Professional Documents
Culture Documents
m2 m2 m2 Excavation Timbunan Galian Stripping Kupasan - 3.775
m2 m2 m2 Excavation Timbunan Galian Stripping Kupasan - 3.775
Kupasan m2
= -
Stripping
Galian
= 3.775 m2 CL
Excavation
Timbunan
649
= 2.097 m2
Embankment 0.30 3.00 0.30
Pas. Batu 647.734
= 2.700 m2
Stone Masonry 1.20 647.206
646.534
0.30
0.30
0.60 3.00 0.60
645
bidang persamaan
reference level
643,00
647,268
647,261
647,388
0,70 647,388
0,70 646,738
646,738
646,738
648,188
648,378
646,660
647,080
ELEVASI TANAH ASLI
1,40
0,20
1,00
JARAK / DISTANCE (m') 2,00 2,00 1,50 4,50 3,00
CD 5/1
Kupasan m2
= -
Stripping
Galian
Excavation
= 5.979 m2 CL
Timbunan
649
= 3.547 m2
Embankment 0.30 3.00 0.30
Pas. Batu 647.618
= 2.700 m2
Stone Masonry
1.20 647.090
646.418
0.30
0.30
0.60 3.00 0.60
645
bidang persamaan
reference level
643,00
647,261
648,149
646,849
646,683
646,795
647,257
647,364
0,70 646,834
646,703
646,255
646,255
0,50 646,856
646,847
ELEVASI TANAH ASLI
1,20
1,20
JARAK / DISTANCE (m') 2,00 1,80 1,80 1,50 3,30
CD 5/2
Kupasan m2
= -
Stripping
Galian m2
= 8.098
Excavation
649 CL
Timbunan m2
= 3.429
Embankment
0.30 3.00 0.30
Pas. Batu
= 2.700 m2 647.452
Stone Masonry
1.20 646.924
646.252
0.30
0.30
0.60 3.00 0.60
645
bidang persamaan
reference level
643,00
647,388
648,855
646,855
646,541
646,619
647,029
647,143
0,80 646,214
646,308
ELEVASI TANAH ASLI
2,84
JARAK / DISTANCE (m') 1,70 1,80 1,50 1,50 1,50
CD 5/3
Kupasan m2
= -
Stripping
Galian m2
= 6.292
Excavation
649 CL
Timbunan m2
= 2.633
Embankment
Pas. Batu 0.30 3.00 0.30
= 2.700 m2
Stone Masonry 647.308
1.20 646.780
646.108
0.30
0.30
0.60 3.00 0.60
645
bidang persamaan
reference level
643,00
647,388
646,544
646,527
646,571
647,069
647,236
646,194
646,368
ELEVASI TANAH ASLI
Kupasan m2
= 0.377
Stripping 649 CL
Galian m2
= 7.185
Excavation
Timbunan 0.30 3.00 0.30
= 5.648 m2
Embankment 647.268
bidang persamaan
reference level
642,00
646,538
646,631
646,624
646,761
647,119
0,60 645,858
646,074
646,074
ELEVASI TANAH ASLI
1,25
1,40
1,48
JARAK / DISTANCE (m') 1,65 1,75 1,75
CD 5/5
651
650
Kupasan m2
= 0.280
Stripping
Galian
CL
= 6.199 m2
Excavation
Timbunan m2 0.30 3.00 0.30
= 3.452
Embankment 647.123
Pas. Batu
= 2.700 m2 1.20 646.595
Stone Masonry
645.923
0.30
0.30
bidang persamaan
reference level
642,00
646,538
648,575
646,575
646,518
646,601
647,000
646,780
0,60 645,719
645,990
645,990
ELEVASI TANAH ASLI
1,40
1,40
1,00
1,61
JARAK / DISTANCE (m') 1,60 1,50 1,50
BCD 6
Kupasan m2
= -
Stripping 649
Galian m2
= -
Excavation
Timbunan m2
= -
Embankment
Pas. Batu
= - m2
Stone Masonry
645
bidang persamaan
reference level
642,00
646,538
647,206
646,022
646,053
0,50 647,213
0,75 645,998
645,998
0,75 645,998
647,207
647,230
645,835
ELEVASI TANAH ASLI
CD 6/1
Kupasan m2
= -
Stripping
Galian CL
= 7.798 m2
Excavation
Timbunan
648
= 3.418 m2 0.30 3.00 0.30
Embankment 647.023
Pas. Batu
= 2.700 m2 1.20 646.494
