BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)

Page 1
BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)
Page 2
BARANGAY MAINIT DISASTER RISK REDUCTION MANAGEMENT PLAN EXECUTIVE SUMMARY

A disaster risk management is the systematic process of using administrative directives, organisations and operational skills and capacities to implement strategies, policies
and improved coping capacities in order to lessen the adverse impacts of hazards and the possibility of disaster. (www.unisdr.org/eng/library/lib-terminology-eng.htm).

Barangay Disaster Risk Reduction and Management Plan of Barangay Mainit was carefully crafted to ensure that it remains true to the essence of the National Disaster Risk
Reduction and Management Framework and the National Disaster Risk Reduction and Management Plan and is consistent with the salient provisions of Republic Act
10121 otherwise known as the Philippine Disaster Risk Reduction and Management Act of 2010.

The BDRRMP details how it shall carryout its mission of providing support to the national government to achieve the overall goal of “Safer, adaptive and disaster resilient
Filipino communities towards sustainable development.”

The goals set in the four distinct yet mutually reinforcing thematic areas (Disaster Prevention and Mitigation, Disaster Preparedness, Disaster Response, and Disaster
Rehabilitation and Recovery) are exepected to be achieved by the year 2016 through fifteen (15) objectives, twenty-three (23) outcomes, fifty-seven (57) outputs and
one hundred three (103) activities.

The Barangay plan carefully considers issues which cuts across the four disaster risk reduction and management aspects. These issues include gender sensitivity, rights-based
approach, multi-sectoral engagement and mental healthand psychosocial services. Likewise, the document attempts to address issues which are unique to the Barangay
like transport related disasters and communication deficiencies.

Honorable Rene L. Montaron, Punong Barangay and the BDRRM Committee are identified in the Barangay plan to ensure the effective implementation of the BDRRMP. As
detailed in the National DRRMP, the Punong Barangay leads at the barangay level shall likewise have the following duties and responsibilities: 1) Takes the lead in
initiating the implementation of the activities; 2) Coordinates and collaborates with the different implementing partners to ensure that the activities are operationalized ;
3) Monitors the progress of the activities; 4) Evaluates the implementation development and program efficiency and 5) Consolidates reports from the implementing
partners and submits to the respective vice-chairperson of the DRRM priority area.

On the other hand, the implementing partners are expected to perform the following functions: 1) Perform the activities to achieve the specific outcomes; 2) Work with other
implementing partners within the context of coordination, collaboration and partnership; and 3) Submit reports to agency leads.

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 3
The MDRRMO is tasked to conduct periodic assessment and performance monitoring of BDRRMC member agencies. Likewise, the MDRRMO is required to ensure that the
physical framework, social, economic and environmental plans of Barangay are consistent with the Municipal DRRM plan which is reflective of the NDRRMP.

Monitoring and evaluation will be led by the MDRRMO & MLGOO, in coordination with council members. The process will focus on relevance, effectiveness, efficiency,
impact and sustainability.

Table of Contents

Part I: Barangay Risk Profile

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 4
Natural and Geographic Conditions 6

Land Area and Political Subdivisions 6

Topography 7

Climatic Characteristics 8

Social and Economic Conditions 8-9

Inter-island Connectivity 9

Major Disaster Experience 9-10

Disaster Characteristics in the Barangay 10

Geological Hazards 10-11

Challenges 11

Hazard Maps of Barangay 12

13-35

Structure of BDRRMC 36-37

Part II: Barangay Disaster Risk Reduction Plan

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 5
The Four Thematic Areas 38-39

