Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

WHRS-RCC, Maihar

Annex - 8.1
Performance parameters for Solar Power Plant
Reliance Cement Company - Maihar (M.P.)

S.No. Description of the parameters Unit Bidders Value Remarks

1 Power Generation at inverter terminal kW


2 Auxiliary Power consumption kW
3 %age Auxiliary Power Consumption % (max)
4 PV module efficiency % >16%
5 PR of the system % ≈ 80%
6 Inverter efficiency % >95%
7 Losses in Inverter due to efficiency kW
8 Inverter losses on sleep mode kW
9 Average Power Generation per Year kW
10 Annual Energy Production MWh/Yr
11 Plant Availibility %
12 Life guarantee of all equipments / system
a) Modules Mechanical warranty 10 Years
b) Warranty on 90% of power output 10 Years
c) Warranty on 80% of power output 25 Years
d) Inverter Warranty 5 Years (min)
e) BOS Warranty 1 Year (min)

1/2
Technical Evaluation Report
WHRS-RCC, Maihar

Performance parameters for Solar Power Plant


Reliance Cement Company - Maihar (M.P.)

S.No. Description of the parameters Unit Bidders Value Remarks

Eighteen (18) months


calculated from the date of
successful completion of PG
#REF! Defect liability period Months Test or Twenty Four (24)
months calculated from the
date Synchronization
whichever is earlier.

2/2
Technical Evaluation Report

You might also like