Professional Documents
Culture Documents
PH Works PH Works PH Works PH Works PH Works PH Works PH Works
PH Works PH Works PH Works PH Works PH Works PH Works PH Works
Name of Building Category Details of damage occurred Details of repair/Replacement Requiredwith Quantity Approximate Amount
of Repair use of suitableCyclone Resilient materials
PH PH WORKS PH PH WORKS PH WORKS PH WORKS PH WORKS
WORKS WORKS
Administrative/Acadaemic PH loading/ feeding line , delivery Water supply pipe lines and sanitary Avg 550 mtr 1.98 lakh
/Gents Hostel /Staff Quarter/ line, sewer pipeline damaged Installations
Principal Qrtr / Workshop
PH rooftop overhead tanks Water tank with safety enclosures 12 1.90 lakh
damaged/blown away
PH doors damaged Doors in Toilets(UPVC/HARD PVC) 28 1.60 lakh
PH nil Window,Louvers nil nil
PH damaged Wash basins,Urinals 27 0.9
PH Partly damaged Septic Tanks ,Soak pits 2+1 1.4
PH Potable drinking water facility(Aquaguard
Partly damaged /,Rosystem/ Filteration plant) 3 1.45
PH Water lifing Pumps 3 0.45
PH Mirrors 10 0.06
PH Digging of borewell 2 4 lakh
PH Any other items as per site requirement can
be added 0.6
Signature of
PHD/GPHD/IDCO/Police C/S
Housing/RW Authority Signature of Estate incharge/TO Principal