearing Pad PF 1-6 14 15-Aug-18 28-Aug-18 Cross Beam & Bearing Pad PF 1-6 127 A30360 Cross Beam & Bearing Pad PF 1-7 14 15-Aug-18 28-Aug-18 Cross Beam & Bearing Pad PF 1-7 128 A30390 Perimeter Beam PF1-5 to PF 1-6 to PF 1-7 (Left & Right Side) 14 22-Aug-18 04-Sep-18 Perimeter Beam PF1-5 to PF 1-6 to PF 1-7 (Left & Right Side) 129 A31260 Ramp Retaining Wall (2 Side) 21 10-Sep-18 30-Sep-18 Ramp Retaining Wall (2 Side) 130 A30430 Pier / Column PF 4-9 (2 Nos) 10 11-Sep-18* 20-Sep-18 Pier / Column PF 4-9 (2 Nos) 131 A30250 Launching M-Beam PF1-5 to PF 1-6 to PF 1-7 2 19-Sep-18 20-Sep-18 Launching M-Beam PF1-5 to PF 1-6 to PF 1-7 132 A30400 Corner Portion P84 (Left) : Beam, Slab & Parapet Cast in-situ 14 21-Sep-18 04-Oct-18 Corner Portion P84 (Left) : Beam, Slab & Parapet Cast in 133 A30410 Corner Portion P84 (Right) : Beam, Slab & Parapet Cast in-situ 14 21-Sep-18 04-Oct-18 Corner Portion P84 (Right) : Beam, Slab & Parapet Cast 134 A30420 Cross Beam & Bearing Pad PF 4-9 14 21-Sep-18 04-Oct-18 Cross Beam & Bearing Pad PF 4-9 135 A31660 Diaphram M-Beam PF1-5 to PF1-6 to PF1-7 5 21-Sep-18 25-Sep-18 Diaphram M-Beam PF1-5 to PF1-6 to PF1-7 136 A30260 Deck Slab PF1-5 to PF1-6 14 26-Sep-18 09-Oct-18 Deck Slab PF1-5 to PF1-6 137 A30270 Parapet PF1-5 to PF1-6 (Right Side) 14 26-Sep-18 09-Oct-18 Parapet PF1-5 to PF1-6 (Right Side) 138 A30370 Deck Slab PF1-6 to PF1-7 14 26-Sep-18 09-Oct-18 Deck Slab PF1-6 to PF1-7 139 A30380 Parapet PF1-6 to PF1-7 (Right Side) 14 26-Sep-18 09-Oct-18 Parapet PF1-6 to PF1-7 (Right Side) 140 A31270 Ramp Backfilling Inside Retaining Wall 5 01-Oct-18 05-Oct-18 Ramp Backfilling Inside Retaining Wall 141 A30440 Launching M-Beam Perimeter Beam (PF1-6 & PF1-7) to PF 4-9 2 12-Oct-18 13-Oct-18 Launching M-Beam Perimeter Beam (PF1-6 & PF1-7) 142 A31670 Diaphram M-Beam PF1-6 to PF1-7 to PF4-9 5 14-Oct-18 18-Oct-18 Diaphram M-Beam PF1-6 to PF1-7 to PF4-9 143 A31780 Launching M-Beam PF4-8 to PF4-9 1 16-Oct-18 16-Oct-18 Launching M-Beam PF4-8 to PF4-9 144 A31830 Diaphram M-Beam PF4-8 to PF4-9 3 17-Oct-18 19-Oct-18 Diaphram M-Beam PF4-8 to PF4-9 145 A30450 Deck Slab Perimeter Beam (PF1-6 & PF1-7) to PF 4-9 14 19-Oct-18 01-Nov-18 Deck Slab Perimeter Beam (PF1-6 & PF1-7) to 146 A30460 Parapet Perimeter Beam (PF1-6 & PF1-7) to PF 4-9 (Left & Right Side) 14 19-Oct-18 01-Nov-18 Parapet Perimeter Beam (PF1-6 & PF1-7) to P 147 A31960 Deck Slab PF4-8 to PF4-9 14 20-Oct-18 02-Nov-18 