Plan: Thematic Area 1 – Disaster Prevention and Mitigation 40-44

Thematic Area 2 – Disaster Preparedness 45-49

Thematic Area 3 – Disaster Response 50-54

Thematic Area 4 – Disaster Rehabilitation and Recovery 55-57

Part III: Annexes

Annex A - Institutionalization of Incident Command System (ICS) 58

Annex B – Barangay Ordinances, Executive Order, MOUs/MOAs 59-63

Annex C – Flood Prone Areas in the Barangay 64-72

Annex D – Landslide Prone Areas in the Barangay 73-77

Annex E – BDRRMC Directory 78-81

Annex F – References 82

Acronyms and abbreviation


BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)
Page 6
AFP Armed Forces of the DRRM Disaster Risk Reduction and
Philippines Management
ASEP Association of Structural DRRMC Disaster Risk Reduction and
Engineers of the Philippines Management Council
ATO Air Transportation Office DSWD Department of Social
BDRRMC Brgy. Disaster Risk Welfare and Development
Reduction DTI Department of Trade and
& Management Council Industry
BFP Bureau of Fire Protection EC Evacuation Center
BSP Bangko Sentral ng Pilipinas EO Executive Order
CCA Climate Change Adaptation EWS Early Warning System
CCC Climate Change Commission GAA General Appropriations Act
CDP Comprehensive HLURB Housing and Land Use
Development Plan Regulatory Board
CHED Commission on Higher ICS Incident Command System
Education IEC Information, Education and
CLUP Comprehensive Land Use Communication
Plan LDRRMF Local Disaster Risk
CSC Civil Service Commission Reduction and Management
CSO Civil Society Organization Fund
DA Department of Agriculture LDRRMO Local Disaster Risk
DANA Damage and Needs Reduction and Management
Assessment Office
DAR Department of Agrarian LGA Local Government Academy
Reform LGU Local Government Unit
DENR Department of Environment MC Memorandum Circular
and Natural Resources MDRRMC Municipal Disaster Risk
DepEd Department of Education Reduction and Management Council
DILG Department of the Interior MGB Mines and Geosciences
and Local Government Bureau
DMAF Disaster Management MHO Municipal Health Office
Assistance Fund MOA Memorandum of Agreement
DOE Department of Energy MOU Memorandum of
DOF Department of Finance Understanding
DOH Department of Health NAMRIA National Mapping and
DOJ Department of Justice Resource Information
DOLE Department of Labor and Authority

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 7
Employment NBI National Bureau of
DOST Department of Science and Investigation
Technology NDRRMC National Disaster Risk
DOTC Department of Reduction and Management
Transportation and Council
Communications
DPWH Department of Public Works
and Highways
NDRRMF National Disaster Risk SAR Search and Rescue
Reduction and Management SOP Standard Operating Procedures
Fund SRR Search, Rescue and Retrieval
NEDA National Economic and TESDA Technical Education and
Development Authority Skills Development Authority
NFA National Food Authority ULAP Union of Local Authorities of
NGO Non-Government the Philippines
Organization
NHA National Housing Authority
NTC National
Telecommunications
Commission
OCD Office of Civil Defense
PAGASA Philippine Atmospheric,
Geophysical and
Astronomical Services
Administration
PCG Philippine Coast Guard
PDNA Post-disaster Needs
Assessment
PDAF Priority Development
Assistance Fund
PDRRMC Provincial Disaster Risk
Reduction and Management
Council
PFI Private Finance Initiative
PHIVOLCS Philippine Institute of
Volcanology and Seismology
PIA Philippine Information
Agency

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 8
PICE Philippine Institute of Civil
Engineers
PLUC Provincial Land Use
Committee
PNP Philippine National Police
PNRI Philippine Nuclear Research
Institute
POI Program of Instruction
PPA Philippine Port Authority
PPP Public-Private Partnership
PRC Philippine Red Cross
RA Republic Act
RDRRMC Regional Disaster Risk
Reduction and Management
Council

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 9
RISK PROFILE

A. Natural and Geographic Conditions

Barangay Mainit was one of the barangays in the Municipality of Boac composed of agricultural area that was a primary source of living of most of the residents. Most of the
people engage in farming which support their children in studying and become professionals. Otherwise some of the residents have their own jobs and business and some are
professionals.

Most of the areas was use for agricultural purposes.

Brgy. Mainit Spot Map

Land Area and Political Subdivisions

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 10
Barangay Mainit has aggregate land area of 459 hectares or 4.59 square kilometers. It consists of 7 Puroks with total the population of 980.

Topography

Barangay Mainit is characterized by varied landforms consisting of lowland areas and upland areas of moderate rolling and undulating plains and hills and
mountains. It is one of the rural areas in the province.

A. Climate Characteristics

Barangay Mainit as part of Marinduque is categorized on the Type III climate having rainfall more or less evenly distributed throughout the year with no clear
boundary between dry and wet seasons. The annual mean, maximum, and minimum temperatures were calculated at 27.0 °C (80.6 °F), 32.9 °C (91.2 °F) and 22.3 °C
(72.1 °F) respectively. Humidity average is 78% year-round with an average annual rainfall totaling 2,034.6 millimeters (80.10 in).

Floods overflow in most of the areas of the barangay during rainy seasons and typhoons. And during that time agricultural products in the area defaced.

B. Social and Economic Condition

Barangay Mainit is an agricultural area that’s why people relies mostly in farming. The people mostly plant rice, banana, rootcrops and vegetables as the major sources of
income for their families. Coconut are also one of the products in the barangay. It has no existing Flea Market or Talipapa. People transport their agricultural products to
the town proper and sell them for their needs.

Barangay Mainit just like the other barangay in the province has its own tourist destination. It has a natural “Hot spring” that can be found in Purok V and Purok I. This
spring was very useful for the people specially when there is typhoon and the pipelines of the water source are broken. The residents use this for drinking and also its a
great help in farming as source of irrigation in most of the ricefields in the community.

C. Inter-Town Connectivity

Barangay Mainit is approximately twelve (12) km. from the town proper. It can be done by the use of land transportation such as jeep, tricycle, motorcycle and other private
vehicle.

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 11
Hydro-meteorological Hazards

Flooding, strong winds and landslides brought by typhoons have been the main hazard that affects MIMAROPA. Changing wind patterns and Climate Change have
made the province of Marinduque more vulnerable to the effects of typhoon are the primary hazards in the barangay. Typhoon Glenda and the latest Typhoon Ruby affects the
barangay. Lots of houses and agricultural products and lands had been damaged.