Stone Masonry
645.823
0.30
0.30
645 0.60 3.00 0.60
bidang persamaan
reference level
642,00
0,50 648,188
647,149
646,510
646,465
646,465
647,368
0,80 647,336
647,030
645,544
645,452
645,452
648,449
1,20
1,00
0,30
1,20
1,57
JARAK / DISTANCE (m') 1,50 1,50 1,50
CD 6/2
Kupasan m2
= 0.559
Stripping 649
Galian
= 6.647 m2
CL
Excavation
Timbunan m2
= 5.109 0.30 3.00 0.30
Embankment
646.957
Pas. Batu
= 2.700 m2 646.428
Stone Masonry 1.20
645.757
0.30
0.30
645 0.60 3.00 0.60
bidang persamaan
reference level
642,00
648,378
646,735
646,352
646,370
646,938
647,006
645,394
644,634
ELEVASI TANAH ASLI
1,10
0,30
1,00
1,20
JARAK / DISTANCE (m') 1,50 1,50 4,81
CD 6/3
650
Kupasan m2
= 0.455
Stripping
Galian
= 8.437 m2
CL
Excavation
Timbunan m2
= 5.221 0.30 3.00 0.30
Embankment
646.985
Pas. Batu
= 2.700 m2 1.20 646.456
Stone Masonry
645.785
0.30
0.30
645 0.60 3.00 0.60
bidang persamaan
reference level
642,00
646,660
646,389
646,363
646,506
646,908
646,960
0,60 646,036
646,012
ELEVASI TANAH ASLI
1,40
JARAK / DISTANCE (m') 2,20 1,50 1,50 2,50
CD 6/4
Kupasan m2
= 0.758
Stripping 649
Galian
= 6.685 m2 CL
Excavation
Timbunan m2
= 6.544
Embankment 0.30 3.00 0.30
645.592
0.30
0.30
645 0.60 3.00 0.60
bidang persamaan
reference level
642,00
645,942
647,080
648,362
646,162
646,260
646,284
646,784
646,887
645,919
645,919
ELEVASI TANAH ASLI
0,20
JARAK / DISTANCE (m') 1,80 1,70 1,50 1,50 1,60 1,70 2,45
CD 6/5
Kupasan m2
= -
Stripping
Galian
= 5.326 m2 CL
Excavation
Timbunan
648
= 2.486 m2
Embankment 0.30 3.00 0.30
Pas. Batu 646.768
= 2.700 m2
Stone Masonry 1.20 646.239
645.568
0.30
0.30
645 0.60 3.00 0.60
bidang persamaan
reference level
642,00
648.342
646,142
646,042
646,214
0,80 647,498
647,482
ELEVASI TANAH ASLI
645.467
0.30
645 0.30
0.60 3.00 0.60
bidang persamaan
reference level
642,00
646,399
646,095
646,211
646,650
646,977
646,038
646,054
ELEVASI TANAH ASLI
1,40
1,40
0,20
JARAK / DISTANCE (m') 2,80 3,00 2,00
CD 6/7
Kupasan m2
= 0.194
Stripping 649
Galian
Excavation
= 8.522 m2 CL
Timbunan m2
= 5.462
Embankment 0.30 3.00 0.30
Pas. Batu 646.634
= 2.700 m2
Stone Masonry
1.20 646.105
645.434
0.30
645 0.30
0.60 3.00 0.60
bidang persamaan
reference level
642,00
647,611
646,111
646,147
646,105
0,80 646,325
646,761
646,903
0,50 647,611
647,611
ELEVASI TANAH ASLI
1,20
1,20
1,00
JARAK / DISTANCE (m') 2,30 1,50 1,50
BCD 7
sqm
Kupasan m2
= -
Stripping
sqm
Galian m2
= -
Excavation
Timbunan
sqm 648
= - m2
Embankment
Pas. Batu
m
= - m2
Stone Masonry
645
bidang persamaan
reference level
642,00
646,391
646,043
645,812
645,581
646,441
646,289
0,80 645,354
645,354
ELEVASI TANAH ASLI
1,10
JARAK / DISTANCE (m') 2,00 1,50 1,50 3,00
Kupasan
Stripping
= 0.131 m2 CD 7/1
Galian m2
= 5.644
Excavation CL
Timbunan m2
= 2.175
Embankment
Pas. Batu 647 0.30 3.00 0.30
= 2.700 m2
Stone Masonry 646.361
1.20 645.832
645.161
645 0.30
0.30
0.60 3.00 0.60
bidang persamaan
reference level
642,00