Deck Slab PF4-8 to PF4-9 148 L0 Level 208 05-Apr-18 A 29-Oct-18 29-Oct-18, L0 Level 149 A31480 Rock Excavation at Section 11 Panel P84 35 05-Apr-18 A 09-May-18 Rock Excavation at Section 11 Panel P84 150 A31490 Ramp B3 Raft Slab - Panel P84 10 23-Jun-18 02-Jul-18 Ramp B3 Raft Slab - Panel P84 151 A31500 Ramp B3 Wall - Panel P84 7 10-Jul-18 16-Jul-18 Ramp B3 Wall - Panel P84 152 A31510 Ramp B2 Slab - Panel P84 10 24-Jul-18 02-Aug-18 Ramp B2 Slab - Panel P84 153 A32040 Backfilling above C18 & C19 up to L0 Level 14 30-Jul-18 12-Aug-18 Backfilling above C18 & C19 up to L0 Level 154 A31520 Ramp B2 Wall - Panel P84 14 31-Jul-18 13-Aug-18 Ramp B2 Wall - Panel P84 155 A31530 Ramp B1 Slab - Panel P84 7 21-Aug-18 27-Aug-18 Ramp B1 Slab - Panel P84 156 A31540 Ramp B1 Wall - Panel P84 14 28-Aug-18 10-Sep-18 Ramp B1 Wall - Panel P84 157 A32170 Backfilling Zone 4 up to L0 Level 14 16-Oct-18 29-Oct-18 Backfilling Zone 4 up to L0 Level 158 Zone 5 (Mulia New Gate, Panel P87, P88) 159 08-Jun-18 13-Nov-18 13-Nov-18, Zone 5 (Mulia New Gate, Panel 159 Vehicle Ramp L0 to B3 86 08-Jun-18 01-Sep-18 01-Sep-18, Vehicle Ramp L0 to B3 160 Underground Road Tunnel - Section 12 86 08-Jun-18 01-Sep-18 01-Sep-18, Underground Road Tunnel - Section 12 161 Sub-Structure 29 08-Jun-18 06-Jul-18 06-Jul-18, Sub-Structure 162 A29840 Capping Beam at Section 12 Panel P87, P88 5 08-Jun-18 12-Jun-18 Capping Beam at Section 12 Panel P87, P88 163 A30130 Ground Anchor at Section 12 Panel P87, P88 (10 Nos, SP96 to SP114) 10 13-Jun-18 22-Jun-18 Ground Anchor at Section 12 Panel P87, P88 (10 Nos, SP96 to SP114) 164 A30920 Rock Excavation at Section 12 Panel P87, P88 14 23-Jun-18 06-Jul-18 Rock Excavation at Section 12 Panel P87, P88 165 Ramp 57 07-Jul-18 01-Sep-18 01-Sep-18, Ramp 166 A30930 Ramp Raft Slab - Panel P87 (Half Panel) 10 07-Jul-18 16-Jul-18 Ramp Raft Slab - Panel P87 (Half Panel) 167 A30940 Ramp Raft Slab - Panel P88 14 07-Jul-18 20-Jul-18 Ramp Raft Slab - Panel P88 168 A30950 Ramp Wall - Panel P87 (Half Panel) 7 17-Jul-18 23-Jul-18 Ramp Wall - Panel P87 (Half Panel) 169 A30960 Ramp Wall - Panel P88 10 21-Jul-18 30-Jul-18 Ramp Wall - Panel P88 170 A30970 Ramp Top Slab - Panel P87 (Half Panel) 10 31-Jul-18 09-Aug-18 Ramp Top Slab - Panel P87 (Half Panel) 171 A30980 Ramp Top Slab - Panel P88 14 07-Aug-18 20-Aug-18 Ramp Top Slab - Panel P88 172 A30990 Backfilling Above Tunnel at Panel P87, P88 5 28-Aug-18 01-Sep-18 