Geological Hazards

In Marinduque, Barangay Mainit is one of the members of Central Marinduque Fault and the reason why it is prone to earthquake.

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 12
Barangay Mainit – HAZARD MAP

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 13
BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)
Page 14
D. Challenges

The geographical spread of provinces comprising the region presents unique challenges in disaster risk reduction and management program implementation. Resource
prepositioning will always be required to ensure adequate response in the immediate aftermath of any emergency.

Communications facilities should also be improved for better coordination in time of calamities. Emergency situations in some instances, were not reported on time. Likewise,
local capacity in end-to-end early warning system are needed to ensure communities appreciation and understanding of the information contained in warning advisories.
Institutionalizing community based flood early warning systems would allow vulnerable communities to identify and implement specific courses of action for each level of
warning.

F. VISION AND MISSION OF THE BARANGAY ON DISASTER

VISION– Center of good Disaster Risk Reduction Management along the Municipality and the province

MISSION– To administer comprehensive disaster risk plan for the sake of the community by providing leadership in the continuous development and strategic and
systematic approaches as well as measures to reduce the vulnerabilities and risks to hazards and manage the consequences of disaster.

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 15
ROLE AND FUNCTION

ROLE AND FUNCTION OF BDRRMC–To help and support one another and every family in the vulnerable areas in the barangay in times of disaster and different
calamities.

BARANGAY CHAIRMAN-

EVACUATION TEAM- Help to transport the evacuees in safer areas and help provide the basic needs of the people in the evacuation center.

RELIEF TEAM- To provide the basic necessity of the people specially the evacuees who are in badly needs.

SECURITY TEAM, BRGY BPATS- To coordinate with the barangay officials for the safety of the people in vulnerable areas in time of calamity/ies.

FIRE TEAM- to ensure safety in the evacuation center against fire and other emergencies

MEDICAL TEAM/BHW- to provide medical assistance in every family in the evacuation area

BNS- help or assist the family and provide healthcare for the evacuees

SECRETARY-

TREASURER-

Committee on Environment –

Committee on Infra-

Committee on Brgy. Affairs –

Committee on Peace and Order –

CIVIL SOCIETY ORGANIZATION-


PRIVATE SECTOR REPRESENTATIVE-
VOLUNTEERS-

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 16
Part II: Barangay Disaster Risk Reduction and Management Plan

Consistent with the essence of the National Disaster Risk Reduction and Management Plan, National DRRM Framework, and the Municipal Disaster Risk Reduction and
Management Plan revolves around four distinct yet mutually reinforcing thematic areas, namely:

(a) Disaster Prevention and Mitigation

Disaster Prevention – the outright avoidance of adverse impacts of hazards and related disasters. It expresses the concept and intention to completely avoid potential adverse
impacts through action taken in advance such as construction of dams or embankments that eliminate flood risks, land-use regulations that do not permit any settlement in
high-risk zones and seismic engineering designs that ensure the survival and function of a critical building in any likely earthquake.

Disaster Mitigation – the way to lessen or limit the adverse impacts of hazards and related disasters. Mitigation measures encompass engineering techniques and hazard-
resilient construction as well as improved environmental policies and public awareness.

(b) Disaster Preparedness - the knowledge and capacities developed by governments, professional response and recovery organizations, communities and individuals to
effectively anticipate, respond to, and recover from the impacts of likely, imminent or current hazard events or conditions. Preparedness action is carried out within the context
of DRRM and aims to build the capacities needed to efficiently manage all types of emergencies and achieve orderly transitions from response to sustained recovery.
Preparedness is based on a sound analysis of DRR and good linkages with early warning systems and includes such activities as contingency planning, stockpiling of
equipment and supplies, the development of arrangements for coordination, evacuation and public information and associated training and field exercises. These must be
supported by formal, institutional, legal and budgetary capacities.

(c) Disaster Response - the provision of emergency services and public assistance during or immediately after a disaster in order to save lives, reduce negative health impacts,
ensure public safety and meet the basic subsistence needs of the people affected. Disaster response is predominantly focused on immediate and short-term needs and is
sometimes called “disaster relief.”

(d) Disaster Rehabilitation and Recovery

Rehabilitation – measures that ensure the ability of affected communities and/or areas to restore their normal level of functioning by rebuilding livelihood and damaged
infrastructure and increasing the communities’ organizational capacity
Post Disaster Recovery – the restoration and improvement where appropriate, of facilities, livelihood and living conditions of disaster-affected communities, including efforts
to reduce disaster risk factors, in accordance with the principle of “build back better”.

With the end view of supporting the country’s overall goal of “Safer, adaptive and disaster resilient Filipino communities towards sustainable development”, each thematic
area has its own goal.

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 17
BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)
Page 18
Thematic Area 1: Disaster Prevention and
Mitigation

Goal:
Avoid hazards and mitigate their potential impacts by reducing vulnerabilities and exposure and enhancing capacities of communities.