645,526
0,70 645,394
645,331
645,136
646,174
646,148
645,987
645,987
0,20 645,298
645,991
ELEVASI TANAH ASLI
1,00
0,30
1,20
0,10
0,90
0,90
JARAK / DISTANCE (m') 1,80
CD 7/2
Kupasan m2
= 0.193
Stripping
Galian
CL
= 6.959 m2
Excavation
Timbunan
647
0.30 3.00 0.30
= 5.335 m2
Embankment 646.147
Pas. Batu 645.618
= 2.700 m2 1.20
Stone Masonry
645 0.30
644.947
0.30
0.60 3.00 0.60
bidang persamaan
reference level
641,00
645,288
645,198
645,302
645,657
0,50 646,292
646,261
0,20 645,294
0,70 645,143
ELEVASI TANAH ASLI
0,90
1,10
JARAK / DISTANCE (m') 1,50 1,60 1,50
BCD 8
Kupasan m2
= -
Stripping 648
Galian m2
= -
Excavation
Timbunan m2
= -
Embankment
Pas. Batu
= - m2
Stone Masonry
645
bidang persamaan
reference level
641,00
0,50 645,256
645,256
645,389
644,988
644,973
0,70 646,046
0,70 645,473
0,70 644,970
644,970
644,874
644,872
644,872
ELEVASI TANAH ASLI
1,00
1,00
1,00
JARAK / DISTANCE (m') 3,50
CD 8/2
Kupasan m2
= 0.048
Stripping
Galian
= 5.968 m2 CL
Excavation
Timbunan
647
= 2.562 m2 0.30 3.00 0.30
Embankment
645.896
Pas. Batu
= 2.700 m2 645.367
Stone Masonry 1.20
645 644.696
0.30
0.30
0.60 3.00 0.60
bidang persamaan
reference level
641,00
646,338
645,188
645,119
645,103
645,628
645,614
644,923
644,958
ELEVASI TANAH ASLI
1,40
1,10
1,10
1,40
0,30
JARAK / DISTANCE (m') 1,50 3,45
CD 8/3
Kupasan m2
= -
Stripping 648
Galian
= 5.885 m2 CL
Excavation
Timbunan m2
= 3.062 0.30 2.50 0.30
Embankment
Pas. Batu 645.807
= 2.550 m2
Stone Masonry 1.20 645.278
645
644.607
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
641,00
645,256
645,002
645,021
645,327
645,578
0,70 644,444
644,322
ELEVASI TANAH ASLI
1,20
Kupasan m2
= -
Stripping 648
Galian
= 5.281 m2 CL
Excavation
Timbunan m2
= 4.004 0.30 2.50 0.30
Embankment
Pas. Batu 645.863
= 2.550 m2
Stone Masonry 1.20 645.335
645 644.663
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
641,00
645,116
644,885
644,911
645,304
645,298
644,501
644,367
ELEVASI TANAH ASLI
1,25
0,25
JARAK / DISTANCE (m') 1,75 1,75 2,00 2,80
Kupasan
Stripping
= m2 CD 8/5
Galian
Excavation
= 4.941 m2 CL
Timbunan m2
= 1.975
Embankment 0.30 3.20 0.30
Pas. Batu 646 645.706
= 3.172 m2
Stone Masonry 645.134
645 1.24
644.463
0.30
0.30
0.90 2.00 0.90
bidang persamaan
reference level
641,00
645,206
0,70 645,266
0,60 644,651
644,681
645,016
0,60 645,173
645,166
0,50 643,831
643,773
ELEVASI TANAH ASLI
1,00
0,90
0,90
bidang persamaan
reference level
641,00
645,206
0,70 645,266
0,60 644,451
644,481
645,016
0,60 645,173
645,166
0,50 643,831
643,773
643,773
ELEVASI TANAH ASLI
1,00
0,90
0,90
JARAK / DISTANCE (m') 1,50 1,50 1,50
CD 9/1
Kupasan
= - m2 CL
Stripping 647
Galian m2
= 6.863
Excavation 0.30 2.50 0.30
Timbunan m2
= 4.184
Embankment
Pas. Batu 645 1.20
= 2.550 m2
Stone Masonry 0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
647,426
645,126
644,766
644,890
645,350
645,826
645,789
643,089
642,939
ELEVASI TANAH ASLI
1,30
1,00
