Wind Load To BS 6399-2: 1997 Code of Practice For Wind Loads
Wind Load To BS 6399-2: 1997 Code of Practice For Wind Loads
Wind Load To BS 6399-2: 1997 Code of Practice For Wind Loads
Client: Sheet:
Stage 2
As value for Cr falls within the limits of applicabilty the Standard Method will be adopted.
Stage 3
Basic Wind Speed (3 sec Gust) Vb = 46.6 m/s
Factor Sb Sb 1.48 Table 4
Basic Wind Speed (1 hour mean) Vb = 31.5 m/s cl. 2.2.1 fig. 6 pg.19
Stage 4
Site altitude measured in metres above sea level = 55 m
Altitude Factor, topography insignificant Sa = 1.055 cl. 2.2.2.2 pg.20
Direction Factor (for all directions) 1 cl. 2.2.2.3 pg.27
Seasonal Factor (permanent building) 1 cl. 2.2.2.4 pg.27
Probability Factor (normal design application) 1 cl. 2.2.2.5 pg.27
Site Wind Speed (Vb x Sa x Sd x Ss x Sp) Vs = 33.2 m/s cl. 2.2.2.1 pg.18
Stage 5
Terrain Catagories Effective Height He = 55 m
Stage 6
Choice of Method Standard Method to be adopted
Stage 7
Site in country or up to 2 km into town. cl. 2.2.3.3 table 4
Closest distance to sea upwind less than 0 km cl. 2.2.3.3 table 4
Terrain & Building Factor Sb = 1.48 cl. 2.2.3.3 table 4
Effective Wind Speed Ve = 49.163 m/s
Stage 8
Dynamic Pressure qs = 1.48 kN/m² cl. 2.1.2 pg.13
Stage 9
Pressure Coefficients Cp = See Structural Report