Objectives:

1. Reduce vulnerability and exposure of communities to all


hazards.
2. Enhance capacities of communities to reduce their own
risks and cope with the impacts of hazards

Lead Implementi Performance Percent of


ng Partners Outcome Outputs Activities Indicators Implementation Budgetary Other source of Fund
Requirem
ents
Timeline
2014 2015 2016
2014 2015 2016

Punong 1. DRRM and CCA 1. Impacts of risk 1. Inclusion of a 1. 100 % utilization 100% 100% 100% 178, 61,516.4 18,4 Mdrr
Baranga Committee mainstreamed and on development provision in the of 70% of the 590. 0 54.9 m
y on integrated in the programs and annual Brgy budget BDRRM fund 28 2 fund
Environment local development projects are well on the 70% of the 5% Regular audit by the Pdrr
policies, plans and recognized in of the Municipal m
Brgy budget. government plans BDRRM fund Accountant fund
Treasurer and budgets.

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 19
Committee 2. 13 reports
on Infra 3. Submission of submitted
annual reports on
the utilization of
Sangguniang the portion of
Brgy BDRRM Fund

Brgy.
Secretary

2. Decision 2.0 Build capacities 10% 15%


supported by to effectively
tools and mainstream DRRM
equipment that and CCA in
will enhance the development
capability of planning, investment
BDRRMC for programming,
mitigation and project development
prevention. and evaluation

Inclusion in the plan 2 creeks/canal, Once a Once a month Once


of the ff. DRRM & drainage, river & month a
CCA projects: river bank 2000 month
5000 trees 1000 DEN
● Clearing % 2000 R

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 20
cleaning of
creek, canal,
drainage 5 6
river& river , m OCD
bank. 0 i ,
● Tree planting 0 l DPW
activities 0 l H
along the . i PDR
river bank 0 o RM
and failure 2.1 0 n BDF/
watershed 4resolutions and BBD
area prepared and RRM
● Construction implemented 2 7 C
of River 8 5 MDR
Control , 0 RMC
0 , PDD
● Construction 0 0 RMC
of evacuation 0 0
center . 0
0 .
0 0
3.1 Formulate 0
provisions/ordin
ances and
regulations for
the acquisition
of equipment
and tools for
disaster
mitigation

● Sanggunian
Resolution on
the purchase
of shredding
machine for
proper
garbage

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 21
disposal
● Sanggunian
Resolutions
on tree
planting
activities
along the
seashore
● Brgy.
Ordinances
enacted on
no illegal
cutting of
trees and use BDR
of kaingin RMF
system

3.2 Acquisition of BDR


equipment on RMF
DRRM & CCA 2
and tools as 7
approved by the , BDR
BDRRMCs 8 RMF
&Sanggunian : 5
0
● Resolutions . BDR
enacted on 8 RMF
the purchase 9
of the siren MS
and WD
batingaw as 3
early 3 1 MS
warning , 0 WD
system 2 ,
● Purchase of 3 0 BDR
two way 2 0 RMF
radio . 0
7 . BDR

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 22
● Purchase of 0 0 RMF
chain saw 0
BDR
● Communicati RMF
on Equipment 5 1
, 5 BDR
● Generator Set 0 , RMF
0 0
● Tent 0 0 BDR
. 0 RMF
● Aladin 0 .
0 0 BDR
● Gas stove 0 RMF

● Flashlight 2 BDR
8 RMF
● Blanket ,
8 BDR
● Search light 7 RMF
3
● Kerr mantle . 7 BDR
rope 1 , RMF
1 0
● Life vest 0 BDR
0 RMF
● Raincoat .
0
● Rubber boat 0

● Hard hat 5 1
, 0
● Spine board 0 ,
0 0
0 0
. 0
0 .
0 0
0

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 23
2 1
, 0
0 ,
0 0
0 0
. 0
0 .
0 0
0
6
,
0
0 2
0 0
. 0
0 ,
0 0
0
0
.
0
0

5
, 1
0 0
0 ,
0 0
. 0
0 0
0 .
0
0

6
,

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 24
2
6
1
.
9
2

3. Enhanced CSO 3. Encourage 3.02CSO accredited


participation in membership in the as members of
the Brgy BDRRMCs to BDRRMC
Development actively participate
Councils in the BDC

● Participation
of NGOs, Sr.
Citizen,
TODA, in
the BDC

3.1Conduct of 3.1 No. of IEC


Information conducted in the
Education Campaign Brgy.
Program on a
quarterly basis and
consultation with
CSO & other
stakeholders in
coordination with
deep

● IEC on
hydro-
meteorologic
al hazards
● IEC on
Geological
Hazards

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 25
● Climate
Change
effects

4. Measures to 4.1 Conduct capacity 4.1 As need arises


reduce vulnerability
vulnerability and assessment on a
to increase regular basis with the
capacity to cope implementing
with disasters are programs & projects
integrated in integrated in the 5 puroks are capacity
plans, programs plans of vulnerability
and projects. ● Brgy. assessment in the
Committee on Brgy
Environment
will conduct
vulnerability
assessment
with the
participation
of MENRO
& MPDO on
quarterly
basis

● Conduct of
Community-
based
Disaster Risk
Management
in the Brgy.
BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)
Page 26
With the
assistance of
MDRRMC