Backfilling Above Tunnel at Panel P87, P88 173 CBD Loop L2 93 23-Jun-18 23-Sep-18 23-Sep-18, CBD Loop L2 174 Foundation CBD 24 23-Jun-18 16-Jul-18 16-Jul-18, Foundation CBD 175 A30140 Rock Excavation at Section 12 Panel P87, P88 (Partial Inner CBD Side) 10 23-Jun-18 02-Jul-18 Rock Excavation at Section 12 Panel P87, P88 (Partial Inner CBD Side) 176 A30150 Pile Cap C17 & C15 14 03-Jul-18 16-Jul-18 Pile Cap C17 & C15 177 A30160 Pile Cap C14 & C12 14 03-Jul-18 16-Jul-18 Pile Cap C14 & C12 178 Super Structure 69 17-Jul-18 23-Sep-18 23-Sep-18, Super Structure 179 A29930 Pier / Column PF 1-3 (2 Nos) 10 17-Jul-18 26-Jul-18 Pier / Column PF 1-3 (2 Nos) 180 A30170 Pier / Column PF 1-4 (2 Nos) 10 17-Jul-18 26-Jul-18 Pier / Column PF 1-4 (2 Nos) 181 A29960 Cross Beam & Bearing Pad PF 1-3 14 10-Aug-18 23-Aug-18 Cross Beam & Bearing Pad PF 1-3 182 A30180 Cross Beam & Bearing Pad PF 1-4 14 10-Aug-18 23-Aug-18 Cross Beam & Bearing Pad PF 1-4 183 A30190 Launching M-Beam PF1-3 to PF 1-4 1 31-Aug-18 31-Aug-18 Launching M-Beam PF1-3 to PF 1-4 184 A31680 Diaphram M-Beam PF1-3 to PF1-4 3 01-Sep-18 03-Sep-18 Diaphram M-Beam PF1-3 to PF1-4 185 A30310 Deck Slab PF1-3 to PF1-4 10 04-Sep-18 13-Sep-18 Deck Slab PF1-3 to PF1-4 186 A30320 Parapet PF1-3 to PF1-4 (Left & Right Side) 10 14-Sep-18 23-Sep-18 Parapet PF1-3 to PF1-4 (Left & Right Side) 187 CBD U-Turn 120 17-Jul-18 13-Nov-18 13-Nov-18, CBD U-Turn 188 Foundation CBD 18 17-Jul-18 03-Aug-18 03-Aug-18, Foundation CBD 189 A31010 Pile Cap C16 14 17-Jul-18 30-Jul-18 Pile Cap C16 190 A31000 Pile Cap C13 14 21-Jul-18 03-Aug-18 Pile Cap C13 191 Super Structure 106 31-Jul-18 13-Nov-18 13-Nov-18, Super Structure 192 A31060 Ramp Pier / Column C16 (1 Nos) 10 31-Jul-18 09-Aug-18 Ramp Pier / Column C16 (1 Nos) 193 A31020 Ramp Pier / Column C13 (1 Nos) 10 04-Aug-18 13-Aug-18 Ramp Pier / Column C13 (1 Nos) 194 A31070 Ramp Head stock bridge C16 10 17-Aug-18 26-Aug-18 Ramp Head stock bridge C16 195 A31030 Ramp Head stock bridge C13 10 21-Aug-18 30-Aug-18 Ramp Head stock bridge C13 196 A31080 Ramp Box Girder at C13 to C16 14 17-Oct-18 30-Oct-18 Ramp Box Girder at C13 to C16
Actual Level of Effort Remaining Work Date Revision Checked Approved
Page 2 of 3 Actual Work Critical Remaining Work TUN RAZAK EXCHANGE CONTRACT 2- PROPOSED CONSTRUCTION AND COMPLETION OF INFRASTRUCTURE AND ROADWAY WORKS
