CONTROL NO : ER 19/A

REV : 0 DTD : JAN,08

SEWAGE TREATMENT PLANT


STARTING PROCEDURE :
 CONFIRM POWER TO CONTROL PANEL AND SOURCE LAMP IS LIT
 CONFIRM THE DIRECTION OF THE DICHARGE PUMP AND TURN THE SWITCH
TO MANUAL AND STOP

 SHUT STOP V/V AND OPEN DRAIN V/V FOR BIO FILTER TANK
 OPEN CLEANING WATER INLET V/V FOR CLEANING
 SHUT CLEANING WATER INLET V/V WHEN HIGH WATER LEVEL
 ALARM COMES ON THE CONTROL PANEL
 OPEN TREATMENT WATER OUTLET V/V, DISCHARGE P/P OUTLET V/V AND
O’BD V/V

 TURN THE DICHARGE P/P SWITCH TO AUTO


 CONFIRM THE DICHARGE PUMP STARTS AUTOMATICALLY AND HIGH WATER
LEVEL ALARM GOES

 CONFIRM THE DICHARGE PUMP STOPS AUTOMATICALLY


 CHECK OIL LEVEL IN THE OIL LEVEL INDICATOR OF AREATION BLOWER
 OPEN AIR LIFT V/V AND SHUT THE AIR SCOUR V/V
 CONFIRM DIRECTION OF ROTATION OF AREATION BLOWER BY TURNING
THE SWITCH TO RUN (CLOCKWISE FROM V-PULLEY SIDE)

 OPEN THE MANHOLE AND CONFIRM THE WATER IS ACTIVATED BY LOOKING


INSIDE THE SEWAGE TREATMENT PLANT

 CLOSE THE MANHOLE


 CHECK THE SUPPLY OF DISINFECTANT BY REMOVING THE CAP OF THE
STERLISER

 OPEN THE V/V ON THE SEWAGE SUPPLY PIPE SO THAT SEWAGE MAY ENTER
THE TREAMENT PLANT