Professional Documents
Culture Documents
BOQ
BOQ
BOQ
Quotation Number:000000742678201702160003
0
2017-02-16
QUOTATION DISCLAIMER
2-The price in this offer only covers the specific items (such as hardware, software and service, etc.) in the BOQ list, excluding the
optional parts.
3-Statement on Embedded Software License :Huawei application package might include Embedded Software License (abbreviated
as “ESL”, means a third-party software that must be bundled or integrated with application software or equipment of Huawei, of which
limited license is granted by owner to users for designated purpose other than anyone else. Maintenance and Upgrade can not be
executed independently or separately). ESL can only be used through Huawei's application package and (1) shall not be installed,
configured, upgraded, or modified directly; (2) nor be accessed directly, but solely through Huawei’s application package. Huawei may
only access the ESL directly for purposes of providing technical assistance.
5-The End of Service (EOS) information of products is listed as follows. The EOS date is a planned date and may be modified as
requested.
iManager U2000-IP: 2023-12-31
NE40E-X8: 2025-12-31
Telkomsel IP RAN PO9 2017 - AGG Module Upgrade HW Commercial in Confidence Page 4 of 9
Quotation Number: 000000742678201702160003QUANTITY LIST: L3-iManager U2000-IP
Telkomsel IP RAN PO9 2017 - AGG Module Upgrade HW Commercial in Confidence Page 5 of 9
Quotation Number: 000000742678201702160003QUANTITY LIST: L3-NE40E-X8
RAN_12_AGG_S RAN_12_AGG_S
GR011 GR011
ran-agg- ran-agg-
Part Preferred level
No. Sub-Item Model Description ttcsgraja.1 ttcsgraja.2
Number of Regions
TTC SINGARAJA TTC SINGARAJA
2 S0012425 CW:6747421 NE40E-X8A Universal Service Router(V800R016)
2.1 Hardware
2.1.1 LPUF-120 Flexible Line Process Card
eSFP-850nm-
Optical Transceiver,eSFP,850nm,2.125Gb/s(Multi
34060286 1000Base- Preferred
rate) ,-9.5~-2.5dBm,-17dBm,LC,MM,0.5km
Sx/FC200 MM
Optical transceiver(eSFP,1310nm,1.25Gb/s,-
S4016067 OSG010N05 Preferred
9dBm~-3dBm,-20dBm,LC,SM,10km)
2.3 Software
Telkomsel IP RAN PO9 2017 - AGG Module Upgrade HW Commercial in Confidence Page 6 of 9
Quotation Number: 000000742678201702160003QUANTITY LIST: Supply Summary
Quantity
Product Name
Preferred
iManager U2000-IP 0
NE40E-X8 8
NE40E-X8 <1> 8
NE40E-X8 <2> 7
NE40E-X8 <3> 7
NE40E-X8 <4> 55
NE40E-X8 <5> 55
NE40E-X8 <6> 48
NE40E-X8 <7> 48
NE40E-X8 <8> 55
NE40E-X8 <9> 55
NE40E-X8 <10> 55
NE40E-X8 <11> 55
NE40E-X8 <12> 15
NE40E-X8 <13> 15
NE40E-X8 <14> 7
NE40E-X8 <15> 7
NE40E-X8 <16> 7
NE40E-X8 <17> 15
NE40E-X8 <18> 7
NE40E-X8 <19> 15
NE40E-X8 <20> 7
NE40E-X8 <21> 7
NE40E-X8 <22> 8
NE40E-X8 <23> 8
NE40E-X8 <24> 8
NE40E-X8 <25> 8
NE40E-X8 <26> 15
NE40E-X8 <27> 7
NE40E-X8 <28> 55
NE40E-X8 <29> 55
NE40E-X8 <30> 56
NE40E-X8 <31> 55
Total 833
This lead time is estimated based on normal supply capacity and demand forecast in advance. For ESS(ahead of GA)/EOP and
please contact your supply specialist for the lead time information.
Telkomsel IP RAN PO9 2017 - AGG Module Upgrade HW Commercial in Confidence Page 7 of 9
Quotation Number: 000000742678201702160003QUANTITY LIST: Supply Summary
Quantity
Product Name
Non-preferred Total
iManager U2000-IP 1,572 1,572
NE40E-X8 1 9
NE40E-X8 <1> 1 9
NE40E-X8 <2> 0 7
NE40E-X8 <3> 0 7
NE40E-X8 <4> 1 56
NE40E-X8 <5> 1 56
NE40E-X8 <6> 1 49
NE40E-X8 <7> 1 49
NE40E-X8 <8> 1 56
NE40E-X8 <9> 1 56
NE40E-X8 <10> 1 56
NE40E-X8 <11> 1 56
NE40E-X8 <12> 0 15
NE40E-X8 <13> 0 15
NE40E-X8 <14> 0 7
NE40E-X8 <15> 0 7
NE40E-X8 <16> 0 7
NE40E-X8 <17> 0 15
NE40E-X8 <18> 0 7
NE40E-X8 <19> 0 15
NE40E-X8 <20> 0 7
NE40E-X8 <21> 0 7
NE40E-X8 <22> 1 9
NE40E-X8 <23> 1 9
NE40E-X8 <24> 1 9
NE40E-X8 <25> 1 9
NE40E-X8 <26> 0 15
NE40E-X8 <27> 0 7
NE40E-X8 <28> 1 56
NE40E-X8 <29> 1 56
NE40E-X8 <30> 1 57
NE40E-X8 <31> 1 56
Total 1,590 2,423
Telkomsel IP RAN PO9 2017 - AGG Module Upgrade HW Commercial in Confidence Page 8 of 9
Quotation Number: 000000742678201702160003QUANTITY LIST: Supply Summary
n normal supply
Thiscapacity
lead timeand
is estimated
demand forecast
based on
in normal
advance. supply
For ESS(ahead
capacity andofdemand
GA)/EOP
forecast
and specified
in advance.
material
For demand,
ESS(ahead of GA)/EOP and
please contact your supply specialist for the lead time information.
Telkomsel IP RAN PO9 2017 - AGG Module Upgrade HW Commercial in Confidence Page 9 of 9