JARAK / DISTANCE (m') 1,50 2,20 1,50 1,50 2,00 2,00
CD 9/2
Kupasan
= - m2 CL
Stripping
Galian m2
= 4.611
Excavation 0.30 2.50 0.30
Timbunan
646 645.646
= 2.305 m2
Embankment 645.114
Pas. Batu 645 1.20
= 2.550 m2 644.446
Stone Masonry 0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
644,844
644,732
644,696
645,386
645,354
643,812
643,761
ELEVASI TANAH ASLI
0,90
1,00
JARAK / DISTANCE (m') 1,50 1,50 1,50 1,60
BCD 9
Kupasan m2
= -
Stripping
Galian m2
= -
Excavation
Timbunan
647
= - m2
Embankment
Pas. Batu
= - m2
Stone Masonry
645
bidang persamaan
reference level
641,00
644,909
0,50 645,351
645,487
644,681
644,488
645,493
0,20 645,586
0,70 644,633
0,70 644,633
0,70 644,227
644,227
0,30 644,623
644,623
643,384
0
0,20
1,00
JARAK / DISTANCE (m') 1,80 2,00
CD 9/3
Kupasan m2
= 0.213
Stripping 648
Galian m2
= 4.828
Excavation CL
Timbunan m2
= 2.687
Embankment
0.30 2.50 0.30
Pas. Batu
= 2.550 m2 645.492
Stone Masonry
645 1.20 644.960
644.292
0.30
0.30
0.60 2.50 0.60
bidang persamaan
645,103
644,733
644,694
645,015
645,343
644,471
644,471
643,763
643,710
ELEVASI TANAH ASLI
1,20
1,00
0,90
1,00
JARAK / DISTANCE (m') 2,00 1,50
CD 9/4
Kupasan m2
Stripping
= 0.152 CL
Galian m2
= 6.133
Excavation
Timbunan
646 0.30 2.50 0.30
= 3.758 m2 645.454
Embankment
Pas. Batu 645 1.20 644.922
= 2.550 m2
Stone Masonry 644.254
0.30
0.30
0.60 2.50 0.60
bidang persamaan
644,569
644,535
644,976
645,017
0,70 643,865
643,865
0,45 643,333
643,177
643,109
ELEVASI TANAH ASLI
1,00
1,20
1,30
1,40
1,00
JARAK / DISTANCE (m') 1,90
CD 9/5
648
Kupasan m2
Stripping
= - CL
Galian m2
= 5.288
Excavation
0.30 2.50 0.30
Timbunan m2
= 3.645 645.430
Embankment
Pas. Batu 645 1.20 644.898
= 2.550 m2
Stone Masonry 644.230
0.30
0.30
0.60 2.50 0.60
bidang persamaan
646.445
0,85 645,295
644,613
0,30 644,489
644,465
644,441
0,40 645,223
645,218
643,316
642,799
642,754
642.692
ELEVASI TANAH ASLI
1,25
1,25
1,00
JARAK / DISTANCE (m') 2,00 2,00 1,90
CD 9/6
649
Kupasan m2
= -
Stripping CL
Galian m2
= 5.272
Excavation
0.30 2.50 0.30
Timbunan m2
= 2.111 645.348
Embankment
Pas. Batu 645 1.20 644.816
= 2.550 m2
Stone Masonry 644.148
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
645.874
644,574
644,465
644,422
644,857
644,941
644,229
647,129
ELEVASI TANAH ASLI
1,20
1,20
1,20
1,30
644.086
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
641,00
644,733
644,292
644,383
0,40 645,095
0,80 645,066
644,049
643,915
ELEVASI TANAH ASLI
1,30
1,00
JARAK / DISTANCE (m') 1,70 1,50 1,50
Kupasan
Stripping
= - m2 CD 9/8 (BCD 10A)
Galian m2
= 4.478
Excavation
Timbunan
CL
= 3.310 m2
Embankment
Pas. Batu 646 0.30 1.60 0.30
= 2.280 m2
Stone Masonry 645.276
645 1.20 644.744
644.076
0.30
0.30
0.60 1.60 0.60
bidang persamaan
reference level
641,00
644,733
644,292
644,383
0,40 645,095
0,80 645,066
644,049
643,915
ELEVASI TANAH ASLI
1,30
648
CL
Kupasan m2
= -
Stripping
0.30 2.50 0.30
Galian m2
= 5.300 645.224
