This document contains tables summarizing the cost estimates for wall construction work. It includes the estimated quantities of materials and labor needed, unit rates, and calculations of subtotals and totals for:
1) Labor costs broken down by worker type and estimated hours needed totaling to Rp 487,165,695.19
2) Material costs broken down by material type and quantities needed totaling to Rp 390,042,645.75
3) The grand total cost estimate for the wall construction work is Rp 877,208,340.93
This document contains tables summarizing the cost estimates for wall construction work. It includes the estimated quantities of materials and labor needed, unit rates, and calculations of subtotals and totals for:
1) Labor costs broken down by worker type and estimated hours needed totaling to Rp 487,165,695.19
2) Material costs broken down by material type and quantities needed totaling to Rp 390,042,645.75
3) The grand total cost estimate for the wall construction work is Rp 877,208,340.93
This document contains tables summarizing the cost estimates for wall construction work. It includes the estimated quantities of materials and labor needed, unit rates, and calculations of subtotals and totals for:
1) Labor costs broken down by worker type and estimated hours needed totaling to Rp 487,165,695.19
2) Material costs broken down by material type and quantities needed totaling to Rp 390,042,645.75
3) The grand total cost estimate for the wall construction work is Rp 877,208,340.93
NO URUTAN PEKERJAAN VOL SAT UPAH BAHAN UPAH BAHAN (UPAH+BAHAN) 1 2 3 4 5 6 7 = (3x5) 8 = (3x6) 9 = (7+8) E PEKERJAAN DINDING E.1 Pemasangan Dinding Bata Merah (5x11x22) Tebal 1 Bata Campuran 1PC : 4PS 1767.508 m² Rp 85,550.00 Rp 160,923.92 Rp 151,210,266.63 Rp 284,434,242.60 Rp 435,644,509.22 E.2 Pemasangan Plesteran Campuran 1PC : 4PS tebal 15 mm 3535.015 m² Rp 48,840.00 Rp 11,854.13 Rp 172,650,132.60 Rp 41,904,520.29 Rp 214,554,652.89 E.3 Pemasangan Dinding Bata Merah (5x11x22) Tebal 1 Bata Campuran 1PC : 2PS 215.88 m² Rp 85,550.00 Rp 182,546.14 Rp 18,468,534.00 Rp 39,408,060.70 Rp 57,876,594.70 E.4 Pemasangan Plesteran Campuran 1PC : 2PS tebal 15 mm 431.76 m² Rp 48,840.00 Rp 16,808.55 Rp 21,087,158.40 Rp 7,257,257.65 Rp 28,344,416.05 E.5 Pemasangan Acian 3800.664 m² Rp 32,560.00 Rp 4,483.05 Rp 123,749,603.56 Rp 17,038,564.50 Rp 140,788,168.06 TOTAL HARGA RAB PEKERJAAN DINDING Rp 487,165,695.19 Rp 390,042,645.75 Rp 877,208,340.93
TABEL BIAYA UPAH PEKERJAAN DINDING
No Tenaga Kerja Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah 1 2 3 4 5 6 = (4 x 5) 1 Pekerja oh 3140.1977 Rp 95,600.00 Rp 300,202,900.12 2 Tukang Batu oh 1371.7601 Rp 109,300.00 Rp 149,933,378.93 3 Kepala Tukang oh 137.17601 Rp 120,000.00 Rp 16,461,121.20 4 Mandor oh 157.009885 Rp 131,000.00 Rp 20,568,294.94 TOTAL BIAYA UPAH PEKERJAAN DINDING Rp 487,165,695.19
TABEL BIAYA BAHAN PEKERJAAN DINDING
No Bahan Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah 1 2 3 4 5 6 = (4 x 5) 1 Bata merah bakar kelas I bh 277674.25 Rp 798.00 Rp 221,584,051.50 2 Semen Tiga Roda kg 95143.06834 Rp 1,379.40 Rp 131,240,348.47 3 Pasir pasang m³ 275.1241575 Rp 135,278.00 Rp 37,218,245.78 TOTAL BIAYA BAHAN PEKERJAAN DINDING Rp 390,042,645.75