5. Measures 5.0 Pass resolutions, 5.0 3 resolution& 3


identified to executive order or ordinances on
ensure that enact ordinances on DRRM & CCA
programs and DRRM & CCA
projects do not ● Prepare
contribute to database on
further risks disaster risk
assessment
and
management
in
coordination
with the
Municipal
Land Use
Committee
and MENRO

● Enacted
ordinance on
CCA program
in the Brgy

● Enacted
Brgy.
Ordinance on
the
construction
of CCA
Evacuation
Center

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 27
6. BDRRMC 6.0 Issuance of
established Executive Order by
the Brgy .Chairman

● Brgy.
Ordinance on
the creation
of BDRRMC
with the
correspondin 2 meetings
g duties & conducted
responsibilitie
s

● Convene the
BDC on a
regular basis
as per RA
10121

2. DRRM and 2.0 Formulation 2.0Formulate 2.0


CCA-sensitive of plans and policies and put into
environmental policies that action on
management. preserve and environmental
develop protection
environment.
● Ordinances
enacted on
non use of
plastic
● Ordinances
on the
Kaingin
System
● Clean-up
drive of
canals and
other

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 28
waterways
● Strict
implementati
on on the 40
meters and 3
meters
easement
2.1 Revise plans 2.0.1. Enact 2.1
and policies that Ordinances on
prevent and prohibited acts
mitigate the
occurrence of
flooding, and ● Ordinances
other disastrous on illegal
events. cutting of
trees
● Ordinances
on tree
planting
activities
● Ordinances
on waste
segregation

2. Acquisition of 2. Inclusion of funds 2.2


tools and for acquisition and
equipment for maintenance of
ecological waste equipment for
management. ecological
management.
● Inclusion of
funds for the
maintenance
of ecological
waste
management
equipment

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 29
such as dump
truck on
waste
disposal

4. Increased 3.0 Enhanced 3. 0 Update 3.0


Disaster disaster &conduct of 1 critical facilities
Resilience of mitigation and inventory of critical
Infrastructure preparedness facilities and
systems strategies for infrastructures in the
infrastructure Brgys.
systems Such as school
buildings, Brgy. Hall
& Brgy Health
Station

● Strict
implementati
on of building
code and use
of green
technology
and integrate
DRRM &
CCA
● Conduct of
retrofitting of
public school
buildings
such as

4. Community- 4. DRRM and 4. Conduct 5. Once a year 100%


based and scientific CCA assessment vulnerability
DRRM and CCA and mapping assessment on
niassessment, tools. regular basis in the

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 30
mapping, analysis barangay level (every
and monitoring are 1st quarter on election
conducted and/or year-per DILG
improved policy as ANA

2. Readily usable 2.1 Conduct hazards 2.1 100%


and accessible mapping and 2 hazard maps
DRRM and CCA assessment at the assessment
knowledge Barangay levels conducted in the
products Brgy. hall

2.2 Printing of 2.2 No. of leaflets on


leaflets on and hydro hydro met and
met and geological geological hazards
hazards printed

2.3 No. of Tarpaulin


2.3 Printing of printed and properly
Tarpaulin on What to hang on the Brgy
do during signal No. Disaster Operation
1,2,3,4 of typhoon Center
and posted in the
Brgy and Some Tips
on how to prepare for 2.4 No. of hectares of
floods lot who introduce
organic farming
implemented in the
2.4 Implement Brgy.
organic farming in
the Brgy. 2.5 No. of hazard
maps

2.5 Printing and


hanging of hazard

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 31
maps in the Brgy
Disaster Operation
Center

2.6 IEC on recycling


of household waste
such as bottled
plastic that will use
as pot for planting
vegetables and other
edible & ornamental
plants

2.7 Information
dissemination
through coordination
with MDRRMO
&other gov’t
agencies

4. Communities 5. Update the 5. 0 Preparation of 5.0 One(1) Directory


have access to directory of Risk financing of financing
effective and available companies directory windows prepared
applicable financing
disaster risk windows for ● CARD Bank
financing Brgy ● TANIKALA
SA
PAGKAKAI
SA COOP.

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 32
5.1 Promote 5.1 20 volunteers in
insurance schemes disaster who availed
for responders of PRC insurance
schemes

1.1 Enhanced 1.1 Installation of 1.1 No. of rain


monitoring, equipment and gauges purchased
forecasting and establish facilities for and installed in the
hazard warning. Early Warning Brgy.
System (Floods) 1 O
● Purchase of 0 C
Manual rain T D
gauge
1.2 Development and EWS information 100%
institutionalize EWS shared
information sharing
between barangay
partner

1.2.a No. of
● Training of participants/attendees
communities in the training of
on rainfall rainfall & water level
and water observation
level
observation
1.2.b One Early
warning system
formulated in the
● Formulation Brgy.
of early
warning
system thru
batingaw

➢ Painting of
Ready(yellow

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 33
) Get
Set(green)
and GO(Red)
in the Electric
Post along the
flood prone
areas
➢ Installation of
Batingaw or
gong n the
Brgy. With
one
gong(ready)
two gong(get
set)and
continuous
gong (GO)