# Activity ID Activity Name Original Start Finish 2018 2019
Duration Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 197 A31090 Ramp Parapet C13 to C16 (Left & Right Side) 7 07-Nov-18 13-Nov-18 Ramp Parapet C13 to C16 (Left & Right S 198 L0 Level 14 27-Jul-18 09-Aug-18 09-Aug-18, L0 Level 199 A32050 Backfilling Above C12, C14, C15, C17 up to L0 Level 14 27-Jul-18 09-Aug-18 Backfilling Above C12, C14, C15, C17 up to L0 Level 200 Zone 6 (Open Portal Area) 103 30-Jun-18 10-Oct-18 10-Oct-18, Zone 6 (Open Portal Area) 201 A30510 Launching M-Beam ABUT-1 to P1-1 2 30-Jun-18* 01-Jul-18 Launching M-Beam ABUT-1 to P1-1 202 A30520 Launching M-Beam P1-1 to P1-2 2 02-Jul-18 03-Jul-18 Launching M-Beam P1-1 to P1-2 203 A32030 Diaphram M-Beam ABUT-1 to P1-1 3 02-Jul-18 04-Jul-18 Diaphram M-Beam ABUT-1 to P1-1 204 A32020 Diaphram M-Beam P1-1 to P1-2 3 04-Jul-18 06-Jul-18 Diaphram M-Beam P1-1 to P1-2 205 A30540 Deck Slab ABUT-1 to P1-1 10 05-Jul-18 14-Jul-18 Deck Slab ABUT-1 to P1-1 206 A30560 Deck Slab P1-1 to P1-2 10 07-Jul-18 16-Jul-18 Deck Slab P1-1 to P1-2 207 A30550 Parapet ABUT-1 to P1-1 (Left & Right Side) 10 15-Jul-18 24-Jul-18 Parapet ABUT-1 to P1-1 (Left & Right Side) 208 A30570 Parapet P1-1 to P1-2 10 17-Jul-18 26-Jul-18 Parapet P1-1 to P1-2 209 A30530 Launching M-Beam P1-2 to PF1-1 2 26-Sep-18 27-Sep-18 Launching M-Beam P1-2 to PF1-1 210 A32010 Diaphram M-Beam P1-2 to PF1-1 3 28-Sep-18 30-Sep-18 Diaphram M-Beam P1-2 to PF1-1 211 A30580 Deck Slab P1-2 to PF1-1 10 01-Oct-18 10-Oct-18 Deck Slab P1-2 to PF1-1 212 A30590 Parapet P1-2 to PF1-1 10 01-Oct-18 10-Oct-18 Parapet P1-2 to PF1-1 213 Zone 7 (Remaining Activity Section 11 Panel P78 - P83) 218 30-Mar-18 A 02-Nov-18 02-Nov-18, Zone 7 (Remaining Activity Section 214 Pier / Column 14 11-Sep-18 24-Sep-18 24-Sep-18, Pier / Column 215 A31690 Column PF4-8 14 11-Sep-18* 24-Sep-18 Column PF4-8 216 CBD Loop L2 218 30-Mar-18 A 02-Nov-18 02-Nov-18, CBD Loop L2 217 Cross Beam 166 26-Apr-18 A 08-Oct-18 08-Oct-18, Cross Beam 218 A31710 Cross Beam PF4-7 14 26-Apr-18 A 09-May-18 A Cross Beam PF4-7 219 A31720 Cross Beam PF4-8 14 25-Sep-18 08-Oct-18 Cross Beam PF4-8 220 M-Beam 190 01-May-18 A 19-Oct-18 19-Oct-18, M-Beam 221 A31740 Launching M-Beam PF4-4 to PF4-5 1 01-May-18 A 01-May-18 A Launching M-Beam PF4-4 to PF4-5 222 A31750 Launching M-Beam PF4-5 to PF4-6 1 02-May-18 A 02-May-18 A Launching M-Beam PF4-5 to PF4-6 223 A31790 Diaphram M-Beam PF4-4 to PF4-5 3 02-May-18 A 04-May-18 A Diaphram M-Beam PF4-4 to PF4-5 224 