Excavation
Timbunan
645 644.692
1.20
= 2.130 m2
Embankment 644.024
Pas. Batu 0.30
= 2.550 m2 0.30
Stone Masonry 0.60 2.50 0.60
bidang persamaan
reference level
639,00
644,509
644,440
644,384
0,40 645,006
645,408
645,350
645,350
642,150
ELEVASI TANAH ASLI
1,40
1,40
1,00
1,20
JARAK / DISTANCE (m') 1,80 3,00
CD 9/10
Kupasan m2
= 0.247
Stripping
Galian CL
= 6.292 m2
Excavation
Timbunan
646
= 4.822 m2 0.30 2.50 0.30
Embankment
Pas. Batu 645 645.046
bidang persamaan
reference level
640,00
644,537
644,537
644,321
644,329
644,857
644,837
643,128
0,30 642,246
641,742
ELEVASI TANAH ASLI 1,10
1,10
1,40
JARAK / DISTANCE (m') 2,60 2,30 2,50 2,70
BCD 10
Kupasan m2
= -
Stripping
Galian m2
= -
Excavation
Timbunan
646
= - m2
Embankment
Pas. Batu 645
= - m2
Stone Masonry
bidang persamaan
reference level
640,00
645,757
644,253
644,111
644,147
0,80 645,225
645,261
644,367
643,639
0,85 643,137
643,145
643,545
ELEVASI TANAH ASLI
1,40
1,30
1,30
JARAK / DISTANCE (m') 2,30 1,60 1,50 1,50
CD 10/1
Kupasan m2
= -
Stripping
Galian
CL
= 5.514 m2
Excavation
Timbunan
646
m2 0.30 2.50 0.30
= 2.823
Embankment 645.136
Pas. Batu 645
= 2.550 m2 1.20 644.585
Stone Masonry
643.936
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
645,264
0,80 644,531
644,243
644,377
644,925
645,159
644,444
0,40 642,837
642,806
ELEVASI TANAH ASLI
1,10
JARAK / DISTANCE (m') 2,20 1,50 1,50 2,40 1,60
CD 10/2
Kupasan m2
= 0.195
Stripping
Galian
CL
= 4.229 m2
Excavation
Timbunan
646
= 2.117 m2 0.30 2.50 0.30
Embankment 645.096
Pas. Batu 645
= 2.550 m2 1.20 644.545
Stone Masonry
643.896
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
644,815
0,50 644,419
644,155
644,277
644,802
644,456
642,749
642,705
ELEVASI TANAH ASLI
1,40
1,40
1,30
1,20
JARAK / DISTANCE (m') 2,10 2,10
CD 10/3
Kupasan m2
= -
Stripping
Galian
CL
= 4.748 m2
Excavation
Timbunan
646
m2 0.30 2.50 0.30
= 2.505
Embankment 645.111
Pas. Batu 645
= 2.550 m2 1.20 644.560
Stone Masonry
643.911
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
644,679
0,30 644,211
644,067
644,341
644,677
644,713
0,30 643,721
643,703
642,400
642,298
ELEVASI TANAH ASLI
1,30
1,40
1,40
1,30
JARAK / DISTANCE (m') 2,00 3,00
CD 10/3+46
Kupasan m2
= -
Stripping
Galian
= 5.519 m2 CL
Excavation
Timbunan
646
= 3.081 m2
Embankment 0.20 0.20
0.15
0.20 643.666
0.10
2.15
2.55
2.75
bidang persamaan
reference level
640,00
644,201
0,80 644,124
0,80 644,223
0,70 645,109
645,055
642,701
642,486
ELEVASI TANAH ASLI
Kupasan
Stripping
= - m2 CD 10/5
Galian
= 8.218 m2 CL
Excavation
Timbunan m2
= 3.354
Embankment 0.30 2.50 0.30
Pas. Batu 645 644.774
= 2.550 m2
Stone Masonry 1.20 644.223
643.574
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
645,634
644,259
644,011
643,513
643,168
642,672
ELEVASI TANAH ASLI
643.474
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
647,771
643,653
643,649
643,673
644,127
644,451
642,602
644,171
ELEVASI TANAH ASLI
0,30
1,40