Thematic Area 2: Disaster Preparedness

Goal: Establish and strengthen capacity of communities to anticipate, cope and recover from the negative impacts of emergency occurrences and disaster

Objectives:

1. Increased the level of awareness of the community to the threats and impacts of all hazards, risk & vulnerabilities

2. Equip the community with the necessary skills to cope with the negative impacts of a disaster

3. Increase the capacity of the institutions

4. Develop and implement comprehensive natl. and local disaster preparedness policies and plans

5. Strengthen partnerships among all key players and stakeholders

Percent of Implementation Budgetary Requirements


Lead Implement Outcome Outputs Activities Performan

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 34
ing ce Timeline Other
Partners Indicators source
of fund
2014 2015 2016 2014 2015 2016
Brgy Committe 1.Communities 1. Increased level 1. Developed and
Chairman e on are equipped of awareness and updated DRRM and
Evacuatio with enhanced CCA IEC and
n necessary capacity of the advocacy plan and
skills and community to program
Committe capability to the threats and ● Posting of
e on Peace cope with the impacts of all IEC materials in
and Order impacts of hazards the Brgy Hall
disasters
Committe ● Conduct of
e on IEC
Livelihood Campaign on
hydro met
hazards,
geological
hazards and
Climate
change issues
and concern

● Conduct of
IEC during
the Brgy
Assembly and
during the
Brgy session

.Conduct of trainings
and simulation
exercises on disaster
preparedness and
3.0Communities are response

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 35
equipped with
necessary skills and Trainings on the ff:
capability to cope
with the impact of ● Camp 10,000.0 BDRR
disaster Management 0 M

2. DRRM is 2.Conduct of 8 Key


mainstreamed capacity building decisions
and taken into activities for makers in
consideration in the Brgy
decision ● BDC & trained
BDRRMC

4. Conduct of DRRM All Brgy 11,000.0


and CCA education officials 0
and training for the attended
Brgy officials(in CCA
coordination with the education &
MDRRMC) trainings

5.1 Conduct of Conducted


contingency Planning CP on Set.
formulation and 29-Oct. 3,
workshop 2014and
nos. of 3
participants

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 36
5.1.2 Develop the Conducted
BDRRM Plan BDRRMP
on Sept. 29-
Oct. 3, 2014
with
3attendees
5.1.3 Conduct of # Inventory
Proper of
Inventory of Resources
resources updated
with the
complete
list of
Memorandu
m receipt
5.1.4 Stock filing and MOA with
prepositioning private
of resources sectors
prepared

5.3.5 Establishment Established


of one Disaster the Brgy
Operations Center Disaster
Operations
Center in
Brgy Hall.
5. Developed 6.0 Enhanced 6.1 Develop and/or 1scenario-
and preparedness & enhanced simulate based
implemented response strategies, scenario-based preparednes
comprehensi including preparedness and s and
ve Brgy. coordination response plans with response
preparedness mechanisms and the assistance of plan
and response infrastructure MDRRMC developed
policies,
plans and
system

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 37
61.Increased 6.1 Develop and 1 Incident
coordination enhance ICS Command
through the coordination and system com.
Incident communication Developed
Incident Command system with the
Systems assistance of trained
MDRRMC on ICS

● Conduct of
training on 12,779.9
ICS for the 5
Brgy

6.2 Better prepared 6.2 Develop and/or 10guideline


Citizenry enhance guidelines s developed
for emergency on
response protocol in emergency
coordination with response
MDRRMC protocol

6.3 Increased 6.3 Develop and/or All BPATS,


coordination, enhance common and BHW
complementation integrated response trained on
and interoperability assessment tools & SRR,
of work in DRRM mechanisms (SOPs RDANA
for deployment and with the
RDANA Teams, assistance
SRR, Evacuation of
Team in MDRRMC

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 38
coordination with the
MDRRMC

6.4.Integrated 6.4 Conduct an 1Prepared


operations and inventory of existing data-base of
essentials services volunteers on disaster disaster
ensured responders and volunteers
existing resources with the
complete
● Inventory of address and
complete lists contact Nos.
of disaster
volunteers
and
responders
including
their
resources
printed and
properly hang
in the BDOC

7. Strengthened 7.0 Partnership 7.0 Update of 1 Updated


partnership and arrangements directory or directory of
coordination among stakeholders database of key key player
among all key established players and
players and stakeholder every
stakeholders year

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 39
7.1 Formulate
coordination
mechanisms &
guidelines for
partnership
arrangements in the
contingency plan

● MOUs, 2MOAs/M
MOAs on OUs
private sector formulated
representative
s in the
BDRRMC
such as
grocery
owners and
Backhoe
owner

Thematic Area 3- Disaster Response

Goal:

Provide life preservation and meet the basic subsistence needs of affected population based on acceptable standards during or immediately after a disaster

Objectives:

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 40
1. Decrease the number of preventable deaths and injuries

