Work Method Statement

Client:- Via Design


Contractor:- Vcivilnet
Job:- POP Punning
S.No Procedure

1 Material Used in Cement Plaster


POP, Water,Trays,Measuring tape,Trowel
finishing and leveling float, straight edge, plumb bob, right angle, line string, brush, damp sponge etc.

2 Proportioning of Cement Plaster


We are using 4:3 ratio

3 Preparation of Surface
The joints were raked out properly. Dust and loose mortar wer brushed out. Efflorescence is
removed by brushing and scrapping.Apply bonding coat to RCC surface (Flexi bond : Cement
: Water) in ratio of (1:1:4) by weight.Fixing flexible mesh at junctions of block masonry and
RCC using u-nails.

4 Procedure
Ensure that entire RCC surface to be plastered is hacked with chisel and hammer.Start punning work
from ceiling and work down towards floor. Applied primer coat to RCCC surface in ratio of 1:1:4. The
flexible mesh is fixed wherever required if necessary. Add gypsum powder in water in ratio of 4:3 and
mix thoroughly to prepare thick paste. Provide level pads(thiyyas) at various levels and corners.after
that spread gypsum paste in layers and level using straight edge and plumb bob. Avg thickness is
12mm.

5 Safety Precautions
Scaffolding & platform shall be checked for stability.Use of PPE’s like goggles, hand gloves, helmet and
dust mask,Gypsum bags shall be stacked not more than 10 bags one above other.