GET - Green Energy Technologies: Mbreti Genc PN, 10000 Prishtina Kosovo
GET - Green Energy Technologies: Mbreti Genc PN, 10000 Prishtina Kosovo
cable and cable within pole size(2*2.5) 8M*EUR 1= EUR 8 USD8 0 no need cable and
battery box copper core cable under ground size(4*16) 24M*EUR13=EUR312 0 0 battery box
Foundation Working process fix fittings and cable fix fitting, cable & bury only fix fitting
easy
base cost EUR96 EUR91 EUR46
need engineering truck and technical need engineering truck and
Technology support no need
Installation support technical support install easily, low cost
Cost EUR 46 EUR 61 EUR 15
Lamp
(without pole) Cost EUR 52 EUR 273 EUR 318