Table of Fixed Service Line Charges For Connections Up To 100 KW

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Table of Fixed Service Line Charges for Connections up to 100 kW

Fixed Service Line charges Security Deposit & Miscellaneous Charges 
Load  in KW Rs. S.D. Charges Miscellaneous charges
Category
Up to 2  3500 Per KW Registration Test Report
Above 2  & up to 6  6500 Residential
Above 6  & up to 12  12000 RGP Rs. 600 Rs. 40 (1 ph) Rs. 20
Above 12 & up to 20  21000 LTMD-1 (>15 KW) Rs. 1250 Rs. 100 (3 ph) Rs. 20
21000+ Commercial / Industrial
1100 per KW  Non-RGP Rs. 1100 Rs. 100 (Com.) Rs. 20
Above 20 & up to 100  (In excess of 20 
KW) LTMD-2 (>15 KW) Rs. 2000 Rs. 400 (Ind.) Rs. 20

“ Fixed Service Line Charges would be Rs. 12000/-in case of Three Phase Service with a load of <= 6 KW.

You might also like