JARAK / DISTANCE (m') 1,80 1,50 1,50 2,60 2,90
Kupasan
Stripping
= - m2 CD 10/7
Galian
Excavation
= 5.655 m2 CL
Timbunan m2
= 4.086
Embankment 0.30 2.50 0.30
Pas. Batu 645 644.634
= 2.550 m2
Stone Masonry
1.20 644.083
643.434
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
644,351
643,637
643,559
643,555
0,40 644,057
644,171
643,191
641,493
641,405
ELEVASI TANAH ASLI
1,30
1,00
1,00
1,30
1,00
1,30
JARAK / DISTANCE (m') 4,00 3,00
Kupasan
Stripping
= - m2 CD 10/8
Galian m2
Excavation
= 6.251 CL
Timbunan m2
= 2.648
Embankment
Pas. Batu 645 0.30 2.50 0.30
= 2.550 m2 644.541
Stone Masonry
1.20 643.990
643.341
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
642,114
645,109
643,897
643,823
643,876
644,469
644,350
644,014
641,914
642,114
642,114
642,414
ELEVASI TANAH ASLI
1,30
1,10
1,10
0,40
0,30
0,10
0,50
0,20
1,00
JARAK / DISTANCE (m') 1,60 1,90
Kupasan
Stripping
= - m2 CD 10/9
Galian
Excavation
= 4.995 m2 CL
Timbunan m2
= 1.489
Embankment
Pas. Batu 645 0.30 2.50 0.30
= 2.550 m2 644.589
Stone Masonry
1.20 644.038
643.389
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
0,70 643,770
643,751
643,798
644,360
644,267
1,10
643.311
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
645,175
645,175
643,775
643,657
643,821
644,289
644,081
640,581
ELEVASI TANAH ASLI
1,00
0,30
1,10
1,10
0,90
JARAK / DISTANCE (m') 1,60 2,00
CD 10/10+27
Kupasan m2
= -
Stripping
Galian m2
= 5.323
Excavation
646 CL
Timbunan m2
= 3.143
Embankment
Pas. Batu 645 0.30 1.00 0.30
= 2.100 m2 644.442
Stone Masonry
1.30 643.891
643.242
0.30
0.30
0.60 1.00 0.60
bidang persamaan
reference level
640,00
645,531
0,70 643,631
643,647
643,794
644,204
644,841
644,745
643,388
643,397
1,30
1,30
1,00
1,30
0,20
643.177
0.30
0.30
0.60 1.80 0.60
bidang persamaan
reference level
640,00
643,474
643,355
643,435
0,60 644,297
644,285
643,265
0,50 644,565
643,277
ELEVASI TANAH ASLI
1,00
1,00
1,10
0,20
JARAK / DISTANCE (m') 1,70 2,10
Kupasan
Stripping
= - m2 CD 10/12
Galian m2
= 12.000
Excavation CL
Timbunan m2
= 2.218
Embankment
Pas. Batu 645 0.30 2.50 0.30
= 2.550 m2 644.368
Stone Masonry
1.20 643.817
643.168
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
646,001
0,80 644,801
644,293
641,293
640,285
ELEVASI TANAH ASLI
1.20 643.685
643.036
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
643,489
643,495
643,529
0,50 644,577
644,389
0,30 643,302
643,264
ELEVASI TANAH ASLI
1,20
1,20
1,00
JARAK / DISTANCE (m') 2,00 3,00
BCD 11
Kupasan m2
= -
Stripping
Galian
CL
= 5.460 m2
Excavation
Timbunan
645
= 3.368 m2 0.30 2.50 0.30
Embankment 644.096
Pas. Batu
= 2.550 m2 1.20 643.545
Stone Masonry
642.896
0.30
0.30
0.60 2.50 0.60
bidang persamaan
0,30 643,425643,425
0,40 644,271644,271
reference level
639,00
644,544
644,539
0,30 644,147
0,70 642,917
642,917
643,131
0,80 642,999
643,105
643,114
643,114
642,054
641,947
ELEVASI TANAH ASLI
1,00
1,10
0,90
JARAK / DISTANCE (m') 1,50 1,50