A31800 Diaphram M-Beam PF4-5 to PF4-6 3 05-May-18 A 07-May-18 A Diaphram M-Beam PF4-5 to PF4-6 225 A31760 Launching M-Beam PF4-6 to PF4-7 1 17-May-18 A 17-May-18 A Launching M-Beam PF4-6 to PF4-7 226 A31810 Diaphram M-Beam PF4-6 to PF4-7 10 22-May-18 A 31-May-18 Diaphram M-Beam PF4-6 to PF4-7 227 A31770 Launching M-Beam PF4-7 to PF4-8 1 16-Oct-18 16-Oct-18 Launching M-Beam PF4-7 to PF4-8 228 A31820 Diaphram M-Beam PF4-7 to PF4-8 3 17-Oct-18 19-Oct-18 Diaphram M-Beam PF4-7 to PF4-8 229 Slab 218 30-Mar-18 02-Nov-18 02-Nov-18, Slab 230 A31930 Deck Slab PF4-5 to PF4-6 14 30-Mar-18 12-Apr-18 Deck Slab PF4-5 to PF4-6 231 A31920 Deck Slab PF4-4 to PF4-5 14 01-May-18* 14-May-18 Deck Slab PF4-4 to PF4-5 232 A31940 Deck Slab PF4-6 to PF4-7 14 01-Jun-18* 14-Jun-18 Deck Slab PF4-6 to PF4-7 233 A31950 Deck Slab PF4-7 to PF4-8 14 20-Oct-18 02-Nov-18 Deck Slab PF4-7 to PF4-8 234 L0 Level 14 16-Oct-18 29-Oct-18 29-Oct-18, L0 Level 235 A32070 Backfilling Zone 7 up to L0 Level 14 16-Oct-18 29-Oct-18 Backfilling Zone 7 up to L0 Level 236 Zone 8 (Remaining Activity Section 2 (Panel P7- P9A) 83 26-Apr-18 A 17-Jul-18 17-Jul-18, Zone 8 (Remaining Activity Section 2 (Panel P7- P9A) 237 CBD Construction 83 26-Apr-18 A 17-Jul-18 17-Jul-18, CBD Construction 238 A31970 CBD Tie Beam PF3-17 to PF3-19 (6 Nos) 45 26-Apr-18 A 09-Jun-18 CBD Tie Beam PF3-17 to PF3-19 (6 Nos) 239 A31980 Launching M-Beam PF3-16 to PF3-19 10 10-Jun-18 19-Jun-18 Launching M-Beam PF3-16 to PF3-19 240 A31990 Diaphram M-Beam PF3-16 to PF3-19 7 20-Jun-18 26-Jun-18 Diaphram M-Beam PF3-16 to PF3-19 241 A32000 Deck Slab 21 27-Jun-18 17-Jul-18 Deck Slab 242 Vehicular Road Finishes 144 01-Aug-18 22-Dec-18 22-Dec-18, Vehicular Road Fi 243 Road at L0 Level 141 01-Aug-18 19-Dec-18 19-Dec-18, Road at L0 Level 244 Utilities 76 01-Aug-18 15-Oct-18 15-Oct-18, Utilities 245 Section 10 35 01-Aug-18 04-Sep-18 04-Sep-18, Section 10 246 A31570 Utilities at L0 35 01-Aug-18 04-Sep-18 Utilities at L0 247 Section 11 35 11-Sep-18 15-Oct-18 15-Oct-18, Section 11 248 A31580 Utilities at L0 35 11-Sep-18 15-Oct-18 Utilities at L0 249 Road Finishes 51 30-Oct-18 19-Dec-18 19-Dec-18, Road Finishes 250 A32090 Kerbs Installation at L0 Level 14 30-Oct-18 12-Nov-18 Kerbs Installation at L0 Level 251 A32100 Asphalt at L0 Level 7 13-Nov-18 19-Nov-18 Asphalt at L0 Level 252 A32110 Granite at Pedestrian & Vehicular Walkway 30 20-Nov-18 19-Dec-18 Granite at Pedestrian & Vehicu 253 A32130 Road Marking 5 23-Nov-18 27-Nov-18 Road Marking 254 A32140 Road Furniture - Street Lighting 14 06-Dec-18 19-Dec-18 Road Furniture - Street Lighting 255 A32120 Road Signages 5 15-Dec-18 19-Dec-18 Road Signages 256 Ramp L0 to B3 45 27-Aug-18 10-Oct-18 10-Oct-18, Ramp L0 to B3 257 Section S11 44 27-Aug-18 09-Oct-18 09-Oct-18, Section S11 258 A31400 Skim Coat at Tunnel S11 21 27-Aug-18 16-Sep-18 Skim Coat at Tunnel S11 259 A31430 VE Panel at Tunnel S11 14 10-Sep-18 23-Sep-18 VE Panel at Tunnel S11 260 A31410 MEP 1st Fix, 2nd Fix, Final Fix Tunnel S11 30 10-Sep-18 09-Oct-18 MEP 1st Fix, 2nd Fix, Final Fix Tunnel S11 261 A31420 Painting Work at Tunnel S11 7 17-Sep-18 23-Sep-18 Painting Work at Tunnel S11 262 Section S12 44 28-Aug-18 10-Oct-18 10-Oct-18, Section S12 263 A31440 Skim Coat at Tunnel S12 21 28-Aug-18 17-Sep-18 Skim Coat at Tunnel S12 264 A31460 Painting Work at Tunnel S12 14 11-Sep-18 24-Sep-18 Painting Work at Tunnel S12 265 A31470 VE Panel at Tunnel S12 21 11-Sep-18 01-Oct-18 VE Panel at Tunnel S12 266 A31450 MEP 1st Fix, 2nd Fix, Final Fix Tunnel S12 30 11-Sep-18 10-Oct-18 MEP 1st Fix, 2nd Fix, Final Fix Tunnel S12 267 CBD Ramp (U-Turn) 14 14-Nov-18 27-Nov-18 27-Nov-18, CBD Ramp (U-Turn) 268 A31280 Installation of Guard Rail 5 14-Nov-18 18-Nov-18 Installation of Guard Rail 269 A31300 Asphalt at Ramp from L2 to L0 3 14-Nov-18 16-Nov-18 Asphalt at Ramp from L2 to L0 270 A31310 Street Lighting 14 14-Nov-18 27-Nov-18 Street Lighting 271 A31290 Rain Water Down Pipe 5 14-Nov-18 18-Nov-18 Rain Water Down Pipe 272 A31330 Road Marking 1 18-Nov-18 18-Nov-18 Road Marking 273 A31320 Road Signages 3 25-Nov-18 27-Nov-18 Road Signages 274 CBD Loop L2 51 02-Nov-18 22-Dec-18 22-Dec-18, CBD Loop L2 275 A30040 Installation of Guard Rail 14 02-Nov-18 15-Nov-18 Installation of Guard Rail 276 A30490 Rain Water Down Pipe 14 02-Nov-18 15-Nov-18 Rain Water Down Pipe 277 A32150 Kerbs Installation at L2 Level 14 02-Nov-18 15-Nov-18 Kerbs Installation at L2 Level 278 A30050 Asphalt at L2 Level 7 16-Nov-18 22-Nov-18 Asphalt at L2 Level 279 A31620 Pedestrian Walkway 21 16-Nov-18 06-Dec-18 Pedestrian Walkway 280 A30470 Road Marking 5 23-Nov-18 27-Nov-18 Road Marking 281 A31600 Granite at Road Work Surface 30 23-Nov-18 22-Dec-18 Granite at Road Work Surfac 282 A30070 Street Lighting 14 09-Dec-18 22-Dec-18 Street Lighting 283 A30060 Road Signages 5 18-Dec-18 22-Dec-18 Road Signages