2. Provide basic subsistence needs of affected population

3. Immediately restore basic social services

Lead Implementing Outcome Outputs Activities Performance Operational


Partners Indicators Other
Timeline Budgetary source
Requirements Of fund

1-7 days 1-3mos Beyon 201 2015 201 2


d3 4 6 0
mos 1
7
Committee on 1.Well 1. Activated 1. Activation of ICS 1 ICP
Brgy. Evacuation established functional/operatio during disaster or installed &
Chairma Committee on disaster response nal Incident emergency with activated
n Rehabilitation operations Command System trained 1st
BPATS responders on site in
BHW coordination with
BNS MDRRMC
Secretary

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 41
2. Well-established 2.0 Gathering of 12 accurate
system of accurate Initial reports
information information for submitted
gathering, reporting purposes
reporting to be reported &
and dissemination submitted to
MDRRMO

3. Established and 3. 0 Activation of 1 Distribution


functional relief distribution points
efficient relief points in the Brgys established
operation and activated
● Purok I
● Purok 2
● Purok 3

2. Adequate and 2. Timely and 2. Activation of 1 RDANA


prompt appropriate and Brgy RDANA teams
assessment of consolidated needs teams(Com. On activated
needs and assessment reports Infrastructure, Com.
damages in the On Environment,
Brgy Com on Health &
Com. On
Relief)together with
the MDRRMC
RDANA teams

2.1 Using the latest 1 DANA


DANA assessment coordinated
tool, consolidate, with the
analyze and MDRRMC
disseminate data in
coordination with
MDRRMC

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 42
3. Integrated and 3.Communities 3. Develop and All persons
coordinated found, retrieved & implement a system found,
Search, Rescue reconnected with for Search Retrieval retrieved &
and their families &Rescue(SRR) reconnected
Retrieval(SRR) operations and with their
Capacity proper disposal of families
dead person in
coordination with
MDRRMC

4.Evacuated 4.Safe and timely 4.Activate All Purok


safely and on evacuation of committee on Leaders
time affected affected Evacuation in the activated and
communities communities Brgy. properly
● Activation of evacuated the
Purok/Sitio affected
Leaders communities
Evacuation
team

5.Temporary 5.All evacuees are 5.Identification of 1 standard-


shelter needs are sheltered in standard-based relief based relief
adequately adequately shelters and sites shelters and
addressed equipped facilities sites
for all(including identified
areas lactating ● Provisions of
mothers) tents & other
temporary
shelters
● Implement
set of
temporary
shelters
● Provision
with the
continuous

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 43
supply of
water
including
potable
drinking
water

5.1 Child friendly 5.1 Establishment of 1 learning


spaces or child-friendly space
temporary learning spaces/temporary provided for
in the Evacuation learning area in the learning area
Center for Evacuation Center
continuity of for continuity of
education education in
coordination with
DepEd
Provision of
learning space in EC
5.2 Safety for the 5.2 Provide spaces 1 space in
sources of for people’s ECs provided
livelihood of the livestock, poultry for the
people and pets in the communities
ECs.(in coordination livestock,
with the MAO poultry and
together with the pets
Com. On
Agriculture)

● Provision of
space at the
back of the
EC for pets
and
poultry(ident
ify the EC)

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 44
5.3 Increased and 5.3 Conduct 1 livelihood
diversified livelihood-oriented Program
people’s livelihood activities for implemented
skills internally displaced for the Brgy.
persons
● Basket
weaving
● Ponding
● Dressmaking
● Bag
making(shop
ping bag)
● Food
processing
● Soap making
● Seaweeds
production
● Dried fish
● Bagoong
making
● Patis making
● Swine
dispersal
● Large Cattle
● Malunggay
Plantation
● Bibingka
making
● Nito making
● Butterfly
culture
6. Basic health 6.All patients 6. Medical 1 Medical
services seen/treated and consultation & consultation
provided to epidemics nutritional and medical
affected prevented assessment (in mission
population coordination with conducted in
whether inside or MDRRMC together the Brgy in
outside ECS with the BEANS & coordination

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 45
BHW) with
● Conduct of MDRRMC
medical
consultation
and Medical
mission in
the ECs thru
MHO with
the
assistance of
BHW

6.1 Water-borne 6.1 Assessment of water quality


diseases prevented water quality (in assessed thru
coordination with the
MDRRMC together MDRRMC/
with Voluntary MHO
Brgy. Sanitary
Inspector(VBSI),
BEANS & BHW

● Water
quality
assessed thru
the
assistance of
MHO, NGOs
● Distribution
of aquatabs
in the
community

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 46
6.2 Database of 6.2 Determination if
hospitals and other there is enough
health care clinics and hospitals
providers including nos. of
beds to address to
casualties
● Sanitarium
● Brgy. Rural
Health
Station

6.3 Lifelines 6.3 Immediate All lifelines


restored restoration of restored after
lifelines. a disaster
● Restoration
of Electricity
thru
MARELCO
● Restoration
of roads and
bridges
● Restoration
of cellsite
7. Psychosocial 7.Disaster-affected 7. Coordination All psycho-
well-being population are in among heads of social
promoted and good mental and Mental health services
mental health psychological state psychosocial coordinated in
problems and services for the the Brgy. with
risks reduced disaster victims the assistance
(in coordination of MHO
with MDRRMC
together with the
Committee on
Health)
● Conduct of
psycho-
social care

