Waaree Energies LTD Post-Commissioning Checklist For 3kwroof Top Project
Waaree Energies LTD Post-Commissioning Checklist For 3kwroof Top Project
No : -
Page 2 of 8
WAAREE ENERGIES LTD. Doc. No : -
Page 3 of 8
WAAREE ENERGIES LTD. Doc. No : -
MMS Installation The Installation of Modules Misalignment in both directions within 10-20
should be done as per the mm
Manufacturer’s guidelines and
should be installed on MMS
with proper nut bolts. It should
be properly aligned.
Page 4 of 8
WAAREE ENERGIES LTD. Doc. No : -
Page 5 of 8
WAAREE ENERGIES LTD. Doc. No : -
Page 6 of 8
WAAREE ENERGIES LTD. Doc. No : -
Earthing cable/Conductor as
specified in Inverter Manual.
Cable Identity Proper labelling of all the cables OK
and components should be done.
Page 7 of 8
WAAREE ENERGIES LTD. Doc. No : -
Remarks :
Page 8 of 8