Cleaning and Repair Boiler and Shoot Blower Scope of Works and Supply
Cleaning and Repair Boiler and Shoot Blower Scope of Works and Supply
Cleaning and Repair Boiler and Shoot Blower Scope of Works and Supply
Scope
No Description Remark
Owner Contractor
GENERAL ITEM
I Mechanical
1 Mechanical blinding equipment’s nozzle x
2 Mechanical deblinding equipment’s nozzle. x
3 Blinding materials x
4 Standby for leak test x
5 Torque wrench x
6 Standby for hot bolting x
7 Remove/Reinstall components x
8 Inspection service (PT,UT,Eddy Current etc.) x
9 Components cleaning x
10 Rectify castable x
11 Castable material x
12 Waterjet machine and mechanical cleaning tools x
13 Cleaning Economizer x
14 Air register replacement x
15 Replace upper natural gas line (BF-2001B) x
16 Natural gas line part x
17 Replace retractable soot blower x
Dismantle, inspect, replace parts/unit (as per
18 x
inspection), and re-install soot blower 14 ea
19 Soot blower and spare parts x
II Utility
1 Air compressor x
Electricity 220/380 VAC/Generator distribution panel
2 x
at site
3 Electricity lighting 24VDC x
4 Service water for cleaning & hydro test x
5 Crane at site x
6 Forklift at site x
Crane truck or trailer truck (for transport equipment’s
7 x
on site)
8 Sewer/Gutter/Drain for cleaning waste x
9 Spare part (bolts,nuts,gasket) x
10 Scaffolding at removal component x
11 Scaffolding for leak test x
12 Site toilets x
13 Walkie-Talkie x
Onsite transportation(for transport equipment’s
14 component) x
Note:
1
Devices or equipment used in the Turnaround principals must meet the requirements on CAP Safety Regulation