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 47
for the
affected
disaster
victims thru
the
assistance of
MDRRMC/
MHO

7.1 Conduct of 7.1 Ten(1)


traumatic and/or psychosocial
psychological stress care and
debriefings for the stress de
disaster victims (in briefing
coordination with activities
the MDRRMC conducted
together with the
Brgy. Committee On
Health)

8. Coordinated, 8. Mechanisms for 8. Conduct of Post One(1)


integrated coordinated and Disaster & Needs PDNA
system for Early integrated early Assessment (PDNA) activities
Recovery recovery activities in the Brgy conducted
implemented on established and with the assistance
the local levels essential services of Brgy. Committee
restores on Health, Brgy.
Com. On Infra &
Brgy Committee on
Environment with
the assistance of
MDRRMC

8.1 Develop

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 48
partnership
mechanisms with
utility providers and
key stakeholders
thru MOUs/MOAs

● MOUs and
MOAs
implemented
with
stakeholders

Thematic Area 4 – Disaster Rehabilitation and Recovery

Goal

● Restore and improve facilities, livelihood and living condition s and organizational capacities of affected communities, and reduce disaster risks in accordance with the
“build back better” principle.

Objectives:

1. To restore people’s means of livelihood and continuity of economic activities and business

2. To restore shelter and other buildings/installation

3. To reconstruct infrastructure and other public utilities

4. To assist in the physical and psychological rehabilitation of persons who suffered from the effects of disaster

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 49
Lead Implementi Outcome Outputs Activities Performanc Percent of Implementation
Agency ng Partners e Indicators Budgetary Othe
Timeline Requirements r
sourc
Within Within Beyon 2015 2016 2017 e
6 mos 1-2yrs d 3 yrs
Brgy. Brgy. 1.Damages, 1. Post Disaster 1. Conduct field 1 field
Chairma Committee Losses and Needs Assessment validation in the validation
n on Needs Brgy together with conducted
Infrastructure Assessed the Mun. RDANA
Brgy PDNA teams
Committee together with the
on Committee on Infra.,
Environment Environment,
Brgy. Health,
Committee Appropriations,
on Health Peace & Order &
Committee Treasurer
on
appropriation
s
Kagawad
Committee
on Peace and
Order

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 50
2.Economic 2.Livelihood 2. Identify the 96
activities programs and needed assistance Livelihood
restored and, projects and formulate/ assistance
if possible Implement implemented
strengthened appropriate program
or expanded in coordination with
the Social Welfare
and Mun.
Agricultural Office

● Hog
fattening
● Bagoong
Making
● Fish
production
● Cash for
work
● Food for
working
● Emergency
shelter
assistance
● Core shelter
assistance
program

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 51
4.Credit facilities 4.Identify mobilize
for affected sectors local funding
sources

● Conduct of
inventory/dat
a-based of
risk
financing
institutions in
the Brgy.

4.1 Execute MOAs


or MOUs with the
ff: credit facilities
● Card Bank
● GASAMCO

3.DRRM/CC 3. Safe relocation 3.Identify and 1 relocation


A elements sites provide habitable site
incorporated relocation sites for identified
in human affected population
settlement

4.Disaster resilient 4. Construction of All disaster


housing designed disaster resilient resilient
and reconstructed housing following housing
building code and constructed
specifications
standard(in
coordination with
the MDRRMC
together with the
Brgy. Com on Infra)

● Construct of
DRRM/CCA

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 52
Housing that
can stand a
250kph wind
velocity

5.Self-sufficient 5. Affected families 1training


communities with provided with conducted to
access to basic sufficient access to host
social services basic social Brgys./Sitios
services(in
coordination with
MDRRMC)

● Conduct
training for
social
preparation
of host
communities
and those
that will be
relocated to
reduce
conflict

6.Disaster 6. Infrastructure 6. Undertake the 1infrastructu


and climate facilities necessary re damaged
change restored/rehabilitate rehabilitation or repaired
infrastructure d according to repair of damaged
safety and resiliency infrastructure

● Brgy
Committee
on

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 53
Infrastructure
will
coordinate
with the
Municipal
Engineering
Office
● Involve the
community
to
reconstructio
n activities

7. A 7.Vulnerable Develop systems for All


psychologica population provided appropriate risk protection
lly sound, with adequate protection measures. measures
safe and appropriate risk developed
secured protection
citizenry that measures Develop systems of
is protected support and
from the communication
effects of among key
disaster able stakeholder like
to restore to kabalikat
normal civicom/MACEC
functioning
after each Build capacities of
disaster psychosocial care
providers

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 54
BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)
Page 55
GGVHJGJKKJGKUFYDXHTRYFJ

BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)


Page 56
BARANGAY DISASTER RISK REDUCTION PLAN (Barangay Mainit, Boac Marinduque)
Page 57