Notice of Practical Completion
The Construction Contractor advises and the EPCM agrees that the above miscellaneous/road works confirms in all respects to the
Contractual drawings and specifications and is considered to have met the requirements for practical completion
Attachments:
Punch have been performed and worked off
Stabilization test was performed and found acceptable (Test Report Attached)